CN209669931U - The constructing structure of external hanging type wind pavilion - Google Patents

The constructing structure of external hanging type wind pavilion Download PDF

Info

Publication number
CN209669931U
CN209669931U CN201920210471.3U CN201920210471U CN209669931U CN 209669931 U CN209669931 U CN 209669931U CN 201920210471 U CN201920210471 U CN 201920210471U CN 209669931 U CN209669931 U CN 209669931U
Authority
CN
China
Prior art keywords
main body
foundation pit
wind pavilion
pavilion
hanging type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920210471.3U
Other languages
Chinese (zh)
Inventor
戴海峰
徐圯
张宝杰
张坤
王金龙
刘梦华
王烨伟
刘帅
孟雪成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN201920210471.3U priority Critical patent/CN209669931U/en
Application granted granted Critical
Publication of CN209669931U publication Critical patent/CN209669931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of constructing structure of the utility model about external hanging type wind pavilion, including being set to the outer dewatering well in hole of the wind pavilion foundation pit far from main body foundation pit side, stay dewatering well in the hole being located in the main body foundation pit of the other side, main body is set and turns over bracing members together between beam and engineering method dowel crown beam, to pour the large steel moulding plate of wind pavilion structure side wall.The utility model has the advantages that reducing the Water And Earth Pressures resultant force for acting on and going along with sb. to guard him in engineering method stake by outer dewatering well in hole;It stays in main body foundation pit and in wind pavilion foundation pit join domain and sets dewatering well, reduce main body Water Level in Foundation Pit rise bring percolating water risk;Inner support supporting point is adjusted from former main body fender post crown beam to main body and turns over beam, abolishing for former main body fender post and crown beam can be carried out with earth excavation, do mechanization operation may be implemented to accelerate speed of application, avoid the inconvenience for hanging out pile section by post-cast strip;The rapid construction for realizing structure side wall is conducive to form fender post lateral support effect, reduces foundation pit deformation risk.

Description

The constructing structure of external hanging type wind pavilion
Technical field
The utility model relates to a kind of civil construction structure more particularly to a kind of constructing structures of external hanging type wind pavilion.
Background technique
Metro Station Structure is generally divided into station main structure and accessory structure, wherein accessory structure be generally divided into wind pavilion and Two class of entrance needs just to need first to apply at this time in the longitudinally parallel setting in main body foundation pit side when wind pavilion uses external hanging type Do wind pavilion foundation pit carry out again wind pavilion structure return build.External hanging type wind pavilion is generally basement one structure, and excavation of foundation pit depth is general In 10m or so, width comprehensively considers economy and safety majority in 6~10m, design using engineering method stake building enclosure, together Shi Shixian sealing effect, is typically provided with twice inner support, and support is respectively arranged at that engineering method stake is gone along with sb. to guard him and former main structure is gone along with sb. to guard him Crown beam and pile body between.In water-rich sand layer ground, the resultant force that the load that engineering method stake is gone along with sb. to guard him is Water And Earth Pressures is acted on, by Small in level of ground water height, active earth pressure, hydraulic pressure load will account for very at high proportion.
Branch will be lost by needing to cut the inner support that original is gone along with sb. to guard him pile body, but is arranged at this time when wind pavilion structure progress structure is returned and built Support point, common way is to stay to set post-cast strip between wind pavilion structure and main structure in engineering, first carry out part backplane, side wall and Returning for top plate is built, and as support is gradually removed in the construction of part-structure, is then cut pile body between post-cast strip and is hung out, finally carries out Post-cast strip pours, and completes entire wind pavilion structure time and builds.Such arrangement and method for construction causes pile body to cut time-consuming since post-cast strip space is small Work consuming and safety is poor, while structure longitudinal direction construction joint is increased, easily lead to later period percolating water.
Utility model content
In view of the problems of the above-mentioned prior art, the purpose of this utility model is to propose a kind of construction of external hanging type wind pavilion Structure.
The utility model mainly provides a kind of constructing structure of external hanging type wind pavilion, comprising:
Dewatering well in cheating is arranged along main body foundation pit and wind pavilion foundation pit join domain interval;
Outer dewatering well in hole is set to side of the wind pavilion foundation pit far from main body foundation pit;And
Bracing members are set up in main body and turn between beam and engineering method dowel crown beam.
Preferably, the constructing structure of the external hanging type wind pavilion, dewatering well is along main body foundation pit and wind pavilion base in the hole Join domain is cheated to be arranged according to the interval 30~35m.
Preferably, the constructing structure of the external hanging type wind pavilion, the outer dewatering well in hole is along wind pavilion foundation pit longitudinal direction It is arranged according to the interval 20~25m.
Preferably, the constructing structure of the external hanging type wind pavilion further includes that main body is arranged in turn over beam absent region Support pier.
Preferably, the constructing structure of the external hanging type wind pavilion further includes the pre- pre-buried anchor for being embedded in wind pavilion structure base slab Muscle.
Preferably, the constructing structure of the external hanging type wind pavilion further includes being installed on pre- to pour wind pavilion structure side wall The large steel moulding plate and tripod of position, the large steel moulding plate and tripod and the pre-buried dowel anchor.
Preferably, the constructing structure of the external hanging type wind pavilion further includes being erected on pre- to pour wind pavilion structure roof The falsework system of position.
The advantages of constructing structure of external hanging type wind pavilion provided by the utility model, the utility model, includes:
1, the utility model reduces the Water And Earth Pressures resultant force for acting on and going along with sb. to guard him in engineering method stake by outer dewatering well in hole, by interior branch Support is reduced to reduce the adverse effect that second support is arranged and builds subsequent earth excavation and structure time together from twice.
2, the utility model sets dewatering well with staying in wind pavilion foundation pit join domain in main body foundation pit, reduces main body foundation pit water Position rise bring percolating water risk.
3, inner support point is adjusted from former main body fender post crown beam to main body and turns over beam by the utility model, can be opened with the earthwork Abolishing for main body fender post and crown beam is dug while being carried out, do mechanization operation may be implemented to accelerate speed of application, avoid and pass through Post-cast strip hangs out the inconvenience of pile section.
4, no setting is required post-cast strip, reduction structure construction seam quantity, the risk of reduction later period percolating water;Realize structure side wall Rapid construction, be conducive to fender post formed lateral support effect, reduce foundation pit deformation risk.
Detailed description of the invention
Fig. 1 is the arrangement schematic diagram of the utility model excavation pit;
Fig. 2 is Hui Zhufeng pavilion structural schematic diagram of the utility model after excavation pit.
Primary clustering symbol description
Reserved 1 outer dewatering well in hole 2 of dewatering well
3 main body foundation pit enclosure stakes 4 are gone along with sb. to guard him in engineering method stake
5 bracing members 6 of main body foundation pit waterproof curtain
7 main body of engineering method dowel crown beam turns over beam 8
9 bottom plate 10 of station main body
11 top plate 12 of side wall
Pre-buried 13 tripod 14 of dowel
15 dewatering well 16 of steel form
Specific embodiment
The preferred embodiment for cooperating schema and the utility model below, it is to reach to make a reservation in fact that the utility model, which is further described, The technological means taken with novel purpose.
As shown in Figure 1 to Figure 2, a kind of construction knot of external hanging type wind pavilion provided in an embodiment of the utility model Structure, including cheat interior dewatering well 1, outer dewatering well in hole 2, bracing members 6, support pier, pre-buried dowel 13, large steel moulding plate 15 and tripod 14 And falsework system.
In cheating dewatering well 1 main structure excavation of foundation pit forward position main body foundation pit and wind pavilion foundation pit join domain according to 30~ The setting of the interval 35m, the well casing for cheating interior dewatering well 1 are all made of real pipe in wind pavilion structure base slab above section, and dewatering well uses steel pipe Well, well top mark height are disposed with immersible pump more than initial water level in well.
Outer dewatering well in hole 2 is set to wind pavilion foundation pit and goes along with sb. to guard him outside 3 far from the side engineering method stake of main body foundation pit, precipitation outside the hole Well 2 uses sand-free concrete tube, goes along with sb. to guard him in engineering method stake and is arranged at 3 and 5 5~8m of seam crossing distance of main body water-stop curtain, remaining edge Wind pavilion foundation pit longitudinal direction arrangement, 20~25m of spacing are disposed with immersible pump in well.
Bracing members 6 are set up in main body and turn between beam 8 and engineering method dowel crown beam 7, branch tie distance 3m, brace pre axial force 300kN.
Support pier is arranged according to bracing members position turns over beam absent region in main body, support pier section 700mm × 750mm, Close to support one side 11B28, the anchorage length away from support one side 4B28, stirrup A12@150, main reinforcement insertion top plate is main reinforcement 15d。
After-pouring is excavated by carrying out wind pavilion pit earthwork to form wind pavilion structure base slab.Pre-buried dowel 13 is embedded in wind pavilion in advance Structure base slab, the pre-buried oblique 45 ° of settings of dowel B32, the length being anchored in bottom plate are no less than 0.5m.
Large steel moulding plate 15 and tripod 14 are installed on the pre- position for pouring wind pavilion structure side wall, large steel moulding plate 15 and tripod 14 anchor with pre-buried dowel 13, to pour the side wall to form wind pavilion structure.
Falsework system is erected on the position of the pre- top plate for pouring wind pavilion structure, to pour the top to form wind pavilion structure Plate.
Constructed using the constructing structure of the external hanging type wind pavilion of the utility model the following steps are included:
1, setting cheat in dewatering well: main structure excavation of foundation pit forward position main body foundation pit and wind pavilion foundation pit join domain according to Interior dewatering well 1 is cheated in the setting of the interval 30~35m.The state of drawing water should be kept during wind pavilion excavation of foundation pit and structure are returned and built, in main body Structure, which is returned, builds period attention protection, and guarantee can be operated normally in wind pavilion excavation of foundation pit.
2, outer dewatering well in hole is set: going along with sb. to guard him the outer drop in setting hole outside 3 far from the side engineering method stake of main body foundation pit in wind pavilion foundation pit Well 2.Outer water level will be cheated during excavation of foundation pit is down to the floor level of wind pavilion structure hereinafter, reducing the water and soil pressure suffered by going along with sb. to guard him Power.
3, be arranged bracing members: it is identical that wind pavilion engineering method dowel crown beam and main body turn over 8 top mark height of beam, on excavation topsoil to main body A distance under beam 8 is turned over, turns over erection bracing members 6 between beam 8 and engineering method dowel crown beam 7 in main body, beam missing area is turned over for main body Support pier is arranged according to bracing members position in domain.
4, it drains and excavates: opening the dewatering well in main body reserved dewatering well 1, outer dewatering well in hole 2 and wind pavilion Foundation Pit 16, it inside and outside water level will be cheated is down to wind pavilion structure base slab and excavated hereinafter, carrying out wind pavilion pit earthwork again, with digging and abolish main body foundation pit Fender post 4 and main body water-stop curtain 5.
6, pour the bottom plate of wind pavilion structure: foundation pit is received bottom and is completed, and pours bed course, and construct waterproof slab and reinforcing bar install bottom The pre-buried dowel 13 of slab muscle Shi Liushe large steel moulding plate, in the pre-buried dowel B 32 of bottom plate before wind pavilion main body bottom slab concreting, to fixation Large steel moulding plate.
7, the side wall of wind pavilion structure is poured: after 10 intensity of wind pavilion structure base slab is met the requirements, side wall waterproof of constructing and steel Muscle is installed large steel moulding plate 15 and tripod 14, and is anchored securely with pre-buried dowel 13, and pouring for wind pavilion structure side wall 11 is carried out, The lateral support for going along with sb. to guard him pile body is acted on being formed as early as possible, controls foundation pit deformation.
8, it pours the top plate of wind pavilion structure: after 11 intensity of wind pavilion structure side wall is met the requirements, removing installation large steel moulding plate 15 and tripod 14, it sets up falsework system and carries out pouring for wind pavilion structure roof 12.
9, complete: after 12 intensity of wind pavilion structure roof is met the requirements, form removal strutting system completes entire wind pavilion knot The construction of structure, the wind pavilion structure include the bottom plate 10 for being connected to station main structure 9, the side wall 11 for being connected to bottom plate and It is connected to the top plate 12 of side wall 11 and station main structure 9, and stops cheating interior dewatering well 1, outer dewatering well in hole 2 and wind pavilion foundation pit Dewatering well 16 in hole runs and shunts in a well, that is, completes whole construction.
, there is the following in the advantages of the utility model:
1, be by outer dewatering well in hole reduce act on go along with sb. to guard him in engineering method stake Water And Earth Pressures resultant force, can by inner support from Twice are reduced to together, and can be reduced setting second and be supported the unfavorable shadow built to subsequent earth excavation and structure time It rings.
2, interior equipped with dewatering well in cheating with wind pavilion foundation pit join domain in main body foundation pit, reduce main body Water Level in Foundation Pit rise band The percolating water risk come.
3, inner support supporting point is adjusted from former main body fender post crown beam to main body and turns over beam, can carried out with earth excavation Abolishing for former main body fender post and crown beam, may be implemented do mechanization operation to accelerate speed of application, no setting is required post-cast strip, reduce Structure construction stitches quantity, reduces the risk of later period percolating water, avoids the inconvenience for hanging out pile section by post-cast strip.
4, the rapid construction for realizing structure side wall is conducive to form fender post lateral support effect, reduces foundation pit deformation Risk.
The above is only the preferred embodiment of the utility model, not does in any form to the utility model Limitation, although the utility model has been disclosed with preferred embodiment as above, is not intended to limit the utility model, any to be familiar with Professional and technical personnel, in the range of not departing from technical solutions of the utility model, when in the technology using the disclosure above Hold the equivalent embodiment made a little change or be modified to equivalent variations, but all without departing from technical solutions of the utility model Hold, any simple modification, equivalent change and modification made by the above technical examples according to the technical essence of the present invention, still It is within the scope of the technical solutions of the present invention.

Claims (7)

1. a kind of constructing structure of external hanging type wind pavilion characterized by comprising
Dewatering well in cheating is arranged along main body foundation pit and wind pavilion foundation pit join domain interval;
Outer dewatering well in hole is set to side of the wind pavilion foundation pit far from main body foundation pit;And
Bracing members are set up in main body and turn between beam and engineering method dowel crown beam.
2. the constructing structure of external hanging type wind pavilion according to claim 1, which is characterized in that dewatering well is along main body in the hole Foundation pit and wind pavilion foundation pit join domain are arranged according to the interval 30~35m.
3. the constructing structure of external hanging type wind pavilion according to claim 1, which is characterized in that the outer dewatering well in hole is along wind pavilion Foundation pit longitudinal direction is arranged according to the interval 20~25m.
4. the constructing structure of external hanging type wind pavilion according to claim 1, which is characterized in that further include that setting is turned in main body The support pier of beam absent region.
5. the constructing structure of external hanging type wind pavilion according to any one of claim 1 to 4, which is characterized in that further include pre- It is embedded in the pre-buried dowel of wind pavilion structure base slab.
6. the constructing structure of external hanging type wind pavilion according to claim 5, which is characterized in that further include being installed on pre- to pour wind The large steel moulding plate and tripod of the position of pavilion structure side wall, the large steel moulding plate and tripod and the pre-buried dowel anchor.
7. the constructing structure of external hanging type wind pavilion according to claim 6, which is characterized in that further include being erected on pre- to pour wind The falsework system of the position of pavilion structure roof.
CN201920210471.3U 2019-02-19 2019-02-19 The constructing structure of external hanging type wind pavilion Active CN209669931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920210471.3U CN209669931U (en) 2019-02-19 2019-02-19 The constructing structure of external hanging type wind pavilion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920210471.3U CN209669931U (en) 2019-02-19 2019-02-19 The constructing structure of external hanging type wind pavilion

Publications (1)

Publication Number Publication Date
CN209669931U true CN209669931U (en) 2019-11-22

Family

ID=68569019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920210471.3U Active CN209669931U (en) 2019-02-19 2019-02-19 The constructing structure of external hanging type wind pavilion

Country Status (1)

Country Link
CN (1) CN209669931U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706967A (en) * 2019-02-19 2019-05-03 上海隧道工程有限公司 The construction method of external hanging type wind pavilion

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706967A (en) * 2019-02-19 2019-05-03 上海隧道工程有限公司 The construction method of external hanging type wind pavilion

Similar Documents

Publication Publication Date Title
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN105804089B (en) Locally increase deep support system and its construction method after a kind of former deep foundation pit construction
CN108487252A (en) A kind of deep foundation pit open cutting is suitable to make construction method
CN205742213U (en) Foundation pit supporting construction
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN106758841A (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN105862930A (en) Protection structure on existing tunnel below new underground engineering
CN107642252B (en) Old building free removal is double to increase rebuilding construction technique
CN108589771A (en) One kind having runed underground station increasing layer transfer node construction method
CN108797637A (en) Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground
CN102162258A (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN103452120A (en) Pile top crown beam structure of high-strength prestress pipe pile for supporting foundation pit and construction method thereof
CN107326932B (en) Quasi-semi-reverse construction method for underground garage
CN209669931U (en) The constructing structure of external hanging type wind pavilion
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN108978673A (en) A kind of foundation pit supporting construction and construction method of viaduct pile foundation underpinning
CN105386779A (en) Arch column method for building large-scale underground structure in shallow buried rock stratums
CN110117959B (en) Construction method for foundation pit support near river
CN205576934U (en) Part increases ramus profundus watch box system behind former deep foundation pit construction
CN205036388U (en) Block of four encircles knot hunch construction structures that PBA secretly dug subway station