CN209585591U - A kind of novel climbing frame scaffold board - Google Patents

A kind of novel climbing frame scaffold board Download PDF

Info

Publication number
CN209585591U
CN209585591U CN201920249827.4U CN201920249827U CN209585591U CN 209585591 U CN209585591 U CN 209585591U CN 201920249827 U CN201920249827 U CN 201920249827U CN 209585591 U CN209585591 U CN 209585591U
Authority
CN
China
Prior art keywords
secondary beam
girder
steel plate
checkered steel
scaffold board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920249827.4U
Other languages
Chinese (zh)
Inventor
黄贞芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920249827.4U priority Critical patent/CN209585591U/en
Application granted granted Critical
Publication of CN209585591U publication Critical patent/CN209585591U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of novel climbing frame scaffold board of the utility model, including girder, secondary beam, checkered steel plate, girder are equipped with 2, and girder side is equipped with the secondary beam butt hole not less than 1, and the end of secondary beam is set in secondary beam butt hole;Girder is mutually fixed with secondary beam using self threading pin or bolt;Secondary beam, which is equipped with, is not less than 1, and is set between two girders;Checkered steel plate is layed in the top of 2 girders;Checkered steel plate is not less than 1, is layed in 2 girders and the secondary beam top between girder, and tiling is taken to be connected or be overlapped laying connection between every two panels checkered steel plate, the advantages of the utility model: checkered steel plate scaffold board Rimless, production is simple, and easy to transportation and installation, structure is overall beautiful;It can partly overlap, non-standard is low;It is at low cost, it is convenient for volume production.

Description

A kind of novel climbing frame scaffold board
Technical field
The utility model relates to construction safety field more particularly to a kind of novel climbing frame scaffold boards.
Background technique
Common climbing frame scaffold board system, generallys use fashioned iron and is welded into frame, checkered steel plate, fashioned iron side are welded on face Drilling interconnects.Above-mentioned scaffold board the disadvantage is that: component processing link is more, at high cost;Frame shaping specification is more, is unfavorable for standard Change;It is big to stack volume, not readily transportable and storage.
Summary of the invention
To overcome above-mentioned deficiency, the utility model provides a kind of novel climbing frame scaffold board.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of novel climbing frame scaffold board, including master Beam, secondary beam, checkered steel plate, it is characterized in that: the girder is equipped with 2;The secondary beam, which is equipped with, is not less than 1, and is set to Between two girders;The checkered steel plate is layed in the bottom of 2 girders.
The girder side is equipped with the secondary beam butt hole not less than 1, and the end of secondary beam is set in secondary beam butt hole.
The girder is fixed with secondary beam using self threading pin or bolt.
The checkered steel plate is not less than 1, is layed in 2 girders and the secondary beam top between girder, every two panels decorative pattern Tiling is taken to be connected or be overlapped laying connection between steel plate.
The advantages of the utility model: checkered steel plate scaffold board Rimless, production is simple, easy to transportation and installation, and structure is whole It is beautiful;It can partly overlap, non-standard is low;It is at low cost, it is convenient for volume production.
Detailed description of the invention:
FIG. 1 is a schematic structural view of the utility model.
Fig. 2 is the utility model side schematic view.
Fig. 3 is the utility model schematic top plan view.
Fig. 4 is the utility model combination of two schematic diagram.
1. girder;2. secondary beam;3. checkered steel plate.
Specific embodiment:
The structural principle of the utility model is described further with reference to the accompanying drawing.
A kind of novel climbing frame scaffold board of the utility model as shown in Figure 1, Figure 2, Figure 3, Figure 4, including girder 1, secondary beam 2, flower Line steel plate 3, girder 1 are equipped with 2, and 1 side of girder is equipped with 2 butt hole of secondary beam not less than 1, and the end of secondary beam 2 is set to secondary In 2 butt hole of beam;Girder 1 is mutually fixed with secondary beam 2 using self threading pin or bolt;Secondary beam 2, which is equipped with, is not less than 1, and is set to two Between root girder 1;Checkered steel plate 3 is layed in the bottom of 2 girders 1;Checkered steel plate 3 is not less than 1, is layed in 2 girders 1 And 2 top of secondary beam between girder 1, take between every two panels checkered steel plate 3 tiling to be connected or be overlapped laying connection.

Claims (4)

1. a kind of novel climbing frame scaffold board, including girder (1), secondary beam (2), checkered steel plate (3), it is characterized in that: the girder (1) 2 are equipped with;The secondary beam (2), which is equipped with, is not less than 1, and is set between two girders (1);The checkered steel plate (3) it is layed in the top of 2 girders (1).
2. a kind of novel climbing frame scaffold board according to claim 1, it is characterized in that: described girder (1) side is equipped with The end of secondary beam (2) butt hole not less than 1, secondary beam (2) is set in secondary beam (2) butt hole.
3. a kind of novel climbing frame scaffold board according to claim 1 or 2, it is characterized in that: the girder (1) and secondary beam (2) it is fixed using self threading pin or bolt.
4. a kind of novel climbing frame scaffold board according to claim 1, it is characterized in that: the checkered steel plate (3) is not less than 1 Piece is layed in 2 girders (1) and secondary beam (2) top between girder (1), and tiling pair is taken between every two panels checkered steel plate (3) Connect or be overlapped in succession laying connection.
CN201920249827.4U 2019-02-26 2019-02-26 A kind of novel climbing frame scaffold board Expired - Fee Related CN209585591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920249827.4U CN209585591U (en) 2019-02-26 2019-02-26 A kind of novel climbing frame scaffold board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920249827.4U CN209585591U (en) 2019-02-26 2019-02-26 A kind of novel climbing frame scaffold board

Publications (1)

Publication Number Publication Date
CN209585591U true CN209585591U (en) 2019-11-05

Family

ID=68370748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920249827.4U Expired - Fee Related CN209585591U (en) 2019-02-26 2019-02-26 A kind of novel climbing frame scaffold board

Country Status (1)

Country Link
CN (1) CN209585591U (en)

Similar Documents

Publication Publication Date Title
CN203247859U (en) Alignment device for butt joint perpendicularity of large steel columns
CN205393883U (en) H shaped steel equipment fixture
CN209585591U (en) A kind of novel climbing frame scaffold board
CN205077498U (en) Steel sheet pile is strutted inside H shaped steel and is enclosed purlin combination layer board
CN206569938U (en) Roofing crane rood beam underframe
CN204174785U (en) The upper and lower syndeton of a kind of precast shear wall
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN203795589U (en) Integrated house based on lightweight steel construction
CN204211397U (en) Assembly type standard knot
CN210976326U (en) Steel-wood roof truss lower chord node
CN209369185U (en) Multidirectional reinforcing steel bar connecting device
CN204691216U (en) Pylon is set up with scale rule and pylon
CN203320420U (en) Temporary locking structure for corrugated steel webs of steel and concrete combined box girder
CN204738401U (en) Assemble integral steel construction secondary beam and absolutely dry formula connection structure of concrete girder lateral part rigid connection
CN203699828U (en) Simple tool-type lifting frame for mounting of steel reinforcement cages
CN209585589U (en) A kind of climbing frame Dense mesh screen horse
CN203462651U (en) Insertion directly-embedded type steel truss connecting structure
CN102733509B (en) Vertical load limiting device for steel plate shear wall
CN205134556U (en) Improved connecting piece for steel -structure beam columns
CN104359539A (en) Reinforced concrete double-T-beam weighing platform
CN204847839U (en) From taking spacing hoist girder and connection structure of end beam
CN205369599U (en) Horizontal bed board waterproof node of steel structure industrial workshop wall
CN205276487U (en) Connection structure of light steel prefabricated exterior wall and major structure with adjustable it is three -dimensional
CN204823745U (en) Two connection structure that drive suspension type crane end beam and girder
CN202831699U (en) Combined type tool house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105