CN209602884U - The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track - Google Patents

The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track Download PDF

Info

Publication number
CN209602884U
CN209602884U CN201822073361.5U CN201822073361U CN209602884U CN 209602884 U CN209602884 U CN 209602884U CN 201822073361 U CN201822073361 U CN 201822073361U CN 209602884 U CN209602884 U CN 209602884U
Authority
CN
China
Prior art keywords
equipment
support body
broach hopper
movable support
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822073361.5U
Other languages
Chinese (zh)
Inventor
曹彦龙
梁建忠
周倩倩
赵小虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201822073361.5U priority Critical patent/CN209602884U/en
Application granted granted Critical
Publication of CN209602884U publication Critical patent/CN209602884U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The equipment that cover concrete pours after laying a railway track the utility model discloses a kind of High-speed Passenger Dedicated Lines, including movable support body (1), movable support body bottom surrounding pass through wheel carrier (5) installation movable pulley (2) respectively;Four upright bars (3) are welded in the middle part of movable support body, broach hopper (4) are fixed between four upright bars, single fan external-open plain batton door (6) is installed at broach hopper bottom discharge port, external-open plain batton door is flexibly connected by door frame (7) with broach hopper periphery or upright bar, and door is closed external-open plain batton door by the discharge port of broach hopper.The advantages that this equipment has light-weight, flexible and convenient operation, increases freight volume, after the completion of track construction, solves the problems, such as that large-sized concrete transporting equipment can not reach construction site, it is few to overcome traditional handicraft freight volume, phenomena such as difficulty of construction is big reduces equipment investment, reduces construction cost;It constructs suitable for high-speed railway passenger traffic station track cover concrete.

Description

The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track
Technical field
Cover concrete pours field after laying a railway track the utility model relates to High-speed Passenger Dedicated Lines, and specially one kind exists When cannot be introduced into construction site due to large scale equipment concrete tank transport vehicle after the completion of track laying construction, by manually pushing rail wheel Boxcar quickly walks in orbit and smoothly completes the construction equipment that cover concrete pours.
Background technique
The construction of High-speed Passenger Dedicated Lines cover concrete only can just construct after the completion of road bed board is constructed, and make For last one of the working procedure of High-speed Passenger Dedicated Lines civil construction, it is desirable that accomplish it is beautiful, smooth, be rapidly completed and construct and do To surface not ponding, thus the efficiency of protective layer construction and quality show it is important.
After the completion of track laying, High-speed Passenger Dedicated Lines cover concrete pouring construction traditional handicraft uses hand push The method transport concrete of vehicle, but that there are freight volumes is few, time-consuming, low efficiency, worker's construction intensity are big, concrete for traditional handicraft It is transported to that construction location is dry or dilute construction effect is not satisfactory, and not can guarantee the construction quality of concrete, or can use Its pump carries out pumping concrete construction under bridge, but construction cost is excessively high, and needs that construction and limitation bridge is rapidly completed Beam construction, and roadbed can not may only use the method for trolley using day pump construction.
It needs to replace trolley using a kind of new construction equipment, overcomes that traditional handicraft freight volume is few, and the period is long, construction is difficult Phenomena such as big is spent, and equipment investment can be reduced, reduces construction cost.
Summary of the invention
In order to solve High-speed Passenger Dedicated Lines lay a railway track cover concrete after the completion of construction construct existing freight volume it is few, The problem of time-consuming, low efficiency, worker's construction intensity is big, construction cost is big, construction quality cannot get effective guarantee, this engineering mentions A kind of novel High-speed Passenger Dedicated Lines cover concrete construction equipment after the completion of track laying is supplied.
The utility model adopts the following technical scheme that realization:
The equipment that cover concrete pours after a kind of High-speed Passenger Dedicated Lines are laid a railway track, including movable support body, the shifting Moving frame body bottom surrounding passes through wheel carrier respectively and installs movable pulley;It is welded with four upright bars in the middle part of the movable support body, four It is fixed with broach hopper between upright bar, single fan external-open plain batton door, the external-open are installed at the broach hopper bottom discharge port Plain batton door is flexibly connected by door frame with broach hopper periphery or upright bar, and the door frame makes external-open flat after positioning by pin shaft The discharge port of plate goalkeeper's broach hopper is closed, and external-open plain batton door side is fixed with control handle;In the middle part of the movable support body Activity installation concrete chute, the concrete chute upper end is located at below the discharge port of broach hopper, its lower end extends to and applies Work area domain.
Preferably, it is located on the outside of each movable pulley and is equipped with only wheel wedge, the only wheel wedge is installed with wedge axis, is installed on the wheel carrier Horizontal axis is connected between the wedge axis and horizontal axis by chock pull rod;The only wheel wedge is equipped with hook, and the movable support body is upper The fixing clasp for hanging hook is equipped with above only wheel wedge.
Preferably, multiple upright bar snap rings, the concrete chute are fixed with positioned at ipsilateral two upright bar sides correspondence Two sides are symmetrically fixed with two chute snap rings, and chute pull rod is installed between the upright bar snap ring and chute snap ring.
Working principle: after rail wheel boxcar is filled concrete by crane lifting mobile hopper, artificial pushing equipment, Construction location is come downwards in the auxiliary of track movable pulley, front and back is carried out to rail wheel boxcar with only wheel wedge and is fixed, thereafter basis The fixation position for the height adjustment chute pull rod that concrete flowing of constructing needs, after fixing, by immediately below broach hopper Control handle open single fan external-open plain batton door and carry out putting concrete, concrete flow to construction area, construction completion by chute Afterwards, it returns at dress concrete, the concrete construction of the other two sides construction area of track transfers hopper hanging ring taper by crane Hopper and chute carry out position conversion, then are pushed to construction location by circulation above and construct, and successively construct.
The utility model is that the attribute for combining rail running wheels to walk in orbit on the basis of hopper and chute can be right The attribute of concrete position transfer improves, and hopper can increase the transporter amount of concrete, and increase below hopper base Add rail running wheels and concrete chute, can not only reduce the time of concrete transportation, but also the position turn of concrete can be carried out It send, improves construction efficiency, and can guarantee the quality of construction, reduce the cost of construction.
Detailed description of the invention
Fig. 1 shows the structural schematic diagrams that concrete chute is located at equipment side.
Fig. 2 indicates that concrete chute is located at the structural schematic diagram of the equipment other side.
Fig. 3 indicates to be located at the only wheel wedge operation schematic diagram on the outside of movable pulley.
Fig. 4 indicates that broach hopper bottom has symmetrical two fans external-open plain batton door schematic diagram.
Fig. 5 indicates equipment side view.
In figure: 1- movable support body, 2- movable pulley, 3- upright bar, 4- broach hopper, 5- wheel carrier, 6- external-open plain batton door, 7- Frame, 8- pin shaft, 9- control handle, and 10- concrete chute, 11- hanging ring, 12-, which stops, takes turns wedge, 13- wedge axis, 14- horizontal axis, 15- chock Pull rod, 16- hook, 17- fixing clasp, 18- upright bar snap ring, 19- chute snap ring, 20- chute pull rod, 21- track, 22- sleeper, 23- roadbed.
Specific embodiment
Specific embodiment of the utility model is described in detail with reference to the accompanying drawing.
The equipment that cover concrete pours after a kind of High-speed Passenger Dedicated Lines are laid a railway track, from top to bottom respectively conical material Fixation plate, chute and the rail running wheels that bucket, hopper base, channel steel are welded, broach hopper are used for High-speed Passenger Dedicated Lines Protective layer construction, this device bottom left and right sides can place chute, artificial to push rail wheel boxcar to control the fortune of concrete It is defeated, concrete is transferred between bridge protecting wall and base plate by chute by concrete, roadbed supporting course between two pedestals Between between supporting course and cable trough.
As shown in Figure 1, 2, movable support body 1 is specifically included, 1 bottom surrounding of movable support body passes through the installation movement of wheel carrier 5 respectively Wheel 2;It is equipped with only wheel wedge 12 as shown in figure 3, being located on the outside of each movable pulley 2, wedge 12 is only taken turns and is installed with wedge axis 13, be installed on wheel carrier 5 Horizontal axis 14 is connected between wedge axis 13 and horizontal axis 14 by chock pull rod 15;Only wheel wedge 12 is equipped with hook 16, in movable support body 1 The fixing clasp 17 for hanging hook 16 is equipped with above only wheel wedge 12.When movable pulley 2 is in walking states, wedge is only taken turns Hook 16 on 12 is hung in fixing clasp 17, and only wheel wedge 12 is in suspended state at this time;When movable support body 1 reaches specific bit It postpones, the only wheel wedge 12 in each 2 outside of movable pulley is inserted into 2 side of movable pulley, movable pulley 2 is fixed, so that at movable support body 1 In stationary state;It wheel wedge 12 can only should be made of timber.
It is welded with four upright bars 3 in the middle part of movable support body 1, passes through welding between four upright bars 3 and is fixed with taper jointly Hopper 4, single fan external-open plain batton door 6 is equipped at 4 bottom discharge port of broach hopper, and external-open plain batton door 6 passes through door frame 7 and conical material Struggle against 6 peripheries or the flexible connection of upright bar 3, and door frame 7 after the positioning of pin shaft 8 by making external-open plain batton door 6 by the discharging of broach hopper 4 Mouth closure, 6 side of external-open plain batton door are fixed with control handle 9;1 middle part activity installation concrete chute 10 of movable support body, coagulation 10 upper end of solifluction slot is located at below the discharge port of broach hopper 4, its lower end extends to construction area.Movable support body 1 is pushed to Behind designated position, the pin shaft 8 on door frame 7 is extracted, operating control handle 9 opens external-open plain batton door 6, then concrete is along coagulation solifluction Slot 10 flow to construction area, repeats the above process, by concrete conveyance to the construction area for being located at track side;Due to construction area Domain is located at track two sides, when carrying out delivering concrete to track other side construction area, is caught on and is set with wirerope using crane It is located on track again after the equipment is rotated 180 degree after four hanging rings 11 lifting at standby top, such concrete chute is located at The other side repeats the above process.
As shown in figure 5, being located at ipsilateral two 3 sides of upright bar correspondence is fixed with multiple upright bar snap rings 18, coagulation solifluction 10 two sides of slot are symmetrically fixed with two chute snap rings 19, and chute pull rod 20 is installed between upright bar snap ring 18 and chute snap ring 19; According to different requirements, the height of concrete chute 10 is adjusted.
Working principle: after rail wheel boxcar is filled concrete by crane lifting mobile hopper, artificial pushing equipment, Construction location is come downwards in the auxiliary of track movable pulley, front and back is carried out to rail wheel boxcar with only wheel wedge and is fixed, thereafter basis The fixation position for the height adjustment chute pull rod that concrete flowing of constructing needs, after fixing, by immediately below broach hopper Control handle open single fan external-open plain batton door and carry out putting concrete, concrete flow to construction area, construction completion by chute Afterwards, it returns at dress concrete, the concrete construction of the other two sides construction area of track transfers hopper hanging ring taper by crane Hopper and chute carry out position conversion, then are pushed to construction location by circulation above and construct, and successively construct.
In order to further decrease labor intensity, four upright bars 3 are movably installed in the middle part of movable support body 1, i.e. four upright bars 3 divide It is not plugged in by the sleeve of its bottom on four pillars at 1 middle part of movable support body;Every 3 top of upright bar is installed with hanging ring 11. Movable support body 1 and broach hopper 4, in each lifting appliance, need to only be lifted by crane broach hopper 4 using seperated design in this way, Movable support body 1 is motionless, and broach hopper 4 is rotated 180 degree.
Further, as shown in figure 4, being symmetrically installed with two fan external-open plain batton doors 6 at 4 bottom discharge port of broach hopper, altogether It is closed with by the discharge port of broach hopper 4;4 bottom bottom left and right sides of broach hopper can place concrete chute, when needs pair When the construction area delivering concrete of left side, concrete chute is located at left side, opens the external-open plain batton door for being located at left side, right side it is outer Opening plate door is closed;When needing to right side construction area delivering concrete, concrete chute is located at right side, then opens and be located at right side External-open plain batton door, the external-open plain batton door in left side closes;Necessity of lifting appliance is eliminated, simplifies work progress, improves efficiency.
When it is implemented, the artificial promotion rail wheel boxcar pours the dress of High-speed Passenger Dedicated Lines cover concrete It sets, broach hopper top is 4 hopper hanging rings, four angles that the broach hopper of rail wheel boxcar passes through composition hopper base Steel carries out being welded into fixed frame, and hopper base is welded plate with lower part channel steel and is welded and fixed by flitch connecting rod, slot The fixation plate that steel is welded constitutes movable support body, by the way that rail running wheels are fixed with the welding of rail wheel connecting rod, track Traveling wheel uses macintoss cincture.Concrete chute using 3mm thickness the U-shaped construction rolled of iron sheet, inside bottom smoothly, light Suitable, concrete chute is set to middle part snap ring, and hopper base (upright bar) sets three snap rings according to the equidistant carry out cloth of hopper height It sets, totally two, chute pull rod, both ends are that right angle eave tile is fixed on hopper column when not in use, and concrete chute one end is placed on Feed hopper bottom, the other end are directed toward concrete construction position;Wedge totally four are only taken turns, construction triangular in shape crosses the horizontal axis of movable pulley It is connected with the wedge axis for only taking turns wedge is crossed by chock pull rod, only taking turns has the hook being fixedly connected on wedge, for hanging on channel steel The fixing clasp for the fixation plate side being welded, spiral shell of the chock pull rod through rail wheel connecting rod and the harness cord button of canting quoin Bolt slidably and in its two ends nut lock is stubbornly refused outer cunning, before trapped orbit wheel, is hung in fixing clasp with hook.
The advantages that this equipment has light-weight, flexible and convenient operation, increases freight volume solves after the completion of track construction The problem of large-sized concrete transporting equipment can not reach construction site, overcomes that traditional handicraft freight volume is few, the period is long, and construction is difficult Phenomena such as big is spent, equipment investment is reduced, reduces construction cost;It is applied suitable for high-speed railway passenger traffic station track cover concrete Work.
In short, the utility model is designed reasonably, increases track travel wheel apparatus on the basis of hopper, utilizes the dress of itself Expect that attribute increases freight volume, has the advantages that structure is simple and convenient to operate, after the completion of track laying, high-speed railway passenger traffic is special Line cover concrete pouring construction is with the obvious advantage, makes simplerization of constructing.
It should be pointed out that for the those skilled in the art of the art, before not departing from the utility model principle It puts, several improvement and application can also be made, these are improved and application is also considered as the protection scope of the utility model.

Claims (5)

  1. The equipment that cover concrete pours after 1. a kind of High-speed Passenger Dedicated Lines are laid a railway track, it is characterised in that: including movable stand Body (1), movable support body (1) bottom surrounding pass through wheel carrier (5) installation movable pulley (2) respectively;In the middle part of the movable support body (1) Four upright bars (3) are welded with, are fixed with broach hopper (4) between four upright bars (3), broach hopper (4) bottom goes out Single fan external-open plain batton door (6) is installed at material mouth, the external-open plain batton door (6) by door frame (7) and broach hopper (4) periphery or Person's upright bar (3) is flexibly connected, and the door frame (7) makes external-open plain batton door (6) by broach hopper (4) after positioning by pin shaft (8) Discharge port closure, external-open plain batton door (6) side be fixed with control handle (9);Activity peace in the middle part of the movable support body (1) It fills concrete chute (10), concrete chute (10) upper end is located at below the discharge port of broach hopper (4), its lower end extends To construction area.
  2. The equipment that cover concrete pours after 2. High-speed Passenger Dedicated Lines according to claim 1 are laid a railway track, feature It is: is located on the outside of each movable pulley (2) and is equipped with only wheel wedge (12), only wheel wedge (12) is installed with wedge axis (13), the wheel carrier (5) it is installed on horizontal axis (14), is connected between the wedge axis (13) and horizontal axis (14) by chock pull rod (15);The only wheel wedge (12) it is equipped with hook (16), is located above only wheel wedge (12) on the movable support body (1) and is equipped with for hanging hook (16) Fixing clasp (17).
  3. 3. the equipment that cover concrete pours after High-speed Passenger Dedicated Lines according to claim 1 or 2 are laid a railway track, special Sign is: two fan external-open plain batton doors (6) is symmetrically installed at broach hopper (4) bottom discharge port, jointly by broach hopper (4) discharge port closure.
  4. 4. the equipment that cover concrete pours after High-speed Passenger Dedicated Lines according to claim 1 or 2 are laid a railway track, special Sign is: four upright bars (3) is movably installed in the middle part of the movable support body (1), i.e. four upright bars (3) pass through its bottom respectively Sleeve is plugged on four pillars in the middle part of movable support body (1);Every upright bar (3) top is installed with hanging ring (11).
  5. The equipment that cover concrete pours after 5. High-speed Passenger Dedicated Lines according to claim 1 are laid a railway track, feature It is: is fixed with multiple upright bar snap rings (18), the concrete chute (10) positioned at ipsilateral two upright bar (3) sides correspondence Two sides are symmetrically fixed with two chute snap rings (19), and chute is installed between the upright bar snap ring (18) and chute snap ring (19) and is drawn Bar (20).
CN201822073361.5U 2018-12-11 2018-12-11 The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track Expired - Fee Related CN209602884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822073361.5U CN209602884U (en) 2018-12-11 2018-12-11 The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822073361.5U CN209602884U (en) 2018-12-11 2018-12-11 The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track

Publications (1)

Publication Number Publication Date
CN209602884U true CN209602884U (en) 2019-11-08

Family

ID=68395713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822073361.5U Expired - Fee Related CN209602884U (en) 2018-12-11 2018-12-11 The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track

Country Status (1)

Country Link
CN (1) CN209602884U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761034A (en) * 2020-12-24 2021-05-07 成都市新筑路桥机械股份有限公司 Fluid material pouring trolley

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761034A (en) * 2020-12-24 2021-05-07 成都市新筑路桥机械股份有限公司 Fluid material pouring trolley
CN112761034B (en) * 2020-12-24 2022-08-09 成都市新筑路桥机械股份有限公司 Fluid material pouring trolley

Similar Documents

Publication Publication Date Title
CN109441459A (en) A kind of earth pressure balanced shield separate launching side excavating construction method
CN209602884U (en) The equipment that cover concrete pours after High-speed Passenger Dedicated Lines are laid a railway track
CN110409845A (en) A kind of discharging platform and its construction method of automatic moving
CN205578009U (en) Two lined steel bones RACK in tunnel equipment of being under construction
CN109208533A (en) Harbour integrated construction system and method based on stake top top pushing platform
CN106837376B (en) Bind module turnover device for subway tunnel section of jurisdiction
CN205638491U (en) Multi -functional platform truck
CN210460004U (en) Consolidate and concrete platform of pouring based on anticollision wall template supports
CN209114417U (en) Harbour integrated construction system based on stake top top pushing platform
CN206448534U (en) One kind suspension movable folding type concrete chute
CN109162737A (en) Self-lifting type steel bar binding trolley
CN212835507U (en) Concrete reinforcement cage ligature and conversion equipment
CN202672156U (en) High-speed-railway roadbed-section road-shoulder concrete pouring machine
CN205526360U (en) Prefab conveyer
CN108482519A (en) A kind of reinforced mesh transport trolley
US2546362A (en) Apparatus for handling heavy slabs and other material
CN207361382U (en) Cushion cap concrete conveying equipment based on conveyer belt transformation
CN208981038U (en) A kind of subway tunnel track paving frame work car
CN209443795U (en) Concrete automatic distributing device and concrete automatic distributing system
CN209890978U (en) Device for removing TBM/shield tunnel track
CN209703307U (en) A kind of empty iron cantilever open web type of suspension applies frame machine
CN111851292A (en) Bridge railing concrete pouring device with translation mechanism
CN208453121U (en) A kind of reinforced mesh transport trolley
CN110042771A (en) A kind of moveable modularization box culvert rapid construction device
CN206053348U (en) Work high above the ground rail electric concrete conveying arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191108

Termination date: 20211211

CF01 Termination of patent right due to non-payment of annual fee