CN209817093U - Concatenation formula steel house room - Google Patents
Concatenation formula steel house room Download PDFInfo
- Publication number
- CN209817093U CN209817093U CN201822228344.4U CN201822228344U CN209817093U CN 209817093 U CN209817093 U CN 209817093U CN 201822228344 U CN201822228344 U CN 201822228344U CN 209817093 U CN209817093 U CN 209817093U
- Authority
- CN
- China
- Prior art keywords
- bolt
- support column
- crossbeam
- ceiling
- steel structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to the technical field of steel structure houses, in particular to a spliced steel structure house, which has the key points of the technical proposal that the spliced steel structure house comprises a ceiling and a steel skeleton for supporting the ceiling, wherein the steel skeleton comprises four support columns supported on the ground and a crossbeam transversely arranged between the adjacent support columns, and the crossbeam is positioned at the upper ends of the support columns; the top of support column is equipped with the constant head tank, the bottom of ceiling be equipped with the constant head tank complex locating piece of pegging graft, the relative both ends of crossbeam are equipped with the installation piece, and the lateral wall of support column runs through along the top has the confession the installation piece complex spout of pegging graft, the support column with be equipped with the connecting piece that is used for fixed cross beam and support column mounted position between the crossbeam. The house can be spliced and disassembled, and is convenient to carry, so that the waste of resources is reduced.
Description
Technical Field
The utility model relates to a steel house technical field, more specifically say, it relates to a concatenation formula steel house room.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. In many building occasions, steel beams and steel columns are adopted as building components and are fixedly connected through connecting components, so that the high strength of the beam columns and the connecting structures of the beam columns is guaranteed, and the steel structure house is widely applied to building engineering at present.
The steel structure house is a residential building taking steel as a building bearing beam column, has the advantages of light dead weight, good earthquake resistance and wind resistance, short construction period, high industrialization degree and the like, and is widely applied to places such as building construction, coal mining and the like.
The existing steel structure mostly adopts a welding fixing mode and cannot be disassembled after being built. If the cutting tool is moved, the cutting tool can only be discarded after mechanical cutting, thereby causing serious resource waste.
Disclosure of Invention
The utility model aims at providing a not enough to prior art, the utility model aims at providing a concatenation formula steel house, this house can splice and dismantle, the transport of being convenient for to the waste of resource has been reduced.
The above technical purpose of the present invention can be achieved by the following technical solutions: a spliced steel structure house comprises a ceiling and a steel skeleton for supporting the ceiling, wherein the steel skeleton comprises four support columns supported on the ground and a cross beam transversely arranged between the adjacent support columns, and the cross beam is positioned at the upper ends of the support columns; the top of support column is equipped with the constant head tank, the bottom of ceiling be equipped with the constant head tank complex locating piece of pegging graft, the relative both ends of crossbeam are equipped with the installation piece, and the lateral wall of support column runs through along the top has the confession the installation piece complex spout of pegging graft, the support column with be equipped with the connecting piece that is used for fixed cross beam and support column mounted position between the crossbeam.
By adopting the technical scheme, when the steel framework is installed, the cross beam is inserted into the sliding groove in a sliding manner relative to the two installation blocks for splicing, and the cross beam and the support column are fixed by the connecting piece; peg graft the locating piece of ceiling in the constant head tank, the ceiling is fixed a position at the steel skeleton top under the effect of gravity to convenient and fast's realization steel house's concatenation, when steel house is dismantled to needs, with the connecting piece unblock, simultaneously with ceiling, crossbeam and support column separate separately can, thereby make things convenient for steel house's transport.
Preferably, the connecting piece includes that the longitudinal section is the butt plate of L type, the butt plate slides along the length direction of crossbeam and connects in the lower surface of crossbeam, the butt plate cooperates with the lateral wall butt of support column, screw-thread fit has first bolt between butt plate and the support column.
Through adopting above-mentioned technical scheme, when needs fixed cross beam and support column, slide the butt joint board in the support column, and then through first bolt with butt joint board and support column fixed connection can.
Preferably, the butt plate comprises a transverse fixing plate and a longitudinal fixing plate, one end of the longitudinal fixing plate is connected with the transverse fixing plate, and a rib plate is fixedly arranged between the transverse fixing plate and the longitudinal fixing plate.
Through adopting above-mentioned technical scheme, the joint strength between horizontal fixed plate and the vertical fixed plate has been strengthened in the setting of floor.
Preferably, the two opposite side surfaces of the rib plate are respectively provided with a connecting block, a second bolt penetrates through the connecting block, the second bolt is far away from the supporting column along the head of the second bolt, the bottom of the second bolt is inclined and upwards arranged in the direction close to the supporting column, and the second bolt is in threaded fit with the supporting column.
Through adopting above-mentioned technical scheme, second bolt and support column screw-thread fit make butt joint board and support column be connected more firmly, and the second bolt is the setting of slope and makes the staff turn round tightly and loosen the operating space of second bolt bigger, convenient to detach and installation.
Preferably, a second washer is sleeved on the second bolt, and the second washer is located between the connecting block and the head of the second bolt; the first bolt is sleeved with a first washer, and the first washer is located between the longitudinal fixing plate and the head of the first bolt.
By adopting the technical scheme, the abutting area of the head of the first bolt and the longitudinal fixing plate is increased by the first washer, so that the locking degree of the first bolt is higher; the second washer increases the abutting area of the head of the second bolt and the connecting block, so that the locking degree of the second bolt is higher.
Preferably, the lower surface of the cross beam is provided with a dovetail groove along the length direction of the cross beam, and the top of the transverse fixing plate is provided with a dovetail block matched with the dovetail groove in a sliding manner.
Through adopting above-mentioned technical scheme, the cooperation of sliding of forked tail piece and dovetail makes the horizontal fixed plate be difficult for breaking away from the dovetail at the in-process that slides, and horizontal fixed plate removes more stably.
Preferably, the bottom of the supporting column is fixedly provided with a supporting seat.
Through adopting above-mentioned technical scheme, the setting up of supporting seat has increased the lifting surface area of support column for the support of support column is more stable.
Preferably, magnets which are mutually attracted are arranged between the bottom of the positioning block and the bottom of the positioning groove.
Through adopting above-mentioned technical scheme, utilize the mutual actuation effect of magnet for the ceiling can be firm fix on the support column.
To sum up, the utility model discloses following beneficial effect has:
1. when the steel framework is installed, the two installation blocks corresponding to the cross beam are inserted into the sliding groove in a sliding mode for splicing, and the cross beam and the support column are fixed through the connecting piece; the positioning blocks of the ceiling are inserted into the positioning grooves, and the ceiling is positioned at the top of the steel skeleton under the action of gravity, so that the splicing of the steel structure house is conveniently and quickly realized;
2. the arrangement of the rib plates strengthens the connection strength between the transverse fixing plate and the longitudinal fixing plate.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic view of the assembly relationship between the ceiling and the steel skeleton according to the embodiment of the present invention;
FIG. 3 is an enlarged view of portion A of FIG. 2;
fig. 4 is a schematic structural view of the embodiment of the present invention with the ceiling removed;
fig. 5 is a schematic view of an assembly relationship of the cross beam, the supporting column and the rib plate in the embodiment of the present invention.
In the figure: 1. a support pillar; 2. a cross beam; 3. a ceiling; 4. a supporting seat; 5. positioning a groove; 6. positioning blocks; 7. mounting blocks; 8. a butt joint plate; 81. a transverse fixing plate; 82. a longitudinal fixing plate; 9. a rib plate; 10. a chute; 11. a dovetail groove; 12. a dovetail block; 13. a first bolt; 14. a first gasket; 15. connecting blocks; 16. a second bolt; 17. a second gasket; 18. a magnet.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A spliced steel structure house, referring to fig. 1, comprises a ceiling 3 and a steel skeleton for supporting the ceiling 3. Specifically, the steel skeleton comprises four cuboid-shaped supporting columns 1 supported on the ground and a cross beam 2 transversely installed between the adjacent supporting columns 1, and the cross beam 2 is located at the upper ends of the supporting columns 1. Meanwhile, the bottom of the support column 1 is welded with a support seat 4. The setting of supporting seat 4 has increased the lifting surface area of support column 1 for support column 1's support is more stable.
Referring to fig. 2 and 3, a positioning groove 5 is formed at the top end of the supporting column 1, and positioning blocks 6 which are in plug-in fit with the positioning groove 5 are welded at four corners of the bottom of the ceiling 3. In addition, magnets 18 which are mutually attracted are arranged between the bottom of the positioning block 6 and the bottom of the positioning groove 5. The mutual attraction of the magnets 18 is utilized to ensure that the ceiling 3 can be firmly fixed on the supporting column 1.
Referring to fig. 4 and 5, the two opposite ends of the beam 2 are fixedly provided with the mounting blocks 7, the side walls of the supporting column 1 are provided with sliding grooves 10 for the mounting blocks 7 to be inserted and matched along the top, and the cross sections of the mounting blocks 7 and the sliding grooves 10 are in trapezoidal arrangement. In addition, a connecting piece for fixing the installation positions of the cross beam 2 and the supporting column 1 is installed between the supporting column 1 and the cross beam 2.
When the steel framework is installed, the two installation blocks 7 of the beam 2 are inserted into the sliding groove 10 in a sliding mode for splicing, and the beam 2 and the support column 1 are fixed through the connecting piece; peg graft in constant head tank 5 with the locating piece 6 of ceiling 3, ceiling 3 is fixed a position at the steel skeleton top under the effect of gravity to convenient and fast's realization steel house's concatenation. When steel house room is dismantled to needs, with the connecting piece unblock, simultaneously with ceiling 3, crossbeam 2 and support column 1 separate separately can to be convenient for steel house room's transport.
Specifically, the connecting piece includes that the longitudinal section is the butt plate 8 of L type, and the butt plate 8 slides along the length direction of crossbeam 2 and connects in the lower surface of crossbeam 2, and the butt plate 8 can cooperate with the lateral wall butt of support column 1, and screw-thread fit has first bolt 13 between butt plate 8 and the support column 1. When needing fixed cross beam 2 and support column 1, slide butt joint board 8 in support column 1, and then through first bolt 13 with butt joint board 8 and support column 1 fixed connection can.
Specifically, the abutting plate 8 includes a rectangular plate-shaped transverse fixing plate 81 and a rectangular plate-shaped longitudinal fixing plate 82 having one end connected to the transverse fixing plate 81, and the rib plate 9 is welded between the transverse fixing plate 81 and the longitudinal fixing plate 82. The arrangement of the rib 9 enhances the connection strength between the transverse fixing plate 81 and the longitudinal fixing plate 82.
Referring to fig. 5, the first bolt 13 is sleeved with the first washer 14, and the first washer 14 is located between the longitudinal fixing plate 82 and the head of the first bolt 13. The first washer 14 increases the abutting area of the head of the first bolt 13 with the longitudinal fixing plate 82, so that the first bolt 13 is locked more.
In addition, a dovetail groove 11 is formed in the lower surface of the cross beam 2 along the length direction of the cross beam, and a dovetail block 12 in sliding fit with the dovetail groove 11 is welded to the top of the transverse fixing plate 81. The sliding fit of the dovetail block 12 and the dovetail groove 11 makes the transverse fixing plate 81 not easy to separate from the dovetail groove 11 in the sliding process, and the transverse fixing plate 81 moves more stably.
Referring to fig. 5, two opposite side surfaces of the rib plate 9 are respectively and fixedly provided with a blocky connecting block 15, a second bolt 16 penetrates through the connecting block 15, the second bolt 16 is far away from the supporting column 1 along the head part, the bottom part of the second bolt is inclined and upwards arranged in the direction close to the supporting column 1, and the second bolt 16 is in threaded fit with the supporting column 1. Second bolt 16 and support column 1 screw-thread fit make butt plate 8 be connected more firmly with support column 1, and second bolt 16 is the setting of slope and makes the staff turn round tight and loosen the operating space of second bolt 16 bigger, convenient to detach and installation.
Meanwhile, the second bolt 16 is sleeved with a second washer 17, and the second washer 17 is located between the connecting block 15 and the head of the second bolt 16. The second washer 17 increases the abutting area of the head of the second bolt 16 with the connecting block 15, so that the locking degree of the second bolt 16 is higher.
The above embodiments are merely illustrative of the present invention, and are not intended to limit the present invention, and those skilled in the art can make modifications of the present embodiments without inventive contribution as required after reading the present specification, but all the embodiments are protected by patent law within the scope of the present invention.
Claims (8)
1. The utility model provides a concatenation formula steel house room, includes ceiling (3) and is used for supporting the steel skeleton of ceiling (3), characterized by: the steel skeleton comprises four supporting columns (1) supported on the ground and a cross beam (2) transversely arranged between the adjacent supporting columns (1), and the cross beam (2) is positioned at the upper ends of the supporting columns (1); the top of support column (1) is equipped with constant head tank (5), the bottom of ceiling (3) be equipped with constant head tank (5) grafting complex locating piece (6), the relative both ends of crossbeam (2) are equipped with installation piece (7), and the lateral wall of support column (1) runs through along the top and has the confession installation piece (7) grafting complex spout (10), support column (1) with be equipped with the connecting piece that is used for fixed cross beam (2) and support column (1) mounted position between crossbeam (2).
2. The spliced steel structure house as claimed in claim 1, wherein: the connecting piece includes that longitudinal section is butt joint board (8) of L type, butt joint board (8) slide along the length direction of crossbeam (2) and connect in the lower surface of crossbeam (2), the lateral wall butt cooperation of butt joint board (8) and support column (1), screw-thread fit has first bolt (13) between butt joint board (8) and support column (1).
3. The spliced steel structure house as claimed in claim 2, wherein: butt joint board (8) are including horizontal fixed plate (81) and longitudinal fixing plate (82) that one end links to each other with horizontal fixed plate (81), it is provided with floor (9) to fix between horizontal fixed plate (81) and longitudinal fixing plate (82).
4. A sectional steel house according to claim 3, wherein: the two opposite side faces of the rib plate (9) are respectively provided with a connecting block (15), a second bolt (16) penetrates through the connecting block (15), the second bolt (16) is far away from the supporting column (1) along the head of the second bolt, the bottom of the second bolt is inclined and upwards arranged in the direction close to the supporting column (1), and the second bolt (16) is in threaded fit with the supporting column (1).
5. The spliced steel structure house as claimed in claim 4, wherein: a second washer (17) is sleeved on the second bolt (16), and the second washer (17) is positioned between the connecting block (15) and the head of the second bolt (16); a first washer (14) is sleeved on the first bolt (13), and the first washer (14) is located between the longitudinal fixing plate (82) and the head of the first bolt (13).
6. The spliced steel structure house as claimed in claim 5, wherein: the lower surface of the cross beam (2) is provided with a dovetail groove (11) along the length direction, and the top of the transverse fixing plate (81) is provided with a dovetail block (12) which is matched with the dovetail groove (11) in a sliding manner.
7. The spliced steel structure house as claimed in claim 1, wherein: the bottom of the support column (1) is fixedly provided with a support seat (4).
8. The spliced steel structure house as claimed in claim 1, wherein: and magnets (18) which are mutually attracted are arranged between the bottom of the positioning block (6) and the bottom of the positioning groove (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822228344.4U CN209817093U (en) | 2018-12-27 | 2018-12-27 | Concatenation formula steel house room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822228344.4U CN209817093U (en) | 2018-12-27 | 2018-12-27 | Concatenation formula steel house room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209817093U true CN209817093U (en) | 2019-12-20 |
Family
ID=68870095
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822228344.4U Active CN209817093U (en) | 2018-12-27 | 2018-12-27 | Concatenation formula steel house room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209817093U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111411690A (en) * | 2020-04-29 | 2020-07-14 | 昌大建筑科技有限公司 | Structure system capable of being assembled quickly and construction method thereof |
CN111441473A (en) * | 2020-04-02 | 2020-07-24 | 湖北工业大学 | Light steel keel energy-saving building and construction method thereof |
CN112177155A (en) * | 2020-09-16 | 2021-01-05 | 飞帆集团有限公司 | Steel skeleton structure and welding process thereof |
CN112554333A (en) * | 2020-12-12 | 2021-03-26 | 深圳新艺华建筑装饰工程有限公司 | Assembled wood-like building and steel-wood connecting structure thereof |
CN114215389A (en) * | 2021-12-23 | 2022-03-22 | 中国建筑土木建设有限公司 | Structure is built in quick detachable interim room |
CN114704140A (en) * | 2022-03-31 | 2022-07-05 | 合肥巍华智能停车设备有限公司 | But cast member stereo garage support body of modularization equipment |
CN115370006A (en) * | 2022-09-30 | 2022-11-22 | 湖南金格建筑科技有限公司 | Steel construction that assembled building has quick mosaic structure |
-
2018
- 2018-12-27 CN CN201822228344.4U patent/CN209817093U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111441473A (en) * | 2020-04-02 | 2020-07-24 | 湖北工业大学 | Light steel keel energy-saving building and construction method thereof |
CN111411690A (en) * | 2020-04-29 | 2020-07-14 | 昌大建筑科技有限公司 | Structure system capable of being assembled quickly and construction method thereof |
CN112177155A (en) * | 2020-09-16 | 2021-01-05 | 飞帆集团有限公司 | Steel skeleton structure and welding process thereof |
CN112554333A (en) * | 2020-12-12 | 2021-03-26 | 深圳新艺华建筑装饰工程有限公司 | Assembled wood-like building and steel-wood connecting structure thereof |
CN114215389A (en) * | 2021-12-23 | 2022-03-22 | 中国建筑土木建设有限公司 | Structure is built in quick detachable interim room |
CN114704140A (en) * | 2022-03-31 | 2022-07-05 | 合肥巍华智能停车设备有限公司 | But cast member stereo garage support body of modularization equipment |
CN114704140B (en) * | 2022-03-31 | 2024-06-04 | 合肥巍华智能停车设备有限公司 | Cast member stereo garage frame body capable of being assembled in modularized mode |
CN115370006A (en) * | 2022-09-30 | 2022-11-22 | 湖南金格建筑科技有限公司 | Steel construction that assembled building has quick mosaic structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209817093U (en) | Concatenation formula steel house room | |
CN211774523U (en) | Prefabricated building that can build temporarily | |
CN211172383U (en) | Stable beam column connected node | |
CN104912190A (en) | Dry type joggle frame structure | |
CN108894339B (en) | Clamping tenon type connecting device of modular unit intermediate column node | |
CN104775517A (en) | Connecting node for steel frame and steel structure module | |
KR101149602B1 (en) | Apparatus and method for combining between unit modules | |
CN210597866U (en) | Steel construction assembled wallboard | |
CN204001219U (en) | Movable plank house assembly type beam column linkage | |
KR20150055497A (en) | Modular unit having socket connector, Modular unit structure using the same and Construction method of modular unit structure | |
CN204080843U (en) | Movable plank house foundation structure | |
CN104674949A (en) | Portable shelter | |
CN212689312U (en) | Assembled external wallboard | |
CN204456438U (en) | Prefabricated house | |
CN105369890A (en) | Earthquake-proof folk house steel framework and installation method thereof | |
CN216517187U (en) | A BIM assembled antidetonation shear force wall for residential building engineering | |
CN212865961U (en) | Detachable building foundation pit supporting beam | |
CN210562620U (en) | Inserting-mortise connection prefabricated assembly type steel frame structure | |
CN202359665U (en) | Stay-cable steel-beam and steel-pipe column mixed node | |
KR102574317B1 (en) | Frame Overlaid System for Prefabricated Buildings | |
CN210636601U (en) | Tenon fourth of twelve earthly branches structure that can be on steel construction | |
KR102224796B1 (en) | Precast Concrete Modualr Structure | |
CN110656697B (en) | Connection node of assembled concrete frame beam column | |
CN203546908U (en) | Assembly type building wall beam stable connection structure | |
CN201722846U (en) | Assembled board house pillar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 211529 Duanzhuang 500, Changshan Community, Jinniuhu Street, Liuhe District, Nanjing City, Jiangsu Province Patentee after: China Railway Steel Structure Co.,Ltd. Address before: 211529 Duanzhuang 500, Changshan Community, Jinniuhu Street, Liuhe District, Nanjing City, Jiangsu Province Patentee before: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP STEEL STRUCTURE Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |