CN209589070U - Concreting wall form verticality easy detection device - Google Patents

Concreting wall form verticality easy detection device Download PDF

Info

Publication number
CN209589070U
CN209589070U CN201920217072.XU CN201920217072U CN209589070U CN 209589070 U CN209589070 U CN 209589070U CN 201920217072 U CN201920217072 U CN 201920217072U CN 209589070 U CN209589070 U CN 209589070U
Authority
CN
China
Prior art keywords
round tube
shape
messenger wire
wall form
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920217072.XU
Other languages
Chinese (zh)
Inventor
孔祥源
弓晓彬
李冬柏
万吉财
盛铁军
杨华
李瑞杰
赵璐艳
屈磊
梅宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi Sanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Co Ltd filed Critical Shanxi Sanjian Group Co Ltd
Priority to CN201920217072.XU priority Critical patent/CN209589070U/en
Application granted granted Critical
Publication of CN209589070U publication Critical patent/CN209589070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of concreting wall form verticality easy detection device, solve the problems, such as how to facilitate the verticality of detection wall form to be corrected in time to reach at any time in the process in setting up for wall form.The measuring for verticality that just carries out after the completion of traditional cast-in-situ wall template is set up during premise to wall form is set up, makes the inclined defect of template by timely discovery and timely correction;Traditional pendant detection is integrated on a light T shape bracket, and by the hook of bracket and vertical rod designs at extension type, to adapt to build the height change and width detection adjustment of middle wall form.Including T-shaped round tube frame body (1) and the right extension fork of two L shapes, L shape hangs and is provided with messenger wire through-hole on fork, and the line end of the messenger wire wound on messenger wire winder links together after passing through messenger wire through-hole from top to bottom with pendant.Construction cost is greatly saved.

Description

Concreting wall form verticality easy detection device
Technical field
The present invention relates to a kind of detection devices that cast in place concrete form is set up, in particular to a kind of pair of concreting wall The verticality of body template carries out the measuring device and measuring method of convenient measurement.
Background technique
In the civil construction of skyscraper, after wall form has been set up, need to carry out the verticality of wall form Detection after detection is qualified, just can be carried out the concreting of wall, therefore the measuring for verticality work of wall form is a Xiang Fei It is often important and be related to the important process that can follow-up work normally go on smoothly;Currently, this detection work is using tradition Messenger wire fall detection method, generally require two operators cooperation, a people puts down line pendant, Ling Yiren on wall form top It is measured in wall form bottom, detects and call wire is fallen and the spacing of wall form;Due to the also non-pouring construction of wall, on Portion personnel are mobile difficult at the top of wall form, and risk is high;When floor layer is high larger, wall form test point needs to adjust When, when two people cooperation is not tacit, influences whether the measuring for verticality working efficiency and quality of wall form, buried for follow-up work Lower hidden danger of quality;In addition, this detection method be in the case where the equal tower of wall integral mold plate sets completion, progress it is subsequent whether Qualified detection;How for the wall form person of setting up one kind simply and easily measuring for verticality work in wall form is set up is provided Tool, makes them in wall form during setting up, can facilitate detection at any time, carries out the verticality correction of template in time, becomes Live problem in urgent need to solve.
Summary of the invention
The present invention provides a kind of concreting wall form verticality easy detection device and detection methods, solve Wall form set up in the process how at any time facilitate detection wall form verticality to reach in time it is corrected Technical problem.
The present invention is to solve the above technical problem by the following technical programs:
The present general inventive concept is: the measuring for verticality just carried out after the completion of traditional cast-in-situ wall template is set up, During premise is set up to wall form, make the inclined defect of template by timely discovery and timely correction;Traditional pendant is detected into collection On Cheng Yi light T shape brackets, and by the hook of bracket and vertical rod designs at extension type, to adapt to build middle wall mould The height change and width detection of plate adjust.
A kind of concreting wall form verticality easy detection device, including T-shaped round tube frame body, in T-shaped circle The left extension fork of the L shape that can be stretched along left and right horizontal direction is provided in the left port of the cross-arm round tube of pipe support body, in T-shaped round tube frame The right extension fork of the L shape that can be stretched along left and right horizontal direction, the cross of T-shaped round tube frame body are provided in the right output port of the cross-arm round tube of body The left extension fork of load round tube, L shape and the right extension fork of L shape are half square shape shapes of composition, in the vertical round tube lower end of T-shaped round tube frame body Frame body lower end horizontal support bar is provided on tube wall, being plugged in the vertical round tube lower port of T-shaped round tube frame body can be vertically The flexible upright bar in direction, is respectively arranged with left messenger wire winder and right messenger wire winder on the T-shaped vertical round tube of round tube frame body, It is provided with left messenger wire through-hole on the left extension fork of L shape, right messenger wire through-hole is provided on the right extension fork of L shape, is twined on left messenger wire winder Around the line end of left messenger wire pass through linked together after left messenger wire through-hole with left pendant from top to bottom, twined on right messenger wire winder Around the line end of right messenger wire pass through linked together after right messenger wire through-hole with right pendant from top to bottom.
The left front and back bar outboard end for hanging fork of L shape and the right front and back bar outboard end for hanging fork of L shape are apical graftings in the outer of wall form On side, the left front and back bar for hanging fork of L shape and the right front and back bar for hanging fork of L shape are the fixed dragons of transverse direction being articulated on the outside of wall form On bone.
A kind of concreting wall form verticality easy detection method, it is characterised in that following steps:
The first step, the L that setting can stretch along left and right horizontal direction in the left port of the cross-arm round tube of T-shaped round tube frame body The left extension fork of shape, the right extension of L shape that setting can stretch along left and right horizontal direction in the right output port of the cross-arm round tube of T-shaped round tube frame body Frame body lower end horizontal support bar is arranged, in T-shaped round tube frame body in fork on the vertical round tube lower end tube wall of T-shaped round tube frame body The upright bar that grafting can stretch along the vertical direction in vertical round tube lower port, is respectively set on the T-shaped vertical round tube of round tube frame body There are left messenger wire winder and right messenger wire winder, be provided with left messenger wire through-hole on the left extension fork of L shape, is arranged on the right extension fork of L shape It is hung after thering is right messenger wire through-hole, the line end of the left messenger wire wound on left messenger wire winder to pass through left messenger wire through-hole from top to bottom with a left side Pendant links together, and the line end of the right messenger wire wound on right messenger wire winder is hung after passing through right messenger wire through-hole from top to bottom with the right side Pendant links together;
Second step, during wall form tower is set, according to the height of wall form adjust it is vertical in T-shaped round tube frame body The stroke of the upright bar that can be stretched along the vertical direction of grafting in round tube lower port, according to the width of wall form measuring for verticality Degree, the L shape that can be stretched along left and right horizontal direction of adjustment grafting on the left and right port of the cross-arm round tube of T-shaped round tube frame body It is right to hang fork and the left stroke for hanging fork of L shape, T-shaped round tube frame body is articulated in tower and is set on the outside of the interim wall form of completion The fixed keel of transverse direction on, its verticality is detected, and according to testing result, inclined interim wall form is carried out Correction.
The present invention only needs a people that can easily be detected in time to the wall form in setting up, execute-in-place letter Single, testing result is accurate, and construction cost is greatly saved.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is structural schematic diagram of the present invention when detecting wall form in side-looking direction;
Fig. 3 is structural schematic diagram of the present invention when detecting wall form in main view direction.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
A kind of concreting wall form verticality easy detection device, including T-shaped round tube frame body 1, in T-shaped circle The left extension fork 2 of the L shape that can be stretched along left and right horizontal direction is provided in the left port of the cross-arm round tube of pipe support body 1, in T-shaped round tube The right extension fork 3 of the L shape that can be stretched along left and right horizontal direction, T-shaped round tube frame body are provided in the right output port of the cross-arm round tube of frame body 1 Right the extensions fork 3 of the left extension fork 2 and L shape of 1 cross-arm round tube, L shape is to form half square shape shape, in the vertical of T-shaped round tube frame body 1 Frame body lower end horizontal support bar 13 is provided on the tube wall of round tube lower end, the grafting in the vertical round tube lower port of T-shaped round tube frame body 1 There is the upright bar 4 that can be stretched along the vertical direction, left 6 He of messenger wire winder is respectively arranged on the vertical round tube of T-shaped round tube frame body 1 Right messenger wire winder 10 is provided with left messenger wire through-hole 5 on the left extension fork 2 of L shape, is provided with right messenger wire through-hole on the right extension fork 3 of L shape 9, the line end of the left messenger wire 7 wound on left messenger wire winder 6 is connect after passing through left messenger wire through-hole 5 from top to bottom with left pendant 8 Together, the line end of the right messenger wire 11 wound on right messenger wire winder 10 is hung after passing through right messenger wire through-hole 9 from top to bottom with the right side Pendant 12 links together.
The left front and back bar outboard end for hanging fork 2 of L shape and the right front and back bar outboard end for hanging fork 3 of L shape are apical graftings in wall form 16 Lateral surface on, L shape it is left hang fork 2 front and back bar and L shape it is right hang fork 3 front and back bar be the transverse direction being articulated on the outside of wall form On fixed keel 15.
A kind of concreting wall form verticality easy detection method, it is characterised in that following steps:
The first step, setting can stretch along left and right horizontal direction in the left port of the cross-arm round tube of T-shaped round tube frame body 1 The left extension fork 2 of L shape, the L shape that setting can stretch along left and right horizontal direction in the right output port of the cross-arm round tube of T-shaped round tube frame body 1 Right extension fork 3, is arranged frame body lower end horizontal support bar 13, T-shaped on the vertical round tube lower end tube wall of T-shaped round tube frame body 1 The upright bar 4 that grafting can stretch along the vertical direction in the vertical round tube lower port of round tube frame body 1, in the vertical round tube of T-shaped round tube frame body 1 On be respectively arranged with left messenger wire winder 6 and right messenger wire winder 10, left messenger wire through-hole 5 is provided on L shape left extension fork 2, in L It is provided with right messenger wire through-hole 9 on the right extension fork 3 of shape, the line end of the left messenger wire 7 wound on left messenger wire winder 6 passes through from top to bottom Link together after left messenger wire through-hole 5 with left pendant 8, the line end of the right messenger wire 11 wound on right messenger wire winder 10 on to Under link together after right messenger wire through-hole 9 with right pendant 12;
Second step, during wall form tower is set, it is perpendicular in T-shaped round tube frame body 1 according to the adjustment of the height of wall form The stroke of the upright bar 4 that can be stretched along the vertical direction of grafting into round tube lower port, according to wall form measuring for verticality Width, the L that can be stretched along left and right horizontal direction of adjustment grafting on the left and right port of the cross-arm round tube of T-shaped round tube frame body 1 Shape is right to hang the left stroke for hanging fork 2 of fork 3 and L shape, and T-shaped round tube frame body 1 is articulated in the interim wall mould that tower sets completion On the fixed keel 15 of transverse direction on the outside of plate, its verticality is detected, and according to testing result, to inclined interim wall Template is corrected.

Claims (2)

1. a kind of concreting wall form verticality easy detection device, including T-shaped round tube frame body (1), feature exists In, be provided in the left port of the cross-arm round tube of T-shaped round tube frame body (1) can along left and right horizontal direction stretch the left extension of L shape It pitches (2), it is right that the L shape that can be stretched along left and right horizontal direction is provided in the right output port of the cross-arm round tube of T-shaped round tube frame body (1) Fork (3) is hung, the left extension fork (2) of the cross-arm round tube of T-shaped round tube frame body (1), L shape and the right extension fork (3) of L shape are half square shape shapes of composition Shape, it is provided with frame body lower end horizontal support bar (13) on the vertical round tube lower end tube wall of T-shaped round tube frame body (1), in T word It is plugged with the upright bar (4) that can be stretched along the vertical direction in the vertical round tube lower port of shape round tube frame body (1), in T-shaped round tube frame body (1) it is respectively arranged with left messenger wire winder (6) and right messenger wire winder (10) on vertical round tube, be arranged on the left extension fork (2) of L shape There is left messenger wire through-hole (5), is provided with right messenger wire through-hole (9), the left side wound on left messenger wire winder (6) on the right extension fork (3) of L shape The line end of messenger wire (7) passes through left messenger wire through-hole (5) from top to bottom and links together afterwards with left pendant (8), right messenger wire winder (10) line end of the right messenger wire (11) wound on passes through right messenger wire through-hole (9) from top to bottom and is connected to one with right pendant (12) afterwards It rises.
2. a kind of concreting wall form verticality easy detection device according to claim 1, which is characterized in that The left front and back bar outboard end for hanging fork (2) of L shape and the right front and back bar outboard end for hanging fork (3) of L shape are apical graftings in wall form (16) On lateral surface, the left front and back bar for hanging fork (2) of L shape and the right front and back bar for hanging fork (3) of L shape are the cross being articulated on the outside of wall form To on fixed keel (15).
CN201920217072.XU 2019-02-20 2019-02-20 Concreting wall form verticality easy detection device Active CN209589070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920217072.XU CN209589070U (en) 2019-02-20 2019-02-20 Concreting wall form verticality easy detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920217072.XU CN209589070U (en) 2019-02-20 2019-02-20 Concreting wall form verticality easy detection device

Publications (1)

Publication Number Publication Date
CN209589070U true CN209589070U (en) 2019-11-05

Family

ID=68355874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920217072.XU Active CN209589070U (en) 2019-02-20 2019-02-20 Concreting wall form verticality easy detection device

Country Status (1)

Country Link
CN (1) CN209589070U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109612450A (en) * 2019-02-20 2019-04-12 山西三建集团有限公司 Concreting wall form verticality easy detection device and detection method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109612450A (en) * 2019-02-20 2019-04-12 山西三建集团有限公司 Concreting wall form verticality easy detection device and detection method

Similar Documents

Publication Publication Date Title
CN209583387U (en) Be used for adjustable hoist of assembled stair hoist and mount
CN209589070U (en) Concreting wall form verticality easy detection device
CN109612450A (en) Concreting wall form verticality easy detection device and detection method
CN209194364U (en) A kind of Continuous Beam-arch Bridge sunpender bridge floor tensioning equipment
CN208471376U (en) A kind of ductile iron pipe pit type health hanging device
CN116044178A (en) Installation method of large-inclination end screen with cantilever structure at upper part
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN207030735U (en) Prefabricated balcony lifts servicing unit
CN207335700U (en) A kind of verticality measuring tool
CN102864935A (en) Novel purline mounting method
CN215296260U (en) Tool for detecting verticality of template
CN112761079A (en) Quick installation device of wet joint suspended formwork bottom plate
CN209682079U (en) Vertical equipment inner part installs the operating platform
CN209369390U (en) High-altitude construction safety suspension arrangement is built in a kind of room
CN210293944U (en) Device for testing impact resistance of soft and hard objects on guardrail
CN210622337U (en) Operation hanging stool for wall column reinforcement operation
CN220167527U (en) Device for controlling thickness of floor slab
CN207295480U (en) Bridge chamber prestressed stretch-draw jack positioning apparatus
CN206540553U (en) The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device
CN208054723U (en) A kind of Pipe installing application c-type suspension hook
CN207976153U (en) Wall form position and verticality detecting device
CN217395288U (en) Vertical ligature frock of superimposed sheet reinforcing bar
CN214573387U (en) Quick installation device of wet joint suspended formwork bottom plate
CN213115463U (en) Reinforcing device of hanging basket suspension mechanism
CN204844097U (en) Be used for overhauing flotation cell mineralize mineralization ware hoist and mount frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant