CN209799566U - Fence for building construction - Google Patents

Fence for building construction Download PDF

Info

Publication number
CN209799566U
CN209799566U CN201920277100.7U CN201920277100U CN209799566U CN 209799566 U CN209799566 U CN 209799566U CN 201920277100 U CN201920277100 U CN 201920277100U CN 209799566 U CN209799566 U CN 209799566U
Authority
CN
China
Prior art keywords
base
passageway
fender
enclose
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920277100.7U
Other languages
Chinese (zh)
Inventor
胡安保
陈玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rescue Team Of Hebi Coal Power Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920277100.7U priority Critical patent/CN209799566U/en
Application granted granted Critical
Publication of CN209799566U publication Critical patent/CN209799566U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a construction encloses fender guardrail, enclose fender base and fender board including mutually supporting, the fender board top is provided with shower head and warning light, enclose and set up two vertical mounting holes on the fender base, enclose the vertical direction that keeps off the base and seted up cable channel and water pipe passageway, enclose the bottom that keeps off the base and seted up the basin, the inside first vertical passageway and the vertical passageway of second of having seted up of fender board, first vertical passageway and the vertical passageway of second pass fixing base and division board and be linked together with cable channel and water pipe passageway respectively, the delivery pipe passes water pipe passageway in proper order, first vertical passageway links to each other with the shower head, the cable passes cable channel in proper order, the vertical passageway of second links to each other with the warning light. The utility model discloses not only install convenient, reuse rate high, in addition when carrying out water and electricity protection, practiced thrift the preparation material that encloses the fender base and enclose the baffle ingeniously, greatly improved the security performance that traditional construction enclosed the fender guardrail, fully ensured construction safety and traffic safety.

Description

Fence for building construction
Technical Field
The utility model relates to a rail guard technical field especially indicates a construction encloses fender guardrail.
Background
According to the requirements of the construction engineering construction site management regulations, the enclosure of the construction site must be continuously arranged along the periphery of the construction site without gaps; the enclosure is firm, stable, tight, neat and beautiful; height of the enclosure: the main road section in the urban area is not lower than 2.5 meters, and the general road section is not lower than 1.8 meters.
Local relevant government departments at the sites of the projects have relevant regulations and specific requirements, and the regulations of the local relevant government departments are more basic requirements of 'safe and civilized construction sites' from the aspects of city appearance and environment. The purpose of the fence setting of the construction site is safety, theft prevention, fire prevention and good management of the construction site. At present, the fender is enclosed in the construction site generally adopts PVC to enclose fender, PVC + galvanized iron wire net enclose fender, the various steel sheet of sandwich foam encloses fender, galvanized iron wire net encloses fender, the various steel sheet of die mould encloses fender, galvanized steel sheet encloses the fender. No matter what kind of enclose fender more than using, all need set up and enclose fender steel pipe support, enclose the fender and set up the back that finishes, the interim water and electricity of building site must be under construction in step, just so can carry out the construction. But the fence guardrail is not only complicated to set up, but also is free in water and electricity network laying, lacks protective measures and has great potential safety hazard.
Through the retrieval, the utility model patent of current application number CN201620362215.2, application date 2016.04.26 discloses a multi-functional fender base structure that encloses: the device comprises a base which is detachably fixed on a hardened road surface, wherein the top of the base is provided with a mounting interface which is detachably fixed with a surrounding barrier, and the outer side surface of the base is also used as a foot baffle plate; a channel for placing a cable or a pipeline is arranged in the base along the length direction of the base. The utility model discloses an although the built-in passageway of placing cable or pipeline that has, the passageway only is located the base, and fixed enclose to keep off and lay cable and pipeline on can't standardizing, fixed enclose keep off the inboard for the job site of complicacy, the outside be traffic route, and external cable and pipeline still have very big potential safety hazard. In addition, the base is of a continuous closed structure, which not only consumes manufacturing materials, but also is heavy in weight and inconvenient to transport. The utility model discloses a waterproof function still does not possess, especially in rainy season, the base can obstruct ground rivers, leads to serious traffic surface ponding and building site ponding.
SUMMERY OF THE UTILITY MODEL
not enough to among the above-mentioned background art, the utility model provides a fender guardrail is enclosed in construction has solved current construction and has enclosed the technical problem that keeps off guardrail security performance is low, easy ponding.
The technical scheme of the utility model is realized like this: the utility model provides a construction encloses fender guardrail, encloses and keeps off base and enclosure baffle including mutually supporting, is provided with shower head and warning light above the enclosure baffle, the longitudinal section that encloses the fender base is isosceles trapezoid, encloses to keep off and has seted up two vertical mounting holes on the base, encloses the longitudinal direction that keeps off the base and has seted up cable channel and water pipe passageway, and cable channel and water pipe passageway are located the both sides of mounting hole respectively, encloses the bottom of keeping off the base and has seted up the basin, enclosure baffle is inside to have seted up first vertical passageway and second vertical passageway, and the enclosure baffle includes fixing base and division board, and the division board is fixed to be set up in the top of fixing base, and the fixing base below is provided with the spliced pole with the mounting hole grafting cooperation, first vertical passageway and second vertical passageway pass fixing base and division board and are linked together with cable channel and water pipe passageway respectively, and the delivery pipe passes water pipe passageway, The first vertical channel is connected with the spray header, and the cable sequentially penetrates through the cable channel and the second vertical channel to be connected with the warning lamp.
The division board includes the various steel casing of hollow, and the inboard packing of various steel casing has the fireproof cotton, the outside packing has the puigging, first vertical passageway and the vertical passageway of second all are located between fireproof cotton and the puigging.
The water passing grooves are symmetrically arranged at the bottom end of the enclosure base, and correspond to the mounting holes.
The length of the insertion column is larger than the depth of the mounting hole and smaller than the height of the enclosure base.
The water passing tank is provided with two filter screens which are symmetrically clamped on two sides of the water passing tank.
The two mounting holes comprise a first mounting hole and a second mounting hole, the first mounting hole is communicated with the cable channel, and the second mounting hole is communicated with the water pipe channel.
The adjacent enclosure bases are connected through steel pipes, and two ends of each steel pipe are respectively inserted into the cable channel and the water pipe channel of the adjacent enclosure bases.
The front end face and the rear end face of each isolation plate are respectively provided with a reinforcing connecting column and a connecting hole, and adjacent isolation plates are matched with the connecting holes through the reinforcing connecting columns.
The utility model discloses not only install convenient, reuse rate high, in addition when carrying out water and electricity protection, practiced thrift the preparation material that encloses the fender base and enclose the baffle ingeniously, greatly improved the security performance that traditional construction enclosed the fender guardrail, fully ensured construction safety and traffic safety. In addition, the water passing groove is arranged, so that accumulated water is avoided, and the construction safety and the smooth traffic are further guaranteed. Due to the arrangement of the filter screen, the relative isolation effect between the construction site and the outside is guaranteed, and the construction waste is prevented from entering the outside road or entering the construction site while the rainwater is prevented from flowing smoothly. The structure that cable channel and water pipe passageway kept apart each other has further ensured construction safety, avoids leaking and influences the normal operating of circuit, has also avoided the electric leakage and influences the normal clear that sprays. The special design of division board can enough play the fire prevention effect, can strengthen the sound insulation effect again, has fully guaranteed job site and external safety isolation. The steel pipe is arranged, so that the reliability of connection between the enclosing and blocking bases is fully guaranteed, the normal use of a water pipe channel and a cable channel is not influenced, and the arrangement of other connection matching structures on the enclosing and blocking bases is avoided. Strengthen spliced pole and connecting hole with the steel pipe combined action has both guaranteed to enclose the fastening nature of connecting between the baffle, has strengthened again and has enclosed the wholeness that keeps off the pedestal connection.
Drawings
In order to illustrate the embodiments of the present invention more clearly, the drawings that are needed in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and that other drawings can be obtained by those skilled in the art without inventive work.
Fig. 1 is a schematic top view of the present invention;
FIG. 2 is a schematic sectional view taken along the line A-A in FIG. 1;
FIG. 3 is an enlarged view at C of FIG. 2;
FIG. 4 is a schematic cross-sectional view taken along the line B-B in FIG. 1;
FIG. 5 is an enlarged view taken at D in FIG. 2;
FIG. 6 is a schematic structural view of a fence base;
FIG. 7 is a cross-sectional view of the enclosure base;
fig. 8 is a schematic view of the assembly position of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1-8, embodiment 1, a fence for building construction includes fence bases 1 and fence plates 2 that are mutually matched, where the fence bases 1 are mutually connected to form a fence base, and the fence plates 2 are inserted and fixed on the fence bases 1 to form a fence. Baffle 2 top is provided with shower head 3 and warning light 4, and shower head 3 is used for removing dust the watering to the inboard construction place of fender guardrail, and warning light 4 can play the warning effect to pedestrian, the vehicle that keeps off the guardrail outside and the inboard workman of fender guardrail night, makes people notice safe current carefully and construction carefully.
The longitudinal section of the enclosure base 1 is isosceles trapezoid, a first mounting hole 1-1 and a second mounting hole 1-2 are formed in the enclosure base 1, and the first mounting hole 1-1 and the second mounting hole 1-2 are respectively located at trisection positions of the enclosure base 1. The enclosure base 1 is provided with a cable channel 1-3 and a water pipe channel 1-4 in the longitudinal direction, the first mounting hole 1-1 is communicated with the cable channel 1-3, and the second mounting hole 1-2 is communicated with the water pipe channel 1-4. The bottom of the enclosure base 1 is provided with two water passing grooves 1-5, the two water passing grooves 1-5 are symmetrically arranged, and the two water passing grooves 1-5 correspond to the first mounting hole 1-1 and the second mounting hole 1-2 respectively. The lengths of the first inserting column 2-5 and the second inserting column 2-6 are larger than the depth of the first mounting hole 1-1 and smaller than the height of the enclosure base 1. Therefore, the stability of the baffle 2 is ensured, and the water passing grooves 1-5 are not influenced to conveniently pass water.
the enclosure baffle 2 is internally provided with a first vertical channel 2-1 and a second vertical channel 2-2, the enclosure baffle 2 comprises a fixed seat 2-3 and an isolation plate 2-4, the isolation plate 2-4 is fixedly arranged above the fixed seat 2-3, and a first plug-in column 2-5 in plug-in fit with the first mounting hole 1-1 and a second plug-in column 2-6 in plug-in fit with the second mounting hole 1-2 are arranged below the fixed seat 2-3. The first vertical channel 2-1 and the second vertical channel 2-2 penetrate through the fixed seat 2-3 and the partition plate 2-4 to be respectively communicated with the cable channel 1-3 and the water pipe channel 1-4, the water supply pipe 5 penetrates through the water pipe channel 1-4 and the first vertical channel 2-1 in sequence to be connected with the spray header 3, and the cable 6 penetrates through the cable channel 1-3 and the second vertical channel 2-2 in sequence to be connected with the warning lamp 4.
The utility model discloses when the installation, as shown in fig. 8, one encloses baffle 2 and installs on two adjacent enclose fender base 1, and same one encloses and installs two continuous enclosure 2 on keeping off base 1, and cross-mounting's connected mode can strengthen the wholeness of stability like this. The adjacent enclosure bases 1 are connected through steel pipes 7, and two ends of each steel pipe 7 are respectively inserted into the cable channels 1-3 and the water pipe channels 1-4 of the adjacent enclosure bases 1. The front end face and the rear end face of each isolation plate 2-4 are respectively provided with a reinforcing connecting column 2-4-4 and a connecting hole, and the adjacent isolation plates 2-4 are matched with the connecting holes through the reinforcing connecting columns 2-4-4. The steel pipe is arranged, so that the reliability of connection between the enclosing and blocking bases is fully guaranteed, the normal use of a water pipe channel and a cable channel is not influenced, and the arrangement of other connection matching structures on the enclosing and blocking bases is avoided. Strengthen spliced pole and connecting hole with the steel pipe combined action has both guaranteed to enclose the fastening nature of connecting between the baffle, has strengthened again and has enclosed the wholeness that keeps off the pedestal connection.
Embodiment 2, a barrier for building construction enclosure, the barrier 2-4 includes a hollow color steel casing 2-4-1, the color steel casing 2-4-1 is filled with fireproof cotton 2-4-2 at the inner side and is filled with a sound insulation layer 2-4-3 at the outer side, and the first vertical channel 2-1 and the second vertical channel 2-2 are both located between the fireproof cotton 2-4-1 and the sound insulation layer 2-4-2. The special design of division board can enough play the fire prevention effect, can strengthen the sound insulation effect again, has fully guaranteed job site and external safety isolation.
The other structure of this embodiment is the same as embodiment 1.
embodiment 3, a fence for building construction, the water passing tanks 1-5 are provided with filter screens 1-5-1, each water passing tank 1-5 is provided with two filter screens 1-5-1, and the two filter screens 1-5-1 are symmetrically clamped at two sides of the water passing tank 1-5. Due to the arrangement of the filter screen, the relative isolation effect between the construction site and the outside is guaranteed, and the construction waste is prevented from entering the outside road or entering the construction site while the rainwater is prevented from flowing smoothly.
The other structure of this embodiment is the same as embodiment 2.
The present invention is not exhaustive and is well known to those skilled in the art.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a construction encloses fender guardrail, encloses the fender base and encloses the baffle including mutually supporting, encloses the baffle top and is provided with shower head and warning light, its characterized in that: the longitudinal section of enclosing and keeping off the base is isosceles trapezoid, encloses to keep off and has seted up two vertical mounting holes on the base, encloses the longitudinal direction that keeps off the base and has seted up cable channel and water pipe passageway, and cable channel and water pipe passageway are located the both sides of mounting hole respectively, enclose the bottom that keeps off the base and have seted up the basin, enclose the inside first vertical passageway and the vertical passageway of second of having seted up of baffle, enclose the baffle and include fixing base and division board, and the division board is fixed to be set up in the top of fixing base, and the fixing base below is provided with pegs graft complex spliced pole with the mounting hole, first vertical passageway and the vertical passageway of second pass fixing base and division board and are linked together with cable channel and water pipe passageway respectively, and the delivery pipe passes water pipe passageway in proper order, and first vertical passageway links to each other with the shower head, and the cable passes cable channel.
2. The construction fence guardrail of claim 1, wherein: the division board includes the various steel casing of hollow, and the inboard packing of various steel casing has the fireproof cotton, the outside packing has the puigging, first vertical passageway and the vertical passageway of second all are located between fireproof cotton and the puigging.
3. The construction fence guardrail of claim 1, wherein: the water passing grooves are symmetrically arranged at the bottom end of the enclosure base, and correspond to the mounting holes.
4. The construction fence guardrail of claim 3, wherein: the length of the insertion column is larger than the depth of the mounting hole and smaller than the height of the enclosure base.
5. the construction fence guardrail of claim 1, wherein: the water passing tank is provided with two filter screens which are symmetrically clamped on two sides of the water passing tank.
6. The construction fence guardrail of claim 1, wherein: the two mounting holes comprise a first mounting hole and a second mounting hole, the first mounting hole is communicated with the cable channel, and the second mounting hole is communicated with the water pipe channel.
7. The construction fencing rail of any one of claims 1 to 6, wherein: the adjacent enclosure bases are connected through steel pipes, and two ends of each steel pipe are respectively inserted into the cable channel and the water pipe channel of the adjacent enclosure bases.
8. The construction fencing rail of any one of claims 1 to 6, wherein: the front end face and the rear end face of each isolation plate are respectively provided with a reinforcing connecting column and a connecting hole, and adjacent isolation plates are matched with the connecting holes through the reinforcing connecting columns.
CN201920277100.7U 2019-03-05 2019-03-05 Fence for building construction Expired - Fee Related CN209799566U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920277100.7U CN209799566U (en) 2019-03-05 2019-03-05 Fence for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920277100.7U CN209799566U (en) 2019-03-05 2019-03-05 Fence for building construction

Publications (1)

Publication Number Publication Date
CN209799566U true CN209799566U (en) 2019-12-17

Family

ID=68823566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920277100.7U Expired - Fee Related CN209799566U (en) 2019-03-05 2019-03-05 Fence for building construction

Country Status (1)

Country Link
CN (1) CN209799566U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114909022A (en) * 2022-04-11 2022-08-16 广州城市职业学院 Environment-friendly green construction is with enclosing fender
EP4339400A1 (en) * 2022-09-16 2024-03-20 Capra GmbH Mobile fence element and modular barrier fence formed by a plurality of such fence elements

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114909022A (en) * 2022-04-11 2022-08-16 广州城市职业学院 Environment-friendly green construction is with enclosing fender
CN114909022B (en) * 2022-04-11 2023-08-04 广州城市职业学院 Environment-friendly enclosure for green construction
EP4339400A1 (en) * 2022-09-16 2024-03-20 Capra GmbH Mobile fence element and modular barrier fence formed by a plurality of such fence elements
EP4339399A1 (en) * 2022-09-16 2024-03-20 Capra GmbH Mobile fence element and modular barrier fence formed by a plurality of such fence elements
WO2024056887A1 (en) * 2022-09-16 2024-03-21 Capra Gmbh Mobile fence element and modular barrier fence formed from multiple such fence elements

Similar Documents

Publication Publication Date Title
CN209799566U (en) Fence for building construction
CN213449635U (en) High-speed railway station room clear water concrete canopy and high-speed railway station
CN111224369A (en) Underground cable is with installation protector
CN204551707U (en) A kind of linear finished product gutter of HDPE carrying wiring conduit
CN212773585U (en) Town road foundation ditch safety device
CN213653515U (en) Assembled multifunctional comprehensive miniature pipe gallery
CN210621777U (en) Box-type substation earthquake-resistant structure
CN112814026A (en) Hidden vent structure of assembled utility tunnel
CN113381374A (en) Protection device suitable for installation of underground cable
CN210917677U (en) Composite cover plate for high-speed rail
CN217811094U (en) Municipal pipe network slot excavation supporting device
CN217204546U (en) Auxiliary drainage waterlogging prevention structure
CN212743157U (en) High-strength composite plate tile and box type plate house roof mounting structure
CN215829288U (en) High strength sound barrier convenient to installation
CN220849143U (en) Municipal construction fast-assembling protector
CN212375796U (en) Multifunctional novel flood control brick and combined flood control wall
CN219410736U (en) Ecological slope structure of river course vegetation concrete
CN220014715U (en) River protection device along
CN216839944U (en) Anti-waterlogging backward-flowing structure of medium and small-section cable trench
CN210236455U (en) Novel comprehensive pipe trench system suitable for container terminal storage yard
CN217872207U (en) Safety protective guard is used in civil engineering
CN217681044U (en) Foundation pit edge protection device
CN110700184A (en) Multifunctional novel flood control brick, combined flood control wall and method
CN212583427U (en) Building foundation pit protection device
CN213425754U (en) Laying structure for underground pipeline of narrow street lane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200429

Address after: No.5 Heshan Road, Heshan District, Hebi City, Henan Province

Patentee after: Rescue team of Hebi Coal Power Co., Ltd

Address before: Longhai West Road Central District 450000 Henan city of Zhengzhou province No. 330

Co-patentee before: Chen Yuming

Patentee before: Hu Anbao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191217

Termination date: 20210305