CN209584872U CN201822057277.4U CN201822057277U CN209584872U CN 209584872 U CN209584872 U CN 209584872U CN 201822057277 U CN201822057277 U CN 201822057277U CN 209584872 U CN209584872 U CN 209584872U
Authority
CN
China
Prior art keywords
permanent
interim
rope
hoist cable
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201822057277.4U
Other languages
Chinese (zh)
Inventor
袁爱民
夏叶飞
徐亚林
王军
买尔旦·艾克拜尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HUATONG ENGINEERING TESTING CO LTD
Hohai University HHU
Original Assignee
JIANGSU HUATONG ENGINEERING TESTING CO LTD
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HUATONG ENGINEERING TESTING CO LTD, Hohai University HHU filed Critical JIANGSU HUATONG ENGINEERING TESTING CO LTD
Priority to CN201822057277.4U priority Critical patent/CN209584872U/en
Application granted granted Critical
Publication of CN209584872U publication Critical patent/CN209584872U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of double interim rope self-balancings of pin ear formula to pull formula suspension bridge sling replacing underpinning device, belong to civil engineering suspension bridge maintenance and reinforcement field of engineering technology, including permanent cord clip (18), box beam otic placode (16) are provided with below the permanent cord clip (18), the top of permanent rope (17) is connected with the permanent cord clip (18), and the bottom end of the permanent rope (17) is connected with the box beam otic placode (16).A kind of double interim rope self-balancings of pin ear formula provided by the utility model pull formula suspension bridge sling replacing underpinning device, in hoist cable replacement, it is zero to remove again that interim cable stretching, which is not needed, to the Suo Li of hoist cable to be replaced, but directly utilize self balancing device, hoist cable to be replaced is pulled using jack, the pin shaft stress zero for making hoist cable to be replaced perturbs small, structure safety to the main push-towing rope of existing suspension bridge, the linear of stiff girder and internal force.

Description

The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device
Technical field
The utility model relates to a kind of double interim rope self-balancings of pin ear formula to pull formula suspension bridge sling replacing underpinning device, belong to In civil engineering suspension bridge maintenance and reinforcement field of engineering technology.
Background technique
Sling of suspension bridge be easiest to be damaged in suspension bridge component, one of the primary structure member of most critical, design life Only 20 years, and the design period of suspension bridge is generally 100 years or more, therefore during the design life of suspension bridge, hangs Rope will at least be replaced 4-6 times.
Hoist cable installation when relative to bridge construction, suspension bridge sling replacing is installed without anchor road and hoisting hook during one's term of military service It is standby to can use, the problems such as facing uninterrupted traffic, high altitude operation, construction faciostenosis, and exist and remove old rope and new rope is installed Two kinds of constructions, complicated construction technique.If it is bad that the sling of suspension bridge selected underpins system, hold very much in hoist cable replacement work progress Easily influence Suspension bridge structure linear and internal force, make replacement front and back structural internal force, it is linear that great changes will take place.As it can be seen that suspension cable The suspender replacement of bridge has the characteristics that big difficulty, complicated construction technique, replacement cost are high.
Although the country has Jiangyin Yangtse River suspension bridge, Fushun Tian Hu self-anchored type Concrete suspension bridge and Shantou Bay Bridge to go out The case of hoist cable is now replaced, but correlation technique data is still less.Document " the detection of large-span suspension bridge abnormal sound wirerope drop shot rope And replacement " and patent 1(CN207685669U) disclose Jiangyin Bridge drop shot rope replace device and process, core technology be Interim rope is arranged in the side of permanent rope, and tensioning makes the Suo Li of permanent rope be reduced to zero, then removes hoist cable.This method uses single-point Replacement, when interim cable stretching is smaller, there are Suo Li, pin shafts to remove difficult for hoist cable to be replaced;When interim cable force be stretched to When to hang cable force be zero, the Suo Li of interim rope is very big, and lifting lug otic placode has been surrendered for replacement, is plastically deformed, meanwhile, temporarily Suo Li great perturbs also greatly main push-towing rope and the linear of stiff girder.Patent 2(CN202214681U) describe the hoist cable of suspension bridge a kind of More changing device, it installs interim cable stretching device in the side of hoist cable to be replaced, and it is real to arrange that punching load transducer carries out When monitor.A kind of drop shot rope more changing device is announced, and arranges interim tensioning equipment in the side of interim hoist cable, is made by tensioning It is to be replaced to hang cable force decline, there is a problem of that same patent 1 is same.Patent 3(CN106480822A) disclose a kind of suspension bridge How the method that hoist cable replaces system and replaces sling of suspension bridge puts rope after removing this method give old rope or before new rope installation With the process of hanging cable, how do not give makes the work progress and device to be replaced for hanging cable force zero, and the part lacked is The core and key content of suspension bridge sling replacing.Document " Shantou Bay Bridge tests hoist cable replacement engineering construction and monitoring " is public A kind of suspension bridge sling replacing mode of cloth, it is arranged truss in bridge floor first, is supported in adjacent hoist cable crossbeam, utilizes former girder The hole for hoist being arranged when prefabricated subsection lifting construction lifts by crane beam body in advance.Then, the replacement of hoist cable is carried out in two ways: One is the anchor bolt spreadings to hoist cable, and upper and lower support frame is arranged in the anchor bolt of anchor slab and spreading, and intermediate arrangement jack drives Dynamic jack jacks upper lower bracing frame, loosens the nut of former anchor bolt, realizes replacement.Another way is that stiff girder is arranged above and below Reaction beam unloads hoist cable internal force by jacking upper reaction beam, realizes hoist cable replacement.Unquestionably, this scheme for changing rope is than it Front case has apparent advantage, and beam body need to only be lifted by crane in advance 400 kN by it, and not have to the Suo Li for making hoist cable to be replaced It is reduced to zero, so that realizing that and internal force linear to stiffening girder of suspension bridge is dry scratches least target.In order to overcome single-point to hang single-point replacement When, the excessive problem of interim cable force, Jiangyin Bridge is in nearest hoist cable replacement, using the lifting of five suspension centres replacement one The scheme of hoist cable is successfully realized the replacement of hoist cable.This method has that operation side is more, on the state of existing bridge influence it is big, The wide feature of range.
As it can be seen that domestic had deeper research to suspension bridge sling replacing technology.But it is big that the utility model relies on profit to raise Bridge crane rope replaces engineering, and some news occurs in the hoist cable replacement problem encountered: first is that the steel anchor box ear of Run-yang bridge The construction of plate is different from Jiangyin Bridge and Shantou Bay Bridge, it has reserved two lifting lug holes, and Jiangyin Bridge has only reserved one A lifting lug hole, Shantou Bay Bridge girder do not have using the prestressed reinforced concrete box beam of single three Room thin-walled fish-bellied type section of case If shackle plate.Second is that the hoist cable form of each seat bridge is different.The hoist cable of Jiangyin Bridge uses wirerope, and both ends use pin shaft Formula fork-shaped otic placode hoist cable, anchor cup is made into vase-shaped;Shantou Bay Bridge then uses straddle-type wire rope sling, the company with stiff girder It connects using cast-in fixing bolt formula.And the hoist cable of Run-yang bridge uses parallel steel wire, although both ends use pin type fork-shaped otic placode, anchor Cup does conical.In conclusion existing technological means is unable to complete the replacement of the hoist cable of Run-yang bridge, the utility model exists Sufficiently on the basis of the construction of the research upper and lower anchored end of Run-yang bridge hoist cable, has devised hoist cable replacement and underpin system.
Utility model content
The utility model underpins system deficiency for existing suspension bridge sling replacing, in conjunction with the upper and lower anchor of Run-yang bridge hoist cable The construction of fixed end proposes a kind of double temporarily rope self-balancings of pin ear formula and pulls formula suspension bridge sling replacing underpinning device, solves Construction cost is high when suspension bridge sling replacing, influences that big, work progress is complicated, difficulty is big etc. to bridge structure standing state asks Topic.
In order to solve the above technical problems, the technical solution adopted by the utility model is:
The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device, including permanent cord clip, it is described forever It is provided with box beam otic placode below long cord clip, the top of permanent rope is connected with the permanent cord clip, the bottom end of the permanent rope It is connected with the box beam otic placode;
The middle and lower part two sides of the permanent rope are symmetrically arranged with reaction beam, are provided on the permanent rope to be replaced permanent Cable stretching cord clip, the two sides of the permanent cable stretching cord clip are connected with the permanent cable stretching bar extended downwardly, the permanent rope After the bottom end of pull rod sequentially passes through permanent cable stretching support foot and permanent cable stretching centre-hole jack after the reaction beam again It is fixed;
The identical end of two reaction beams is held in interim hoist cable tensioning anchor cup, and the permanent cord clip two sides are equal It is provided with interim cord clip, interim rope is provided between the interim cord clip of same side and the interim hoist cable tensioning anchor cup, faces When hoist cable tensioning screw rod bottom end and interim hoist cable pitch ear Liang Xianglian, the lower surface of the interim hoist cable fork ear beam and described face When rope top be provided with interim hoist cable fork-shaped otic placode, interim hoist cable pin shaft passes through the hole on the interim hoist cable fork-shaped otic placode And it fixes;The top of the interim hoist cable tensioning screw rod sequentially passes through interim hoist cable after being pierced by the interim hoist cable tensioning anchor cup again Tensioning support foot is fixed with after interim hoist cable stretch-draw jack by interim hoist cable tensioning stem nut.
The both ends of the permanent rope are provided with permanent hoist cable fork-shaped otic placode, the permanent hoist cable fork-shaped otic placode and the case It is fixedly connected between type beam otic placode or permanent cord clip by permanent rope pin shaft.
It is reserved in each interim hoist cable tensioning anchor cup that there are two be convenient for the interim hoist cable tensioning screw rod to pass through Through-hole, i.e., the number of the described interim hoist cable tensioning screw rod are 4.
In the middle part of the permanent rope to be replaced, the PE sheath of the permanent rope to be replaced is stripped, then described in clamping forever Long cable stretching cord clip.
The clamping position of the permanent cable stretching cord clip is at 3 ~ 5m of anchor cup apart from the permanent rope to be replaced.
The permanent cable stretching cord clip is made of a pair with a thickness of the clamping plate of 2 ~ 3cm, the shape of the permanent cable stretching cord clip Shape be it is rectangular, first for passing through the permanent rope to be replaced is reserved in the middle part of the permanent cable stretching cord clip and is run through Hole and the second through hole for passing through two permanent cable stretching bars for being set to first through hole two sides, institute The side for stating permanent cable stretching cord clip is provided with several bolt fixing holes for running through two clamping plates.
The reaction beam is steel box-girder, and the reaction beam is reserved with just at anchor cup with the position of the permanent Suo Pinghang In the hole for allowing the interim hoist cable tensioning screw rod and permanent cable stretching bar to pass through.
The reaction beam is by the permanent cable stretching centre-hole jack force position setting web and lateral stiffening Plate.
A kind of double interim rope self-balancings of pin ear formula provided by the utility model pull formula suspension bridge sling replacing underpinning device, The interim Suo Caiyong of underpinning device sells ear formula, and interim cord clip uses structural form identical with permanent cord clip, interim cord clip with face When rope by pin shaft be connected;The interim rope of underpinning device need only be stretched to target Suo Li, without huge stretching force is applied, make to The Suo Li of replacement hoist cable is reduced to zero.On the one hand the effect of interim rope is the Suo Li (being not zero) for reducing hoist cable to be replaced, another party Face is entirely to change rope process and providing safety guarantee.
The utility model has the advantage that one, adapts to the reserved two lifting lug holes of lifting lug anchor slab, different hoist cable spacing, The hoist cable replacement operation of all kinds of suspension bridges of sling length;Two, interim Suo Caiyong sells ear formula, and interim cord clip uses and permanent cord clip Identical construction;Three, when hoist cable is replaced, not needing interim cable stretching is zero to remove again to the Suo Li of hoist cable to be replaced, but straight It connects using self balancing device, pulls hoist cable to be replaced using jack, make the pin shaft stress zero of hoist cable to be replaced;Four, to both There are the main push-towing rope of suspension bridge, the linear of stiff girder and internal force to perturb small, structure safety;Five, this underpins system and can be used for close to bridge tower Hoist cable replacement at position.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of reaction beam in the utility model;
Fig. 3 is the structural schematic diagram of interim hoist cable tensioning anchor cup in the utility model;
Fig. 4 is the structural schematic diagram of permanent cable stretching cord clip in the utility model;
Fig. 5 is the structural schematic diagram that interim hoist cable pitches ear beam in the utility model;
Fig. 6 is the structural schematic diagram of interim cord clip in the utility model;
Wherein: 1 interim cord clip;2 interim ropes;3, interim hoist cable tensioning anchor cup;4 interim hoist cable tensioning screw rods;5 temporarily hang Rope pitches ear beam;6 interim hoist cable fork-shaped otic placodes;7 interim hoist cable pin shafts;8 interim hoist cable tensioning support foots;9 interim hoist cable tensioning are very heavy Top;10 interim hoist cable tensioning stem nuts;11 permanent cable stretching cord clips;12 permanent cable stretching support foots;13 permanent cable stretching punchings Jack;14 reaction beams;15 permanent cable stretching bars;16 box beam otic placodes;17 permanent ropes;18 permanent cord clips;19 permanent rope pin shafts.
Specific embodiment
The utility model is further described with reference to the accompanying drawing.
As shown in Fig. 1 ~ Fig. 6, the double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device, including forever Long cord clip 18, the lower section of the permanent cord clip 18 are provided with box beam otic placode 16, the top of permanent rope 17 and the permanent cord clip 18 are connected, and the bottom end of the permanent rope 17 is connected with the box beam otic placode 16;Permanent rope 17 and permanent 18/ box beam ear of cord clip The specific connection type of plate 16 are as follows: the both ends of the permanent rope 17 are provided with permanent hoist cable fork-shaped otic placode, the permanent hoist cable It is fixedly connected between fork-shaped otic placode and the box beam otic placode 16 or permanent cord clip 18 by permanent rope pin shaft 19.
The middle and lower part two sides of the permanent rope 17 are symmetrically arranged with reaction beam 14, are arranged on the permanent rope 17 to be replaced There is permanent cable stretching cord clip 11, the two sides of the permanent cable stretching cord clip 11 are connected with the permanent cable stretching bar 15 extended downwardly, The bottom end of the permanent cable stretching bar 15 sequentially passes through permanent cable stretching support foot 12 and permanent rope after passing through the reaction beam 14 again It is tightened by nut and is fixed after tensioning centre-hole jack 13;
The identical end of two reaction beams 14 is held in interim hoist cable tensioning anchor cup 3, the permanent cord clip 18 Two sides are provided with interim cord clip 1, are provided between the interim cord clip 1 of same side and the interim hoist cable tensioning anchor cup 3 The bottom end of interim rope 2, interim hoist cable tensioning screw rod 4 is connected with interim hoist cable fork ear beam 5, under the interim hoist cable fork ear beam 5 Surface and 2 top of interim rope are provided with interim hoist cable fork-shaped otic placode 6, and interim hoist cable pin shaft 7 is temporarily hung across described Hole on rope fork-shaped otic placode 6 and fix;The top of the interim hoist cable tensioning screw rod 4 is pierced by the interim hoist cable tensioning anchor cup Interim hoist cable tensioning support foot 8 is sequentially passed through after 3 again to be consolidated with after interim hoist cable stretch-draw jack 9 by interim hoist cable tensioning stem nut 10 It is fixed.
It is reserved in each interim hoist cable tensioning anchor cup 3 that there are two pass through convenient for the interim hoist cable tensioning screw rod 4 Through-hole, i.e., the number of the described interim hoist cable tensioning screw rod 4 is 4.
Preferably, at permanent 17 middle part of rope to be replaced, the PE sheath of the permanent rope 17 to be replaced is stripped, then Permanent cable stretching cord clip 11 described in clamping.It is further preferred that the clamping position of the permanent cable stretching cord clip 11 be distance to Replacement the permanent rope 17 3 ~ 5m of anchor cup at, still more preferably for 4 m at.
The permanent cable stretching cord clip 11 is made of a pair with a thickness of the clamping plate of 2 ~ 3cm, and further preferably 2cm is described Permanently the shape of cable stretching cord clip 11 is rectangular, and the middle part of the permanent cable stretching cord clip 11 is reserved with for making institute to be replaced State the first through hole that permanent rope 17 passes through and be set to first through hole two sides for making two permanent ropes The second through hole that tension rod 15 passes through, the side of the permanent cable stretching cord clip 11 are provided with several two clamping plates that run through Bolt fixing hole.Bolt passes through bolt fixing hole, is clamped permanent rope 17 by tightening bolt, permanent cable stretching cord clip 11 Length is determining according to suspension bridge design specification according to power is pulled.
The reaction beam 14 is steel box-girder, and for the reaction beam 14 at anchor cup, the position parallel with the permanent rope 17 is pre- There are the holes convenient for allowing the interim hoist cable tensioning screw rod 4 and permanent cable stretching bar 15 to pass through.
The reaction beam 14 is by permanent 13 force position of the cable stretching centre-hole jack setting web and transverse direction Stiffener, to enhance local stability.
The device of the present embodiment makes full use of profit to raise existing a pair of of the otic placode of bridge and reserves pin shaft hole, left in permanent cord clip 18 The right side, each a pair of interim rope 2 of arrangement.Interim 2 one end of rope uses pin ear formula, and the other end uses the interim hoist cable tensioning of tensioning chill casting formula Two circular cavities are reserved in the two sides of anchor cup 3, interim hoist cable tensioning anchor cup 3, pass through convenient for interim hoist cable tensioning screw rod 4.It is hung temporarily The upside of cable stretching anchor cup 3 is shelved reaction beam 14, interim hoist cable tensioning support foot 8, interim hoist cable stretch-draw jack 9 and is temporarily hung Cable stretching stem nut 10.
The underpinning device that the present embodiment is related to is by interim cord clip 1, interim hoist cable fork-shaped otic placode 6, interim rope 2, interim hoist cable Tensioning anchor cup 3, interim hoist cable tensioning screw rod 4, interim hoist cable tensioning support foot 8, interim hoist cable stretch-draw jack 9, interim hoist cable Pull-rod nut 10, interim hoist cable pitch ear beam 5, permanent cable stretching bar 15, permanent cable stretching cord clip 11, permanent cable stretching punching thousand Jin top 13, permanent cable stretching support foot 12, permanent cable stretching stem nut, reaction beam 14 etc. form.The major technique of the underpinning device Feature is as follows:
1. 2 upper end of interim rope of underpinning device is connect using pin type with interim cord clip 1, interim cord clip 1 using with it is permanent The identical form of cord clip 18.
2. 2 lower end of interim rope of underpinning device is interim hoist cable tensioning anchor cup 3, the two sides of interim hoist cable tensioning anchor cup 3 are pre- It boxes out hole, is passed through convenient for interim hoist cable tensioning screw rod 4.The lower end of interim hoist cable tensioning screw rod 4 is connect with fork ear.Interim hoist cable It draws 9 pushing tow of jack to draw interim hoist cable tensioning screw rod 4, Suo Li is applied to interim rope 2.On the one hand the effect of interim rope 2 is pair Permanent rope 17 plays unloading, is on the other hand to play safety protection function to hoist cable work progress to be replaced.
3. existing steel box-girder in underpinning device, permanent rope pin shaft 19, interim hoist cable pin shaft 7, is temporarily hung steel box-girder otic placode 16 Rope pitches ear beam 5, interim hoist cable tensioning screw rod 5 and interim hoist cable tensioning stem nut 10, reaction beam 14 and forms a self-balancing system, Replacement for permanent rope 17.
4. stripping the PE sheath of permanent rope 17 to be replaced at the anchor cup 4m apart from permanent rope 17 to be replaced, installation is permanent Cable stretching cord clip 11, permanent cable stretching bar 15, permanent cable stretching support foot 12 and permanent cable stretching centre-hole jack 13 etc..
5. permanent cable stretching centre-hole jack 13 works, in the base force of permanent cable stretching centre-hole jack 13 Transmittance process is: 13 → reaction beam of permanent cable stretching centre-hole jack 14 → interim hoist cable tensioning stem nut 10 → interim hoist cable Tensioning screw rod 4 → interim hoist cable fork ear beam 5 → interim hoist cable 7 → box beam of pin shaft otic placode 16.In permanent cable stretching punching thousand The other end on jin top 13, the power transfer mode of permanent cable stretching centre-hole jack 13 is: permanent cable stretching centre-hole jack Nut → permanent cable stretching bar 15 → permanent cable stretching cord clip 11 → permanent rope 17 to be replaced of 13 → permanent cable stretching bar.This reality The reaction beam system of the interim cable system and permanent Suo Genghuan that play unloading is combined into one by the underpinning device for applying example, makes the body System has double action.
6. permanent rope 17 is replaced, since interim rope 2 only plays slightly unloading and security protection to permanent rope 17 to be replaced Effect, and the Suo Li that original pin shaft undertakes is transferred to permanent cable stretching bar 15 and goes to hold by permanent cable stretching centre-hole jack 13 Load, neither will increase the Suo Li of permanent rope 17, will not reduce.Therefore, using above-mentioned hoist cable substitute mode, hoist cable construction pair Main push-towing rope, the internal force of girder and hoist cable and linear influence are smaller, and the influence to Suo Li around is also small.
7. due to the hoist cable replacing options to original structure it is dry scratch variation be reduced to it is minimum, hoist cable replace when construction peace Entirely, convenient.
8. the scheme of hoist cable at a suspension centre, this hoist cable are replaced using three suspension centres or five suspension centres relative to the replacement of some suspension bridges Replacing Scheme need to only be arranged on hoist cable position to be replaced, reduce operation side and construction temporary facility, solve The problems such as construction is complicated and the construction period is long.
The work progress of the present embodiment is as follows:
Step 1: preparing before construction
According to hoist cable underpinning device dimensional drawing, setting-out, blanking, assembly, drilling, welding.Detect the Suo Li of hoist cable to be replaced And the preparation (hoist engine, material, component etc.) before construction;
Step 2: interim rope installation
Interim cord clip 1, interim rope 2, interim hoist cable tensioning anchor cup 3, interim hoist cable fork ear beam 5, interim hoist cable tensioning are installed Screw rod 4, reaction beam 14, interim hoist cable tensioning support foot 8, interim hoist cable stretch-draw jack 9, interim hoist cable tensioning stem nut 10, so The interim rope 2 of post-stretching makes old 17 part Suo Li of permanent rope be transferred to interim rope 2 to target Suo Li;
Step 3: permanent cable stretching cord clip and replacement underpinning device installation
The permanent cable stretching cord clip 11 of permanent rope 17 to be replaced, permanent cable stretching bar 15, permanent cable stretching support foot are installed 12, permanent cable stretching centre-hole jack 13, and tightened with nut.
Step 4: permanent rope to be replaced is removed
With permanent 13 pushing reaction beam 14 of cable stretching centre-hole jack, permanent cable stretching bar 15 is drawn, tensioning is to be replaced Permanent rope 17, makes the Suo Li of old permanent rope 17 be transferred to permanent cable stretching bar 15, and permanent rope pin shaft 19 is made to be in unstressed State removes permanent rope pin shaft 19, and then the permanent slowly unloading of cable stretching centre-hole jack 13, removes permanent cable stretching cord clip 11 and permanent cable stretching bar 15, remove old permanent rope 17;Then old permanent 17 upper end pin shaft of rope is removed with hoist engine, and by old rope Slowly place bridge floor.
Step 5: new rope installation
New permanent rope 17 installs end pin shaft by elevator machine travel, then installs the permanent cable stretching rope of new cable stretching Folder 11 and permanent cable stretching bar 15, with permanent 13 pushing reaction beam 14 of cable stretching centre-hole jack and the permanent cable stretching of new rope Bar 15, the new rope of tensioning keep the fork-shaped otic placode pin shaft hole of new rope and 16 preformed hole of box beam otic placode concentric, install permanent rope pin shaft 19, remove permanent cable stretching cord clip 11 and permanent cable stretching bar 15;
Step 6: repeating above step 4 and step 5, remove another old rope, another Gen Xinsuo is installed;
Step 7: removing underpinning device and interim rope
It removes hoist cable and replaces underpinning device: interim rope 2, interim hoist cable tensioning anchor cup 3, interim hoist cable tensioning screw rod 4 and facing When cord clip 1, interim hoist cable fork ear beam 5 etc., interim 2 Suo Li of rope is transferred to a pair of new permanent rope 17, hangs cable force and redistribute, hang Suo Genghuan is finished.
The above is only the preferred embodiment of the utility model, it should be pointed out that: for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the protection scope of the utility model.

Claims (8)

1. the double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device, it is characterised in that: including permanent rope It presss from both sides (18), is provided with box beam otic placode (16) below the permanent cord clip (18), the top of permanent rope (17) and described permanent Cord clip (18) is connected, and the bottom end of the permanent rope (17) is connected with the box beam otic placode (16);
The middle and lower part two sides of the permanent rope (17) are symmetrically arranged with reaction beam (14), are set on the permanent rope (17) to be replaced It is equipped with permanent cable stretching cord clip (11), the two sides of the permanent cable stretching cord clip (11) are connected with the permanent cable stretching extended downwardly Bar (15), the bottom end of the permanent cable stretching bar (15) sequentially pass through permanent cable stretching support foot after passing through the reaction beam (14) again (12) it is fixed afterwards with permanent cable stretching centre-hole jack (13);
The identical end of two reaction beams (14) is held on interim hoist cable tensioning anchor cup (3), the permanent cord clip (18) two sides are provided with interim cord clip (1), the interim cord clip (1) and the interim hoist cable tensioning anchor cup (3) of same side Between be provided with interim rope (2), the bottom end of interim hoist cable tensioning screw rod (4) is connected with interim hoist cable fork ear beam (5), it is described temporarily The lower surface and the interim rope (2) top of hoist cable fork ear beam (5) are provided with interim hoist cable fork-shaped otic placode (6), temporarily hang Rope pin shaft (7) passes through the hole on the interim hoist cable fork-shaped otic placode (6) and fixes;The interim hoist cable tensioning screw rod (4) Top sequentially passes through interim hoist cable tensioning support foot (8) and interim hoist cable tensioning after being pierced by the interim hoist cable tensioning anchor cup (3) again It is fixed by interim hoist cable tensioning stem nut (10) after jack (9).
2. the double interim rope self-balancings of pin ear formula according to claim 1 pull formula suspension bridge sling replacing underpinning device, Be characterized in that: the both ends of the permanent rope (17) are provided with permanent hoist cable fork-shaped otic placode, the permanent hoist cable fork-shaped otic placode with It is fixedly connected between the box beam otic placode (16) or permanent cord clip (18) by permanent rope pin shaft (19).
3. the double interim rope self-balancings of pin ear formula according to claim 1 pull formula suspension bridge sling replacing underpinning device, Be characterized in that: reserved on each interim hoist cable tensioning anchor cup (3) there are two convenient for the interim hoist cable tensioning screw rod (4) The through-hole passed through, i.e., the number of the described interim hoist cable tensioning screw rod (4) are 4.
4. the double interim rope self-balancings of pin ear formula according to claim 1 pull formula suspension bridge sling replacing underpinning device, It is characterized in that: in the middle part of the permanent rope (17) to be replaced, stripping the PE sheath of the permanent rope (17) to be replaced, refill Press from both sides the permanent cable stretching cord clip (11).
5. the double interim rope self-balancings of pin ear formula according to claim 4 pull formula suspension bridge sling replacing underpinning device, Be characterized in that: the clamping position of the permanent cable stretching cord clip (11) be anchor cup 3 apart from the permanent rope (17) to be replaced ~ At 5m.
6. the double interim rope self-balancings of pin ear formula according to claim 1 pull formula suspension bridge sling replacing underpinning device, Be characterized in that: the permanent cable stretching cord clip (11) is made of a pair with a thickness of the clamping plate of 2 ~ 3cm, the permanent cable stretching cord clip (11) shape be it is rectangular, be reserved in the middle part of the permanent cable stretching cord clip (11) for making the permanent rope to be replaced (17) the first through hole for passing through and be set to first through hole two sides for making two permanent cable stretching bars (15) side of the second through hole passed through, the permanent cable stretching cord clip (11) is provided with several spiral shells for running through two clamping plates Bolt fixation hole.
7. the double interim rope self-balancings of pin ear formula according to claim 1 pull formula suspension bridge sling replacing underpinning device, Be characterized in that: the reaction beam (14) is steel box-girder, and the reaction beam (14) is parallel with permanent rope (17) at anchor cup The hole that position is reserved with convenient for allowing the interim hoist cable tensioning screw rod (4) and permanent cable stretching bar (15) to pass through.
8. the double interim rope self-balancings of pin ear formula according to claim 1 or claim 7 pull formula suspension bridge sling replacing underpinning device, It is characterized by: web is being arranged by permanent cable stretching centre-hole jack (13) force position in the reaction beam (14) With lateral stiffening plate.
CN201822057277.4U 2018-12-10 2018-12-10 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device Withdrawn - After Issue CN209584872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822057277.4U CN209584872U (en) 2018-12-10 2018-12-10 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822057277.4U CN209584872U (en) 2018-12-10 2018-12-10 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device

Publications (1)

Publication Number Publication Date
CN209584872U true CN209584872U (en) 2019-11-05

Family

ID=68349788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822057277.4U Withdrawn - After Issue CN209584872U (en) 2018-12-10 2018-12-10 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device

Country Status (1)

Country Link
CN (1) CN209584872U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537476A (en) * 2018-12-10 2019-03-29 河海大学 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537476A (en) * 2018-12-10 2019-03-29 河海大学 The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device
CN109537476B (en) * 2018-12-10 2024-02-23 河海大学 Pin lug type double-temporary-rope self-balancing pulling type suspension bridge sling replacement underpinning device

Similar Documents

Publication Publication Date Title
CN209584873U (en) The double interim rope self-balancing push mode suspension bridge sling replacing underpinning devices of straddle-type
CN101200916B (en) Construction method of prestressed suspension type building structure
CN100453999C (en) 32m/900t prestressed concrete pretension box beam static loading test method
CN109487709A (en) The interim rope self-balancing push mode suspension bridge sling replacing underpinning device of side straddle-type
CN109537476A (en) The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN103669217A (en) Hanging basket with rear fulcrum and transverse moving method for integral range replacement of hanging basket with rear fulcrum
CN110205940A (en) 0# block construction bracket and its reverse drawing preloading method
CN108489748A (en) A kind of experimental rig and test method for continuous bridge long period Study of Cyclic Loading
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN110104568B (en) Tower crane installation self-checking evaluation method
CN209584872U (en) The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device
CN210420902U (en) Concrete box girder flange plate cutting and dismantling stabilizing device
CN110820566A (en) Corrugated steel web part bearing type hanging basket suspension casting construction method
CN100545353C (en) Adopt external eccentric prestress system to carry out steel girder cantilever erection construction method
CN209584874U (en) The interim rope self-balancing push mode suspension bridge sling replacing underpinning device of side straddle-type
CN110426284B (en) Large-tonnage cantilever type self-balancing test loading system and implementation method thereof
CN102877657B (en) Large-span H-shaped plane composite structure beam string upper-air cable replacement construction method
JP6905556B2 (en) Truss bridge member replacement method and replacement method
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN215925647U (en) Arch rib buckle cable anchoring beam for tower buckle integration
CN210803119U (en) Large-tonnage cantilever type self-balancing test loading system
CN112240007A (en) Temporary support tool for replacing bridge tension and compression support and replacement construction method thereof
CN101457516B (en) Multilayer horizontal stay fixing method
CN218880608U (en) Rear anchor device for hanging basket of bridge fabrication machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20191105

Effective date of abandoning: 20240223

AV01 Patent right actively abandoned

Granted publication date: 20191105

Effective date of abandoning: 20240223

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned