CN2096596U - Quick lifting frame - Google Patents

Quick lifting frame Download PDF

Info

Publication number
CN2096596U
CN2096596U CN 90213883 CN90213883U CN2096596U CN 2096596 U CN2096596 U CN 2096596U CN 90213883 CN90213883 CN 90213883 CN 90213883 U CN90213883 U CN 90213883U CN 2096596 U CN2096596 U CN 2096596U
Authority
CN
China
Prior art keywords
pull bar
lifting frame
column
quick lifting
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 90213883
Other languages
Chinese (zh)
Inventor
刘明山
曲桂先
王明智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUCHENG RADIO SPARES FACTORY
Original Assignee
CHUCHENG RADIO SPARES FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUCHENG RADIO SPARES FACTORY filed Critical CHUCHENG RADIO SPARES FACTORY
Priority to CN 90213883 priority Critical patent/CN2096596U/en
Publication of CN2096596U publication Critical patent/CN2096596U/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a quick lifting frame which is composed of a U-shaped spider (1), a base (9), an upright post (8), etc. The quick lifting frame is characterized in that the lower end of the upright post (8) is sheathed on the jacket tube (10) of the base (9), and the upper end inserts into a draw rod (4) and is sheathed with a control ring (5). The upper hole of the quick lifting frame is matched with the draw rod, and the lower hole is matched with the upright post. The interior of the quick lifting frame is provided with a couple of locating blocks (6) that is tightly locked by springs (7). The top opening of the draw rod (4) is inserted with an adjusting bolt (2) and a screw nut (3). The utility model has convenient installation and operation, suitable for the ceiling construction of the cement concrete placed in the site of building construction, and for the support of the upper layer part of a scaffold as well as the working facet top and the roofing in a coal mine.

Description

Quick lifting frame
The utility model belongs to building supporting hack lever, but particularly template supports, the stand of the fast lifting of the stand of scaffold with doing.
The support of the scaffold of prior art or cast-in-place system ceiling is generally colligation, and it is slow to add mode construction speeds such as underbed under the column.And the fluid pressure type support that heavy construction is adopted is because complex structure, and involving great expense is difficult for being extensive use of in building.
This practical task provides a kind of fast lifting stand that is used to support construction formwork.The purpose of this utility model reaches like this.With a whole stand of base support, the lower end of column is enclosed within on the sleeve pipe of base, pull bar is inserted in its upper end, and at gate ring of upper port suit, the hole cooperates with the pull bar external diameter on this gate ring, and following hole cooperates with the column external diameter, the a pair of semilune locating piece of assembling in the groove wherein by spring locking, with the suitable for reading middle adjustment screw bolt and nut that cooperates that inserts of pull bar, the upper surface of adjusting bolt is with bolt U type fork again, and gate ring is with screw.Above-mentioned device has promptly been realized the purpose that the utility model proposes.
Description of drawings: Fig. 1 is structure rigging position figure of the present utility model, and Fig. 2 is the component diagram of pull bar, and Fig. 3 is a semilune locating piece component diagram.In the accompanying drawings, 1U type fork, 2 adjust bolt, and 3 adjust nut, 4 pull bars, 5 gate rings, 6 locating pieces, 7 springs, 8 columns, 9 bases, 10 sleeve pipes, 11 gussets, 12 screws, 13 screws, 14 inclined-plane chamfered edges.
Below in conjunction with the embodiment accompanying drawing stand of the present utility model is elaborated.The weight of whole stand is all with base (11) supporting, the weight of bearing when comprising work.Symmetric arrangement gusset (9) is to increase the intensity of base on base.The lower end sleeve of pipe support (8) is contained on the sleeve pipe (10) of base (9), and the upper port of column (8) is inserted pull bar (4), and pull bar also is a hollow section, and its length is not run into sleeve pipe (10) behind the column and is advisable to insert.A gate ring of the upper port suit of column (8) (5), the last oral pore of this ring is outer through cooperating with pull bar, following hole cooperates with the external diameter of column, bosom at gate ring has a groove, symmetry is joined a pair of semilune locating piece (6) by spring (7) locking in groove, with restriction pull bar (4) to bottom offset.The inserting suitable for reading of pull bar (4) is closed and is adjusted bolt (2), and the adjustment nut (3) that cooperates with bolt (2) has a step to cooperate with the external diameter suitable for reading of pull bar.U type fork (1) is fixed on the center, top of adjusting bolt (2) with screw (12).The rotational that U type fork can be determined around screw is to adapt to the needs of different azimuth.Gate ring (5) is fixed on the upper end of column (8) with screw (13).
Some equidirectional inclined-plane chamfered edges (14) to symmetry are arranged on the tube wall of pull bar (4).The right-angle side step of cutting out is in the direction that makes progress of pull bar, notices during installation that right-angle side behind the chamfered edge is last.The position of cutting symmetry 180 degree on the diameter of pipe outer wall are equidirectional.At least a pair of chamfered edge should be arranged in general, but consider the needs of convenience and each lifting altitude of lifting, preferably open a pair of chamfered edge (14) every the 100-150 millimeter.
The garden arc groove that a suitable spring (7) is arranged on the arc limit, garden of semilune locating piece (6) also has an inclined-plane on its straight flange upper edge thickness direction, and the direction of its gradient and size are identical with the gradient of chamfered edge on the pull bar (4).Locating piece (6) is that two relative straight flanges are installed, and locks with spring.The checkpost, right angle of the chamfered edge during work on upper surface and the pull bar (4) is equipped with moving down of restriction pull bar.
During work, fix by shown position, gate ring is good with screw, then pull bar (4) is pulled upwardly to suitable height, put Form beam and can construct.If improper can the rotation of the height that rises adjusted nut (3) fine motion adjusting height to correct position.U type fork can rotate the needs with the Form beam that is fit to different directions.Stand of the present utility model is when needs reduce when highly promptly removing, and turn 90 degrees as long as pull bar (4) revolved, at this moment, semilune locating piece (6) has broken away from the right-angle side of chamfered edge, it is unrestricted that pull bar (4) is gone up, and descends under the effect of deadweight, can reduce to least significant end always.If need to rise once more.Turn 90 degrees as long as pull bar (4) any direction revolved, the process when repeating to begin gets final product.
Stand of the present utility model is suitable for the construction of the cast-in-place cement concrete of ceiling in the building operations most or is used as the last layer of scaffold and fixing stand.Can also be applied to the support on the top, tunnel and the work plane top in colliery.It is simple in structure, and up-down mode is quick, easy, easy operating.Improve the operating efficiency that the cast-in-place concrete mold is made.

Claims (3)

1, a kind of fast lifting stand with U type fork [1], base [9], column [8], it is characterized in that the lower end of column [8] is sleeved on last its upper end insertion pull bar [4] of sleeve pipe [10] of base [9], a gate ring of the upper port suit of column [8] [5], hole on this gate ring cooperates with the pull bar external diameter, following hole is outer through cooperating with column, and wherein a pair of half shape by spring [7] locking of assembling is driven locating piece [6] and adjusted nut [3] in the groove.
2,, it is characterized in that on the outer wall of said pull bar (4) that symmetry is equidirectional and have a pair of inclined-plane chamfered edge (14) at least according to the described fast lifting stand of claim 1.
3,, it is characterized in that the straight flange of said semilune locating piece (6) has identical with inclined-plane chamfered edge (14) gradient of pull bar (4) on thickness direction according to the described fast lifting stand of claim 1.
CN 90213883 1990-05-30 1990-05-30 Quick lifting frame Withdrawn CN2096596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90213883 CN2096596U (en) 1990-05-30 1990-05-30 Quick lifting frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90213883 CN2096596U (en) 1990-05-30 1990-05-30 Quick lifting frame

Publications (1)

Publication Number Publication Date
CN2096596U true CN2096596U (en) 1992-02-19

Family

ID=4893319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90213883 Withdrawn CN2096596U (en) 1990-05-30 1990-05-30 Quick lifting frame

Country Status (1)

Country Link
CN (1) CN2096596U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113638752A (en) * 2021-09-09 2021-11-12 西安经发城市更新建设投资有限公司 Prefabricated bracket structure of electric power tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113638752A (en) * 2021-09-09 2021-11-12 西安经发城市更新建设投资有限公司 Prefabricated bracket structure of electric power tunnel

Similar Documents

Publication Publication Date Title
CN113585965B (en) Roadbed high slope anchor rod frame beam movable drilling platform
CN205309390U (en) Water bores tapping machine trompil angle adjusting mechanism
CN207794608U (en) A kind of adjustable support for shuttering of movement for groove construction column
CN211736059U (en) Temporary support for binding concrete structure beam reinforcing steel bars
CN214090960U (en) Aluminum alloy template for building that can be used to bearing diagonal
CN209874484U (en) Aluminum alloy template bracing device
CN2096596U (en) Quick lifting frame
CN116838079A (en) Steel template convenient to install and use method thereof
CN212336762U (en) Guiding and temporary fixing device for installation process of inclined steel column
CN211948914U (en) Steel material connecting device for steel structure building of angularly adjustable
CN210947751U (en) Cast in situ concrete assembled template bearing structure
CN219794652U (en) Adjustable general overhanging tool
CN221277680U (en) Device convenient to drilling rod installation
CN220080090U (en) Cantilever type retaining wall shaping die carrier structure
CN217053320U (en) Profile steel positioning die for SMW construction method pile construction
CN220953430U (en) Steel sheet pile for foundation pit support
CN220301867U (en) Building construction precast floor plank strutting arrangement
CN214402890U (en) Steel bearing structure convenient to dismouting
CN219411881U (en) Be used for hidden cable pit reinforcing bar bracket
CN215978541U (en) Building pipeline installation construction equipment
CN220301589U (en) Novel curved curtain wall
CN216840675U (en) Beam reinforcement binding and positioning device under special operation environment
CN218668539U (en) Building templates location installation auxiliary device
CN220319130U (en) Template supporting structure for building engineering construction
CN215711426U (en) Prefabricated tube bank integral lifting construction device and prefabricated tube bank limiting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee