CN209652925U - A kind of ground anchored structure - Google Patents
A kind of ground anchored structure Download PDFInfo
- Publication number
- CN209652925U CN209652925U CN201920128030.9U CN201920128030U CN209652925U CN 209652925 U CN209652925 U CN 209652925U CN 201920128030 U CN201920128030 U CN 201920128030U CN 209652925 U CN209652925 U CN 209652925U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- bolt body
- sleeve
- outside
- fixing shell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920128030.9U CN209652925U (en) | 2019-01-25 | 2019-01-25 | A kind of ground anchored structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920128030.9U CN209652925U (en) | 2019-01-25 | 2019-01-25 | A kind of ground anchored structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209652925U true CN209652925U (en) | 2019-11-19 |
Family
ID=68522572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920128030.9U Active CN209652925U (en) | 2019-01-25 | 2019-01-25 | A kind of ground anchored structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209652925U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117629312A (en) * | 2024-01-26 | 2024-03-01 | 四川川核地质工程有限公司 | Monitoring device and monitoring method for slope collapse |
-
2019
- 2019-01-25 CN CN201920128030.9U patent/CN209652925U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117629312A (en) * | 2024-01-26 | 2024-03-01 | 四川川核地质工程有限公司 | Monitoring device and monitoring method for slope collapse |
CN117629312B (en) * | 2024-01-26 | 2024-04-02 | 四川川核地质工程有限公司 | Monitoring device and monitoring method for slope collapse |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209652925U (en) | A kind of ground anchored structure | |
CN111764931B (en) | High-ground-stress weak surrounding rock tunnel supporting structure and construction method thereof | |
CN110984857B (en) | Grouting reinforcement drilling device capable of being adjusted in two directions | |
CN110700853A (en) | Shallow soil covering shield tunnel reinforcing method based on weak stratum | |
CN113529707A (en) | Umbrella-shaped light anchor rod, slope supporting structure and construction method thereof | |
CN108330973A (en) | Pile pulling device under low clearance height and quick pile extracting method | |
CN110513048A (en) | A kind of automatic reducing borehole-enlarging drilling header structure | |
CN110439353A (en) | A kind of erection construction method of concrete wire pole overturning-preventing | |
CN109944269B (en) | Anti-freeze drawing device and construction method thereof | |
CN107829748B (en) | A kind of complementary cycle formula excavation method suitable for floating pebble layer large cross-section tunnel | |
CN112482409B (en) | Combined supporting device and construction method thereof | |
CN106761494B (en) | A kind of guider and method for tunnel pre-grouting armature boring | |
CN204139169U (en) | A kind of multi-layer helical blade self-drilling soil anchor bolt | |
CN103938621B (en) | A kind of screw cast-in-place pile pile-forming apparatus with nut obvolvent lazy-tongs | |
CN203547754U (en) | Device for improving construction precision of long and large pipe shed | |
CN109469055A (en) | A kind of part pipe seam formula end expansion type energy-absorption anchor rod and its construction method | |
CN212612466U (en) | Special geological pile foundation construction equipment | |
CN115371629A (en) | Geotechnical engineering subgrade settlement automatic monitoring system | |
CN212866003U (en) | Pile foundation | |
CN107795181A (en) | A kind of power distribution network pole guy pulling plate method | |
CN111733812A (en) | Ground anchor fixing system for stay wire iron tower | |
CN209429121U (en) | A kind of part pipe seam formula end expansion type energy-absorption anchor rod | |
CN103527849B (en) | The non-excavating construction method of ultra-large caliber PE waste pipe | |
CN210564363U (en) | Anchoring drilling machine convenient to install | |
CN102003169B (en) | Method for repairing accident well of coal bed methane multi-branch horizontal well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Room 503, No. 2368, Fangzhong Road, Huli District, Xiamen City, Fujian Province 361000 Patentee after: Fujian Iwata Infrastructure Engineering Technology Co., Ltd. Address before: 5th Floor, Building 4#, Jinshan Fortune Plaza, No. 2368 Fangzhong Road, Huli District, Xiamen City, Fujian Province 361000 Patentee before: Fujian Yantian Foundation Engineering Technology Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A geotechnical anchoring structure Effective date of registration: 20230309 Granted publication date: 20191119 Pledgee: Xiamen Jinyuan Financing Guarantee Co.,Ltd. Pledgor: Fujian Iwata Infrastructure Engineering Technology Co.,Ltd. Registration number: Y2023980034473 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |