CN209703854U - Steel structure building top waterproof construction - Google Patents

Steel structure building top waterproof construction Download PDF

Info

Publication number
CN209703854U
CN209703854U CN201920382059.XU CN201920382059U CN209703854U CN 209703854 U CN209703854 U CN 209703854U CN 201920382059 U CN201920382059 U CN 201920382059U CN 209703854 U CN209703854 U CN 209703854U
Authority
CN
China
Prior art keywords
parapet
roof
vertical wall
edge
junction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920382059.XU
Other languages
Chinese (zh)
Inventor
李合松
樊永喆
崔璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920382059.XU priority Critical patent/CN209703854U/en
Application granted granted Critical
Publication of CN209703854U publication Critical patent/CN209703854U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

Steel structure building top waterproof construction, it is the waterproof construction at the top of a kind of steel structure factory building, waterproofing design including parapet and parapet and roof junction, the parapet includes parapet at parapet and outer vertical wall at outer cross wall, parapet and roof by flashing plate are connected as enclosed construction at parapet, that is, gable at the outer cross wall, drainage channel is offered between parapet and roof at the outer vertical wall, the roof includes upper layer roof boarding, lower layer's roof boarding, the heat-preservation cotton being arranged between upper layer roof boarding and lower layer's roof boarding, upper layer roof boarding, layered arrangement above and below heat-preservation cotton and lower layer's roof boarding, roof is fixed on roof girder steel by roof purline.The utility model clever structure, novel, drainage effect is good, and water-proof function is outstanding, while having certain heat insulating effect, and overall structure is stablized, long service life.

Description

Steel structure building top waterproof construction
Technical field
Waterproof construction the utility model relates to steel building field, at the top of specifically a kind of steel structure workshop.
Background technique
In order to build a good production environment, in order to be protected from it by exposing to the weather to equipment and product, Need to erect a good factory.Due to demand difference, there is biggish difference in workshop and general house structure, Seek big, stable structure in space etc. in workshop, it is clear that the house of existing concrete structure is difficult to take into account these effects, this is just needed A kind of steel structure workshop.
Steel structure workshop refers to the workshop that main load-supporting part is made of steel, including steel column, girder steel, steel structure base, Steel roof truss and steel worm-gearing etc..Since China's steel output is big, so that many workshops have been all made of steel structure workshop, steel construction is built Build that light weight, intensity are big, span is big, steel building builds that the construction period is short, consuming cost is low, and it is all that fire line is high, corrosion resistance is strong etc. More advantages are more and more applied to factory building.
However there is also its distinctive deficiencies for steel structure workshop, such as the problems such as heat preservation, waterproof, noise reduction, these problems are in steel Particularly evident in structure factory building, existing steel structure factory building is difficult to solve these problems by some measures come perfect, i.e., Make the facility outside by plus, cost can improve very much, and effect is also barely satisfactory.
Utility model content
In order to solve the deficiencies in the prior art, the utility model proposes a kind of top waterproof constructions of steel structure workshop, effectively Realization steel structure workshop waterproof problem.
The technical problems to be solved in the utility model is achieved through the following technical solutions:
Steel structure building top waterproof construction is the waterproof construction at the top of a kind of steel structure factory building, including parapet and female The waterproofing design of youngster's wall and roof junction, the parapet includes parapet at parapet and outer vertical wall at outer cross wall, described Parapet and roof are enclosed construction at parapet, that is, gable at outer cross wall, are opened up between parapet and roof at the outer vertical wall There is drainage channel, the roof includes upper layer roof boarding, lower layer's roof boarding, is arranged between upper layer roof boarding and lower layer's roof boarding Heat-preservation cotton, upper layer roof boarding, heat-preservation cotton and lower layer's roof boarding layered arrangement up and down, roof is fixed on roof by roof purline On girder steel;The junction on parapet and roof is provided with flashing plate at the gable, and flashing plate is strip, sets along strip direction It is equipped with the parallel bending of twice, so that bending downward, covering and being fixed on above the edge on roof on the left of flashing plate, flashing plate is right Side is folded upward at, and is fixed at gable in parapet wall;Draining structure is provided between parapet and roof at the outer vertical wall Part, water discharge member are the channel steel structure that both sides of the edge have extension edge, and one side extension edge is embedded into outer vertical wall virgin within the walls, Other side extension edge is embedded into roof, the gutter that the groove in the middle part of channel steel is drained as water discharge member, sets below gutter It is equipped with vertically arranged downpipe, the upper end of downpipe is fixedly connected with the opening of gutter bottom preset, gutter and downpipe structure At drainage channel.
In the present invention, the edge on the roof and inside are evenly distributed with fixing seat, by the upper layer roofing on roof The three-decker fixation of plate, heat-preservation cotton and lower layer's roof boarding, the edge setting of roof parapet at gable Have hush panel, hush panel is fixed in the fixing seat of roof edge, and the layer structure on roof is closed, prevent moisture be splashed into or It penetrates into inside roof.
Further, the top of roof edge fixing seat and hush panel is fixed on the left of the flashing plate.
Further, the side extension edge of the water discharge member be fixed on roof lower layer's roof boarding and roof purline it Between.
Further, the junction of parapet is close at the junction on the flashing plate and roof, flashing plate and gable The junction of parapet is sealing structure at the junction on seal structure, water discharge member and roof, water discharge member and outer vertical wall.
In the present invention, parapet is consistent with outer vertical wall virgin wall construction at the gable, including in parapet Plate, parapet outside plate and the vertical wall beam being arranged between parapet inner panel and parapet outside plate, vertical wall beam are load-carrying members, Parapet inner panel and parapet outside plate are each attached on vertical wall beam, and daughter's coping button is equipped with waterproof and receives side, waterproof The two sides for receiving side are bent downward, and are separately fixed on parapet inner panel and parapet outside plate at its lower edge.
Further, the lower edge of the parapet inner panel is not less than the edge height on roof, the right side of the flashing plate The other side extension edge of side and water discharge member pass through parapet inner panel lower edge be embedded into parapet inner panel and vertical wall beam it Between.
Further, it bends inwards at the lower edge on waterproof receipts side, so that itself and parapet inner panel and parapet The junction of outside plate is hidden in waterproof and receives below side, reduces junction and is soaked with rain the possibility of corrosion.
Further, the waterproof receives connection while with the junction of parapet inner panel, waterproof receipts with parapet outside plate Place is sealing structure;The parapet inner panel and the junction of vertical wall beam, the junction of parapet outside plate and vertical wall beam It is sealing structure.
Compared with prior art, the utility model clever structure, novel, the closing knot on roof and gable and parapet The discharge structure of structure, roof and outer vertical wall and parapet improves effectively under the premise of guaranteeing steel structure workshop proper drainage Waterproof effect;The effective heat insulation effect for improving steel structure workshop of multilayered structure of the roof with heat-preservation cotton;Roof and gable With the separation design of outer vertical wall, expands with heat and contract with cold for steel structure factory building and provide necessary leeway, be respectively connected and fixed position Sealing structure also further improves the service life of steel structure workshop, significant effect.
Detailed description of the invention
Fig. 1 is parapet and roof attachment structure schematic diagram at the gable of the utility model;
Fig. 2 is parapet and roof attachment structure schematic diagram at the outer vertical wall of the utility model.
In figure: parapet 1, parapet inner panel 11, vertical wall beam 12, parapet outside plate 13, waterproof receive side 14;
Roof 2, upper layer roof boarding 21, heat-preservation cotton 22, lower layer's roof boarding 23, fixing seat 24, hush panel 25;
Roof purline 3, roof girder steel 4, flashing plate 5, water discharge member 6, gutter 7, downpipe 8.
Specific embodiment
The utility model is further described below in conjunction with Figure of description and specific preferred embodiment, but not because This and limit the protection scope of the utility model.
It is connect referring to steel structure building top waterproof construction shown in Fig. 1 and 2, including parapet 1 and parapet 1 with roof 2 The waterproofing design at place, the parapet 1 include parapet at parapet at gable and outer vertical wall, parapet and roof 2 at gable For enclosed construction, offer drainage channel at outer vertical wall between parapet and roof 2, the roof 2 include upper layer roof boarding 21, Heat-preservation cotton 22 and lower layer's roof boarding 23, heat-preservation cotton 22 is filled between upper layer roof boarding 21 and lower layer's roof boarding 23, by being arranged in 2 edge of roof and internal equally distributed fixing seat 24 are fixed, and roof 2 is fixed on roof girder steel 4 by roof purline 3 On, the roof 2 edge of parapet at gable is provided with hush panel 25, and hush panel 25 is fixed on 2 edge of roof In fixing seat 24, the layer structure on roof 2 is closed.
Parapet is consistent with outer vertical wall virgin wall construction at the gable, including parapet inner panel 11, vertical wall beam 12, Parapet outside plate 13, vertical wall beam 12 are load-carrying members, and parapet inner panel 11 and parapet outside plate 13 are each attached to vertical wall beam On 12, the brim height on the lower edge height of parapet inner panel 11 and roof 2 maintain an equal level or higher than roof 2 edge.
The junction on parapet and roof 2 is provided with flashing plate 5 at the gable, and flashing plate 5 is strip, along strip side To the parallel bending of twice is provided with, so that being bent downward on the left of flashing plate 5, it is covered on above the edge on roof 2, is fixed on room It pushes up in the fixing seat 24 and hush panel 25 at 2 edges, is folded upward on the right side of flashing plate 5, in the parapet by parapet at gable 11 lower edge of plate is embedded between parapet inner panel 11 and vertical wall beam 12.
Water discharge member 6 is provided between parapet and roof 2 at the outer vertical wall, water discharge member 6 has for both sides of the edge The channel steel structure of extension edge, one side extension edge are embedded between lower layer's roof boarding 23 on roof 2 and roof purline 3, the other side Extension edge by 11 lower edge of parapet inner panel of parapet at outer vertical wall, be embedded into parapet inner panel 11 and vertical wall beam 12 it Between;The gutter 7 that groove in the middle part of channel steel is drained as water discharge member 6 is provided with vertically arranged downpipe below gutter 7 8, the upper end of downpipe 8 is fixedly connected with the opening of 7 bottom preset of gutter, and gutter 7 and downpipe 8 constitute drainage channel.
Daughter's coping button is equipped with waterproof and receives side 14, and the two sides that waterproof receives side 14 bend downward, bend downward Edge curve inwardly, be fixed to parapet inner panel 11 and parapet outside plate 13 at lower edge by bolt, bolt It is hidden in the lower section that waterproof receives side 14.
In the present invention, the connection of the flashing plate 5 and the junction, flashing plate 5 and parapet at gable on roof 2 Place is sealing structure, and the junction of water discharge member 6 and roof 1, water discharge member 6 and the junction of parapet at outer vertical wall are Sealing structure;The waterproof receives when 14 receive with the junction of parapet inner panel 11, waterproof 14 connections with parapet outside plate 13 Place is sealing structure;Junction, parapet outside plate 13 and the vertical wall beam 12 of the parapet inner panel 11 and vertical wall beam 12 Junction be sealing structure.
When the utility model is applied to workshop, the enclosed construction of roof and gable and parapet, roof and outer vertical wall and female The discharge structure of youngster's wall improves waterproof effect effectively under the premise of guaranteeing steel structure workshop proper drainage;Roof is with guarantor The effective heat insulation effect for improving steel structure workshop of the multilayered structure of warm cotton;The separate type on roof and gable and outer vertical wall is set Meter expands with heat and contract with cold for steel structure factory building and provides necessary leeway, and the sealing structure for being respectively connected and fixed position also further mentions The service life of steel structure workshop is risen.
Therefore, in conjunction with above-mentioned construction it can be found that waterproof construction described in the utility model is applied to not only as factory When the steel building in room is built, clever structure is novel, and drainage effect is good, and water-proof function is outstanding, while having certain thermal insulation separation Thermal effect, overall structure are stablized, long service life.

Claims (9)

1. steel structure building top waterproof construction, the waterproofing design including parapet and parapet and roof junction, feature exist In: the parapet include parapet at parapet and outer vertical wall at outer cross wall, parapet, that is, gable virgin at the outer cross wall Youngster's wall and roof are enclosed construction, drainage channel are offered between parapet and roof at the outer vertical wall, the roof includes Upper layer roof boarding, lower layer's roof boarding, the heat-preservation cotton being arranged between upper layer roof boarding and lower layer's roof boarding, upper layer roof boarding are protected Layered arrangement above and below warm cotton and lower layer's roof boarding, roof is fixed on roof girder steel by roof purline;The gable virgin The junction on wall and roof is provided with flashing plate, and flashing plate is strip, and strip direction is provided with the parallel bending of twice, makes It obtains and is bent downward on the left of flashing plate, covered and be fixed on above the edge on roof, be folded upward on the right side of flashing plate, be fixed on gable Locate in parapet wall;Water discharge member is provided between parapet and roof at the outer vertical wall, water discharge member is both sides of the edge Channel steel structure with extension edge, one side extension edge are embedded into outer vertical wall virgin within the walls, and other side extension edge is embedded into room In top, the gutter that the groove in the middle part of channel steel is drained as water discharge member, gutter lower section is provided with vertically arranged downpipe, The upper end of downpipe is fixedly connected with the opening of gutter bottom preset, and gutter and downpipe constitute drainage channel.
2. steel structure building top waterproof construction according to claim 1, it is characterised in that: the edge and inside on the roof It is evenly distributed with fixing seat, it is described by the three-decker fixation of the upper layer roof boarding on roof, heat-preservation cotton and lower layer's roof boarding Roof edge of parapet at gable is provided with hush panel, and hush panel is fixed in the fixing seat of roof edge, by room The layer structure on top is closed.
3. steel structure building top waterproof construction according to claim 2, it is characterised in that: the left side of the flashing plate is fixed In the top of roof edge fixing seat and hush panel.
4. steel structure building top waterproof construction according to claim 2, it is characterised in that: prolong the side of the water discharge member Side is stretched to be fixed between lower layer's roof boarding on roof and roof purline.
5. steel structure building top waterproof construction according to claim 1, it is characterised in that: the company of the flashing plate and roof The junction of parapet is sealing structure, the junction of water discharge member and roof, water discharge member at the place of connecing, flashing plate and gable Junction with parapet at outer vertical wall is sealing structure.
6. steel structure building top waterproof construction according to claim 1, it is characterised in that: parapet and outer at the gable Vertical wall virgin wall construction is consistent, including parapet inner panel, parapet outside plate and setting are in parapet inner panel and parapet outside plate Between vertical wall beam, vertical wall beam is load-carrying members, and parapet inner panel and parapet outside plate be each attached on vertical wall beam, institute It states daughter's coping button and receives side equipped with waterproof, the two sides that waterproof receives side are bent downward, and are fixed respectively at its lower edge On parapet inner panel and parapet outside plate.
7. steel structure building top waterproof construction according to claim 6, it is characterised in that: the parapet inner panel it is following Edge is not less than the edge height on roof, and the right side of the flashing plate and the other side extension edge of water discharge member pass through parapet Inner panel lower edge is embedded between parapet inner panel and vertical wall beam.
8. steel structure building top waterproof construction according to claim 6, it is characterised in that: the waterproof receives the lower edge on side Place bends inwards, so that the junction of itself and parapet inner panel and parapet outside plate is hidden in waterproof and receives below side.
9. steel structure building top waterproof construction according to claim 6, it is characterised in that: the waterproof receives side and parapet It is sealing structure that side and the junction of parapet outside plate are received in the junction of inner panel, waterproof;The parapet inner panel and vertical wall Junction, parapet outside plate and the junction of vertical wall beam of beam are sealing structure.
CN201920382059.XU 2019-03-25 2019-03-25 Steel structure building top waterproof construction Expired - Fee Related CN209703854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920382059.XU CN209703854U (en) 2019-03-25 2019-03-25 Steel structure building top waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920382059.XU CN209703854U (en) 2019-03-25 2019-03-25 Steel structure building top waterproof construction

Publications (1)

Publication Number Publication Date
CN209703854U true CN209703854U (en) 2019-11-29

Family

ID=68647501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920382059.XU Expired - Fee Related CN209703854U (en) 2019-03-25 2019-03-25 Steel structure building top waterproof construction

Country Status (1)

Country Link
CN (1) CN209703854U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456341A (en) * 2020-04-14 2020-07-28 蔡世女 Building external tool system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456341A (en) * 2020-04-14 2020-07-28 蔡世女 Building external tool system

Similar Documents

Publication Publication Date Title
US10577803B2 (en) Supporting a load on a roof
US8793944B2 (en) Rail mounting system for mounting skylights and the like directly to rib elevations of a raised rib metal panel roofing system
CN103711262B (en) A kind of curved surface aluminum-magnesium-manganese alloy roof plate system construction method
CN107762073B (en) Double-deck roofing system of waterproof performance improves
CN107762074B (en) Double-deck roofing system of anti wind performance of taking off improves
CN209703854U (en) Steel structure building top waterproof construction
CN109457876B (en) Metal roof system with hidden maintenance horse way
JP2931240B2 (en) Building with solar cell module
CN211775208U (en) Waterproof treatment node for upper and lower end surfaces of steel structure downslope dormer and roof outer plate
CN209261282U (en) A kind of Novel steel structure workshop
CN211548448U (en) Waterproof construction at concrete wall and various steel roof boarding position of connecting
CN209261281U (en) A kind of steel structure workshop of insulation
CN208329326U (en) Water proof type steel structural roof structure
CN210067260U (en) A waterproof drainage system of assembled roofing for modular building
CN207453290U (en) A kind of laterally attached roofing bottom plate and roof board system
CN106894528B (en) Waterproof node structure of steel structure factory building
CN107780600B (en) Double-deck roofing system of thermal insulation performance improves
CN205259423U (en) Steel construction gable nodal connection structure
CN107780598B (en) Double-deck roof boarding
CN207582825U (en) A kind of insolation proof ribbon skylight
CN219491510U (en) Assembled integrated roof structure
CN215926498U (en) Metal roof assembled support column threaded connection
CN212773206U (en) Connecting structure of open platform skylight
CN214302612U (en) Waterproof structure at node department is striden to steel construction sloping roof height
CN215759905U (en) Sunshine room ceiling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129

CF01 Termination of patent right due to non-payment of annual fee