CN209815578U - Adaptive supporting device for building pipeline installation - Google Patents

Adaptive supporting device for building pipeline installation Download PDF

Info

Publication number
CN209815578U
CN209815578U CN201920469713.0U CN201920469713U CN209815578U CN 209815578 U CN209815578 U CN 209815578U CN 201920469713 U CN201920469713 U CN 201920469713U CN 209815578 U CN209815578 U CN 209815578U
Authority
CN
China
Prior art keywords
fixedly connected
rod
base
pipeline installation
helical gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920469713.0U
Other languages
Chinese (zh)
Inventor
李存梅
丁雨薇
昂胜华
武昌锁
丁忠武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Meiweitao Electronic Technology Co Ltd
Original Assignee
Hefei Meiweitao Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Meiweitao Electronic Technology Co Ltd filed Critical Hefei Meiweitao Electronic Technology Co Ltd
Priority to CN201920469713.0U priority Critical patent/CN209815578U/en
Application granted granted Critical
Publication of CN209815578U publication Critical patent/CN209815578U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a piping erection technical field just discloses a building is adaptability strutting arrangement for piping erection, the on-line screen storage device comprises a base, the upper end center department of base rotates through ball bearing and is connected with a screw thread section of thick bamboo, the fixed driven helical gear that has cup jointed of lower extreme outer wall of a screw thread section of thick bamboo, the upper end of base is fixedly connected with bearing frame still, rotate through ball bearing in the bearing frame and be connected with the bull stick, the one end fixedly connected with and the driven helical gear engaged's of bull stick initiative helical gear, the other end fixedly connected with deflection pole of bull stick, the one end lateral wall that the bull stick was kept away from to the deflection pole is rotated through the pivot and is connected with the footboard, screw thread section of thick bamboo female connection has lifting. The utility model discloses can be applicable to the pipeline support of not unidimensional size, do not need electric power can be quick convenient realization to the adjustment of device height, convenient to use.

