CN209924489U - Screw hole plugging structure - Google Patents

Screw hole plugging structure Download PDF

Info

Publication number
CN209924489U
CN209924489U CN201920519200.6U CN201920519200U CN209924489U CN 209924489 U CN209924489 U CN 209924489U CN 201920519200 U CN201920519200 U CN 201920519200U CN 209924489 U CN209924489 U CN 209924489U
Authority
CN
China
Prior art keywords
screw rod
wall body
polyphenyl
rod hole
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920519200.6U
Other languages
Chinese (zh)
Inventor
成爱飞
陈华
缪元喜
孙珍荣
顾贞兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Suzhong Construction Group Co Ltd
Original Assignee
Jiangsu Suzhong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Suzhong Construction Group Co Ltd filed Critical Jiangsu Suzhong Construction Group Co Ltd
Priority to CN201920519200.6U priority Critical patent/CN209924489U/en
Application granted granted Critical
Publication of CN209924489U publication Critical patent/CN209924489U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a screw rod hole block structure belongs to the construction field, has solved current screw rod hole shutoff mode, can not resist higher water pressure, the general problem of antiseep quality, the technical scheme of adoption: including wall body and screw rod hole, the whole wall body is link up in the screw rod hole, the whole shape in screw rod hole is the wedge, wall body outside entrance to a cave area is greater than inboard entrance to a cave area, screw rod hole middle part is inlayed and is equipped with polyphenyl voussoir, closely laminate after bonding through the polyurethane layer between polyphenyl voussoir lateral surface and the screw rod hole medial surface, the both ends packing of polyphenyl voussoir has cement mortar layer, cement mortar layer and wall body surface parallel and level, set up the polyurethane coating layer between cement mortar layer and the polyphenyl voussoir, the wall body lateral surface scribbles waterproof coating layer.

Description

Screw hole plugging structure
Technical Field
The utility model belongs to the building construction field especially relates to a screw rod hole block structure.
Background
High-rise buildings are more and more, and when the concrete shear wall is fixed by using a template in the building industry, a fixing device is needed, so that a wall-penetrating bolt, namely the wall-penetrating pull rod fastener, is needed. The construction team is a normal construction process when a shear wall is constructed, and the use of the through-wall bolt is a conventional measure of a construction unit, so that the bolt hole is reserved on the surface of the wall body after the construction of workers is finished.
The screw hole is not sealed, and the risk of outer wall leakage is generated. The most original treatment mode is that when inner and outer walls are painted, mortar is added into the screw hole, but the middle part of the screw is hollow, cracks are easy to generate, the screw hole cannot be sealed for a long time, and the outer wall leakage risk is extremely high. In order to solve the problem, most construction companies adopt a screw hole plugging method in which cement mortar, foaming agent, waterproof paste and the like are filled in a screw hole. The middle part of the screw is filled by the filling modes, so that the probability of cracks generated by blocking mortar is reduced, but the existing filling modes can not ensure the compactness of fillers in a screw hole, can not resist higher water pressure, have common water seepage prevention quality, can generate a leakage phenomenon after being used for a long time, and increase the repair time and cost.
SUMMERY OF THE UTILITY MODEL
The utility model overcomes prior art exists not enough, has solved current screw hole shutoff mode, can not resist higher water pressure, the general problem of antiseep quality aims at providing a screw rod hole block structure, and this structure adopts polyphenyl voussoir to glue polyurethane and glues and fill the screw rod hole, and operation process is simple and easy, the low price, and convenience saved time.
In order to solve the technical problem, the utility model discloses a technical scheme does: the utility model provides a screw rod hole block structure, includes wall body and screw rod hole, and the screw rod hole link up whole wall body, the whole shape in screw rod hole is the wedge, and wall body outside entrance to a cave area is greater than inboard entrance to a cave area, and the screw rod hole middle part is inlayed and is equipped with polyphenyl voussoir, closely laminates after bonding through the polyurethane layer between polyphenyl voussoir lateral surface and the screw rod hole medial surface, and the both ends packing of polyphenyl voussoir has the cement mortar layer, cement mortar layer and wall body surface parallel and level, sets up the polyurethane dope layer between cement mortar layer and the polyphenyl voussoir, and the wall body lateral surface.
The polystyrene wedge block is made of a polyethylene foam rod.
The distance between the end face of the polyphenyl wedge block and the side face of the wall body is 24-26 mm.
The polyurethane coating layer is a three-layer heterochromatic polyurethane waterproof coating layer with the thickness of 1 mm.
The cement mortar layer adopts dry and hard cement mortar.
Compared with the prior art, the utility model following beneficial effect has: the utility model is used for the polyphenyl voussoir of filling can be processed into the shape that needs in advance, and during high altitude construction shutoff screw hole, directly fill in the screw hole. Compared with the existing mode of filling foaming glue and waterproof factice, the method has the advantages of simple and easy operation process, low price, time saving, convenience, cost reduction and efficiency improvement.
In addition, the inner wall of the screw hole is smooth and flat and can be tightly connected with the polyphenyl wedge block, the polyphenyl wedge block is tightly jointed, one end of the screw hole is flushed by water through a water pipe, water cannot permeate, polyurethane is adhered, the polyphenyl wedge block is more tightly filled in the screw hole, the waterproof effect is greatly improved, the compacting effect is good, higher water pressure can be resisted, the leakage phenomenon after the screw hole of the outer wall is plugged is effectively avoided, the screw hole is in place once, and later-stage owner complaints and maintenance cost are greatly reduced.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a partially enlarged view of a portion a in fig. 1.
In the figure: the concrete wall comprises a 1-bit wall body, 2 screw holes, 3 polyphenyl wedges, 4 cement mortar layers, 5 polyurethane layers and 6 polyurethane coating layers.
Detailed Description
As shown in fig. 1-2, a screw hole plugging structure comprises a wall body 1 and a screw hole 2, wherein the screw hole 2 penetrates through the whole wall body 1, the whole shape of the screw hole 2 is wedge-shaped, the area of an outer side opening of the wall body 1 is larger than that of an inner side opening, a polyphenyl wedge block 3 is embedded in the middle of the screw hole 2, the outer side surface of the polyphenyl wedge block 3 is tightly attached to the inner side surface of the screw hole 2 after being bonded through a polyurethane layer 5, cement mortar layers 4 are filled at two ends of the polyphenyl wedge block 3, the cement mortar layers 4 are flush with the surface of the wall body 1, a polyurethane coating layer 6 is arranged between the cement mortar layers 4 and the polyphenyl wedge block 3, and a waterproof coating layer is coated.
The screw hole 2 adopts a special PVC sleeve, a wedge-shaped screw hole 2 structure is formed after the PVC sleeve is taken out, and the polystyrene wedge 3 adopts a polyethylene foam rod and is in a concentric circle structure with the special PVC sleeve.
The polystyrene wedge 3 is made of a polyethylene foam rod. Compared with foaming glue and waterproof factice, the polyethylene foam rod is cheaper in manufacturing cost, is processed and molded in advance, and is adaptive to the shape of the screw hole 2, so that the compactness of the screw hole 2 can be ensured during filling, and the incomplete filling phenomenon cannot occur. Meanwhile, the structure reduces the risk of high-altitude operation of construction workers and improves the construction efficiency.
In order to ensure the filling effect of the whole screw hole 2, the distance between the end surface of the polyphenyl wedge block 3 and the side surface of the wall body 1 is 24-26 mm. This ensures a sufficient filling length of the polystyrene wedges 3 while leaving a filling space for the cement mortar bed 4.
The utility model discloses the concrete operation mode of structure does:
1. cleaning a screw hole 2: and after the template is dismantled, taking out the PVC special sleeve, and cleaning floating dust in the cavity by using a blower.
2. Packing of the polyphenyl wedge block 3: the end part of the polyphenyl wedge block 3 is dipped with polyurethane and is plugged into the screw hole 2 to be clamped, and the two ends are reserved with 25 mm.
3. Plugging by cement mortar: and plugging two ends of the polyphenyl wedge block 3 by using dry and hard cement mortar, and compacting and leveling.
4. Construction of waterproof paint: after the cement mortar on the outer side of the concrete outer wall is hardened, three different-color polyurethane waterproof coatings with the thickness of 1mm are coated on the outer side.
The wall-penetrating screw hole 2 adopts a special PVC sleeve, the polystyrene wedge block 3 is a polyethylene foam rod, the structure is concentric with the special PVC sleeve, the special PVC sleeve is taken out, the inner wall of the screw hole 2 is smooth and flat and can be tightly connected with the foam rod, the tight joint is formed, one end of the screw hole is flushed by water through a water pipe, the water cannot permeate, the polyurethane is adhered, the foam rod fills the screw hole 2 more tightly, the waterproof effect is greatly improved, compared with the traditional process, the operation process is simple and easy, the price is low, the time and the convenience are saved, the cost is reduced, the effect is improved, the compacting effect is good, higher water pressure can be resisted, the leakage phenomenon after the outer wall screw hole 2 is plugged is effectively avoided, the position is achieved at one time, and the later-stage.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (5)

1. The utility model provides a screw rod hole block structure, includes wall body (1) and screw rod hole (2), and screw rod hole (2) link up whole wall body (1), a serial communication port, screw rod hole (2) whole shape is the wedge, and wall body (1) outside entrance to a cave area is greater than inboard entrance to a cave area, and screw rod hole (2) middle part is inlayed and is equipped with polyphenyl voussoir (3), closely laminates after bonding through polyurethane layer (5) between polyphenyl voussoir (3) lateral surface and screw rod hole (2) medial surface, and the both ends packing of polyphenyl voussoir (3) has cement mortar layer (4), cement mortar layer (4) and wall body (1) surface parallel and level, sets up polyurethane (6) between cement mortar layer (4) and polyphenyl voussoir (3), and wall body (1) lateral surface scribbles waterproof coating layer.
2. A screw hole plugging structure according to claim 1, wherein: the polystyrene wedge block (3) is made of a polyethylene foam rod.
3. A screw hole plugging structure according to claim 1 or 2, wherein: the distance between the end face of the polyphenyl wedge block (3) and the side face of the wall body (1) is 24-26 mm.
4. A screw hole plugging structure according to claim 1, wherein: the polyurethane coating layer (6) is a three-layer heterochromatic polyurethane waterproof coating layer with the thickness of 1 mm.
5. A screw hole plugging structure according to claim 1, wherein: the cement mortar layer (4) adopts dry and hard cement mortar.
CN201920519200.6U 2019-04-17 2019-04-17 Screw hole plugging structure Expired - Fee Related CN209924489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920519200.6U CN209924489U (en) 2019-04-17 2019-04-17 Screw hole plugging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920519200.6U CN209924489U (en) 2019-04-17 2019-04-17 Screw hole plugging structure

Publications (1)

Publication Number Publication Date
CN209924489U true CN209924489U (en) 2020-01-10

Family

ID=69073914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920519200.6U Expired - Fee Related CN209924489U (en) 2019-04-17 2019-04-17 Screw hole plugging structure

Country Status (1)

Country Link
CN (1) CN209924489U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852066A (en) * 2020-07-28 2020-10-30 北京城建七建设工程有限公司 Screw hole plugging node and construction method thereof
CN113700156A (en) * 2021-09-03 2021-11-26 中核华辰建筑工程有限公司 Cement cone plugging construction process for shear wall screw hole
CN114876238A (en) * 2022-06-28 2022-08-09 中建七局(上海)有限公司 Aluminum mould outer wall screw hole plugging structure and construction method thereof
CN115142565A (en) * 2022-07-31 2022-10-04 中冶建工集团有限公司 Plugging construction process of fully-inserted outer wall screw hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852066A (en) * 2020-07-28 2020-10-30 北京城建七建设工程有限公司 Screw hole plugging node and construction method thereof
CN113700156A (en) * 2021-09-03 2021-11-26 中核华辰建筑工程有限公司 Cement cone plugging construction process for shear wall screw hole
CN114876238A (en) * 2022-06-28 2022-08-09 中建七局(上海)有限公司 Aluminum mould outer wall screw hole plugging structure and construction method thereof
CN115142565A (en) * 2022-07-31 2022-10-04 中冶建工集团有限公司 Plugging construction process of fully-inserted outer wall screw hole

Similar Documents

Publication Publication Date Title
CN209924489U (en) Screw hole plugging structure
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN110924702A (en) Hole plugging device for brick-concrete or prefabricated part and operation method thereof
CN211422313U (en) Novel waterproof and heat-preservation energy-saving outer window
CN113802698A (en) Construction method for plugging split bolt holes of shear wall
CN111852066A (en) Screw hole plugging node and construction method thereof
CN111058629A (en) Construction method for plugging through-wall bolt hole of concrete outer wall
CN212743485U (en) Screw hole plugging node
CN205153571U (en) Outer wall bolt hole novel to drawing block structure
CN113775197A (en) Construction method for plugging and preventing leakage of concrete outer wall through-wall bolt hole
CN209907610U (en) Toilet waterproof structure
CN213329477U (en) A regeneration waterproof layer and waterproof construction for bathroom ceramic tile surface
CN211901861U (en) PVC drainage pipe passes entrance to a cave shutoff piece of floor department
CN110984237B (en) Deformation joint composite plugging and sealing system and construction method thereof
CN210857547U (en) Be used for outer wall screw rod entrance to a cave plugging device
CN209891256U (en) Basement outer wall post-cast strip structure
CN206800667U (en) Plugging device for gap between seal glass curtain wall and civil engineering wall
CN211037919U (en) Reinforced concrete structure reserves bolt hole block structure
CN212897741U (en) Novel waterproof shutoff in shear force wall screw rod hole device
CN213014735U (en) Bolt hole antiseep plugging device
CN220059003U (en) Outer wall hole plugging structure
CN217557701U (en) Three-section type wall bushing of pull bolt
CN217204695U (en) Outer wall bolt hole plugging structure
CN216552100U (en) Connection structure of new and old structure joint of reconstruction engineering basement
CN216713405U (en) Waterstop structure for prevention of seepage of construction joint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110

Termination date: 20210417