CN209696566U - A kind of power plant's civil construction dust collecting - Google Patents
A kind of power plant's civil construction dust collecting Download PDFInfo
- Publication number
- CN209696566U CN209696566U CN201822004874.0U CN201822004874U CN209696566U CN 209696566 U CN209696566 U CN 209696566U CN 201822004874 U CN201822004874 U CN 201822004874U CN 209696566 U CN209696566 U CN 209696566U
- Authority
- CN
- China
- Prior art keywords
- water
- fixedly connected
- hose
- collecting box
- dust
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of power plant's civil construction dust collectings, it is related to dust collection technical field, it includes support plate, the upper surface of the support plate is fixedly connected with collecting box, the upper surface of the collecting box is provided with water tank, the upper surface of the water tank is connected by drinking-water pipe with the water inlet end of water-delivery pump, and the water outlet of the water-delivery pump is connected with the right end of water-supply-pipe, and the lower surface of water-delivery pump is fixedly connected with the upper surface of water tank.Power plant's civil construction dust collecting, pass through the first connecting plate, the second connecting plate, threaded post, the collective effect of the first thread cap, the second thread cap, sealing ring and annular groove, to realize the disassembly for hose, hose and the second filter screen are cleaned to facilitate, to ensure the cleaning of hose and the second filter screen, reducing dust accumulation influences the probability that dust collection efficiency happens.
Description
Technical field
The utility model relates to dust collection technical field, specially a kind of power plant's civil construction dust collecting.
Background technique
Civil construction: i.e. the construction of civil construction project covers ground, underground, land, each scope waterborne and underwater etc.
Facility in all works scopes such as interior house, road, railway, airport, bridge, water conservancy, harbour, tunnel, plumbing and protection
With the construction of building, structures and engineering object in place, both included exploration during engineering-built, design, construction,
Every technical activity such as maintenance and management.
Many dust can be generated during power plant's civil construction, need to be collected dust, traditional dust collection
Device does not handle dust dust collection later, to easily cause secondary pollution, and sweep-up pipe is usually and collecting box
To be fixedly connected, it is not easy to dismantle, after sweep-up pipe permanent dust suction, there are many dust for the inner wall absorption contamination of sweep-up pipe, and
The dust of dust suction inside pipe wall is cleared up in inconvenience, to influence dust collection efficiency.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of power plant's civil construction dust collecting, solves
Traditional dust collecting does not handle dust dust collection later, to easily cause secondary pollution, and suction
Dirt pipe is usually to be fixedly connected with collecting box, is not easy to dismantle, and after sweep-up pipe permanent dust suction, the inner wall absorption of sweep-up pipe is stained with
Many dust are infected with, and the dust of dust suction inside pipe wall is cleared up in inconvenience, thus the problem of influencing dust collection efficiency.
(2) technical solution
To achieve the above objectives, the technical scheme adopted by the utility model is that: a kind of power plant's civil construction dust collection dress
It sets, including support plate, the upper surface of the support plate is fixedly connected with collecting box, and the upper surface of the collecting box is provided with water storage
The upper surface of case, the water tank is connected by drinking-water pipe with the water inlet end of water-delivery pump, the water outlet of the water-delivery pump with it is defeated
The right end of water pipe is connected, and the lower surface of water-delivery pump is fixedly connected with the upper surface of water tank, and the bottom end of the water-supply-pipe is worn
It crosses the upper surface of collecting box and is connected with the upper surface of flusher, and the right side of water-supply-pipe passes through the first fixed link and storage
The left side of water tank is fixedly connected, the upper table that the upper surface of the flusher passes through two the second fixed links and collection chamber interior wall
Face is fixedly connected, and the right side for collecting chamber interior wall is provided with the first filter screen, and corresponding first filtering in collecting box right side
The position of net is connected with air intake device air inlet, and the bottom end of the air intake device is fixed connection to the upper surface of the support plate.
The left side of the collecting box is provided with connecting tube, and the upper and lower surfaces of the connecting tube are fixedly connected to second
Connecting plate, the left side of the connecting tube are provided with sealing ring, and the left side of the sealing ring and hose outer wall open up ring
The inner wall of connected in star overlaps, and the right end of the hose extends to the inside of connecting tube, two table up and down of the hose
Face is fixedly connected to the first connecting plate, and the right side of first connecting plate and the left side of the second connecting plate are connected with same
A screw device, the right end of the screw device are fixedly connected with motion bar, and the left end of the hose is provided with dust suction dress
It sets, and hose is connected in the card slot that fixed plate front opens up, the lower surface of the fixed plate and the upper surface of support plate
It is fixedly connected.
The lower surface of the collecting box is provided with outlet pipe, and the bottom end of the outlet pipe passes through support plate and is located at support plate
Lower section, and the front of outlet pipe is provided with valve, and the upper surface of the support plate is provided with handle, and the lower surface of support plate
There are four pulleys for setting, and the right side of the collecting box is provided with power supply, first switch and the second switch, the output of the power supply
End is electrically connected with the input terminal of first switch and the second switch respectively by conducting wire.
Preferably, the flusher includes water storage box, and the upper surface of the water storage box is connected with the bottom end of water-supply-pipe,
And the upper surface of water storage box is fixedly connected with the bottom end of two the second fixed links respectively, and the lower surface of water storage box be provided with it is several
A spray head.
Preferably, the air intake device includes blower, and the air inlet of the blower is connected with the right side of collecting box, and
The lower surface of blower is fixedly connected with bracket, and the bottom end of the bracket is fixed connection to the upper surface of the support plate.
Preferably, the screw device includes the first thread cap, and first thread cap is connected to the right side of the first connecting plate
Side, and the inner thread of the first thread cap is connected with threaded post, the outer wall thread of the threaded post is connected with the second thread cap,
And the right end of threaded post is fixedly connected with the left side of motion bar, and the second thread cap is connected to the left side of the second connecting plate.
Preferably, the dust exhaust apparatus includes dust hood, and the right end of the dust hood is connected with the left end of hose,
And the inner wall of dust hood is provided with the second filter screen.
Preferably, the output end of the first switch is electrically connected by conducting wire with the input terminal of blower, the second switch
Output end be electrically connected with the input terminal of water-delivery pump by conducting wire.
(3) beneficial effect
The utility model has the beneficial effects that:
1, power plant's civil construction dust collecting, passes through the first connecting plate, the second connecting plate, threaded post, the first spiral shell
The collective effect of line cap, the second thread cap, sealing ring and annular groove, worker rotate backward motion bar, so that threaded post is
It turns right under the action of one thread cap and the second thread cap, so that threaded post is separated with the first thread cap, then takes dynamic
Hose, so that hose is separated with connecting tube, sealing ring is separated with annular groove, to realize for hose
Disassembly, hose and the second filter screen are cleaned to facilitate, thus ensured hose and second filtering
The cleaning of net, reducing dust accumulation influences the probability that dust collection efficiency happens.
2, power plant's civil construction dust collecting, by water storage box, water-delivery pump, drinking-water pipe, water-supply-pipe, water storage box and
The collective effect of spray head, water delivery pump work, so that the water flow of water tank flows through water storage by drinking-water pipe, water-delivery pump and water-supply-pipe
Case is finally sprayed from several spray heads, so that the water flow of atomization precipitates dust, to realize for after dust collection
Timely precipitating, avoid the secondary pollution of dust.
3, power plant's civil construction dust collecting is soft by blower, the first filter screen, collecting box, connecting tube, dust suction
The collective effect of pipe, dust hood and the second filter screen, blower work, so that hose generates air-flow, so that constructing
The dust floated in journey enters hose by the filtering of the second filter screen, and dust enters receipts by hose and connecting tube
In header, to realize the centralized collection for dust, avoids the distribution at random of dust in work progress and inhaled by construction personnel
Enter internal situation, ensures the health of construction personnel.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure that the utility model is faced;
Fig. 2 is the structural schematic diagram of the portion the utility model A amplification;
Fig. 3 is the partial profile structure that the utility model connecting tube is faced;
Fig. 4 is the structural schematic diagram of the utility model dust exhaust apparatus left view.
In figure: 1 support plate, 2 collecting boxs, 3 water tanks, 4 drinking-water pipes, 5 water-delivery pumps, 6 first fixed links, 7 flushers, 71
Water storage box, 72 spray heads, 8 water-supply-pipes, 9 second fixed links, 10 first filter screens, 11 air intake devices, 111 blowers, 112 brackets, 12
Connecting tube, 13 sealing rings, 14 hoses, 15 annular grooves, 16 first connecting plates, 17 screw devices, 171 first thread caps,
172 threaded posts, 173 second thread caps, 18 motion bars, 19 dust exhaust apparatuses, 191 dust hoods, 192 second filter screens, 20 card slots, 21
Fixed plate, 22 handles, 23 outlet pipes, 24 valves, 25 pulleys, 26 power supplys, 27 first switches, 28 second switches, 29 second connections
Plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figs 1-4, the utility model provides a kind of technical solution: a kind of power plant's civil construction dust collecting,
Including support plate 1, the upper surface of support plate 1 is fixedly connected with collecting box 2, and the upper surface of collecting box 2 is provided with water tank 3, storage
The upper surface of water tank 3 is connected by drinking-water pipe 4 with the water inlet end of water-delivery pump 5, the water outlet of water-delivery pump 5 and the right side of water-supply-pipe 8
End is connected, and passes through the collective effect of water storage box 71, water-delivery pump 5, drinking-water pipe 4, water-supply-pipe 8, water storage box 71 and spray head 72, water delivery
5 work of pump, so that the water flow of water tank 3 flows through water storage box 71 finally from several by drinking-water pipe 4, water-delivery pump 5 and water-supply-pipe 8
A spray head 72 sprays, so that the water flow of atomization precipitates dust, thus realize for the timely precipitating after dust collection,
The secondary pollution of dust is avoided, and the lower surface of water-delivery pump 5 is fixedly connected with the upper surface of water tank 3, the bottom end of water-supply-pipe 8
Across collecting box 2 upper surface and be connected with the upper surface of flusher 7, and the right side of water-supply-pipe 8 is fixed by first
Bar 6 is fixedly connected with the left side of water tank 3, by the way that the first fixed link 6 is arranged, to realize the fixation of water-supply-pipe 8, is sprayed
The upper surface of device 7 is fixedly connected by two the second fixed links 9 with the upper surface of 2 inner wall of collecting box, and flusher 7 includes storing
The upper surface of water tank 71, water storage box 71 is connected with the bottom end of water-supply-pipe 8, and the upper surface of water storage box 71 respectively with two second
The bottom end of fixed link 9 is fixedly connected, and the lower surface of water storage box 71 is provided with several spray heads 72, by the way that spray head 72 is arranged, from
And the atomization of water flow is realized, so that the precipitating of dust is more comprehensive, the right side of 2 inner wall of collecting box is provided with the first filter screen
10, by the way that the first filter screen 10 is arranged, so that the filtering for dust is realized, so as to avoid dust as air-flow flows together
Collecting box 2 out, and the position of corresponding first filter screen 10 in 2 right side of collecting box is connected with 11 air inlet of air intake device, air draught
The bottom end of device 11 is fixedly connected with the upper surface of support plate 1, air intake device 11 include blower 111, the air inlet of blower 111 with
The right side of collecting box 2 is connected, and by blower 111, the first filter screen 10, collecting box 2, connecting tube 12, hose 14, inhales
The collective effect of dust hood 191 and the second filter screen 192, blower 111 work, so that hose 14 generates air-flow, so that
The dust floated in work progress enters hose 14 by the filtering of the second filter screen 192, and dust passes through hose 14
Enter in collecting box 2 with connecting tube 12, to realize the centralized collection for dust, it is at random to avoid dust in work progress
Distribution has ensured the health of construction personnel, and the lower surface of blower 111 is fixedly connected with by the situation in construction personnel's suction body
Bracket 112, to realize the fixation of 111 fuselage of blower, avoids the rotation of 111 fuselage of blower, bracket by bracket 112
112 bottom end is fixedly connected with the upper surface of support plate 1.
The left side of collecting box 2 is provided with connecting tube 12, and the upper and lower surfaces of connecting tube 12 are fixedly connected to the second company
Fishplate bar 29, the left side of connecting tube 12 are provided with sealing ring 13, and the left side of sealing ring 13 and 14 outer wall of hose open up ring
The inner wall of connected in star 15 overlaps, by the way that sealing ring 13 is arranged, to realize the close of connecting tube 12 and 14 junction of hose
Envelope, avoids the leakage of dust, the right end of hose 14 extends to the inside of connecting tube 12, two table up and down of hose 14
Face is fixedly connected to the first connecting plate 16, and the left side of the right side of the first connecting plate 16 and the second connecting plate 29 is connected with together
One screw device 17, the right end of screw device 17 are fixedly connected with motion bar 18, and screw device 17 includes the first thread cap
171, the first thread cap 171 is connected to the right side of the first connecting plate 16, and the inner thread of the first thread cap 171 is connected with spiral shell
Line column 172, the outer wall thread of threaded post 172 are connected with the second thread cap 173, pass through threaded post 172,171 and of the first thread cap
The collective effect of second thread cap 173, worker rotate backward motion bar 18, so that threaded post 172 is in the first thread cap 171 and
It turns right under the action of two thread caps 173, so that threaded post 172 is separated with the first thread cap 171, then takes dynamic dust suction
Hose 14, so that hose 14 is separated with connecting tube 12, sealing ring 13 is separated with annular groove 15, to realize for inhaling
The disassembly of dirt hose 14 cleans hose 14 and the second filter screen 192 to facilitate, to ensure that dust suction is soft
The cleaning of pipe 14 and the second filter screen 192, reducing dust accumulation influences the probability that dust collection efficiency happens, and threaded post
172 right end is fixedly connected with the left side of motion bar 18, and the second thread cap 173 is connected to the left side of the second connecting plate 29
Face, the left end of hose 14 are provided with dust exhaust apparatus 19, and dust exhaust apparatus 19 includes dust hood 191, the right end of dust hood 191 with
The left end of hose 14 is connected, and the inner wall of dust hood 191 is provided with the second filter screen 192, passes through the second filtering of setting
The case where net 192 avoids some big impurity and enters in hose 14, blocks hose 14, and hose 14 is clamped
In the card slot 20 that 21 front of fixed plate opens up, by the way that card slot 20 is arranged, to facilitate the placement of hose 14, fixed plate
21 lower surface is fixedly connected with the upper surface of support plate 1.
The lower surface of collecting box 2 is provided with outlet pipe 23, and the bottom end of outlet pipe 23 passes through support plate 1 and is located at support plate 1
Lower section, and the front of outlet pipe 23 is provided with valve 24, by setting outlet pipe 23 and valve 24, is opened out by valve 24
Water pipe 23, so that sewage flows out collecting box 2, to realize the discharge of sewage, the upper surface of support plate 1 is provided with handle 22,
And the lower surface setting of support plate 1 is there are four pulley 25, the right side of collecting box 2 is provided with power supply 26, first switch 27 and the
The output end of two switches 28, power supply 26 is electrically connected with the input terminal of first switch 27 and second switch 28 respectively by conducting wire, the
The output end of one switch 27 is electrically connected by conducting wire with the input terminal of blower 111, by the way that first switch 27 is arranged, so that worker couple
More convenient in the manipulation of 111 working condition of blower, the output end of second switch 28 passes through the input terminal of conducting wire and water-delivery pump 5 electricity
Connection, by the way that second switch 28 is arranged, so that worker is more convenient for the manipulation of 5 working condition of water-delivery pump.
The operating procedure of the utility model are as follows:
S1, worker push support plate 1 by handle 22, so that support plate 1 moves to the position of construction, worker passes through operation
First switch 27 makes blower 111 work, and by operating second switch 28 water-delivery pump 5 is worked, so that hose
14 generate air-flow, so that the dust floated in work progress enters hose 14 by the filtering of the second filter screen 192,
Some big impurity are avoided to enter in hose 14, dust is entered in collecting box 2 by hose 14 and connecting tube 12, and powder
Dirt does not flow out collecting box 2 under the filtration of the first filter screen 10, and worker Ke Na moves hose 14, so that hose 14
It is separated with card slot 20, dust hood 191 may make to be directed at the collection that construction location carries out dust;
S2, water-delivery pump 5 work, so that the water flow of water tank 3 flows through water storage by drinking-water pipe 4, water-delivery pump 5 and water-supply-pipe 8
Case 71 is finally sprayed from several spray heads 72, so that the water flow of atomization precipitates dust, after the completion of collection, worker passes through behaviour
Making first switch 27 makes blower 111 stop working, and by operating second switch 28 water-delivery pump 5 is stopped working, passes through valve
Door 24 opens outlet pipe 23, so that sewage flows out collecting box 2;
S3, when needing to clean the inner wall of hose, worker rotates backward motion bar 18, so that threaded post 172 is
It turns right under the action of one thread cap 171 and the second thread cap 173, so that threaded post 172 is divided with the first thread cap 171
From, dynamic hose 14 is then taken, so that hose 14 is separated with connecting tube 12, sealing ring 13 is separated with annular groove 15,
Hose 14 and the second filter screen 192 are cleaned, after the completion of cleaning, worker is socketed in the right end of hose 14
The inner wall of connecting tube 12, sealing ring 13 are contacted with annular groove 15, and worker rotates forward motion bar 18, so that threaded post 172 exists
It turns left under the action of the one the second thread caps 173, so that threaded post 172 is threadedly coupled with the first thread cap 171.
Above-described specific embodiment, to the purpose of this utility model, technical scheme and beneficial effects carried out into
One step is described in detail, it should be understood that being not used to limit the foregoing is merely specific embodiment of the present utility model
The utility model processed, within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done,
It should be included within the scope of protection of this utility model.
Claims (6)
1. a kind of power plant's civil construction dust collecting, including support plate (1), it is characterised in that: the support plate (1) it is upper
Surface is fixedly connected with collecting box (2), and the upper surface of the collecting box (2) is provided with water tank (3), the water tank (3)
Upper surface is connected by drinking-water pipe (4) with the water inlet end of water-delivery pump (5), the water outlet and water-supply-pipe (8) of the water-delivery pump (5)
Right end be connected, and the lower surface of water-delivery pump (5) is fixedly connected with the upper surface of water tank (3), the bottom of the water-supply-pipe (8)
It holds the upper surface across collecting box (2) and is connected with the upper surface of flusher (7), and the right side of water-supply-pipe (8) passes through
First fixed link (6) is fixedly connected with the left side of water tank (3), and the upper surface of the flusher (7) passes through two second
Fixed link (9) is fixedly connected with the upper surface of collecting box (2) inner wall, and the right side of collecting box (2) inner wall is provided with first
Filter screen (10), and the position of collecting box (2) right side corresponding first filter screen (10) is connected with air intake device (11) air inlet
Logical, the bottom end of the air intake device (11) is fixedly connected with the upper surface of support plate (1);
The left side of the collecting box (2) is provided with connecting tube (12), and the upper and lower surfaces of the connecting tube (12) are fixed to be connected
It is connected to the second connecting plate (29), the left side of the connecting tube (12) is provided with sealing ring (13), a left side for the sealing ring (13)
The inner wall that side and hose (14) outer wall open up annular groove (15) overlaps, and the right end of the hose (14) extends to
The upper and lower surfaces of the inside of connecting tube (12), the hose (14) are fixedly connected to the first connecting plate (16), described
The right side of first connecting plate (16) and the left side of the second connecting plate (29) are connected with the same screw device (17), the spiral shell
The right end of line device (17) is fixedly connected with motion bar (18), and the left end of the hose (14) is provided with dust exhaust apparatus
(19), and hose (14) is connected in the card slot (20) that fixed plate (21) front opens up, the following table of the fixed plate (21)
Face is fixedly connected with the upper surface of support plate (1);
The lower surface of the collecting box (2) is provided with outlet pipe (23), and the bottom end of the outlet pipe (23) passes through support plate (1) simultaneously
It is provided with valve (24) positioned at the front of the lower section of support plate (1), and outlet pipe (23), the upper surface of the support plate (1) is set
It is equipped with handle (22), and the lower surface setting of support plate (1), there are four pulley (25), the right side of the collecting box (2) is arranged
There are power supply (26), first switch (27) and a second switch (28), the output end of the power supply (26) is by conducting wire respectively with first
Switch the input terminal electrical connection of (27) and second switch (28).
2. a kind of power plant's civil construction dust collecting according to claim 1, it is characterised in that: the flusher
It (7) include water storage box (71), the upper surface of the water storage box (71) is connected with the bottom end of water-supply-pipe (8), and water storage box (71)
Upper surface be fixedly connected respectively with the bottom end of two the second fixed links (9), and the lower surface of water storage box (71) be provided with it is several
A spray head (72).
3. a kind of power plant's civil construction dust collecting according to claim 1, it is characterised in that: the air intake device
It (11) include blower (111), the air inlet of the blower (111) is connected with the right side of collecting box (2), and blower (111)
Lower surface be fixedly connected with bracket (112), the bottom end of the bracket (112) is fixedly connected with the upper surface of support plate (1).
4. a kind of power plant's civil construction dust collecting according to claim 1, it is characterised in that: the screw device
(17) include the first thread cap (171) that first thread cap (171) is connected to the right side of the first connecting plate (16), and the
The inner thread of one thread cap (171) is connected with threaded post (172), and the outer wall thread of the threaded post (172) is connected with second
Thread cap (173), and the right end of threaded post (172) is fixedly connected with the left side of motion bar (18), and the second thread cap (173)
It is connected to the left side of the second connecting plate (29).
5. a kind of power plant's civil construction dust collecting according to claim 1, it is characterised in that: the dust exhaust apparatus
It (19) include dust hood (191), the right end of the dust hood (191) is connected with the left end of hose (14), and dust hood
(191) inner wall is provided with the second filter screen (192).
6. a kind of power plant's civil construction dust collecting according to claim 3, it is characterised in that: the first switch
(27) output end is electrically connected by conducting wire with the input terminal of blower (111), and the output end of the second switch (28) is by leading
Line is electrically connected with the input terminal of water-delivery pump (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822004874.0U CN209696566U (en) | 2018-12-02 | 2018-12-02 | A kind of power plant's civil construction dust collecting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822004874.0U CN209696566U (en) | 2018-12-02 | 2018-12-02 | A kind of power plant's civil construction dust collecting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209696566U true CN209696566U (en) | 2019-11-29 |
Family
ID=68635853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822004874.0U Expired - Fee Related CN209696566U (en) | 2018-12-02 | 2018-12-02 | A kind of power plant's civil construction dust collecting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209696566U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110952650A (en) * | 2019-12-09 | 2020-04-03 | 李晓婷 | Municipal administration environmental protection pipeline desilting device |
-
2018
- 2018-12-02 CN CN201822004874.0U patent/CN209696566U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110952650A (en) * | 2019-12-09 | 2020-04-03 | 李晓婷 | Municipal administration environmental protection pipeline desilting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209564801U (en) | A kind of Environmental-protecting dust-removing equipment of building engineering construction | |
CN206508781U (en) | A kind of multistage water smoke purifier of simple type | |
CN209696566U (en) | A kind of power plant's civil construction dust collecting | |
CN209464797U (en) | Flour processing dust-extraction unit | |
CN207654875U (en) | Dust-extraction unit and cleaner | |
CN108654265A (en) | A kind of workshop disordered exhaust gas collection device | |
CN210278711U (en) | Waste gas collection device for chemical products | |
CN210021581U (en) | Waste gas treatment air inlet unit | |
CN211585831U (en) | Dust collector who facilitates use | |
CN106861345A (en) | One kind is used for coal factory building gas cleaning plant | |
CN209519517U (en) | A kind of fountain dust treatment device | |
CN207786192U (en) | A kind of dust-extraction unit | |
CN208952311U (en) | A kind of dust filtering air draft pipe device | |
CN211585847U (en) | Flue gas dust removal device | |
CN208599392U (en) | A kind of workshop disordered exhaust gas collection device | |
CN104998492B (en) | A kind of efficiently haze absorption tower | |
CN221385787U (en) | Dust collecting equipment is used in on-the-spot construction of building engineering | |
CN205850502U (en) | A kind of waste gas recovery purifier | |
CN212417351U (en) | Bridge-dismantling dustproof device | |
CN208564607U (en) | A kind of coal mine sampling ventilation device convenient for cleaning dust stratification | |
CN211400133U (en) | Automatic clean dustless workshop purifier | |
CN214513582U (en) | Dry dust recovery device with spraying function | |
CN216604516U (en) | A waste gas collection device that is used for cigarette factory to have clean function | |
CN215027342U (en) | Energy-concerving and environment-protective type dust collector | |
CN107583392A (en) | A kind of City-level air cleaning member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191129 Termination date: 20211202 |