Description

Adaptive supporting device for building pipeline installation
Technical Field
The utility model relates to a piping erection technical field especially relates to a building is adaptability strutting arrangement for piping erection.
Background
Partial pipeline in the building need install at the floor top, need be connected fixedly and fix on the building with the anterior segment in proper order when the installation, when being connected fixedly with the anterior segment and fix before on the building body, mostly all lift by the artifical instrument such as with the help of scaffold frame, nevertheless because pipeline overlength and overweight lead to the working strength that the manual work bore too big, take place danger easily and inefficiency.
Through retrieval, the patent with patent application publication No. CN 108793001A provides an auxiliary device for building pipeline installation, which comprises a base, universal wheels are arranged at four corners of the bottom of the base, an electric telescopic rod is arranged at the top end of the base, the bottom end of the electric telescopic rod is fixedly connected with the surface of the base, a supporting plate is arranged at the top end of the electric telescopic rod, the bottom end of the supporting plate is fixedly connected with the top end of the electric telescopic rod, a clamping device is arranged at the top end of the supporting plate, the bottom end of the fixing shell is fixedly connected with the top end of the supporting plate, grooves are arranged at two sides of the inner wall of the fixing shell, sliding blocks are arranged in the grooves, a spring is arranged at one side of each sliding block, one end of the spring is fixedly connected with one side of each sliding block, the other end of the spring is fixedly connected with, the form of the fixed shell of this patent is fixed, can not adjust according to the size of pipeline, and application scope is limited, and carries out adjusting device's height through electric telescopic handle, and the power is not convenient for look for in-process of piping erection, uses comparatively inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the form of the set casing among the prior art and fixing, can not adjust according to the size of pipeline, application scope is limited, and carries out adjusting device's height through electric telescopic handle, and the power is not convenient for look for to the in-process of piping erection, uses comparatively inconvenient problem, and the building adaptability strutting arrangement for piping erection that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an adaptive supporting device for building pipeline installation comprises a base, wherein the center of the upper end of the base is rotatably connected with a threaded cylinder through a ball bearing, the outer wall of the lower end of the threaded cylinder is fixedly sleeved with a driven helical gear, the upper end of the base is also fixedly connected with a bearing seat, a rotating rod is rotatably connected in the bearing seat through the ball bearing, one end of the rotating rod is fixedly connected with a driving helical gear meshed with the driven helical gear, the other end of the rotating rod is fixedly connected with a deflection rod, the side wall of one end, away from the rotating rod, of the deflection rod is rotatably connected with a pedal through a rotating shaft, a lifting screw rod is in threaded connection with the threaded cylinder, a lifting plate is fixedly connected at the upper end of the lifting screw rod, the left side and the right side of the upper end of the lifting plate are fixedly connected with open square cylinders, and two L, the horizontal part of L shape splint passes through block mechanism and fixed square barrel joint, the vertical wall of L shape splint has the clamp plate through a plurality of extrusion spring fixedly connected with.
Preferably, the rod wall of the rotating rod and the surface of the base are symmetrically provided with limiting pin holes and fixed through limiting pin column bolts.
Preferably, a binding band is fixedly connected to the surface of the pedal.
Preferably, the four corners of the bottom of the base are fixedly connected with universal wheels.
Preferably, a plurality of limiting telescopic rods are symmetrically and fixedly connected between the lower end of the lifting plate and the upper end of the base.
Preferably, block mechanism is including seting up the recess at fixed square barrel inner wall, the tank bottom of recess passes through thrust spring fixedly connected with gag lever post, the spacing groove that corresponds with the gag lever post is seted up to the horizontal part of L shape splint, the one end fixedly connected with pull rod that the gag lever post is located the recess, the one end that the gag lever post was kept away from to the pull rod stretches out the outer and fixedly connected with arm-tie of fixed square barrel through the through-hole, the fixed surface of arm-tie is connected with the stay cord.
Preferably, a plurality of ball grooves are formed in the upper end of the fixed square barrel and the side wall of the pressing plate, and universal balls are fixedly connected in the ball grooves through ball mounting mechanisms.
Compared with the prior art, the utility model provides a building is adaptability strutting arrangement for piping erection possesses following beneficial effect:
1. this building is adaptability strutting arrangement for piping erection, through L shape splint and the fixed square tube that is equipped with, place the pipeline on the fixed square tube, adjust the relative position between two L shape splint, make the gag lever post aim at the spacing groove nearby after removing suitable position, thrust spring promotes the gag lever post, release the gag lever post outside the recess and make gag lever post and spacing groove block can realize the firm spacing to L shape splint, can be applicable to not unidimensional pipeline support, application scope is wide, and when the position of L shape splint is adjusted once more to needs, through stay cord pulling arm-tie, utilize the pull rod to pull out the relative spacing to L shape splint can be relieved outside the spacing groove with the gag lever post, and the operation is simple and convenient, and convenient to use.
2. This building is adaptability strutting arrangement for piping erection, footboard through being equipped with, the footboard is trampled to the height of holding as required, the footboard drives the deflection pole and rotates and then drives the bull stick and rotate, and then drive the rotation of initiative helical gear, the meshing effect that utilizes initiative helical gear and driven helical gear drives a screw thread section of thick bamboo and rotates, the relative limiting displacement who utilizes a screw thread section of thick bamboo and lifting screw's threaded connection effect and spacing telescopic link makes lifting screw promote the lifter plate and goes up the pipeline and promote to the height that needs, the grafting cooperation of spacing pinhole of rethread and spacing round pin post realizes the firm spacing to the bull stick, do not need electric power can be quick convenient realization to the adjustment of device height, and convenient use.
3. This building is adaptability strutting arrangement for piping erection promotes the clamp plate through the extrusion spring that is equipped with and can carry out more firm centre gripping and can make the slip of pipeline more smooth and easy through the universal ball that is equipped with to the pipeline, and the going on of the piping erection work of being convenient for.
And the part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses can be applicable to the pipeline support of different sizes, do not need electric power can be quick convenient realization to the adjustment of device height, convenient to use.
Drawings
Fig. 1 is a schematic structural view of an adaptive support device for building pipeline installation according to the present invention;
fig. 2 is the utility model provides a building is structural schematic that adaptive support device's fixed square cylinder and L-shaped clamp plate are connected for piping erection.
In the figure: the device comprises a base 1, a threaded cylinder 2, a driven bevel gear 3, a bearing seat 4, a rotating rod 5, a driving bevel gear 6, a deflection rod 7, a pedal 8, a lifting screw 9, a lifting plate 10, a fixed square cylinder 11, a 12L-shaped clamping plate 13, an extrusion spring 14, a pressing plate 15, a limit pin hole 16, a limit pin column 17, a universal wheel 17, a groove 18, a thrust spring 19, a limit rod 20, a limit groove 21, a pull rod 22 and a pull plate 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, an adaptive supporting device for building pipeline installation comprises a base 1, a threaded cylinder 2 is rotatably connected to the center of the upper end of the base 1 through a ball bearing, a driven helical gear 3 is fixedly sleeved on the outer wall of the lower end of the threaded cylinder 2, a bearing seat 4 is also fixedly connected to the upper end of the base 1, a rotating rod 5 is rotatably connected to the inside of the bearing seat 4 through a ball bearing, a driving helical gear 6 meshed with the driven helical gear 3 is fixedly connected to one end of the rotating rod 5, a deflection rod 7 is fixedly connected to the other end of the rotating rod 5, a pedal 8 is rotatably connected to the side wall of the deflection rod 7, which is far away from the rotating rod 5, a lifting screw 9 is in threaded connection with the inside of the threaded cylinder 2, a lifting plate 10 is fixedly connected to the upper end of the lifting screw 9, a fixed square cylinder 11 with an opening is fixedly connected to the left side and the right side, the horizontal part of L shape splint 12 passes through block mechanism and fixed square barrel 11 joint, and the vertical wall of L shape splint 12 has clamp plate 14 through a plurality of extrusion spring 13 fixedly connected with.
The rod wall of the rotating rod 5 and the surface of the base 1 are symmetrically provided with limit pin holes 15 and are fixed through limit pins 16.
The surface of the pedal 8 is fixedly connected with a binding belt.
The bottom four corners of the base 1 are fixedly connected with universal wheels 17.
A plurality of limiting telescopic rods are symmetrically and fixedly connected between the lower end of the lifting plate 10 and the upper end of the base 1.
The clamping mechanism comprises a groove 18 formed in the inner wall of the fixed square barrel 11, a limiting rod 20 is fixedly connected to the bottom of the groove 18 through a thrust spring 19, a limiting groove 21 corresponding to the limiting rod 20 is formed in the horizontal portion of the L-shaped clamp plate 12, the limiting rod 20 is located in the groove 18, a pull rod 22 is fixedly connected to one end of the pull rod 22, which is far away from the limiting rod 20, the pull plate 23 is fixedly connected to the outer portion of the fixed square barrel 11 through a through hole, and a pull rope is fixedly connected to the surface of the pull plate 23.
A plurality of ball grooves are formed in the upper end of the fixed square barrel 11 and the side wall of the pressing plate 14, universal balls 24 are fixedly connected in the ball grooves through ball mounting mechanisms, and the ball mounting mechanisms are in the prior art and are not described in detail herein.
In the utility model, when in use, the pipeline is placed on the fixed square tube 11 through the L-shaped clamp plates 12 and the fixed square tube 11, the relative position between the two L-shaped clamp plates 12 is adjusted, the limiting rod 20 is aligned to the nearby limiting groove 21 after moving to a proper position, the thrust spring 19 pushes the limiting rod 20, the limiting rod 20 is pushed out of the groove 18 and the limiting rod 20 is clamped with the limiting groove 21 to realize the stable limiting of the L-shaped clamp plates 12, the pipeline support device can be suitable for pipeline support with different sizes, the application range is wide, when the position of the L-shaped clamp plates 12 needs to be adjusted again, the pull plate 23 is pulled through the pull rope, the limiting rod 20 is pulled out of the limiting groove 21 by the pull rod 22 to remove the relative limiting of the L-shaped clamp plates 12, the operation is simple and convenient, the use is convenient, the pedal 8 is trampled according to the height required, the pedal 8 drives the deflection rod 7 to rotate so as to drive the rotating rod 5 to rotate, and then drive initiative helical gear 6 and rotate, the meshing that utilizes initiative helical gear 6 and driven helical gear 3 drives a screw thread section of thick bamboo 2 and rotates, utilize screw thread section of thick bamboo 2 and lifting screw 9's threaded connection effect and spacing telescopic link's relative limiting displacement to make lifting screw 9 promote the riser 10 and go up the descending pipeline and promote to the height that needs, the grafting cooperation realization of rethread spacing pinhole 15 and spacing round pin post 16 is spacing to the firm of bull stick 5, do not need electric power can be fast convenient realization to the adjustment of device height, and convenient to use, it can make the slip of pipeline more smooth and easy to carry out more firm centre gripping and through the universal ball that is equipped with to the pipeline to promote clamp plate 14 through the extrusion spring 13 that is equipped with, the pipeline installation work of being convenient for goes.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. An adaptive supporting device for building pipeline installation comprises a base (1) and is characterized in that the center of the upper end of the base (1) is rotatably connected with a threaded cylinder (2) through a ball bearing, a driven helical gear (3) is fixedly sleeved on the outer wall of the lower end of the threaded cylinder (2), a bearing seat (4) is fixedly connected to the upper end of the base (1), a rotating rod (5) is rotatably connected to the inside of the bearing seat (4) through the ball bearing, a driving helical gear (6) meshed with the driven helical gear (3) is fixedly connected to one end of the rotating rod (5), a deflection rod (7) is fixedly connected to the other end of the rotating rod (5), a pedal (8) is rotatably connected to the side wall of one end, far away from the rotating rod (5), of the deflection rod (7), a lifting screw (9) is connected to the inner thread of the threaded cylinder (2), and a lifting plate (10) is fixedly connected to the, the utility model discloses a lifter plate, including lifter plate (10), L shape splint (12) and L shape splint (12), the upper end fixedly connected with left and right sides of lifter plate (10) is established to open-ended fixed square tube (11), two sliding connection L shape splint (12) in fixed square tube (11) interior symmetry activity have been cup jointed, the horizontal part of L shape splint (12) passes through block mechanism and fixed square tube (11) joint, the vertical wall of L shape splint (12) is through a plurality of extrusion spring (13) fixedly connected with clamp plate (14).
2. The adaptive support device for building pipeline installation according to claim 1, wherein the rod wall of the rotating rod (5) and the surface of the base (1) are symmetrically provided with limit pin holes (15) and are fixed through limit pin columns (16) in a plug-in manner.
3. The adaptive support device for building pipeline installation according to claim 1, wherein a binding band is fixedly connected to the surface of the pedal (8).
4. The adaptive support device for building pipeline installation according to claim 1, wherein universal wheels (17) are fixedly connected to four corners of the bottom of the base (1).
5. The adaptive support device for building pipeline installation according to claim 1, wherein a plurality of limiting telescopic rods are symmetrically and fixedly connected between the lower end of the lifting plate (10) and the upper end of the base (1).
6. The adaptive support device for building pipeline installation according to claim 1, wherein the clamping mechanism comprises a groove (18) formed in the inner wall of the fixed square tube (11), a limit rod (20) is fixedly connected to the bottom of the groove (18) through a thrust spring (19), a limit groove (21) corresponding to the limit rod (20) is formed in the horizontal portion of the L-shaped clamp plate (12), the limit rod (20) is located in the groove (18), one end of the pull rod (22) far away from the limit rod (20) extends out of the fixed square tube (11) through a through hole and is fixedly connected with a pull plate (23), and a pull rope is fixedly connected to the surface of the pull plate (23).
7. The adaptive supporting device for building pipeline installation according to claim 1, wherein a plurality of ball grooves are formed in the upper end of the fixed square tube (11) and the side wall of the pressing plate (14), and universal balls (24) are fixedly connected in the ball grooves through ball mounting mechanisms.
CN201920469713.0U 2019-04-09 2019-04-09 Adaptive supporting device for building pipeline installation Expired - Fee Related CN209815578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920469713.0U CN209815578U (en) 2019-04-09 2019-04-09 Adaptive supporting device for building pipeline installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920469713.0U CN209815578U (en) 2019-04-09 2019-04-09 Adaptive supporting device for building pipeline installation

Publications (1)

Publication Number Publication Date
CN209815578U true CN209815578U (en) 2019-12-20

Family

ID=68879142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920469713.0U Expired - Fee Related CN209815578U (en) 2019-04-09 2019-04-09 Adaptive supporting device for building pipeline installation

Country Status (1)

Country Link
CN (1) CN209815578U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109911810A (en) * 2019-04-09 2019-06-21 合肥梅薇涛电子科技有限公司 A kind of building Pipe installing adaptability support device
CN111255990A (en) * 2020-03-11 2020-06-09 浙江省肿瘤医院 Medical equipment strutting arrangement
CN111646392A (en) * 2020-06-16 2020-09-11 湖南生物机电职业技术学院 Complex crane
CN111945744A (en) * 2020-08-20 2020-11-17 张涛 Connecting structure of foundation pit stand column and foundation pit bidirectional support

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109911810A (en) * 2019-04-09 2019-06-21 合肥梅薇涛电子科技有限公司 A kind of building Pipe installing adaptability support device
CN111255990A (en) * 2020-03-11 2020-06-09 浙江省肿瘤医院 Medical equipment strutting arrangement
CN111646392A (en) * 2020-06-16 2020-09-11 湖南生物机电职业技术学院 Complex crane
CN111646392B (en) * 2020-06-16 2021-05-25 湖南生物机电职业技术学院 Complex crane
CN111945744A (en) * 2020-08-20 2020-11-17 张涛 Connecting structure of foundation pit stand column and foundation pit bidirectional support
CN111945744B (en) * 2020-08-20 2021-12-17 中铁二十一局集团路桥工程有限公司 Connecting structure of foundation pit stand column and foundation pit bidirectional support

Similar Documents

Publication Publication Date Title
CN209815578U (en) Adaptive supporting device for building pipeline installation
CN109911810A (en) A kind of building Pipe installing adaptability support device
CN109184233B (en) Be used for assembled building element to place connection structure
CN109958847A (en) A kind of regulating device of research and development of software computer display screen
CN113503043B (en) Assembly type building installation equipment
CN217201621U (en) Be used for generating set installation overhead hoist
CN207608239U (en) A kind of handling machine support of adjustable angle
CN112589195A (en) Multimedia platform box body thin plate shaping, conveying, clamping and cutting device
CN108995694B (en) Wide-mouth flowerpot carrying device based on six-face clamping and lifting
CN211594825U (en) Portable release mechanism of small-size ROV
CN213629736U (en) Stable camera support for news dissemination
CN212038799U (en) Dorsal muscle trainer for physical training
CN211962194U (en) Support is used in anesthesia with adjustable rotatory gesture
CN112520556A (en) Building hoisting device
CN215908741U (en) Electromechanical device installation adjusting device that installation accuracy is high
CN211559590U (en) Cash desk with operation computer altitude mixture control function
CN217914901U (en) Differential mechanism casing centre gripping positioner
CN216201126U (en) Adjustable pipeline bracket
CN219798402U (en) Steel structure detector
CN211594533U (en) Cable erecting device for building electromechanical installation
CN217420502U (en) Improved tool for reinforcing beam mold
CN221095980U (en) But bracing piece of quick adjustment
CN218668604U (en) Template is accepted to outer wall seam
CN216190472U (en) Fixing frame for crane
CN215335908U (en) Adjustable lamp pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191220

Termination date: 20210409

CF01 Termination of patent right due to non-payment of annual fee