CN209703788U - A kind of diamond-shaped element curtain wall construction - Google Patents
A kind of diamond-shaped element curtain wall construction Download PDFInfo
- Publication number
- CN209703788U CN209703788U CN201920341268.XU CN201920341268U CN209703788U CN 209703788 U CN209703788 U CN 209703788U CN 201920341268 U CN201920341268 U CN 201920341268U CN 209703788 U CN209703788 U CN 209703788U
- Authority
- CN
- China
- Prior art keywords
- steel
- support
- tube
- diamond
- glass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of diamond-shaped element curtain wall constructions, it is related to building curtain wall field, it include: the diamond structure steelframe body and glue doubling steel glass junior unit of combination installation, the diamond structure steelframe body includes the first structure steelframe from top to bottom successively assembled, second structural steel, third structural steel, the inner wall of the angle tempered glass junior unit is provided with aluminium alloy adapter pendant, the surface of diamond structure steelframe body is mounted on by stainless steel bolt, the utility model is using steel construction as Main heavy truss, simultaneously, diamond shape polyhedron plate is split into flat glass junior unit, integral hoisting after the diamond structure steelframe body can splice with the glue doubling steel glass junior unit, the lifting that the diamond structure steelframe body completes the glue doubling steel glass junior unit again can also first be lifted, sequence of construction is flexible.Compared to the prior art, the diamond-shaped element curtain wall construction has bigger cost, odds for effectiveness in production.
Description
Technical field
The utility model relates to building curtain wall field more particularly to a kind of diamond-shaped element curtain wall constructions.
Background technique
With the continuous development of curtain wall industry, cell curtain wall has become the dominant form of large-scale external decoration engineering, unit
The production precision of curtain wall is high, and the in-site installation period is short, has been widely used in a large amount of engineering;For appearance using big
Color lump or metrical large area pattern highlight the landmark building of its decorative effect, and usual mode is using aluminium alloy face
Plate curtain wall does the aluminium sheet decorative curtain wall system of decorative splicing formula, by the moulding of various complexity and characteristic pattern curtain wall etc. with one kind compared with
It is completed for succinct make.
During realizing the utility model, at least there are the following problems in the prior art: traditional aluminium for inventor's discovery
Alloy profile composition, profile materials are very big, mounting means similar to frame glass curtain wall system, meanwhile, space development model block is only
It is formed with profile, very high for assembling quality and required precision, assembling difficulty is very big, needs that a large amount of manpower and material resources is spent
It tries to meet the deadline for the project, while the dosage of aluminium alloy extrusions is huge, cost is higher.
Utility model content
In order to overcome the shortcomings of Related product in the prior art, the utility model proposes a kind of diamond-shaped element curtain wall construction,
Solve the problems, such as that the assembling difficulty of cell curtain wall in the prior art is big, cost is high.
The utility model provides a kind of diamond-shaped element curtain wall construction, comprising: combine the diamond structure steelframe body of installation with
And glue doubling steel glass junior unit, the diamond structure steelframe body include the first structure steelframe from top to bottom successively assembled,
Two structural steels, third structural steel, the glue doubling steel glass junior unit covers the diamond structure steelframe body and places, described
The inner wall of glue doubling steel glass junior unit is provided with aluminium alloy adapter pendant.
In the certain embodiments of the utility model, the first structure steelframe includes two first disposed in parallel
Support, be sequentially arranged at intervals between two first support frames disposed in parallel first connecting tube, the second connecting tube and
The side of third connecting tube, first connecting tube towards the glue doubling steel glass junior unit is provided with perpendicular first
Support tube, two the second parallel support tubes are provided with below first support tube, and second support tube is vertically arranged
In second connecting tube, it is provided with third support tube below the middle part of two parallel second support tubes, described the
Three support tubes are vertically set in the third connecting tube, and first support tube, the second support tube are all provided on third support tube
It is equipped with angle steel, meanwhile, the bearing height of first support tube, the second support tube and third support tube is linearly incremented by.
In the certain embodiments of the utility model, second structural steel includes two second disposed in parallel
Support, be sequentially arranged at intervals between two second support frames disposed in parallel 4th connecting tube, the 5th connecting tube and
6th connecting tube;The third structural steel includes two third support frames disposed in parallel, and two disposed in parallel described the
The 7th connecting tube, the 8th connecting tube and the 9th connecting tube are sequentially arranged at intervals between three support frames, wherein the described 4th connects
Adapter tube is identical as the third connecting pipe structure, and the 6th connecting tube is identical as the 7th connecting pipe structure;
5th connecting tube, the 6th connecting tube, the 7th connecting tube, the 8th connecting tube, the 9th connecting tube are towards the folder
The side of glue tempered glass junior unit is respectively arranged with the 5th perpendicular support tube, the 6th support tube, the 7th support tube,
Eight support tubes and the 9th support tube, the 5th support tube, the 6th support tube, the 7th support tube, the 8th support tube and
The bearing height of nine support tubes linearly successively decreases, and the 5th support tube, the 6th support tube, the 7th support tube, the 8th support
The angle steel is provided on pipe, the 9th support tube.
In the certain embodiments of the utility model, the glue doubling steel glass junior unit include glue doubling steel glass and
With it around the glass auxiliary frame profile of setting, the glass auxiliary frame profile includes lateral auxiliary frame profile and vertical auxiliary frame profile, institute
State the gap between the inner wall of lateral auxiliary frame profile and the vertical auxiliary frame profile and the glue doubling steel glass junior unit outer wall
It is filled with structure glue, the inner wall of the vertical auxiliary frame profile is provided with aluminium alloy adapter pendant, the aluminium alloy adapter
Pendant is fixedly connected with the angle steel.
In the certain embodiments of the utility model, the aluminium alloy adapter pendant passes through stainless steel bolt group and institute
It states vertical auxiliary frame profile to be fixedly connected, the other end of the aluminium alloy adapter pendant passes through stainless steel bolt group and the angle steel
It is fixedly connected.
In the certain embodiments of the utility model, first support frame is also spaced towards the side of building body to be set
It is equipped with steel hook, the other end of the steel hook is fixedly connected with steel square tube, and the other end of the steel square tube is connected to described build
It builds in main body.
In the certain embodiments of the utility model, the steel hook passes through stainless steel bolt group and first support
The both ends of frame are fixedly connected.
In the certain embodiments of the utility model, the diamond structure steelframe body, glass auxiliary frame profile and aluminium are closed
Golden adapter pendant passes through fluorocarbon-sprayed processing.
Compared with prior art, the utility model has the advantage that
Diamond-shaped element curtain wall construction described in the utility model embodiment uses steel construction as Main heavy truss, instead of existing
There is the aluminium alloy extrusions that technology generallys use, keeps the diamond-shaped element curtain wall construction stress more stable, using steel construction conduct
Main heavy truss reduces the production cost of curtain wall entirety;Meanwhile diamond shape polyhedron plate is split into flat glass junior unit,
The assembly precision of junior unit body is high, high-quality, high-efficient, the splicing difficulty of diamond shape plate entirety is reduced, compared to existing skill
Art, the diamond-shaped element curtain wall construction have bigger cost, odds for effectiveness in production.
Detailed description of the invention
In order to illustrate more clearly of the technical scheme in the embodiment of the utility model, will make below to required in embodiment
Attached drawing is briefly described, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention,
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings
Other attached drawings.
Fig. 1 is the main view of diamond-shaped element curtain wall construction described in the utility model;
Fig. 2 is the structural schematic diagram of diamond shape frame in diamond-shaped element curtain wall construction described in the utility model;
Fig. 3 is glue doubling steel glass junior unit and diamond structure steel in diamond-shaped element curtain wall construction described in the utility model
The partial enlarged view of frame body connection;
Fig. 4 is the office that diamond structure steelframe body is connect with building body in diamond-shaped element curtain wall construction described in the utility model
Portion's enlarged drawing.
1- diamond structure steelframe body, 11- first structure steelframe, the second structural steel of 12-, 13- third structural steel,
The first support frame of 110-, the second support frame of 120-, 130- third support frame, 1101- steel hook, 1102- steel square tube, 111- first
Connecting tube, the first support tube of 1111-, the second connecting tube of 112-, the second support tube of 1121-, 113- third connecting tube, 1131-
Three support tubes, the 4th connecting tube of 114-, the 4th support tube of 1141-, the 5th connecting tube of 115-, the 5th support tube of 1151-, 116-
6th connecting tube, the 6th support tube of 1161-, the 7th connecting tube of 117-, the 7th support tube of 1171-, the 8th connecting tube of 118-,
The 8th support tube of 1181-, the 9th connecting tube of 119-, the 9th support tube of 1191-, 2- glue doubling steel glass junior unit, 21- glass are attached
Frame section, 211- transverse direction auxiliary frame profile, the vertical auxiliary frame profile of 212-, 213- aluminium alloy adapter pendant, 3- angle steel.
Specific embodiment
In order to make those skilled in the art better understand the scheme of the utility model, below in conjunction with the utility model reality
The attached drawing in example is applied, the technical scheme in the utility model embodiment is clearly and completely described.Obviously, described
Embodiment is only that the utility model a part of the embodiment gives the utility model instead of all the embodiments in attached drawing
Preferred embodiment.The utility model can be realized in many different forms, however it is not limited to embodiment described herein,
It is made the understanding of the disclosure of the utility model more thorough and comprehensive on the contrary, purpose of providing these embodiments is.
Fig. 1 is the main view of diamond-shaped element curtain wall construction described in the utility model, and Fig. 2 is diamond shape list described in the utility model
The structural schematic diagram of diamond shape frame in first curtain wall construction, refering to fig. 1 and shown in Fig. 2, the diamond-shaped element curtain wall construction includes group
Close installation diamond structure steelframe body 1 and glue doubling steel glass junior unit 2, the diamond structure steelframe body 1 include by up to
Under the first structure steelframe 11, the second structural steel 12, third structural steel 13 that successively assemble, wherein the first structure steel
Frame 11 includes two first support frames 110 disposed in parallel, between two first support frames 110 disposed in parallel successively between
Every being vertically installed with the first connecting tube 111, the second connecting tube 112 and third connecting tube 113;
The side of first connecting tube 111 towards the glue doubling steel glass junior unit 2 is provided with perpendicular
One support tube 1111, the lower section of first support tube 1111 are provided with two the second parallel support tubes 1121, and described second
Support tube 1121 is vertically set in second connecting tube 112, under the middle part of two parallel second support tubes 1121
Side is provided with third support tube 1131, and the third support tube 113 is vertically set in the third connecting tube 113, and described the
Three support tubes, 1131 two sides are provided with the auxiliary support tube placed at an angle with it, first support tube 1111, second
Angle steel 3 is provided on stay tube 1121, third support tube 1131 and the auxiliary support tube, the angle steel 3 is used to be the folder
The installation of glue tempered glass junior unit 2 provides installation node;Meanwhile first support tube 1111, the second support tube 1121 with
And the bearing height of third support tube 1131 is linearly incremented by, to be provided for the installation of the glue doubling steel glass junior unit 2
Stable structural support.
Second structural steel 12 includes two second support frames 120 disposed in parallel, and two disposed in parallel described
The 4th connecting tube 114, the 5th connecting tube 115 and the 6th connecting tube 116 are sequentially arranged at intervals between second support frame 120;
The third structural steel 13 includes two third support frames 130 disposed in parallel, two third supports disposed in parallel
The 7th connecting tube 117, the 8th connecting tube 118 and the 9th connecting tube 119 are sequentially arranged at intervals between frame 130, wherein described
4th connecting tube 114 is identical as 113 structure of third connecting tube, the 6th connecting tube 116 and the 7th connecting tube
117 structures are identical;
5th connecting tube 115, the 6th connecting tube 116, the 7th connecting tube 117, the connection of the 8th connecting tube the 118, the 9th
The side of pipe 119 towards the glue doubling steel glass junior unit 2 is respectively arranged with the 5th perpendicular support tube the 1151, the 6th
Support tube 1161, the 7th support tube 1171, the 8th support tube 1181 and the 9th support tube 1191, the 5th support tube
1151, the bearing height of the 6th support tube 1161, the 7th support tube 1171, the 8th support tube 1181 and the 9th support tube 1191
Linearly successively decrease, and the 5th support tube 115, the 6th support tube 116, the 7th support tube 117, the 8th support tube the 118, the 9th
Multiple angle steel 3 are provided on chord stay tube 119.
Fig. 3 is glue doubling steel glass junior unit and diamond structure steel in diamond-shaped element curtain wall construction described in the utility model
Frame body connection partial enlarged view, as shown in fig.3, the glue doubling steel glass junior unit 2 include glue doubling steel glass and with
, around the glass auxiliary frame profile 21 of setting, the glass auxiliary frame profile 21 includes lateral auxiliary frame profile 211 and vertical auxiliary frame type for it
Material 212, the inner wall and the glue doubling steel glass junior unit 2 of the transverse direction auxiliary frame profile 211 and the vertical auxiliary frame profile 212
Gap between outer wall is filled with structure glue, and the inner wall of the vertical auxiliary frame profile 212 is provided with multiple aluminium alloy adapters
Pendant 213, the aluminium alloy adapter pendant 213 with the angle steel 3 for being fixedly connected;The aluminium alloy adapter pendant
213 are fixedly connected by the stainless steel bolt group of model M6x25mm with the vertical auxiliary frame profile 212, and the aluminium alloy turns
The other end of fitting pendant 213 is fixedly connected by the stainless steel bolt group of model M8x30mm with the angle steel 3.Passing through will
Multiple glue doubling steel glass junior units 2 successively cover the diamond structure steelframe body 1 and place, and the glue doubling steel glass is small
The inner wall of unit 2 is provided with multiple aluminium alloy adapter pendants 213, and the aluminium alloy adapter pendant 213 is used for and the water chestnut
The angle steel 3 on shape structural steel frame body 1 is fixedly connected, and the glue doubling steel glass junior unit 2 is made to be fixed at the water chestnut
On shape structural steel frame body 1.
Fig. 4 is the office that diamond structure steelframe body is connect with building body in diamond-shaped element curtain wall construction described in the utility model
Portion's enlarged drawing is hung as shown in fig.4, first support frame 110 is also arranged at intervals with multiple steel towards the side of building body
Hook 1101, the stainless steel bolt group and the two of first support frame 110 that the steel hook 1101 passes through model M12x160mm
End is fixedly connected, and the other end of the steel hook 1101 is fixedly connected with steel square tube 1102, the other end of the steel square tube 1102
It is arranged on the building body, so that first support frame 110 is fixedly connected on the building by the steel square tube 1102
In main body, the installation number and installation site of the steel hook 1101 are specifically true according to the length of first support frame 110
It is fixed.
In the utility model embodiment, the first structure steelframe 11 of the diamond structure steelframe body 1, the second structure
Steelframe 12 and third structural steel 13 can carry out modularization making in advance, when needing to install, successively by first knot
Structure steelframe 11, the second structural steel 12, the lifting of third structural steel 13 are hung on the steel hook 1101, then hang the steel
Hook 1101 is respectively welded on first support frame 110, the second support frame 120 and third support frame 130, in order to keep installing
Then the consistency of quality, elder generation's spot welding when construction unify adjustment disengaging size and elevation dimension, then carry out being fully welded fixation;Finally
The first structure steelframe 11, the second structural steel 12,13 vertical array of third structural steel are formed into the diamond structure steel
Frame body 1 is fixed on the major structure of construction by the steel square tube 1102;
Certainly it should be noted that the diamond structure steelframe body 1 can be spelled first with the glue doubling steel glass junior unit 2
Integral hoisting again after connecing can also first lift the diamond structure steelframe body 1, then complete the glue doubling steel glass junior unit 2
Lifting.
In the utility model embodiment, the diamond structure steelframe body 1, glass auxiliary frame profile 21, aluminium alloy adapter
Pendant 213, steel hook 1101 and steel square tube 1102 pass through fluorocarbon-sprayed processing.
Diamond-shaped element curtain wall construction described in the utility model embodiment using steel construction as Main heavy truss, instead of
The aluminium alloy extrusions that the prior art generallys use keeps the diamond-shaped element curtain wall construction stress more stable, using steelframe conduct
Main heavy truss reduces the production cost of curtain wall entirety;Meanwhile diamond shape polyhedron plate is split into flat glass junior unit,
The assembly precision of junior unit body is high, high-quality, high-efficient, reduces the splicing difficulty of diamond shape plate entirety, meanwhile, the diamond shape
Integral hoisting after structural steel frame body 1 can splice with the glue doubling steel glass junior unit 2, can also first lift the diamond shape knot
Structure steelframe body body 1, then the lifting of the glue doubling steel glass junior unit 2 is completed, sequence of construction is flexible, simplifies site operation step
Suddenly, the security risk for reducing site operation improves installation effectiveness, compared to the prior art, the diamond-shaped element curtain wall knot
Structure has bigger cost, odds for effectiveness in production.
The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.More than
Only the embodiments of the present invention are not intended to limit the scope of the patents of the utility model, although with reference to the foregoing embodiments to this
Utility model is described in detail, still can be to aforementioned each specific reality for coming for those skilled in the art
It applies technical solution documented by mode to modify, or equivalence replacement is carried out to part of technical characteristic.It is all to utilize this
The equivalent structure that utility model specification and accompanying drawing content are done directly or indirectly is used in other related technical areas,
Similarly within the utility model patent protection scope.
Claims (8)
1. a kind of diamond-shaped element curtain wall construction characterized by comprising combine the diamond structure steelframe body and doubling steel of installation
Change glass junior unit, the diamond structure steelframe body includes the first structure steelframe from top to bottom successively assembled, the second structural steel
Frame, third structural steel, the glue doubling steel glass junior unit cover the diamond structure steelframe body and place, the glue doubling steel
The inner wall of glass junior unit is provided with aluminium alloy adapter pendant.
2. diamond-shaped element curtain wall construction according to claim 1, it is characterised in that: the first structure steelframe includes two
First support frame disposed in parallel is sequentially arranged at intervals with the first connection between two first support frames disposed in parallel
Pipe, the second connecting tube and third connecting tube, the side of first connecting tube towards the glue doubling steel glass junior unit are set
It is equipped with the first perpendicular support tube, two the second parallel support tubes are provided with below first support tube, it is described
Second support tube is vertically set in second connecting tube, is provided with below the middle part of two parallel second support tubes
Third support tube, the third support tube are vertically set in the third connecting tube, first support tube, the second support
It is provided with angle steel on pipe, third support tube, meanwhile, the branch of first support tube, the second support tube and third support tube
Support height is linear to be incremented by.
3. diamond-shaped element curtain wall construction according to claim 2, it is characterised in that: second structural steel includes two
Second support frame disposed in parallel is sequentially arranged at intervals with the 4th connection between two second support frames disposed in parallel
Pipe, the 5th connecting tube and the 6th connecting tube;The third structural steel include two third support frames disposed in parallel, two
The 7th connecting tube, the 8th connecting tube and the 9th connection are sequentially arranged at intervals between the third support frame disposed in parallel
Pipe, wherein the 4th connecting tube is identical as the third connecting pipe structure, the 6th connecting tube and the 7th connecting tube
Structure is identical;
5th connecting tube, the 6th connecting tube, the 7th connecting tube, the 8th connecting tube, the 9th connecting tube are towards the doubling steel
The side for changing glass junior unit is respectively arranged with the 5th perpendicular support tube, the 6th support tube, the 7th support tube, the 8th
Stay tube and the 9th support tube, the 5th support tube, the 6th support tube, the 7th support tube, the 8th support tube and the 9th
The bearing height of stay tube linearly successively decreases, and the 5th support tube, the 6th support tube, the 7th support tube, the 8th support tube,
The angle steel is provided on nine support tubes.
4. diamond-shaped element curtain wall construction according to claim 1, it is characterised in that: the glue doubling steel glass junior unit packet
Include glue doubling steel glass and the glass auxiliary frame profile with it around setting, the glass auxiliary frame profile include lateral auxiliary frame profile and
The inner wall and the glue doubling steel glass junior unit of vertical auxiliary frame profile, the transverse direction auxiliary frame profile and the vertical auxiliary frame profile
Gap between outer wall is filled with structure glue, and the inner wall of the vertical auxiliary frame profile is provided with aluminium alloy adapter pendant, institute
Aluminium alloy adapter pendant is stated to be fixedly connected with angle steel.
5. diamond-shaped element curtain wall construction according to claim 4, it is characterised in that: the aluminium alloy adapter pendant passes through
Stainless steel bolt group is fixedly connected with the vertical auxiliary frame profile, and the other end of the aluminium alloy adapter pendant passes through stainless steel
Bolt group is fixedly connected with the angle steel.
6. diamond-shaped element curtain wall construction according to claim 2, it is characterised in that: first support frame is led towards building
The side of body is also arranged at intervals with steel hook, and the other end of steel hook is fixedly connected with steel square tube, the steel square tube it is another
One end is connected on the building body.
7. diamond-shaped element curtain wall construction according to claim 6, it is characterised in that: the steel hook passes through stainless steel bolt
Group is fixedly connected with the both ends of first support frame.
8. diamond-shaped element curtain wall construction according to claim 1, it is characterised in that: the diamond structure steelframe body, glass
Auxiliary frame profile and aluminium alloy adapter pendant pass through fluorocarbon-sprayed processing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920341268.XU CN209703788U (en) | 2019-03-18 | 2019-03-18 | A kind of diamond-shaped element curtain wall construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920341268.XU CN209703788U (en) | 2019-03-18 | 2019-03-18 | A kind of diamond-shaped element curtain wall construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209703788U true CN209703788U (en) | 2019-11-29 |
Family
ID=68646657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920341268.XU Active CN209703788U (en) | 2019-03-18 | 2019-03-18 | A kind of diamond-shaped element curtain wall construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209703788U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114351915A (en) * | 2022-01-21 | 2022-04-15 | 武汉凌云建筑装饰工程有限公司 | Ultra-thick gradual change surface unit curtain wall system and construction method |
-
2019
- 2019-03-18 CN CN201920341268.XU patent/CN209703788U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114351915A (en) * | 2022-01-21 | 2022-04-15 | 武汉凌云建筑装饰工程有限公司 | Ultra-thick gradual change surface unit curtain wall system and construction method |
CN114351915B (en) * | 2022-01-21 | 2023-11-28 | 武汉凌云建筑装饰工程有限公司 | Super-thick gradual change surface unit curtain wall system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209703788U (en) | A kind of diamond-shaped element curtain wall construction | |
CN103806600A (en) | Cross-shaped steel pipe bundle combining structure | |
CN108104348A (en) | The assembled architecture roof truss of nested type steel construction | |
CN2795323Y (en) | Ceiling structure of cleaning room | |
CN103850367A (en) | L-shaped steel pipe bundle composite structure | |
CN217500734U (en) | Large-span and large-space hyperboloid assembled aluminum plate drop ceiling for station room waiting hall | |
CN208039585U (en) | The assembled architecture roof truss of nested type steel construction | |
CN203174879U (en) | Quick-install truss and quick-install house using same | |
CN206110329U (en) | Rigid support pipe | |
CN214402353U (en) | Three-hinge type steel structure curtain wall assembling and hoisting structure | |
CN214423784U (en) | H-shaped steel beam and steel frame light roof panel connected node | |
CN211774598U (en) | Connecting piece for connecting steel structure and wall body of prefabricated building | |
CN212359005U (en) | Steel box arch segment | |
CN209893439U (en) | Large-span flue | |
CN209837288U (en) | Novel C-shaped steel purline connecting piece distributed in node mode | |
CN210530170U (en) | Lighting skylight with V-shaped hanging steel structure | |
CN203905286U (en) | Z-shaped steel pipe bundle combined structure | |
CN219138056U (en) | Steel frame structure for assembled building | |
CN109667419B (en) | Folded plate type aluminum alloy template and construction method | |
CN216380102U (en) | Green energy-saving assembled building wall | |
CN211895671U (en) | Large-span arched pipe truss hoisting auxiliary device | |
CN214995104U (en) | Split opening floor support plate | |
CN212836613U (en) | Split type operating platform that hangs | |
CN203905217U (en) | An "L" type steel tube bundle composite structure | |
CN221168358U (en) | Special-shaped wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |