CN209963653U - Construction tool for cable stay wire in building electrical engineering - Google Patents

Construction tool for cable stay wire in building electrical engineering Download PDF

Info

Publication number
CN209963653U
CN209963653U CN201921016215.7U CN201921016215U CN209963653U CN 209963653 U CN209963653 U CN 209963653U CN 201921016215 U CN201921016215 U CN 201921016215U CN 209963653 U CN209963653 U CN 209963653U
Authority
CN
China
Prior art keywords
electrical engineering
bearing
construction tool
cable
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921016215.7U
Other languages
Chinese (zh)
Inventor
叶中亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921016215.7U priority Critical patent/CN209963653U/en
Application granted granted Critical
Publication of CN209963653U publication Critical patent/CN209963653U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a construction electrical engineering cable construction tool that acts as go-between, which comprises a bod, organism one end is equipped with the bin gate, the bin gate all is through fixed establishment fixed connection with the organism bottom, organism lower extreme fixed mounting has four universal wheels, fixed the inlaying is established and is installed bearing two on the bin gate, two one sides fixed mounting of bearing have slewing mechanism, the utility model discloses the beneficial effect who reaches is: the utility model relates to a building electrical engineering cable construction tool that acts as go-between, hinge fixed connection is passed through with the organism bottom to this device to the line wheel that will treat the threading through the pulling bin gate makes it carry out the centre gripping to the line wheel fixedly through fixture, dismantles the line wheel through the installation and makes the efficiency of acting as go-between to the cable conductor promote, compares with current device, this device is more convenient, and easy operation has promoted the efficiency of acting as go-between to the cable conductor, and this device is a building electrical engineering construction tool who uses manpower sparingly, convenient the removal, job stabilization.

Description

Construction tool for cable stay wire in building electrical engineering
Technical Field
The utility model relates to a construction electrical engineering cable construction tool that acts as go-between belongs to electrical engineering technical field.
Background
In the building technical field today, building electrical wiring often all is after the pre-buried spool, bind the back of knoing with the one end of wire or steel wire and electric wire, the workman is at pre-buried pipeline's one end and is past the steel wire that pulls outward, another workman transmits the electric wire toward pre-buried pipeline at pre-buried pipeline's the other end, the threading work progress of traditional cable conductor all adopts the manual work to receive line and unwrapping wire to the cable conductor, relatively extravagant manpower on the one hand, the cable conductor piles up together easily on the one hand, cause the state that the confusion was knoed, current threading construction equipment, inconvenient removal just because the complicated influence of operation is to the efficiency that the cable was acted as go-between, waste time and energy, we propose a building electrical engineering cable construction tool.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, provide a construction tool is acted as go-between to building electrical engineering cable.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a construction electrical engineering cable construction tool that acts as go-between, which comprises a bod, organism one end is equipped with the bin gate, the bin gate all passes through fixed establishment fixed connection with the organism bottom, organism lower extreme fixed mounting has four universal wheels, fixed the inlaying is established and is installed bearing two on the bin gate, two one side fixed mounting of bearing have slewing mechanism, slewing mechanism and the relative one side vertical fixation of bin gate have the fixed plate, slewing mechanism is last to install fixture.
As a preferred technical scheme of the utility model, organism lower extreme fixed mounting has four universal wheels, just four universal wheels are the rectangle each other and distribute in organism bottom four corners department.
As a preferred technical scheme of the utility model, fixed establishment includes two hinges, two the hinge both ends expansion end is all fixed on bin gate and organism bottom outer wall through hex bolts threaded connection.
As a preferred technical scheme of the utility model, slewing mechanism includes the motor, the perpendicular fixed mounting of motor is on organism bottom inner wall, motor output end fixedly connected with initiative bevel gear, initiative bevel gear is connected with the meshing of driven bevel gear, driven bevel gear one end fixed connection pivot, the cover is equipped with bearing one in the pivot just bearing one rotates with the pivot to be connected.
As an optimal technical scheme of the utility model, bearing one inlays and establishes fixed mounting on the fixed plate, the pivot other end passes bearing two and rotates with bearing two to be connected.
As a preferred technical scheme of the utility model, fixture includes cylindrical elastic tube, cylindrical elastic tube cover is established in the pivot, just cylindrical elastic tube inner wall is connected through the flexible perpendicular fixed connection of a plurality of elasticity pipes with the pivot outer wall, and is a plurality of the flexible equal fixed cover in elasticity pipe upper end is established and is installed the spring.
The utility model discloses the beneficial effect who reaches is: the utility model relates to a construction tool for cable drawing in building electrical engineering, the device is fixedly connected with the bottom end of a machine body through a material door through a hinge, the material door can be rotated, a wire wheel to be threaded is clamped and fixed through a clamping mechanism by pulling the material door, a motor is started, the output end of the motor is fixedly connected with a driving gear which is meshed and connected with a driven gear, the driven gear is fixedly connected with a rotating shaft, namely, the motor drives the rotating shaft to rotate, the rotating shaft is fixedly provided with the clamping mechanism, the wire drawing efficiency of the cable is improved by installing and disassembling the wire wheel, the wire wheel is driven to pay off through a feeding groove, the feeding is carried out through the arranged feeding groove, the cable is not required to be manually pressed to a designated notch, the universal wheel is fixedly installed through the lower end of the machine body, compared with the existing device, the device is more, the device is simple to operate, the efficiency of cable conductor stay wires is improved, and the device is a construction tool for building electrical engineering, which saves manpower, is convenient to move and works stably.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
fig. 1 is a schematic side view of the present invention;
FIG. 2 is a schematic structural view of the front side of the utility model cut along line A;
FIG. 3 is a schematic structural view of the clamping mechanism of the present invention;
fig. 4 is a schematic front view of the present invention;
fig. 5 is a schematic structural diagram of the utility model after the wire wheel is assembled.
In the figure: 1. a body; 2. a material door; 3. a fixing mechanism; 31. a hinge; 32. a hexagon bolt; 4. a universal wheel; 5. a rotating mechanism; 51. a motor; 52. a driving bevel gear; 53. a driven bevel gear; 54. a rotating shaft; 55. a first bearing; 6. a fixing plate; 7. a clamping mechanism; 71. an elastic telescopic pipe; 72. a spring; 73. a cylindrical elastic tube; 8. a second bearing; 9. a wire wheel.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Examples
As shown in fig. 1-5, a construction tool for a cable stay wire in building electrical engineering comprises a machine body 1, wherein a material door 2 is arranged at one end of the machine body 1, the material door 2 is fixedly connected with the bottom end of the machine body 1 through a fixing mechanism 3, four universal wheels 4 are fixedly arranged at the lower end of the machine body 1, a second bearing 8 is fixedly embedded and arranged on the material door 2, a rotating mechanism 5 is fixedly arranged on one side of the second bearing 8, a fixing plate 6 is vertically and fixedly arranged on one side of the rotating mechanism 5 opposite to the material door 2, and a clamping mechanism 7 is arranged on the rotating mechanism 5.
Wherein, 1 lower extreme fixed mounting of organism has four universal wheels 4, and four universal wheels 4 are the rectangle each other and distribute in 1 bottom four corners department of organism.
Wherein, fixed establishment 3 includes two hinges 31, and two hinges 31 both ends expansion end all fixes on bin gate 2 and organism 1 bottom outer wall through hex bolts 32 threaded connection.
The rotating mechanism 5 comprises a motor 51, the motor 51 is vertically and fixedly installed on the inner wall of the bottom end of the machine body 1, the output end of the motor 51 is fixedly connected with a driving bevel gear 52, the driving bevel gear 52 is meshed with a driven bevel gear 53, one end of the driven bevel gear 53 is fixedly connected with a rotating shaft 54, a bearing I55 is sleeved on the rotating shaft 54, and the bearing I55 is rotatably connected with the rotating shaft 54.
Wherein, the first bearing 55 is embedded and fixedly installed on the fixing plate 6, and the other end of the rotating shaft 54 passes through the second bearing 8 and is rotatably connected with the second bearing 8.
The clamping mechanism 7 includes a cylindrical elastic tube 73, the cylindrical elastic tube 73 is sleeved on the rotating shaft 54, the inner wall of the cylindrical elastic tube 73 is vertically and fixedly connected with the outer wall of the rotating shaft 54 through a plurality of elastic extension tubes 71, and springs 72 are fixedly sleeved at the upper ends of the elastic extension tubes 71.
Wherein, a feeding groove is arranged on one side of the rotating shaft 54 opposite to the machine body 1.
Specifically, when the utility model is used, firstly, the device is moved to a designated position through the universal wheel 4 fixedly installed at the bottom of the machine body 1, the motor 51 is powered on, the reel 9 is clamped and fixed through the cylindrical elastic cylinder 73 through the charging door 2 fixedly connected with the hinge of the machine body 1, the inner wall of the cylindrical elastic cylinder 73 is fixedly connected with the outer wall of the rotating shaft 54 through the elastic extension tube 71 and the spring 72, the reel is clamped and fixed through the acting force and the reaction force of the spring 72 and the elastic extension tube 71, the motor is started, the output end of the motor 51 is fixedly connected with the driving gear 52, the driving gear 52 is meshed and connected with the driven gear 53, the driven gear 53 is fixedly connected with the rotating shaft 54, the rotating shaft 54 is rotatably connected with the first bearing 55 and the second bearing 8, namely, the motor 51 rotates to drive the rotating shaft 54 to rotate, namely, the cylindrical elastic, drive line wheel 9 and carry out the pay-off, dismantle line wheel 9 through the installation and make the efficiency of acting as go-between to the cable conductor promote to drive line wheel 9 and carry out the unwrapping wire through the chute feeder, carry out the pay-off through the chute feeder that sets up, just do not need the manual work to press the cable conductor to appointed notch, make this device save the waste of unnecessary manpower and materials, make the device more convenient, until accomplishing whole work order.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a construction electrical engineering cable stay wire construction tool, a serial communication port, includes organism (1), organism (1) one end is equipped with bin gate (2), bin gate (2) all pass through fixed establishment (3) fixed connection with organism (1) bottom, organism (1) lower extreme fixed mounting has four universal wheels (4), fixed the inlaying is established and is installed bearing two (8) on bin gate (2), bearing two (8) one side fixed mounting has slewing mechanism (5), slewing mechanism (5) and the relative one side vertical fixation of bin gate (2) install fixed plate (6), install fixture (7) on slewing mechanism (5).
2. The construction tool for pulling the cable in the building electrical engineering according to claim 1, wherein four universal wheels (4) are fixedly mounted at the lower end of the machine body (1), and the four universal wheels (4) are mutually and rectangularly distributed at four corners of the bottom end of the machine body (1).
3. The construction tool for the cable stay wire in the electrical engineering of buildings according to claim 1, wherein the fixing mechanism (3) comprises two hinges (31), and the movable ends at the two ends of the two hinges (31) are fixed on the outer walls at the bottom ends of the charging door (2) and the machine body (1) through hexagonal bolts (32) in a threaded connection manner.
4. The cable pulling construction tool for building electrical engineering according to claim 1, wherein the rotating mechanism (5) comprises a motor (51), the motor (51) is vertically and fixedly installed on the inner wall of the bottom end of the machine body (1), a driving bevel gear (52) is fixedly connected to the output end of the motor (51), the driving bevel gear (52) is meshed with a driven bevel gear (53), one end of the driven bevel gear (53) is fixedly connected with a rotating shaft (54), a first bearing (55) is sleeved on the rotating shaft (54), and the first bearing (55) is rotatably connected with the rotating shaft (54).
5. The construction tool for the cable pulling of the building electrical engineering according to claim 4, wherein the first bearing (55) is fixedly embedded in the fixing plate (6), and the other end of the rotating shaft (54) penetrates through the second bearing (8) and is rotatably connected with the second bearing (8).
6. The construction tool for the cable pulling of the building electrical engineering according to claim 1, wherein the clamping mechanism (7) comprises a cylindrical elastic tube (73), the cylindrical elastic tube (73) is sleeved on the rotating shaft (54), the inner wall of the cylindrical elastic tube (73) is vertically and fixedly connected with the outer wall of the rotating shaft (54) through a plurality of elastic telescopic tubes (71), and springs (72) are fixedly sleeved at the upper ends of the elastic telescopic tubes (71).
7. The construction tool for pulling the cable in the building electrical engineering according to claim 4, wherein a feeding groove is formed in one side of the rotating shaft (54) opposite to the machine body (1).
CN201921016215.7U 2019-07-02 2019-07-02 Construction tool for cable stay wire in building electrical engineering Expired - Fee Related CN209963653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921016215.7U CN209963653U (en) 2019-07-02 2019-07-02 Construction tool for cable stay wire in building electrical engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921016215.7U CN209963653U (en) 2019-07-02 2019-07-02 Construction tool for cable stay wire in building electrical engineering

Publications (1)

Publication Number Publication Date
CN209963653U true CN209963653U (en) 2020-01-17

Family

ID=69248727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921016215.7U Expired - Fee Related CN209963653U (en) 2019-07-02 2019-07-02 Construction tool for cable stay wire in building electrical engineering

Country Status (1)

Country Link
CN (1) CN209963653U (en)

Similar Documents

Publication Publication Date Title
CN211644206U (en) Cable winding and unwinding devices for municipal construction
CN211003887U (en) Adjustable power cable pay-off device
CN209963653U (en) Construction tool for cable stay wire in building electrical engineering
CN215924054U (en) Auxiliary conveying device for large cable threading
CN210326834U (en) Quick installation mechanism for shipborne cable pipeline
CN211521354U (en) Electric pipeline hoisting device
CN211790443U (en) Building indoor wiring auxiliary device
CN210380022U (en) Winding and repairing device for damaged wire
CN213034507U (en) Novel electrician is special wire grip of steel wire steel cable for threading
CN212387440U (en) Pay-off is used in electric power construction
CN110429516B (en) Power cable laying device
CN206331163U (en) A kind of communications network service special optical cable turnbuckle
CN214543557U (en) Pipe laying and paying-off device for hydraulic engineering
CN204847068U (en) Plumbing fitting is with defeated device that draws in tow chain
CN210944279U (en) Automatic winding device for transformer substation site construction
CN216512143U (en) Coiling mechanism is used in cable manufacture processing
CN208874188U (en) A kind of universal cable traction apparatus adjusted using electric hand drill positive and negative rotation gear
CN220660738U (en) Quick screwing device for ceiling expansion bolts
CN216904059U (en) Automatic stringing equipment for electric wires of power line pole
CN217672920U (en) Butt joint traction device
CN212773533U (en) Straight thread connection reinforcing bar erection equipment
CN216625109U (en) Erection device for power transmission and transformation engineering construction
CN220358690U (en) Overhead line construction device for power equipment installation
CN220066666U (en) Cable fastening line-following device for building electrical installation
CN220564023U (en) Pay-off is used in construction is built in room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200117