Prior art keywords
rouge
main shaft
pressure
shaft seals
current divider
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821900283.5U
Other languages
Chinese (zh)
Inventor
王国义
孟庆明
王成
杨斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xihua University
PowerChina Railway Construction Investment Group Co Ltd
PowerChina Chengdu Construction Investment Co Ltd
Original Assignee
Clp Construction Chengdu Construction Investment Co Ltd
Xihua University
PowerChina Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Clp Construction Chengdu Construction Investment Co Ltd, Xihua University, PowerChina Railway Construction Co Ltd filed Critical Clp Construction Chengdu Construction Investment Co Ltd
Priority to CN201821900283.5U priority Critical patent/CN209621869U/en
Application granted granted Critical
Publication of CN209621869U publication Critical patent/CN209621869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of shield automatic adjustment main shaft seals rouge injected system, so that main shaft seals rouge can inject in real time when cutterhead rotates during shield-tunneling construction, and the amount of being actually implanted into is farthest close to design flow.Including the current divider being connect with main shaft seals rouge injection chamber, the setting gear motor actuated by pressure seal rouge corresponding with decanting point in current divider, the arrival end of current divider is connected by pressure seal rouge transfer pipeline with the outlet end that pneumatic greasing pumps, and the arrival end of pneumatic greasing pump is connect with main shaft seals lipid phase.High-pressure gas pipe road sequence solenoid valve, condenser, electric gas pressure reducing valve, oil sprayer and safety check valve, electric gas pressure reducing valve have the bi-directional mini stepper motor for adjusting high-pressure gas pressure.Be arranged on current divider for monitor the gear motor rotation number of teeth close to switch, the movement of bi-directional mini stepper motor is automatically controlled by the unit time actual pulse number arrived close to switch monitors, the air pressure of electric gas pressure reducing valve is adjusted in real time, makes unit time actual pulse number infinite approach or is equal to design umber of pulse.

Description

A kind of shield automatic adjustment main shaft seals rouge injected system
Technical field
The utility model relates to shield-tunneling construction, in particular to a kind of shield automatic adjustment main shaft seals rouge injection system System.
Background technique
During shield-tunneling construction, the normal operation of main bearing of shield machine is most important.For the safety for ensuring base bearing, In Main shaft seals rouge is injected when shield cutter rotates (i.e. base bearing work) in main shaft seals outer chamber, by main shaft seals It is isolated with dregs in shield soil cabin, prevents dregs and water from entering main shaft seals, and then damage main bearing of shield machine.
It is under working as solenoid valve in an ON state that conventional spindle, which holds stop-leak compound injected system, and the high pressure gas that air compressor machine generates passes through Solenoid valve, condenser, manual gas pressure reducing valve, oil sprayer and safety check valve enter pneumatic greasing and pump pump head, pneumatic greasing pump Pump head drives pump rod working in reciprocating mode under body effect of calming the anger, and the lower mouth pumped when pump rod uplink from pneumatic greasing sucks low pressure Main shaft seals rouge, when pump rod downlink from outlet pumping out pressure seal rouge, (the time of pump rod uplink is extremely short, pump rod downlink one The secondary time mainly receives body pressure size influence of calming the anger), pressure seal rouge is transported in current divider through shut-off valve, high pressure sealing rouge 8 gear motors rotation in current divider is pushed, while being divided into 8 equal portions stop-leak compounds and being injected separately into main shaft seals rouge injection chamber Circumference uniform distribution 8 decanting points in (position 1~8).Gear motor rotates a tooth (i.e. main shaft seals rouge injection is primary) It is primary that pulse is generated close to switch.The greasing speed (i.e. greasing amount) of pneumatic greasing pump and the gas pressure for passing through gas pressure reducer It is proportional.
Main shaft seals rouge injection control system is conventional, and there are two types of methods: first is that input design one minute in shield machine program The required minimum pulse number (close to umber of pulse, that is, minimum injection rate of switch) of current divider, when detecting one minute actual pulse number Cutterhead is automatically stopped when less than design umber of pulse;When the one minute actual pulse number detected is greater than or equal to design umber of pulse Cutterhead normally rotates.To prevent the frequent stop jumping of cutterhead, do not influence to tunnel, the air pressure for manually adjusting gas pressure reducer need to be greater than reality Required air pressure, practical main shaft seals rouge injection rate are greater than design flow, lead to the waste of main shaft seals rouge.Second is that shield machine journey The required minimum pulse number (i.e. minimum injection rate) of one minute current divider of input design in sequence, when detecting one minute actual pulse Cutterhead is automatically stopped when number is less than design umber of pulse;It is pneumatic when detecting that actual pulse number is equal to design umber of pulse in one minute Greasing pump is automatically closed, and pneumatic greasing pump is opened again after last time injection length and one minute total pneumatic greasing pump shut-in time It opens, circulation injection main shaft seals rouge.Such method main shaft seals rouge when cutterhead rotates is not real-time injection (discontinuity note Enter), it is unfavorable for the protection of base bearing.
Shield is that main shaft seals rouge injects in real time when cutterhead rotates with main shaft seals rouge injected system best practice And the amount of being actually implanted into infinite approach design flow, i.e. effective protection base bearing control the injection rate of main shaft seals rouge again.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of automatic adjustment main shaft seals rouge injections of shield System, so that main shaft seals rouge can inject in real time when cutterhead rotates during shield-tunneling construction, and the amount of being actually implanted into is utmostly Ground is close to design flow.
It is as follows that the utility model solves technical solution used by the technical problem:
A kind of shield of the utility model automatic adjustment main shaft seals rouge injected system, including with main shaft seals rouge The current divider of chamber connection is injected, the setting gear motor actuated by pressure seal rouge corresponding with decanting point in current divider, point The arrival end of stream device is connected by pressure seal rouge transfer pipeline with the outlet end that pneumatic greasing pumps, the entrance of pneumatic greasing pump End is connect with main shaft seals lipid phase, it is characterized in that: the high-pressure gas pipeline of setting and pneumatic greasing pump connection, the high pressure gas Sequence solenoid valve, condenser, electric gas pressure reducing valve, oil sprayer and safety check valve, electric gas pressure reducing valve have on pipeline Adjust the bi-directional mini stepper motor of high-pressure gas pressure;It is arranged on the current divider for monitoring the gear motor rotation number of teeth Close to switch, the movement of bi-directional mini stepper motor is automatically controlled by the unit time actual pulse number arrived close to switch monitors, The air pressure of electric gas pressure reducing valve is constantly adjusted, unit time actual pulse number infinite approach is made or is equal to design umber of pulse.
The utility model has the beneficial effects that automatically adjusting the air pressure of electric gas pressure reducing valve by control system, pneumatically Greasing pump injection main shaft seals rouge can constantly inject when cutterhead rotates and close to design injection rate, both ensure base bearing Safety again reduce costs.
Detailed description of the invention
This specification includes following two width attached drawing:
Fig. 1 is main shaft seals rouge injection phase schematic diagram;
Fig. 2 is a kind of schematic diagram of shield automatic adjustment main shaft seals rouge injected system of the utility model;
Component, position and corresponding label be shown in figure: main shaft seals rouge inject chamber 1, base bearing external seal 2, with The fixed component 3 of cutterhead and shield body fixation member 4, solenoid valve 5, condenser 6, electric gas pressure reducing valve 7, bi-directional mini stepping Motor 8, oil sprayer 9, low pressure seal rouge entrance 10, pneumatic greasing pump seal disk 11, stop-leak compound working chamber 12, pressure seal rouge Outlet 13, pump rod 14, safety check valve 15, pneumatic greasing pump 16, pneumatic greasing pump pump head 17, shut-off valve 18, auxiliary device 19, current divider 20, close switch 21.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
Referring to Figures 1 and 2, a kind of shield of the utility model automatic adjustment main shaft seals rouge injected system, including with Main shaft seals rouge injects the current divider 20 that chamber 1 connects, and setting is corresponding with decanting point by pressure seal rouge in current divider 20 The gear motor actuated.Gear motor one tooth of every rotation injects once sealing rouge into main shaft seals rouge injection chamber 1. The arrival end of current divider 20 is connected by pressure seal rouge transfer pipeline with the pressure seal rouge outlet 13 of pneumatic greasing pump 16, The low pressure seal rouge entrance 10 of pneumatic greasing pump 16 is connect with main shaft seals lipid phase.When solenoid valve 5 in an ON state when, High pressure gas enters in 17 rodless cavity of pump head of pneumatic greasing pump 16, active force of the high pressure gas to rodless cavity piston in pump head 17 Greater than the rod chamber inner spring in pump head 17 to the active force of piston, 14 downlink of piston driving pump rod in pump head 17, stop-leak compound Low pressure seal rouge in working chamber 12 is collapsed into pressure seal rouge and 13 is pumped out by the outlet of pressure seal rouge, when pump head downlink extremely In limited time, high pressure gas is automatically drained out in pump head rodless cavity, and pump head rod chamber inner spring promotes pump rod 14 fast the active force of piston Fast uplink is sealed since auxiliary device 19 promotes stop-leak compound to be entered by low pressure seal rouge entrance 10 pushing of pneumatic greasing pump 16 Rouge working chamber 12, when pump head goes upward to the limit, high pressure gas is again introduced into 17 working chamber of pump head, pump rod downlink.Pneumatic injection 16 such cycle operation always of rouge pump.Auxiliary device 19 may be implemented the replacement of main shaft seals rouge bucket, and by pneumatic greasing Pump 16 is fixed on above main shaft seals rouge, will be in low pressure seal rouge entrance 10 and bucket by pneumatic greasing pump seal disk 11 Stop-leak compound connection.In pneumatic greasing 16 work of pump, auxiliary device 19 promotes to be pressed under air driven pump seal disc 13 with certain pressure close It seals on rouge.Shut-off valve 18 is set on pressure seal rouge transfer pipeline.
Referring to Fig. 2, the high-pressure gas pipeline connecting with pneumatic greasing pump 16 is set, high-pressure gas pipe road sequence is arranged Solenoid valve 5, condenser 6, electric gas pressure reducing valve 7, oil sprayer 9 and safety check valve 15.Electric gas pressure reducing valve 7, which has, to be adjusted The bi-directional mini stepper motor 8 of high-pressure gas pressure.It is arranged on the current divider 20 for monitoring the gear motor rotation number of teeth Close to switch 21, bi-directional mini stepper motor 8 is automatically controlled by the unit time actual pulse number monitored close to switch 21 Movement adjusts 7 air pressure of electric gas pressure reducing valve in real time, makes unit time actual pulse number infinite approach or is equal to design pulse Number is actually implanted into stop-leak compound amount infinite approach or is equal to design flow.
Referring to Fig. 2, when solenoid valve 5 in an ON state, the high pressure gas that air compressor machine generates is through solenoid valve 5, condenser 6, electricity Dynamic gas pressure reducer 7, oil sprayer 9 and safety check valve 15 enter in pneumatic greasing pump 17 rodless cavity of pump head.Pneumatic greasing pump 16 It works under high pressure gas effect, sucks low pressure seal rouge from lower mouth, pump out pressure seal rouge from outlet, pressure seal rouge is through cutting Only valve 18 is transported in current divider 20, and pressure seal rouge pushes 8 gear motors rotation in current divider 20, while being divided into 8 etc. Part pressure seal rouge is injected separately into 8 decanting points of the circumference uniform distribution of main shaft seals rouge injection chamber 1.
Automatic adjustment main shaft seals rouge programming is as follows: when cutterhead starts rotation, solenoid valve 5 is connected and is located always In on-state, electric gas pressure reducing valve 7 is in state (practical main shaft seals rouge when the injection of last time main shaft seals rouge stops The close design injection rate state of injection rate), start to detect the umber of pulse close to 21 unit time of switch (assuming that designing arteries and veins per minute Rushing number is 12 times, and can detecte in 5 seconds unit time to be 1 time).If unit time umber of pulse is greater than design flow, electronic Bi-directional mini stepper motor 8 on gas pressure reducer 7 is positive that electric step is further (pressure reducing valve rotates in the forward direction 90 degree), will export gas The low 0.1bar of pressure drop, air driven pump pumping main shaft seals rouge pressure reduction 6.5bar (it is electronic to set this system electric gas pressure reducing valve The air pressure change 0.4bar that turns around is revolved, air driven pump atmospheric pressure value is 1:65 with stop-leak compound pressure value ratio is pumped out), rate of pumping becomes Slowly;If unit time umber of pulse is less than design flow, the bi-directional mini stepper motor 8 on electric gas pressure reducing valve 7 is electricly reversed Step further (pressure reducing valve reversely rotates 90 degree), by output pressure improves 0.1bar, and air driven pump pumps main shaft seals rouge pressure 6.5bar is improved, rate of pumping becomes faster;If next unit time actual pulse number is not inconsistent with design flow, bi-directional mini stepping electricity Machine 8 continues to adjust pneumatic greasing pump rate of pumping, adjusts electric gas decompression in real time according to the unit time umber of pulse detected The output pressure of valve 7 finally achievees the effect that unit time umber of pulse is consistent with design flow in real time.
The automatic adjustment main shaft seals rouge injected system detection unit time is shorter and unit time number of pulses is bigger, from Dynamic degree of regulation is more quasi-, and the amount of being actually implanted into is closer to design injection rate.The greasing amount according to needed for main shaft seals, pneumatic greasing The actual conditions such as pump capacity, the construction of electric gas pressure reducing valve 7, it is appropriate to carry out to the step angle of bi-directional mini stepper motor 8 Adjustment, to achieve the effect that accurately to adjust practical greasing amount.
The above is a kind of shield automatic adjustment main shaft seals rouge injection system of the utility model that explains through diagrams The some principles and function of system are not intended to shown in being confined to the utility model and described specific structure and the scope of application It is interior, therefore all corresponding modifications that may be utilized and equivalent, especially pneumatic greasing, which pumps, configures electricity in injected system Dynamic gas pressure reducer simultaneously automatically adjusts gas pressure reducer pressure control by the feedback bi-directional mini stepper motor for the amount of being actually implanted into System belongs to the applied the scope of the patents of the utility model.

Claims (2)

1. a kind of shield automatic adjustment main shaft seals rouge injected system, including connect with main shaft seals rouge injection chamber (1) Current divider (20), the setting gear motor actuated by pressure seal rouge corresponding with decanting point in current divider (20), shunting The arrival end of device (20) is connected by the pressure seal rouge outlet (13) that pressure seal rouge transfer pipeline pumps (16) with pneumatic greasing It connects, the low pressure seal rouge entrance (10) of pneumatic greasing pump (16) connect with main shaft seals lipid phase, it is characterized in that: setting and pneumatically Greasing pumps the high-pressure gas pipeline of (16) connection, high-pressure gas pipe road sequence setting solenoid valve (5), condenser (6), electronic Gas pressure reducer (7), oil sprayer (9) and safety check valve (15), electric gas pressure reducing valve (7), which has, adjusts high-pressure gas pressure Bi-directional mini stepper motor (8);Be arranged on the current divider (20) for monitor the gear motor rotation number of teeth close to switch (21), bi-directional mini stepper motor (8) are automatically controlled by the unit time actual pulse number monitored close to switch (21) to move Make, adjust electric gas pressure reducing valve (7) air pressure in real time, make unit time actual pulse number infinite approach or is equal to design pulse Number.
2. a kind of shield automatic adjustment main shaft seals rouge injected system as described in claim 1, it is characterized in that: the pressure Shut-off valve (18) are set on power stop-leak compound transfer pipeline.
CN201821900283.5U 2018-11-18 2018-11-18 A kind of shield automatic adjustment main shaft seals rouge injected system Active CN209621869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821900283.5U CN209621869U (en) 2018-11-18 2018-11-18 A kind of shield automatic adjustment main shaft seals rouge injected system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821900283.5U CN209621869U (en) 2018-11-18 2018-11-18 A kind of shield automatic adjustment main shaft seals rouge injected system

Publications (1)

Publication Number Publication Date
CN209621869U true CN209621869U (en) 2019-11-12

Family

ID=68443998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821900283.5U Active CN209621869U (en) 2018-11-18 2018-11-18 A kind of shield automatic adjustment main shaft seals rouge injected system

Country Status (1)

Country Link
CN (1) CN209621869U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854625A (en) * 2018-11-18 2019-06-07 中国电建集团铁路建设有限公司 A kind of shield automatic adjustment main shaft seals rouge injected system
CN114755445A (en) * 2022-04-06 2022-07-15 中交天和机械设备制造有限公司 Integrated monitoring system and method for rotation state of shield tunneling machine cutter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854625A (en) * 2018-11-18 2019-06-07 中国电建集团铁路建设有限公司 A kind of shield automatic adjustment main shaft seals rouge injected system
CN114755445A (en) * 2022-04-06 2022-07-15 中交天和机械设备制造有限公司 Integrated monitoring system and method for rotation state of shield tunneling machine cutter
CN114755445B (en) * 2022-04-06 2024-05-28 中交天和机械设备制造有限公司 Integrated monitoring system and method for rotation state of shield tunneling machine cutterhead

Similar Documents

Publication Publication Date Title
CN209621869U (en) A kind of shield automatic adjustment main shaft seals rouge injected system
CN104859626B (en) A kind of electric hydrostatic braking action device of aircraft
EP1805395B1 (en) Method for embedding rock anchors
CN105569609B (en) With brill by-passing valve
CN103321627B (en) The pressure break pulse realizing ultrahigh flow conductivity adds sand system and method for work thereof
CN105401900A (en) Cable type electrohydraulic control pipe cutting tool
CN108952711B (en) Coal cutter capable of smoothly cutting hard coal rock and coal mining method
CN102168530A (en) Pressure drilling device for a drill stem and a using method thereof
CN109854625A (en) A kind of shield automatic adjustment main shaft seals rouge injected system
AU2021443833A1 (en) Automated construction method for anchor bolt
DK3184732T3 (en) Method and arrangement for injection of rock and soil material
CN201963209U (en) Drilling equipment with pressure for drilling rods
CN207647508U (en) Note the online closed sampling device of polymers
CN106437576A (en) Electric bypass valve
CN102162336B (en) Locating device for rotary steering drilling tool of motor pump
CN201606230U (en) Hydraulic system used for shield machine synchronous injection pump
CN105422065A (en) Oil-submersible electric reciprocating pump huff and puff oil production device
CN102493950B (en) A kind of control pressurer system of emulsion pump No Load Start and method
US4472105A (en) Rotary type pumping machine
CN207297310U (en) A kind of low pressure transfiguration flow control device for adjustable-flow injection pump
CN104747072A (en) Waterpower drilling, cutting and sewing system
CN104747071B (en) A kind of hydrodynamic force drilling slotting method
CN205370529U (en) Oil-submersible electric reciprocating pump huff and puff oil production device
CN111852380B (en) Water burst plugging device and control method thereof
CN215057346U (en) Inner spraying control device for heading machine and coal mining machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100160 701, 7th floor, building 3, yard 10, Automobile Museum East Road, Fengtai District, Beijing

Patentee after: China Power Construction Railway Construction Investment Group Co.,Ltd.

Patentee after: XIHUA University

Patentee after: POWERCHINA CHENGDU CONSTRUCTION INVESTMENT Co.,Ltd.

Address before: 100044 1001, 10th floor, building 2, yard 22, Chegongzhuang West Road, Haidian District, Beijing

Patentee before: POWERCHINA RAILWAY CONSTRUCTION Co.,Ltd.

Patentee before: XIHUA University