CN209585609U - Late poured band support structure - Google Patents

Late poured band support structure Download PDF

Info

Publication number
CN209585609U
CN209585609U CN201920124905.8U CN201920124905U CN209585609U CN 209585609 U CN209585609 U CN 209585609U CN 201920124905 U CN201920124905 U CN 201920124905U CN 209585609 U CN209585609 U CN 209585609U
Authority
CN
China
Prior art keywords
steel
band support
cushion block
support structure
poured band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920124905.8U
Other languages
Chinese (zh)
Inventor
董琦荣
黄越桥
沈鲁斌
刘龙
刘祖波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG PROVINCIAL ERJIAN CONSTRUCTION GROUP CO Ltd
Priority to CN201920124905.8U priority Critical patent/CN209585609U/en
Application granted granted Critical
Publication of CN209585609U publication Critical patent/CN209585609U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of late poured band support structures, each one piece of steel jacking block including being welded on the steel reinforcement cage bottom surface of two side frame beams of post-cast strip, every piece of steel jacking block is connected with a supporting steel pipe, and the bottom end of supporting steel pipe is supported to the top surface of a cushion block, and the bottom surface of cushion block is supported to floor;Cushion block is steel cushion block, there is multiple through-holes passed through for clamping screw on steel cushion block, and floor is embedded with the steel connecting plate equipped with multiple threaded holes, and steel connection plate top surface is concordant with floor surface, the steel reinforcement cage welding of steel connecting plate side and bottom plate;Supporting steel pipe can be upper and lower two, the small down tube of upper tube is big, internal and external threads screw with adjust supporting steel pipe height and with the abutting degree of top and bottom;Every piece of steel jacking block bottom surface is welded with a steel sleeve, and the top of upper tube is movably combined in steel sleeve.This late poured band support structure does not block ground construction space, and occupancy steel tube fastener is few, and supporting element can reuse, and late poured band support sound construction is reliable, easy to disassemble.

Description

Late poured band support structure
Technical field
The utility model relates to engineering construction technology fields, are especially a kind of late poured band support structure.
Background technique
The flooring panel and building of cast-in-place monolithic reinforced-concrete panel such as basement roof, building Roof panels etc., in order to solve relative settlement between armored concrete panel and panel, the contraction distortion of concrete and mixed It the problems such as solidifying soil member temperature stress, generallys use post-cast strip in recent years to replace traditional construction joint, is poured in large area panel When building concrete, it is arranged to post-cast strip by original construction joint pitch requirements, width is generally 0.8~1.0m, and bar construction is Steel reinforcement cage is then continuously arranged.
The later period concreting of post-cast strip has been very mature technology, but in the prior art, dismantling concrete panel The support construction of post-cast strip after full hall scaffold, there are still following disadvantages: referring to Fig. 1, some is using complete post-cast strip steel Pipe support frame system, generally four across scaffold, and in a crisscross manner, structure is complicated, and in practice of construction, dismantling concrete panel is expired It to post-cast strip concreting after hall scaffold, generally requires seven, eight months, which is similar to a wall, has blocked ground Construction space;It occupies that a large amount of steel pipe, fastener, the lumps of wood be stupefied and the construction materials such as end template, in steel pipe currently on the market, buckles It is particularly problematic under part, the lumps of wood be stupefied and the environment in short supply such as end template;And should structure is complicated, remove it is time-consuming and laborious.Recently There is technical staff to replace above-mentioned post-cast strip steel pipe support frame system using concrete column, but support and Demolition Construction are relatively tired Difficulty, construction efficiency is low, and the concrete column after especially removing cannot be reused, and waste of material is larger, and cost is higher.
Utility model content
The technical problems to be solved in the utility model is to provide one kind and does not block ground construction space, occupies steel tube fastener Less, the late poured band support structure that supporting element can reuse.
The technical solution of the utility model is to provide a kind of late poured band support structure, including is welded on post-cast strip two Each one piece of steel jacking block of the steel reinforcement cage bottom surface of side frame beams, every piece of steel jacking block are connected with a supporting steel pipe, the bottom of supporting steel pipe End is supported to the top surface of a cushion block, and the bottom surface of cushion block is supported to floor.
After using the above structure, the utility model late poured band support structure has the advantage that its structure is simple, does not block Ground construction space, especially in addition to two supporting steel pipes, remaining all post-cast strip steel pipe support frame system is all removed, in mesh Under preceding steel pipe in the market, fastener, the lumps of wood be stupefied and the environment in short supply such as end template, by a large amount of steel pipes removed, fastener, the lumps of wood Stupefied and end template etc. all put into other construction works, substantially reduces occupancy, in 8 months or so the recycling materials It is considerable to save economic benefit brought by the material.And the steel pipe support part of the utility model remove after steel pipe and Cushion block etc. can reuse, and avoid wasting.And the late poured band support sound construction is reliable, disassembly is simple, easy for construction, construction It is high-efficient.
Further, the cushion block is steel cushion block, have on steel cushion block it is multiple passed through for clamping screw it is vertical first logical Hole, floor are embedded with the steel connecting plate equipped with multiple threaded holes, and steel connection plate top surface is concordant with floor surface, steel connecting plate and bottom The steel reinforcement cage of plate welds.After using the above structure, late poured band support structure is stronger reliable and easy to disassemble, and to ground Subsequent construction and the no any negative effect of use.
Further, the supporting steel pipe is upper pipe type supporting steel pipe, and upper tube is small, and down tube is big, and the lower end of upper tube has There are the first internal screw thread in first external screw thread, the upper end of down tube, internal and external threads screw with adjust upper pipe type supporting steel pipe height and with The abutting degree of top and bottom;Every piece of steel jacking block bottom surface is welded with a steel sleeve that Open Side Down, the top activity fitting of upper tube In steel sleeve.After using the above structure, late poured band support structure is stronger reliable, easily facilitates disassembly.
Further, the plane bearing that the top of the upper tube is fixed with top to steel jacking block bottom surface and relatively rotates.It adopts After the above structure, upper tube is laborsaving, flexible when rotating and pushing against to steel jacking block and through down tube to steel cushion block, and abutting effect is more preferable, Late poured band support structure is stronger reliable.
Further, detachable connection has horizontal steel connecting rod in two upper tubes.After using the above structure, both made Late poured band support structure is more solid and reliable, and does not influence the passage and ground construction of people, is also convenient for dismantling, and especially can be next Step provides cross-brace or on it place mat foot pedal when pouring post-cast strip concrete support end template.
Further, it is equipped with anchor ear in two upper tubes, has link block on the inside of anchor ear, there are vertical through holes on link block, The bolt for being actively plugged in vertical second through-hole downwards is arranged at the both ends bottom of steel connecting rod.After using the above structure, can in advance by Anchor ear is mounted in upper tube, anchor ear and up and down and rotation fine tuning need to be only loosened when installing steel connecting rod, then by steel connecting rod both ends Bolt be plugged in vertical through holes, equal convenient power-saving of installing and construct, construction efficiency is high.
Further, the steel connecting rod is left and right two, wherein the first bar has second far from one end of supporting steel pipe External screw thread, the second bar have third external screw thread, the second external screw thread and third external screw thread hand of spiral phase far from one end of supporting steel pipe Instead, a fastening for adjusting steel connecting rod Yu two supporting steel pipes on two external screw threads with the steel joint rotating connection of positive and negative internal screw thread Degree.After using the above structure, it can screw or unscrew according to the actual range of two steel connecting rods so that steel connecting rod and two supports Steel pipe connection is stronger.
Detailed description of the invention
Fig. 1 is the late poured band support structural schematic diagram of the prior art.
Fig. 2 is the schematic cross-sectional view of side in a kind of embodiment of the utility model late poured band support structure.
Fig. 3 is the schematic cross-sectional view of two sides in the utility model late poured band support structure another embodiment.
As shown in the figure 1, bottom plate, 2a, upper pipe type supporting steel pipe, 2b, integral support steel pipe, 3, post-cast strip, 4, after pour Band steel reinforcement cage, 5, Vierendeel girder, 6, steel jacking block, 7, steel connector, 8, Concrete seat pad, 9, anchor ear bolt, 10, plane bearing, 11, first Bar, 12, steel sleeve, 13, the steel reinforcement cage of Vierendeel girder, the 14, second bar, 15, clamping screw, 16, upper tube, 17, anchor ear, 18, connection Block, 19, steel connecting rod, 20, bolt, 21, steel connecting plate, 22, the steel reinforcement cage of bottom plate, 23, down tube, 24, steel cushion block.
Specific embodiment
Specific embodiment of the present utility model is described further with reference to the accompanying drawing.Herein it is to be understood that, The explanation of these embodiments is used to help to understand the utility model, but does not constitute the restriction to the utility model.This Outside, as long as technical characteristic involved in the various embodiments of the utility model disclosed below does not constitute punching each other It is prominent to can be combined with each other.
As shown in Figure 1, Figure 2, Figure 3 shows
Like the prior art, post-cast strip steel bar cage 4 is one whole with the steel reinforcement cage of entire cast-in-place concrete panel in advance Body, only the concrete of post-cast strip waits for subsequent pour and the end template of post-cast strip is also in subsequent installation.
The utility model late poured band support structure, 13 bottom surface of steel reinforcement cage of the Vierendeel girder including being welded on 3 two sides of post-cast strip Each one piece of steel jacking block 6, every piece of steel jacking block 6 is connected with a supporting steel pipe, and the bottom end of supporting steel pipe is supported to the top surface of a cushion block, The bottom surface of cushion block is supported to such as basement bottom board of bottom plate 1, and floor can also be claimed.Supporting steel pipe can also claim supporting steel pipe.
Fig. 2 show a kind of specific implementation of the utility model: the bottom surface of Vierendeel girder 5 is embedded with a steel jacking block 6, steel top The steel reinforcement cage 13 of block 6 and Vierendeel girder welds.Supporting steel pipe can be integral support steel pipe 2b, and integral support steel pipe 2b can be with steel Jacking block 6 welds.Cushion block is that Concrete seat pad 8 is concrete pad.
Fig. 3 show another specific implementation of the utility model:
The supporting steel pipe can be upper pipe type supporting steel pipe 2a, and upper tube 16 is small, and down tube 23 is big, and the lower end of upper tube 16 has There are the first internal screw thread in first external screw thread, the upper end of down tube 23, and internal and external threads are screwed to adjust upper pipe type supporting steel pipe 2a height With the abutting degree of top surface and bottom surface.Upper tube can be rotated by tool such as pipe vice.Every piece of 6 bottom surface of steel jacking block is welded with a steel sleeve 12, the top of upper tube 16 is movably combined in steel sleeve 12, and steel sleeve 12 can also claim steel bushing or steel cylinder.The top of the upper tube 16 The plane bearing 10 that end is fixed with top to 6 bottom surface of steel jacking block and relatively rotates.
The cushion block is steel cushion block 24, has multiple vertical first through hole passed through for clamping screw 15 on steel cushion block 24, Bottom plate 1 is embedded with the steel connecting plate 21 equipped with multiple threaded holes, 21 top surface of steel connecting plate and 1 flush of bottom plate, steel connecting plate 21 weld with the steel reinforcement cage 22 of bottom plate.Bolt can be screwed on threaded hole in advance when pre-buried steel connecting plate 21 so that threaded hole not It is blocked by concrete.It can also not have to steel connecting plate 21 and be directly welded on the steel reinforcement cage 22 of bottom plate using foundation bolt, then Vertical first through hole on steel cushion block 24 is passed through multiple foundation bolts to be locked with nut again, but it is prominent to want oxyacetylene metal-cutting to remove after removing For the foundation bolt on ground.
Detachable connection has horizontal steel connecting rod 19 in two upper tubes 16.It can be appreciated that two horizontal steel connect The height of extension bar 19 is not to influence logical principle of conduct.Anchor ear 17 is equipped in two upper tubes 16, anchor ear 17 is locked through anchor ear bolt 9 Tightly.There is link block 18 in the inside of anchor ear 17, there is vertical second through-hole on link block 18, and the both ends bottom of steel connecting rod 19 has downwards It is plugged in the bolt 20 of vertical second through-hole.Bolt can also be substituted with inserted block, and vertical second through-hole can also match with inserted block, certainly It is preferred that bolt.Anchor ear also can be used the ring flange equipped with multiple vertical through holes to replace, and the centre bore of ring flange covers merging welding in advance Outside upper tube, but preferred anchor ear.
The steel connecting rod 19 is left and right two, wherein the first bar 11 has the second outer spiral shell far from one end of supporting steel pipe 2a Line, the second bar 14 have third external screw thread, the second external screw thread and the externally threaded hand of spiral of third far from one end of supporting steel pipe 2a On the contrary, a steel connector 7 with positive and negative internal screw thread screws on two external screw threads i.e. the second external screw thread and third external screw thread to adjust steel The fastening degree of connecting rod 19 and two supporting steel pipe 2a.Steel connector 7 can be rotated by tool such as pipe vice.It will be understood that steel connects Steel pipe can also be used as shown in the figure using solid steel pole or round bar steel in extension bar 19.Certainly, the structure of upper section and this section It is equally applicable to integral support steel pipe 2b.
The structure of each supporting steel pipe of 3 two sides of post-cast strip, that is, above-mentioned is identical and is symmetricly set on 3 two sides of post-cast strip The utility model late poured band support structure is generally arranged along 3 length direction interval of post-cast strip.After using the above structure, it can be poured to after Strip length direction rationally supports, in the case where guaranteeing the firm precondition of supporting & stablizing, reasonable employment supporting steel pipe and joint steel pipe.
Above description is merely a prefered embodiment of the utility model, is not intended to limit the utility model, for ability For the technical staff in domain, various modifications and changes may be made to the present invention.It is all within the spirit of the present invention and principle, Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (7)

1. a kind of late poured band support structure, it is characterised in that: the steel reinforcement cage including being welded on the Vierendeel girder of post-cast strip (3) two sides (13) each one piece of steel jacking block (6) of bottom surface, every piece of steel jacking block (6) are connected with a supporting steel pipe, and the bottom end of supporting steel pipe is supported extremely The bottom surface of the top surface of one cushion block, cushion block is supported to bottom plate (1).
2. late poured band support structure according to claim 1, it is characterised in that: the cushion block is steel cushion block (24), steel There are multiple vertical first through hole passed through for clamping screw (15) on cushion block (24), bottom plate (1) is embedded with equipped with multiple threaded holes Steel connecting plate (21), steel connecting plate (21) top surface and bottom plate (1) flush, the steel reinforcement cage of steel connecting plate (21) and bottom plate (22) it welds.
3. late poured band support structure according to claim 1, it is characterised in that: the supporting steel pipe is upper pipe type branch It supports steel pipe (2a), upper tube (16) is small, and greatly, there is the first external screw thread in the lower end of upper tube (16) to down tube (23), and the upper end of down tube (23) has First internal screw thread, internal and external threads are screwed to adjust upper pipe type supporting steel pipe (2a) height and the abutting degree with top and bottom; Every piece of steel jacking block (6) bottom surface is welded with a steel sleeve (12), and the top of upper tube (16) is movably combined in steel sleeve (12).
4. late poured band support structure according to claim 3, it is characterised in that: the top of the upper tube (16) is fixed with Push up the plane bearing (10) to steel jacking block (6) bottom surface and relative rotation.
5. late poured band support structure according to claim 3, it is characterised in that: detachable connection on two upper tubes (16) There is horizontal steel connecting rod (19).
6. late poured band support structure according to claim 5, it is characterised in that: be equipped with anchor ear on two upper tubes (16) (17), have link block (18) on the inside of anchor ear (17), there is vertical second through-hole, the both ends of steel connecting rod (19) on link block (18) The bolt (20) for being plugged in vertical second through-hole downwards is arranged at bottom.
7. late poured band support structure according to claim 6, it is characterised in that: the steel connecting rod (19) is left and right two Root, wherein the first bar (11) has the second external screw thread far from one end of upper pipe type supporting steel pipe (2a), the second bar (14) is far from upper There is third external screw thread in one end of pipe type supporting steel pipe (2a), and the second external screw thread and the externally threaded hand of spiral of third are on the contrary, one Steel connector (7) with positive and negative internal screw thread screws on two external screw threads to adjust steel connecting rod (19) and two upper pipe type supporting steels Manage the fastening degree of (2a).
CN201920124905.8U 2019-01-24 2019-01-24 Late poured band support structure Expired - Fee Related CN209585609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920124905.8U CN209585609U (en) 2019-01-24 2019-01-24 Late poured band support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920124905.8U CN209585609U (en) 2019-01-24 2019-01-24 Late poured band support structure

Publications (1)

Publication Number Publication Date
CN209585609U true CN209585609U (en) 2019-11-05

Family

ID=68380429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920124905.8U Expired - Fee Related CN209585609U (en) 2019-01-24 2019-01-24 Late poured band support structure

Country Status (1)

Country Link
CN (1) CN209585609U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719894A (en) * 2020-07-09 2020-09-29 南阳师范学院 Post-cast strip supporting structure for civil house construction
CN112963019A (en) * 2021-02-08 2021-06-15 中国十七冶集团有限公司 Building engineering post-cast strip strutting arrangement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719894A (en) * 2020-07-09 2020-09-29 南阳师范学院 Post-cast strip supporting structure for civil house construction
CN112963019A (en) * 2021-02-08 2021-06-15 中国十七冶集团有限公司 Building engineering post-cast strip strutting arrangement
CN112963019B (en) * 2021-02-08 2022-04-26 中国十七冶集团有限公司 Building engineering post-cast strip strutting arrangement

Similar Documents

Publication Publication Date Title
CN209585609U (en) Late poured band support structure
CN110424601B (en) Concrete pouring anti-floating device for composite floor slab with fabricated structure and implementation method
CN113073746A (en) C-shaped sleeve detachable and replaceable reinforced concrete column-column connection structure and construction method
CN211499816U (en) Device for pouring construction of cantilever support of steel-concrete composite beam
CN109208483B (en) Bridge assembled closure section rigid connection assembly capable of being recycled
CN111350345A (en) Pull-rod-free template reinforcing system for outer wall of buried sewage treatment plant and installation method
CN212984631U (en) Plate lowering hanging die
CN210164054U (en) Quick butt joint and temporary fixing device for upper and lower layers of steel concrete composite pipe
CN111809792B (en) Assembled precast concrete wallboard
CN212478675U (en) Convenient ann tears assembled steel construction reinforcing bar processing protection canopy open
CN210658427U (en) Embedded positioning frame for hidden support main rib
CN210529735U (en) Building steel structure platform base
CN208487274U (en) A kind of ground pump standpipe bracing means being used in turn
CN209799001U (en) High-strength ductile assembled connecting joint utilizing T-shaped steel
CN206396764U (en) A kind of supporting pile column of deep basal pit
CN111877755A (en) Angle formwork supporting device and method during secondary concrete pouring at intersection of precast beam and precast slab
CN206815366U (en) A kind of prefabricated assembled basis
CN220117405U (en) Steel-concrete composite beam connection structure
CN213952534U (en) Tool type template device for grouting and plugging hand hole of PC wall of prefabricated building structure
CN217582028U (en) Bridge high mound construction cat ladder
CN211621992U (en) Steel construction pipe truss roof support built-in fitting
CN217897267U (en) Aluminum template system
CN217106134U (en) Telescopic floor slab supporting truss
CN220705179U (en) Steel back column template reinforcing device
CN221194303U (en) Can have enough to meet need concrete pump pipe fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20220124

CF01 Termination of patent right due to non-payment of annual fee