CN209703328U - A kind of steel box girder assembling positioning device - Google Patents

A kind of steel box girder assembling positioning device Download PDF

Info

Publication number
CN209703328U
CN209703328U CN201920390023.6U CN201920390023U CN209703328U CN 209703328 U CN209703328 U CN 209703328U CN 201920390023 U CN201920390023 U CN 201920390023U CN 209703328 U CN209703328 U CN 209703328U
Authority
CN
China
Prior art keywords
steel box
girder
plate
positioning
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920390023.6U
Other languages
Chinese (zh)
Inventor
肖天录
匡午初
冯金强
曾爱云
徐杨飞
曾伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guanyue Highway and Bridge Co Ltd
Original Assignee
Guangdong Guanyue Highway and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Guanyue Highway and Bridge Co Ltd filed Critical Guangdong Guanyue Highway and Bridge Co Ltd
Priority to CN201920390023.6U priority Critical patent/CN209703328U/en
Application granted granted Critical
Publication of CN209703328U publication Critical patent/CN209703328U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The problem of the utility model discloses a kind of steel box girder assembling positioning devices, are related to bridge support equipment technical field, and inaccurate, low efficiency is positioned in consolidation service to solve existing steel box-girder, complicated for operation, waste a large amount of manpower and material resources.The side for having installed steel box-girder is provided with steel box-girder to be installed, described installed is mounted on a yard plate above steel box-girder and steel box-girder to be installed, the code plate is internally provided with welding hole, the rear end face of the code plate is provided with height difference positioning mechanism, the height difference positioning mechanism is internally provided with loading plate, the loading plate is internally provided with inserted link, the side of the inserted link is provided with first support bar, the side of the first support bar is provided with the first adjusting screw rod, the first pressing plate is provided with below first adjusting screw rod, the other side of the inserted link is provided with second support bar, the side of the second support bar is provided with the second adjusting screw rod, the second pressing plate is provided with below second adjusting screw rod.

Description

A kind of steel box girder assembling positioning device
Technical field
The utility model relates to bridge support equipment technical field, specially a kind of steel box girder assembling positioning device.
Background technique
Big cross-border suspension bridge domestic at present, to reduce bridge self weight while increasing across footpath as far as possible, increasing bridge bearing Power, the girder of general suspension bridge are all made of the box girder construction of steel plate.When steel structure bridge lifts, it is necessary in advance by steel to be installed Box beam and mounted steel box-girder exactitude position, after exactitude position can by weld the two be connected it is integral.Steel box-girder Generally lifting and consolidation service need to be carried out at bridge construction scene.And the positioning accuracy request of steel box-girder is very high, including lifting, Assembly is until be finally installed into position.To ensure steel box girder construction quality and construction speed, steel box-girder needs one in hoisting process Kind can fast, accurately positioning device be rapid, secured before lifting is completed, circumferential weld splices by steel box-girder, accurately be connected to Together.
But when the welding of existing steel box-girder, difficulty of construction is big, installation accuracy require it is high, it is complicated for operation, accounted in work progress Longer with the time of crane barge, weld seam prestressing force is difficult to control when girth welding, both wastes material and manpower, efficiency is also relatively low Under;Therefore, it is unsatisfactory for existing demand, we have proposed a kind of steel box girder assembling positioning devices to this.
Utility model content
The purpose of this utility model is to provide a kind of steel box girder assembling positioning devices, to solve to mention in above-mentioned background technique Existing steel box-girder out positions inaccurate, low efficiency in consolidation service, complicated for operation, wastes asking for a large amount of manpower and material resources Topic.
To achieve the above object, the utility model provides the following technical solutions: a kind of steel box girder assembling positioning device, including Steel box-girder has been installed, the side for having installed steel box-girder is provided with steel box-girder to be installed, it is described installed steel box-girder with wait pacify A yard plate is mounted on above steel loading box beam, the code plate is internally provided with welding hole, and the rear end face of the code plate is provided with height Poor positioning mechanism, the height difference positioning mechanism are internally provided with loading plate, and the loading plate is internally provided with inserted link, described The side of inserted link is provided with first support bar, and the side of the first support bar is provided with the first adjusting screw rod, and described first adjusts It is provided with the first pressing plate below section screw rod, the other side of the inserted link is provided with second support bar, the second support bar Side is provided with the second adjusting screw rod, is provided with the second pressing plate below second adjusting screw rod, in the lower section of the inserted link Wall is provided with spacer pin, it is described steel box-girder and steel box-girder to be installed be installed be internally provided with assembled positioning plate, the assembly The side of positioning plate is provided with positioning fixing axle, and the other side of the assembly positioning plate is provided with positioning sleeve, the positioning sleeve It is internally provided with location hole, the inside of the location hole is equipped with locating shaft, and one end of the locating shaft is provided with handle.
Preferably, it is provided with idler wheel below the first support bar and second support bar, and there are two idler wheel settings.
Preferably, there are two the positioning fixing axle settings, and fixing axle and assembled positioning plate is positioned and passes through positioning shaft hole It is fixedly connected.
Preferably, there are two code plate settings, and code plate and steel box-girder and the steel box-girder to be installed company of welding have been installed It connects.
Preferably, the first support bar and second support bar are symmetrical about the vertical center line of inserted link.
Preferably, there are four the height difference positioning mechanism settings, and adjacent height difference positioning mechanism equidistantly distributed.
Compared with prior art, the utility model has the beneficial effects that
1, the utility model by setting height difference positioning mechanism, adjustable two steel box-girders vertical direction height difference, Not only disassembly easy to adjust also facilitates, and does not need to be weldingly fixed on steel box-girder, ensure that the intensity of steel box-girder and uses the longevity Life, and can reuse, it is simple and practical.It, can not only be fixed to height difference by the way that spacer pin is arranged inside height difference positioning mechanism Position mechanism plays the role of fixation, quickly pinpoint, moreover it is possible to prevent height difference positioning mechanism from occurring shaking phenomenon, shadow in construction It rings and adjusts positioning.
2, by the internal assembled positioning plate of setting, the inside of steel box-girder is accurately positioned, and more firm steel case The positioning of beam prevents not firm enough weld size when leading to welding uneven, influences efficiency.
Detailed description of the invention
Fig. 1 is the schematic diagram of internal structure of the utility model;
Fig. 2 is the overlooking structure diagram of the utility model;
Fig. 3 is the height difference positioning mechanism partial structural diagram of the utility model;
In figure: 1, steel box-girder has been installed;2, steel box-girder to be installed;3, code plate;4, height difference positioning mechanism;5, handle;6, it spells Fill positioning plate;7, locating shaft;8, positioning sleeve;9, fixing axle is positioned;10, location hole;11, welding hole;401, loading plate;402, it inserts Bar;403, the second adjusting screw rod;404, the first adjusting screw rod;405, spacer pin;406, the first pressing plate;407, the second pressing plate; 408, idler wheel;409, second support bar;410, first support bar.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Fig. 1-3 is please referred to, a kind of embodiment provided by the utility model: a kind of steel box girder assembling positioning device, including Steel box-girder 1 is installed, the side for having installed steel box-girder 1 is provided with steel box-girder 2 to be installed, has installed steel box-girder 1 and steel case to be installed The top of beam 2 is mounted on yard plate 3, and code plate 3 is internally provided with welding hole 11, plays a part of to be welded and fixed, the rear end face of code plate 3 It is provided with height difference positioning mechanism 4, serves pinpoint, height difference positioning mechanism 4 is internally provided with loading plate 401, carrying Plate 401 is internally provided with inserted link 402, and the side of inserted link 402 is provided with first support bar 410, plays a supportive role, the first support The side of bar 410 is provided with the first adjusting screw rod 404, by the first adjusting screw rod 404 and loading plate by the way of threaded connection 401 are fixed up, and the lower section of the first adjusting screw rod 404 is provided with the first pressing plate 406, play a part of to reduce pressure, avoid to steel Box beam causes extrusion damage, and the other side of inserted link 402 is provided with second support bar 409, and the side of second support bar 409 is provided with Second adjusting screw rod 403, the lower section of the second adjusting screw rod 403 are provided with the second pressing plate 407, the lower section inner wall setting of inserted link 402 There is spacer pin 405, play a part of quick and precisely to position, that has installed steel box-girder 1 and steel box-girder to be installed 2 is internally provided with assembly Positioning plate 6, the side of assembled positioning plate 6 are provided with positioning fixing axle 9, play fixation, the other side of assembled positioning plate 6 is set It is equipped with positioning sleeve 8, positioning sleeve 8 is internally provided with location hole 10, and the inside of location hole 10 is equipped with locating shaft 7, rises firm Effect, one end of locating shaft 7 is provided with handle 5, plays a part of to facilitate operation.
Further, the lower section of first support bar 410 and second support bar 409 is provided with idler wheel 408, and idler wheel 408 is set There are two setting, support rod is facilitated to rotate.
Further, there are two the settings of positioning fixing axle 9, and it is solid by positioning shaft hole to position fixing axle 9 and assembled positioning plate 6 Fixed connection, plays stronger effect.
Further, there are two the settings of code plate 3, and code plate 3 and steel box-girder 1 and the steel box-girder to be installed 2 company of welding have been installed It connects, steel box-girder 1 has been installed by the way of welded connecting and steel box-girder to be installed 2 is fixedly connected with code plate 3.
Further, first support bar 410 and second support bar 409 are symmetrical about the vertical center line of inserted link 402, rise flat Weighing apparatus, beautiful effect.
Further, there are four the settings of height difference positioning mechanism 4, and adjacent 4 equidistantly distributed of height difference positioning mechanism, beauty, The effect of equality.
Working principle: in use, will first be carried out just at the abutment joint position for having installed steel box-girder 1 and steel box-girder to be installed 2 Then code plate 3 and height difference positioning mechanism 4 are distributed in pair for having installed steel box-girder 1 and steel box-girder to be installed 2 by the positioning of step Seam crossing, by height difference positioning mechanism 4 first to having installed steel box-girder 1 and steel box-girder to be installed 2 is accurately positioned, when having installed When the top surface of steel box-girder 1 is higher than the top surface of steel box-girder 2 to be installed, the first adjusting screw rod 404 is rotated, the first adjusting screw rod 404 is made It moves down, then makes the either flush of the top surface for having installed steel box-girder 1 and steel box-girder 2 to be installed, otherwise similarly, steel has been installed Box beam 1 and steel box-girder to be installed 2 are internally provided with assembled positioning plate 6, and locating shaft 7 is first fixed on location hole by handle 5 In 10, then positioning fixing axle 9 is fixed on again on assembled positioning plate 6 again, plays firm effect, more accurate can positioned Steel box-girder prevents from positioning inaccurate and increasing difficulty of construction.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of steel box girder assembling positioning device, including steel box-girder (1) has been installed, it is characterised in that: it is described that steel box-girder has been installed (1) side is provided with steel box-girder to be installed (2), described to have installed steel box-girder (1) and the top of steel box-girder to be installed (2) is pacified Equipped with code plate (3), the code plate (3) is internally provided with welding hole (11), and the rear end face of the code plate (3) is provided with height difference positioning Mechanism (4), the height difference positioning mechanism (4) are internally provided with loading plate (401), the inside setting of the loading plate (401) Having inserted link (402), the side of the inserted link (402) is provided with first support bar (410), and the one of the first support bar (410) Side is provided with the first adjusting screw rod (404), is provided with the first pressing plate (406) below first adjusting screw rod (404), described The other side of inserted link (402) is provided with second support bar (409), and the side of the second support bar (409) is provided with the second tune It saves screw rod (403), is provided with the second pressing plate (407) below second adjusting screw rod (403), under the inserted link (402) Square inner wall is provided with spacer pin (405), it is described steel box-girder (1) and steel box-girder to be installed (2) be installed be internally provided with assembly Positioning plate (6), it is described assembly positioning plate (6) side be provided with positioning fixing axle (9), it is described assembly positioning plate (6) it is another Side is provided with positioning sleeve (8), and the positioning sleeve (8) is internally provided with location hole (10), the inside peace of the location hole (10) Equipped with locating shaft (7), one end of the locating shaft (7) is provided with handle (5).
2. a kind of steel box girder assembling positioning device according to claim 1, it is characterised in that: the first support bar (410) and below second support bar (409) it is provided with idler wheel (408), and there are two idler wheel (408) settings.
3. a kind of steel box girder assembling positioning device according to claim 1, it is characterised in that: the positioning fixing axle (9) There are two settings, and positions fixing axle (9) and be fixedly connected with assembled positioning plate (6) by positioning shaft hole.
4. a kind of steel box girder assembling positioning device according to claim 1, it is characterised in that: the code plate (3) is provided with Two, and code plate (3) with steel box-girder (1) has been installed and steel box-girder to be installed (2) is welded to connect.
5. a kind of steel box girder assembling positioning device according to claim 1, it is characterised in that: the first support bar (410) and second support bar (409) is symmetrical about the vertical center line of inserted link (402).
6. a kind of steel box girder assembling positioning device according to claim 1, it is characterised in that: the height difference positioning mechanism (4) there are four setting, and adjacent height difference positioning mechanism (4) equidistantly distributed.
CN201920390023.6U 2019-03-26 2019-03-26 A kind of steel box girder assembling positioning device Active CN209703328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920390023.6U CN209703328U (en) 2019-03-26 2019-03-26 A kind of steel box girder assembling positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920390023.6U CN209703328U (en) 2019-03-26 2019-03-26 A kind of steel box girder assembling positioning device

Publications (1)

Publication Number Publication Date
CN209703328U true CN209703328U (en) 2019-11-29

Family

ID=68645528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920390023.6U Active CN209703328U (en) 2019-03-26 2019-03-26 A kind of steel box girder assembling positioning device

Country Status (1)

Country Link
CN (1) CN209703328U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112301894A (en) * 2020-10-21 2021-02-02 南京交通工程有限公司 Steel box girder positioning device and steel box girder construction method for large-span bridge
CN113174855A (en) * 2021-04-20 2021-07-27 中交第三公路工程局有限公司 Nondestructive assembling device and method for road steel plate beam
CN115506239A (en) * 2022-01-27 2022-12-23 浙江理工大学 Temporary connecting piece of initial stage quick location

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112301894A (en) * 2020-10-21 2021-02-02 南京交通工程有限公司 Steel box girder positioning device and steel box girder construction method for large-span bridge
CN113174855A (en) * 2021-04-20 2021-07-27 中交第三公路工程局有限公司 Nondestructive assembling device and method for road steel plate beam
CN115506239A (en) * 2022-01-27 2022-12-23 浙江理工大学 Temporary connecting piece of initial stage quick location

Similar Documents

Publication Publication Date Title
CN209703328U (en) A kind of steel box girder assembling positioning device
CN111056455B (en) Concrete pouring positioning equipment for iron tower base of communication base station
CN108708297A (en) Punching stick anchor ear support device
CN204728217U (en) The assembled positioning plate device of steel box girder segment
CN207878428U (en) A kind of hydraulic bolt formula jack-up unit wedge bracket guide frame
CN210827533U (en) Device for embedding foundation bolt group
CN203298984U (en) Tower crane general test platform
CN215052155U (en) Continuous beam combined shear connector structure device
CN107237515A (en) The support meanss and its application method of circular steel truss structure
CN210369024U (en) Assembled tower crane cushion cap basis festival standard height controlling means
CN210136644U (en) Airplane main undercarriage supporting structure for training and teaching
CN202571680U (en) Pipe flange plate correcting and welding device
CN203402301U (en) Track frame structure
CN208201882U (en) A kind of narrow deep foundation pit construction steel support structure
CN213896713U (en) Improved steel box girder bridge assembling and positioning device
CN209919225U (en) Barrel butt joint positioner
CN218643097U (en) Roadbed box with connecting structure
CN216838985U (en) Accurate adjusting device of precast beam vertical and horizontal slope wedge
CN209175167U (en) Weld positioning tool in hydraulic bolt formula jacking system fixed pile chamber guide rod hole
CN214423123U (en) Sectional type steel truss bridge structure
CN217947352U (en) Steel column hoisting device
CN203034381U (en) Steel shotcrete hoop
CN218320401U (en) Crane with auxiliary mounting structure
CN112924008B (en) Weighing module convenient for field transformation
CN210066520U (en) Simple concrete spreader

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 502, No. 106, East Ring Road, Dalong street, Panyu District, Guangzhou City, Guangdong Province

Patentee after: GUANGDONG GUANYUE HIGHWAY & BRIDGE Co.,Ltd.

Address before: 510000 802, eight floor, 461 Tianrun Road, Tianhe District, Guangzhou, Guangdong.

Patentee before: GUANGDONG GUANYUE HIGHWAY & BRIDGE Co.,Ltd.

CP02 Change in the address of a patent holder