CN209817093U - Concatenation formula steel house room - Google Patents

Concatenation formula steel house room Download PDF

Info

Publication number
CN209817093U
CN209817093U CN201822228344.4U CN201822228344U CN209817093U CN 209817093 U CN209817093 U CN 209817093U CN 201822228344 U CN201822228344 U CN 201822228344U CN 209817093 U CN209817093 U CN 209817093U
Authority
CN
China
Prior art keywords
bolt
support column
crossbeam
ceiling
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822228344.4U
Other languages
Chinese (zh)
Inventor
高利军
王轩
顾正涛
邵云肖
段乔华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Steel Structure Co Ltd
Original Assignee
Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd filed Critical Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd
Priority to CN201822228344.4U priority Critical patent/CN209817093U/en
Application granted granted Critical
Publication of CN209817093U publication Critical patent/CN209817093U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to the technical field of steel structure houses, in particular to a spliced steel structure house, which has the key points of the technical proposal that the spliced steel structure house comprises a ceiling and a steel skeleton for supporting the ceiling, wherein the steel skeleton comprises four support columns supported on the ground and a crossbeam transversely arranged between the adjacent support columns, and the crossbeam is positioned at the upper ends of the support columns; the top of support column is equipped with the constant head tank, the bottom of ceiling be equipped with the constant head tank complex locating piece of pegging graft, the relative both ends of crossbeam are equipped with the installation piece, and the lateral wall of support column runs through along the top has the confession the installation piece complex spout of pegging graft, the support column with be equipped with the connecting piece that is used for fixed cross beam and support column mounted position between the crossbeam. The house can be spliced and disassembled, and is convenient to carry, so that the waste of resources is reduced.

Description

Concatenation formula steel house room
Technical Field
The utility model relates to a steel house technical field, more specifically say, it relates to a concatenation formula steel house room.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. In many building occasions, steel beams and steel columns are adopted as building components and are fixedly connected through connecting components, so that the high strength of the beam columns and the connecting structures of the beam columns is guaranteed, and the steel structure house is widely applied to building engineering at present.
The steel structure house is a residential building taking steel as a building bearing beam column, has the advantages of light dead weight, good earthquake resistance and wind resistance, short construction period, high industrialization degree and the like, and is widely applied to places such as building construction, coal mining and the like.
The existing steel structure mostly adopts a welding fixing mode and cannot be disassembled after being built. If the cutting tool is moved, the cutting tool can only be discarded after mechanical cutting, thereby causing serious resource waste.
Disclosure of Invention
The utility model aims at providing a not enough to prior art, the utility model aims at providing a concatenation formula steel house, this house can splice and dismantle, the transport of being convenient for to the waste of resource has been reduced.
The above technical purpose of the present invention can be achieved by the following technical solutions: a spliced steel structure house comprises a ceiling and a steel skeleton for supporting the ceiling, wherein the steel skeleton comprises four support columns supported on the ground and a cross beam transversely arranged between the adjacent support columns, and the cross beam is positioned at the upper ends of the support columns; the top of support column is equipped with the constant head tank, the bottom of ceiling be equipped with the constant head tank complex locating piece of pegging graft, the relative both ends of crossbeam are equipped with the installation piece, and the lateral wall of support column runs through along the top has the confession the installation piece complex spout of pegging graft, the support column with be equipped with the connecting piece that is used for fixed cross beam and support column mounted position between the crossbeam.
By adopting the technical scheme, when the steel framework is installed, the cross beam is inserted into the sliding groove in a sliding manner relative to the two installation blocks for splicing, and the cross beam and the support column are fixed by the connecting piece; peg graft the locating piece of ceiling in the constant head tank, the ceiling is fixed a position at the steel skeleton top under the effect of gravity to convenient and fast's realization steel house's concatenation, when steel house is dismantled to needs, with the connecting piece unblock, simultaneously with ceiling, crossbeam and support column separate separately can, thereby make things convenient for steel house's transport.
Preferably, the connecting piece includes that the longitudinal section is the butt plate of L type, the butt plate slides along the length direction of crossbeam and connects in the lower surface of crossbeam, the butt plate cooperates with the lateral wall butt of support column, screw-thread fit has first bolt between butt plate and the support column.
Through adopting above-mentioned technical scheme, when needs fixed cross beam and support column, slide the butt joint board in the support column, and then through first bolt with butt joint board and support column fixed connection can.
Preferably, the butt plate comprises a transverse fixing plate and a longitudinal fixing plate, one end of the longitudinal fixing plate is connected with the transverse fixing plate, and a rib plate is fixedly arranged between the transverse fixing plate and the longitudinal fixing plate.
Through adopting above-mentioned technical scheme, the joint strength between horizontal fixed plate and the vertical fixed plate has been strengthened in the setting of floor.
Preferably, the two opposite side surfaces of the rib plate are respectively provided with a connecting block, a second bolt penetrates through the connecting block, the second bolt is far away from the supporting column along the head of the second bolt, the bottom of the second bolt is inclined and upwards arranged in the direction close to the supporting column, and the second bolt is in threaded fit with the supporting column.
Through adopting above-mentioned technical scheme, second bolt and support column screw-thread fit make butt joint board and support column be connected more firmly, and the second bolt is the setting of slope and makes the staff turn round tightly and loosen the operating space of second bolt bigger, convenient to detach and installation.
Preferably, a second washer is sleeved on the second bolt, and the second washer is located between the connecting block and the head of the second bolt; the first bolt is sleeved with a first washer, and the first washer is located between the longitudinal fixing plate and the head of the first bolt.
By adopting the technical scheme, the abutting area of the head of the first bolt and the longitudinal fixing plate is increased by the first washer, so that the locking degree of the first bolt is higher; the second washer increases the abutting area of the head of the second bolt and the connecting block, so that the locking degree of the second bolt is higher.
Preferably, the lower surface of the cross beam is provided with a dovetail groove along the length direction of the cross beam, and the top of the transverse fixing plate is provided with a dovetail block matched with the dovetail groove in a sliding manner.
Through adopting above-mentioned technical scheme, the cooperation of sliding of forked tail piece and dovetail makes the horizontal fixed plate be difficult for breaking away from the dovetail at the in-process that slides, and horizontal fixed plate removes more stably.
Preferably, the bottom of the supporting column is fixedly provided with a supporting seat.
Through adopting above-mentioned technical scheme, the setting up of supporting seat has increased the lifting surface area of support column for the support of support column is more stable.
Preferably, magnets which are mutually attracted are arranged between the bottom of the positioning block and the bottom of the positioning groove.
Through adopting above-mentioned technical scheme, utilize the mutual actuation effect of magnet for the ceiling can be firm fix on the support column.
To sum up, the utility model discloses following beneficial effect has:
1. when the steel framework is installed, the two installation blocks corresponding to the cross beam are inserted into the sliding groove in a sliding mode for splicing, and the cross beam and the support column are fixed through the connecting piece; the positioning blocks of the ceiling are inserted into the positioning grooves, and the ceiling is positioned at the top of the steel skeleton under the action of gravity, so that the splicing of the steel structure house is conveniently and quickly realized;
2. the arrangement of the rib plates strengthens the connection strength between the transverse fixing plate and the longitudinal fixing plate.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic view of the assembly relationship between the ceiling and the steel skeleton according to the embodiment of the present invention;
FIG. 3 is an enlarged view of portion A of FIG. 2;
fig. 4 is a schematic structural view of the embodiment of the present invention with the ceiling removed;
fig. 5 is a schematic view of an assembly relationship of the cross beam, the supporting column and the rib plate in the embodiment of the present invention.
In the figure: 1. a support pillar; 2. a cross beam; 3. a ceiling; 4. a supporting seat; 5. positioning a groove; 6. positioning blocks; 7. mounting blocks; 8. a butt joint plate; 81. a transverse fixing plate; 82. a longitudinal fixing plate; 9. a rib plate; 10. a chute; 11. a dovetail groove; 12. a dovetail block; 13. a first bolt; 14. a first gasket; 15. connecting blocks; 16. a second bolt; 17. a second gasket; 18. a magnet.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A spliced steel structure house, referring to fig. 1, comprises a ceiling 3 and a steel skeleton for supporting the ceiling 3. Specifically, the steel skeleton comprises four cuboid-shaped supporting columns 1 supported on the ground and a cross beam 2 transversely installed between the adjacent supporting columns 1, and the cross beam 2 is located at the upper ends of the supporting columns 1. Meanwhile, the bottom of the support column 1 is welded with a support seat 4. The setting of supporting seat 4 has increased the lifting surface area of support column 1 for support column 1's support is more stable.
Referring to fig. 2 and 3, a positioning groove 5 is formed at the top end of the supporting column 1, and positioning blocks 6 which are in plug-in fit with the positioning groove 5 are welded at four corners of the bottom of the ceiling 3. In addition, magnets 18 which are mutually attracted are arranged between the bottom of the positioning block 6 and the bottom of the positioning groove 5. The mutual attraction of the magnets 18 is utilized to ensure that the ceiling 3 can be firmly fixed on the supporting column 1.
Referring to fig. 4 and 5, the two opposite ends of the beam 2 are fixedly provided with the mounting blocks 7, the side walls of the supporting column 1 are provided with sliding grooves 10 for the mounting blocks 7 to be inserted and matched along the top, and the cross sections of the mounting blocks 7 and the sliding grooves 10 are in trapezoidal arrangement. In addition, a connecting piece for fixing the installation positions of the cross beam 2 and the supporting column 1 is installed between the supporting column 1 and the cross beam 2.
When the steel framework is installed, the two installation blocks 7 of the beam 2 are inserted into the sliding groove 10 in a sliding mode for splicing, and the beam 2 and the support column 1 are fixed through the connecting piece; peg graft in constant head tank 5 with the locating piece 6 of ceiling 3, ceiling 3 is fixed a position at the steel skeleton top under the effect of gravity to convenient and fast's realization steel house's concatenation. When steel house room is dismantled to needs, with the connecting piece unblock, simultaneously with ceiling 3, crossbeam 2 and support column 1 separate separately can to be convenient for steel house room's transport.
Specifically, the connecting piece includes that the longitudinal section is the butt plate 8 of L type, and the butt plate 8 slides along the length direction of crossbeam 2 and connects in the lower surface of crossbeam 2, and the butt plate 8 can cooperate with the lateral wall butt of support column 1, and screw-thread fit has first bolt 13 between butt plate 8 and the support column 1. When needing fixed cross beam 2 and support column 1, slide butt joint board 8 in support column 1, and then through first bolt 13 with butt joint board 8 and support column 1 fixed connection can.
Specifically, the abutting plate 8 includes a rectangular plate-shaped transverse fixing plate 81 and a rectangular plate-shaped longitudinal fixing plate 82 having one end connected to the transverse fixing plate 81, and the rib plate 9 is welded between the transverse fixing plate 81 and the longitudinal fixing plate 82. The arrangement of the rib 9 enhances the connection strength between the transverse fixing plate 81 and the longitudinal fixing plate 82.
Referring to fig. 5, the first bolt 13 is sleeved with the first washer 14, and the first washer 14 is located between the longitudinal fixing plate 82 and the head of the first bolt 13. The first washer 14 increases the abutting area of the head of the first bolt 13 with the longitudinal fixing plate 82, so that the first bolt 13 is locked more.
In addition, a dovetail groove 11 is formed in the lower surface of the cross beam 2 along the length direction of the cross beam, and a dovetail block 12 in sliding fit with the dovetail groove 11 is welded to the top of the transverse fixing plate 81. The sliding fit of the dovetail block 12 and the dovetail groove 11 makes the transverse fixing plate 81 not easy to separate from the dovetail groove 11 in the sliding process, and the transverse fixing plate 81 moves more stably.
Referring to fig. 5, two opposite side surfaces of the rib plate 9 are respectively and fixedly provided with a blocky connecting block 15, a second bolt 16 penetrates through the connecting block 15, the second bolt 16 is far away from the supporting column 1 along the head part, the bottom part of the second bolt is inclined and upwards arranged in the direction close to the supporting column 1, and the second bolt 16 is in threaded fit with the supporting column 1. Second bolt 16 and support column 1 screw-thread fit make butt plate 8 be connected more firmly with support column 1, and second bolt 16 is the setting of slope and makes the staff turn round tight and loosen the operating space of second bolt 16 bigger, convenient to detach and installation.
Meanwhile, the second bolt 16 is sleeved with a second washer 17, and the second washer 17 is located between the connecting block 15 and the head of the second bolt 16. The second washer 17 increases the abutting area of the head of the second bolt 16 with the connecting block 15, so that the locking degree of the second bolt 16 is higher.
The above embodiments are merely illustrative of the present invention, and are not intended to limit the present invention, and those skilled in the art can make modifications of the present embodiments without inventive contribution as required after reading the present specification, but all the embodiments are protected by patent law within the scope of the present invention.

Claims (8)

1. The utility model provides a concatenation formula steel house room, includes ceiling (3) and is used for supporting the steel skeleton of ceiling (3), characterized by: the steel skeleton comprises four supporting columns (1) supported on the ground and a cross beam (2) transversely arranged between the adjacent supporting columns (1), and the cross beam (2) is positioned at the upper ends of the supporting columns (1); the top of support column (1) is equipped with constant head tank (5), the bottom of ceiling (3) be equipped with constant head tank (5) grafting complex locating piece (6), the relative both ends of crossbeam (2) are equipped with installation piece (7), and the lateral wall of support column (1) runs through along the top and has the confession installation piece (7) grafting complex spout (10), support column (1) with be equipped with the connecting piece that is used for fixed cross beam (2) and support column (1) mounted position between crossbeam (2).
2. The spliced steel structure house as claimed in claim 1, wherein: the connecting piece includes that longitudinal section is butt joint board (8) of L type, butt joint board (8) slide along the length direction of crossbeam (2) and connect in the lower surface of crossbeam (2), the lateral wall butt cooperation of butt joint board (8) and support column (1), screw-thread fit has first bolt (13) between butt joint board (8) and support column (1).
3. The spliced steel structure house as claimed in claim 2, wherein: butt joint board (8) are including horizontal fixed plate (81) and longitudinal fixing plate (82) that one end links to each other with horizontal fixed plate (81), it is provided with floor (9) to fix between horizontal fixed plate (81) and longitudinal fixing plate (82).
4. A sectional steel house according to claim 3, wherein: the two opposite side faces of the rib plate (9) are respectively provided with a connecting block (15), a second bolt (16) penetrates through the connecting block (15), the second bolt (16) is far away from the supporting column (1) along the head of the second bolt, the bottom of the second bolt is inclined and upwards arranged in the direction close to the supporting column (1), and the second bolt (16) is in threaded fit with the supporting column (1).
5. The spliced steel structure house as claimed in claim 4, wherein: a second washer (17) is sleeved on the second bolt (16), and the second washer (17) is positioned between the connecting block (15) and the head of the second bolt (16); a first washer (14) is sleeved on the first bolt (13), and the first washer (14) is located between the longitudinal fixing plate (82) and the head of the first bolt (13).
6. The spliced steel structure house as claimed in claim 5, wherein: the lower surface of the cross beam (2) is provided with a dovetail groove (11) along the length direction, and the top of the transverse fixing plate (81) is provided with a dovetail block (12) which is matched with the dovetail groove (11) in a sliding manner.
7. The spliced steel structure house as claimed in claim 1, wherein: the bottom of the support column (1) is fixedly provided with a support seat (4).
8. The spliced steel structure house as claimed in claim 1, wherein: and magnets (18) which are mutually attracted are arranged between the bottom of the positioning block (6) and the bottom of the positioning groove (5).
CN201822228344.4U 2018-12-27 2018-12-27 Concatenation formula steel house room Active CN209817093U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822228344.4U CN209817093U (en) 2018-12-27 2018-12-27 Concatenation formula steel house room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822228344.4U CN209817093U (en) 2018-12-27 2018-12-27 Concatenation formula steel house room

Publications (1)

Publication Number Publication Date
CN209817093U true CN209817093U (en) 2019-12-20

Family

ID=68870095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822228344.4U Active CN209817093U (en) 2018-12-27 2018-12-27 Concatenation formula steel house room

Country Status (1)

Country Link
CN (1) CN209817093U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111411690A (en) * 2020-04-29 2020-07-14 昌大建筑科技有限公司 Structure system capable of being assembled quickly and construction method thereof
CN111441473A (en) * 2020-04-02 2020-07-24 湖北工业大学 Light steel keel energy-saving building and construction method thereof
CN112177155A (en) * 2020-09-16 2021-01-05 飞帆集团有限公司 Steel skeleton structure and welding process thereof
CN112554333A (en) * 2020-12-12 2021-03-26 深圳新艺华建筑装饰工程有限公司 Assembled wood-like building and steel-wood connecting structure thereof
CN114215389A (en) * 2021-12-23 2022-03-22 中国建筑土木建设有限公司 Structure is built in quick detachable interim room
CN114704140A (en) * 2022-03-31 2022-07-05 合肥巍华智能停车设备有限公司 But cast member stereo garage support body of modularization equipment
CN115370006A (en) * 2022-09-30 2022-11-22 湖南金格建筑科技有限公司 Steel construction that assembled building has quick mosaic structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441473A (en) * 2020-04-02 2020-07-24 湖北工业大学 Light steel keel energy-saving building and construction method thereof
CN111411690A (en) * 2020-04-29 2020-07-14 昌大建筑科技有限公司 Structure system capable of being assembled quickly and construction method thereof
CN112177155A (en) * 2020-09-16 2021-01-05 飞帆集团有限公司 Steel skeleton structure and welding process thereof
CN112554333A (en) * 2020-12-12 2021-03-26 深圳新艺华建筑装饰工程有限公司 Assembled wood-like building and steel-wood connecting structure thereof
CN114215389A (en) * 2021-12-23 2022-03-22 中国建筑土木建设有限公司 Structure is built in quick detachable interim room
CN114704140A (en) * 2022-03-31 2022-07-05 合肥巍华智能停车设备有限公司 But cast member stereo garage support body of modularization equipment
CN114704140B (en) * 2022-03-31 2024-06-04 合肥巍华智能停车设备有限公司 Cast member stereo garage frame body capable of being assembled in modularized mode
CN115370006A (en) * 2022-09-30 2022-11-22 湖南金格建筑科技有限公司 Steel construction that assembled building has quick mosaic structure

Similar Documents

Publication Publication Date Title
CN209817093U (en) Concatenation formula steel house room
CN211774523U (en) Prefabricated building that can build temporarily
CN211172383U (en) Stable beam column connected node
CN104912190A (en) Dry type joggle frame structure
CN108894339B (en) Clamping tenon type connecting device of modular unit intermediate column node
CN104775517A (en) Connecting node for steel frame and steel structure module
KR101149602B1 (en) Apparatus and method for combining between unit modules
CN210597866U (en) Steel construction assembled wallboard
CN204001219U (en) Movable plank house assembly type beam column linkage
KR20150055497A (en) Modular unit having socket connector, Modular unit structure using the same and Construction method of modular unit structure
CN204080843U (en) Movable plank house foundation structure
CN104674949A (en) Portable shelter
CN212689312U (en) Assembled external wallboard
CN204456438U (en) Prefabricated house
CN105369890A (en) Earthquake-proof folk house steel framework and installation method thereof
CN216517187U (en) A BIM assembled antidetonation shear force wall for residential building engineering
CN212865961U (en) Detachable building foundation pit supporting beam
CN210562620U (en) Inserting-mortise connection prefabricated assembly type steel frame structure
CN202359665U (en) Stay-cable steel-beam and steel-pipe column mixed node
KR102574317B1 (en) Frame Overlaid System for Prefabricated Buildings
CN210636601U (en) Tenon fourth of twelve earthly branches structure that can be on steel construction
KR102224796B1 (en) Precast Concrete Modualr Structure
CN110656697B (en) Connection node of assembled concrete frame beam column
CN203546908U (en) Assembly type building wall beam stable connection structure
CN201722846U (en) Assembled board house pillar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 211529 Duanzhuang 500, Changshan Community, Jinniuhu Street, Liuhe District, Nanjing City, Jiangsu Province

Patentee after: China Railway Steel Structure Co.,Ltd.

Address before: 211529 Duanzhuang 500, Changshan Community, Jinniuhu Street, Liuhe District, Nanjing City, Jiangsu Province

Patentee before: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP STEEL STRUCTURE Co.,Ltd.

CP01 Change in the name or title of a patent holder