CN209583418U - Hanging device - Google Patents
Hanging device Download PDFInfo
- Publication number
- CN209583418U CN209583418U CN201822273486.2U CN201822273486U CN209583418U CN 209583418 U CN209583418 U CN 209583418U CN 201822273486 U CN201822273486 U CN 201822273486U CN 209583418 U CN209583418 U CN 209583418U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- supporting part
- lifting
- hanging device
- support bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a kind of hanging device.The hanging device includes supporting part, support portion, running part and lifting portion, length direction of the supporting part along tunnel is extended, support portion is multiple, length direction of multiple support portions along tunnel is positioned apart from, multiple support portions are connected with supporting part, at least one of running part and multiple support portions are connected, so that running part drives corresponding support portion to move in tunnel, lifting portion is movably connected with supporting part, lifting portion is for lifting inverted arch prefabricated section, lifting portion is used to inverted arch prefabricated section being moved to predeterminated position along the length direction in tunnel or the width direction in tunnel.By the way that running part is arranged on support portion, to drive supporting part mobile, and lifting portion is movably disposed on supporting part, and the displacement on opposite tunnel width direction and length of tunnel direction can be generated by supporting part, so that inverted arch prefabricated section can neatly be placed predeterminated position by lifting portion, the efficiency of installation is improved.
Description
Technical field
The utility model relates to tunnel equipment technology field of transport, in particular to a kind of hanging device.
Background technique
Component part of the tunnel inverted arch as liner structure plays a significant role to supporting and protecting system of tunnel stabilization.Inverted arch
Digging process be into tunnel process be easy cause safety accident stage, inverted arch build quality more with the hair of tunnel defect
Raw rate is closely bound up.In recent years, the special line for passenger trains tunnel excavation section built is big, and working procedure is cumbersome, tunnel structure by
Power is also increasingly complex, especially most complicated with tunnel inverted arch portion, and abutment wall bottom and inverted arch junction stress are relatively concentrated, simultaneously as tunnel
Inverted arch structure, which is in for a long time under Train induced load effect and groundwater erosion adverse circumstances, to be highly prone to destroy, and causes substrate heavy
Fall into, railway roadbed such as is risen soil at the diseases, influence operation security, traditional inverted arch builds technology, and oneself is extremely difficult to safety, durability
With the high request of waterproofness.
However, inverted arch component, because itself is thick and heavy, existing haulage equipment is difficult to flexibly transport inverted arch component in tunnel
Need destination locations to be mounted.
Utility model content
The main purpose of the utility model is to provide a kind of hanging devices, to solve to be difficult in tunnel in the prior art
Flexibly the problem of transport inverted arch component.
To achieve the goals above, one aspect according to the present utility model provides a kind of hanging device, comprising: hold
Load portion, length direction of the supporting part along tunnel are extended;Support portion, support portion are multiple, length of multiple support portions along tunnel
Degree direction is positioned apart from, and multiple support portions are connected with supporting part;In running part, running part and multiple support portions at least
One is connected, so that running part drives corresponding support portion to move in tunnel;Lifting portion, lifting portion and supporting part are removable
Ground is connected, and lifting portion is used for inverted arch prefabricated section for lifting inverted arch prefabricated section, lifting portion along the length direction or tunnel in tunnel
The width direction in road is moved to predeterminated position.
Further, supporting part includes the first load bearing beam and the second load bearing beam, the first load bearing beam and the equal edge of the second load bearing beam
The length direction in tunnel is extended, and the width direction of the first load bearing beam and the second load bearing beam along tunnel is positioned apart from, and first
Attachment beam is provided between load bearing beam and the second load bearing beam.
Further, it is provided with the first sliding rail on the first load bearing beam, the second sliding rail, lifting portion are provided on the second load bearing beam
It is cooperatively connected with the first sliding rail and the second sliding rail.
Further, lifting portion includes: lifting pedestal, lifts pedestal and the first sliding rail and the second sliding rail is cooperatively connected, hang
Filling pedestal has traverse rod, and width direction of the traverse rod along tunnel is arranged;Ontology is lifted, lifting ontology and traverse rod are cooperatively connected, lifting
Ontology is movably disposed along traverse rod.
Further, multiple support portions include: the first support portion, and the first end of the first support portion is connected with supporting part,
The second end of first support portion is connected with running part;Second support portion, the second support portion and the first support portion interval are arranged, the
The first end of two support portions is connected with supporting part, and the second end of the second support portion and the ground in tunnel touch.
Further, the first support portion includes: the first upper support bar, and the first upper support bar is to prop up on two, two first
Strut is oppositely disposed in the two sides of supporting part, and two the first upper support bars are connected with supporting part;First lower support bar, the
One lower support bar is two, and two the first lower support bars are arranged correspondingly with two the first upper support bars, under two first
Support rod is connected with running part, and the first receiving portion is offered on the first lower support bar, and the first upper support bar is movably set
It is placed in the first receiving portion of corresponding first lower support bar;First driving portion, the first driving portion are two, two first drives
Dynamic portion is arranged and connect correspondingly with two the first lower support bars, two the first driving portions and two the first upper support bars one
One is accordingly drivingly connected.
Further, the second support portion includes: the second upper support bar, and the second upper support bar is to prop up on two, two second
Strut is oppositely disposed in the two sides of supporting part, and two the second upper support bars are connected with supporting part;Second lower support bar, the
Two lower support bars are two, and two the second upper support bars are arranged correspondingly with two the second lower support bars, the second lower support
The second receiving portion is offered on bar, the second upper support bar is movably disposed in the second receiving of corresponding second lower support bar
In portion;Rubber pad, rubber pad are two, and two rubber pads are arranged and are located at correspondingly with two the second lower support bars
The bottom of two the second lower support bars;Second driving portion, the second driving portion are two, under two the second driving portions and two second
Support rod is arranged and connects correspondingly, two the second driving portions and two the second upper support bars company of driving correspondingly
It connects.
Further, hanging device further include: control unit, control unit are electrically connected with lifting portion, to control lifting portion along tunnel
The length direction in road is mobile or the width direction along tunnel moves.
Further, hanging device further include: infrared positioning region, infrared positioning region are electrically connected with control unit, infrared positioning
Portion determines the default installation site of inverted arch prefabricated section by transmitting infrared ray.
Further, hanging device further include: horizontal measuring instrument, horizontal measuring instrument are electrically connected with control unit, horizontal measurement
Instrument is used to measure the horizontal accuracy of the inverted arch prefabricated section in the state that is installed.
Using the technical solution of the utility model, by the way that running part is arranged on support portion, to drive supporting part mobile, and
Lifting portion is movably disposed on supporting part, and opposite tunnel width direction and length of tunnel side can be generated by supporting part
Upward displacement improves the efficiency of installation so that inverted arch prefabricated section can neatly be placed predeterminated position by lifting portion.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide a further understanding of the present invention, this is practical
Novel illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model.
In the accompanying drawings:
Fig. 1 shows the first visual angle schematic diagram of the embodiment of hanging device according to the present utility model;
Fig. 2 shows the second visual angle schematic diagrames of the embodiment of hanging device according to the present utility model.
Wherein, the above drawings include the following reference numerals:
10, supporting part;11, the first load bearing beam;12, the second load bearing beam;13, attachment beam;
20, support portion;21, the first support portion;211, the first upper support bar;212, the first lower support bar;22, the second support
Portion;221, the second upper support bar;222, the second lower support bar;223, rubber pad;
30, running part;
40, lifting portion;41, pedestal is lifted;42, ontology is lifted.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
Specifically, as depicted in figs. 1 and 2, the hanging device, including supporting part 10, support portion 20, running part 30 and lifting
Portion 40, length direction of the supporting part 10 along tunnel are extended, and support portion 20 is multiple, length of multiple support portions 20 along tunnel
Direction is positioned apart from, and multiple support portions 20 are connected with supporting part 10, in running part 30 and multiple support portions 20 at least
One is connected, so that running part 30 drives corresponding support portion 20 to move in tunnel, lifting portion 40 and supporting part 10 are removable
It is connected dynamicly, lifting portion 40 is used for inverted arch prefabricated section for lifting inverted arch prefabricated section, lifting portion 40 along the length side in tunnel
To or the width direction in tunnel be moved to predeterminated position.
In the present embodiment, mobile to drive supporting part by the way that running part is arranged on support portion, and it is removable to lift portion
It is arranged on supporting part dynamicly, and the displacement on opposite tunnel width direction and length of tunnel direction can be generated by supporting part,
So that inverted arch prefabricated section can neatly be placed predeterminated position by lifting portion, the efficiency of installation is improved.
As shown in Figure 1, supporting part 10 includes the first load bearing beam 11 and the second load bearing beam 12, the first load bearing beam 11 and second is held
Carrier beam 12 is extended along the length direction in tunnel, and the first load bearing beam 11 and the second load bearing beam 12 are between the width direction in tunnel
It is arranged every ground, is provided with attachment beam 13 between the first load bearing beam 11 and the second load bearing beam 12.It is arranged in this way so that lifting portion 40 can
Moved along the first load bearing beam 11 and the second load bearing beam 12, and then inverted arch prefabricated section be hoisted in default fitting limit, so as into
One step is accurately installed.
In the present embodiment, it is provided with the first sliding rail on the first load bearing beam 11, it is sliding that second is provided on the second load bearing beam 12
Rail, lifting portion 40 and the first sliding rail and the second sliding rail are cooperatively connected.Setting is easy to lift portion 40 in the first load bearing beam and the in this way
Oriented movement on two load bearing beams 12.
As depicted in figs. 1 and 2, lifting portion 40 includes lifting pedestal 41 and lifting ontology 42, lifts pedestal 41 and first and slides
Rail and the second sliding rail are cooperatively connected, and lifting pedestal 41 has traverse rod, and width direction of the traverse rod along tunnel is arranged;Lift ontology 42 with
Traverse rod is cooperatively connected, and lifting ontology 42 is movably disposed along traverse rod.Setting is easy to lift pedestal 41 and lifting ontology 42 in this way
It can be by being moved respectively along tunnel width direction and length of tunnel direction, and then realize the accurate lifting to inverted arch prefabricated section.
In addition, multiple support portions 20 include the first support portion 21 and the second support portion 22, the first end of the first support portion 21
It is connected with supporting part 10, the second end of the first support portion 21 is connected with running part 30, the second support portion 22 and the first support
The setting of the interval of portion 21, the first end of the second support portion 22 are connected with supporting part 10, the second end and tunnel of the second support portion 22
Ground touching.Setting is convenient for driving supporting part 10 to be moved near installation site range using the first support portion 21 in this way,
And then the second support portion 22 is recycled to play a supporting role, in order to lift portion's operation.
In the present embodiment, the first support portion 21 includes the first upper support bar 211, the first lower support bar 212 and the first drive
Dynamic portion, the first upper support bar 211 are two, and two the first upper support bars 211 are oppositely disposed in the two sides of supporting part 10, two
First upper support bar 211 is connected with supporting part 10, and the first lower support bar 212 is two, two the first lower support bars 212 with
Two the first upper support bars 211 are arranged correspondingly, and two the first lower support bars 212 are connected with running part 30, and first
The first receiving portion is offered on lower support bar 212, the first upper support bar 211 is movably disposed in the corresponding first lower support
In first receiving portion of bar 212, the first driving portion is two, and two the first driving portions and two the first lower support bars 212 are one by one
It is arranged in correspondence with and connects, two the first driving portions are drivingly connected correspondingly with two the first upper support bars 211.It sets in this way
It sets convenient for changing the working depth position in lifting portion by the first driving portion according to the height in tunnel.
Further, the second support portion 22 includes the second upper support bar 221, the second lower support bar 222,223 and of rubber pad
Second driving portion, the second upper support bar 221 are two, and two the second upper support bars 221 are oppositely disposed two in supporting part 10
Side, two the second upper support bars 221 are connected with supporting part 10, and the second lower support bar 222 is to support on two, two second
Bar 221 is arranged correspondingly with two the second lower support bars 222, and the second receiving portion is offered on the second lower support bar 222, the
Two upper support bars 221 are movably disposed in the second receiving portion of corresponding second lower support bar 222, and rubber pad 223 is
Two, two rubber pads 223 and two the second lower support bars 222 are arranged correspondingly and are located at two second lower supports
The bottom of bar 222, the second driving portion are two, and two the second driving portions are set correspondingly with two the second lower support bars 222
It sets and connects, two the second driving portions are drivingly connected correspondingly with two the second upper support bars 221.Root is convenient in setting in this way
The working depth position in lifting portion is changed by the first driving portion and the cooperation of the second driving portion according to the height in tunnel, and passes through setting
Rubber pad 223 improve hanging device achieve the goal position when body stability, be not easy to lead to machine because of the operation in lifting portion
The relative movement of body.
In the present embodiment, hanging device further includes control unit, and control unit is electrically connected with lifting portion 40, to control lifting portion
40 length direction along tunnel moves or the width direction along tunnel moves.Setting is convenient for user according to actual job ring in this way
Border is remotely controlled 40 operation of lifting portion by control unit.
In addition, hanging device further includes infrared positioning region, infrared positioning region is electrically connected with control unit, and infrared positioning region passes through
Emit infrared ray to determine the default installation site of inverted arch prefabricated section.Setting improves the accurate of inverted arch prefabricated section installation in this way
Property.
Further, hanging device further includes horizontal measuring instrument, and horizontal measuring instrument is electrically connected with control unit, horizontal measuring instrument
For measuring the horizontal accuracy for being in the inverted arch prefabricated section for the state that is installed.Setting improves the installation of inverted arch prefabricated section in this way
Operation quality.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.
Claims (10)
1. a kind of hanging device characterized by comprising
Supporting part (10), length direction of the supporting part (10) along tunnel are extended;
Support portion (20), the support portion (20) be it is multiple, multiple support portions (20) are between the length direction in the tunnel
It is arranged every ground, multiple support portions (20) are connected with the supporting part (10);
Running part (30), at least one of the running part (30) and multiple described support portions (20) are connected, so that described
Running part (30) drives the corresponding support portion (20) to move in tunnel;
Lifting portion (40), the lifting portion (40) are movably connected with the supporting part (10), and the lifting portion (40) is used
In lifting inverted arch prefabricated section, the lifting portion (40) is used for inverted arch prefabricated section along the length direction or the tunnel in the tunnel
Width direction be moved to predeterminated position.
2. hanging device according to claim 1, which is characterized in that the supporting part (10) includes the first load bearing beam (11)
With the second load bearing beam (12), the length direction of first load bearing beam (11) and second load bearing beam (12) along tunnel extends
Setting, the width direction of first load bearing beam (11) and second load bearing beam (12) along the tunnel are positioned apart from, institute
It states and is provided with attachment beam (13) between the first load bearing beam (11) and second load bearing beam (12).
3. hanging device according to claim 2, which is characterized in that it is sliding to be provided with first on first load bearing beam (11)
Rail is provided with the second sliding rail, the lifting portion (40) and first sliding rail and described second on second load bearing beam (12)
Sliding rail is cooperatively connected.
4. hanging device according to claim 3, which is characterized in that the lifting portion (40) includes:
It lifts pedestal (41), the lifting pedestal (41) and first sliding rail and second sliding rail are cooperatively connected, described to hang
Filling pedestal (41) has traverse rod, and width direction of the traverse rod along the tunnel is arranged;
It lifts ontology (42), the lifting ontology (42) and the traverse rod are cooperatively connected, and the lifting ontology (42) is along the cross
Rail is movably disposed.
5. hanging device according to claim 1, which is characterized in that multiple support portions (20) include:
The first end of first support portion (21), first support portion (21) is connected with the supporting part (10), and described first
The second end of support portion (21) is connected with the running part (30);
Second support portion (22), second support portion (22) and first support portion (21) interval are arranged, and described second
The first end of support part (22) is connected with the supporting part (10), second end and the tunnel of second support portion (22)
Ground touching.
6. hanging device according to claim 5, which is characterized in that first support portion (21) includes:
First upper support bar (211), first upper support bar (211) are two, two the first upper support bar (211) phases
Be set to the two sides of the supporting part (10) over the ground, two first upper support bars (211) with the supporting part (10) phase
Connection;
First lower support bar (212), first lower support bar (212) are two, two first lower support bars (212) with
Two first upper support bars (211) are arranged correspondingly, two first lower support bars (212) with the walking
Portion (30) is connected, and the first receiving portion is offered on first lower support bar (212), first upper support bar (211) can
It is actively set in first receiving portion of corresponding first lower support bar (212);
First driving portion, first driving portion are two, two first driving portions and two first lower support bars
(212) it is arranged and connects correspondingly, two first driving portions and two first upper support bars (211) one is a pair of
It is drivingly connected with answering.
7. hanging device according to claim 5, which is characterized in that second support portion (22) includes:
Second upper support bar (221), second upper support bar (221) are two, two the second upper support bar (221) phases
Be set to the two sides of the supporting part (10) over the ground, two second upper support bars (221) with the supporting part (10) phase
Connection;
Second lower support bar (222), second lower support bar (222) are two, two second upper support bars (221) with
Two second lower support bars (222) are arranged correspondingly, offer the second receiving on second lower support bar (222)
Portion, second upper support bar (221) are movably disposed in described the second of corresponding second lower support bar (222)
In receiving portion;
Rubber pad (223), the rubber pad (223) are two, two rubber pads (223) and two described second lower supports
Bar (222) is arranged correspondingly and is located at the bottom of two second lower support bars (222);
Second driving portion, second driving portion are two, two second driving portions and two second lower support bars
(222) it is arranged and connects correspondingly, two second driving portions and two second upper support bars (221) one is a pair of
It is drivingly connected with answering.
8. hanging device according to claim 1, which is characterized in that the hanging device further include:
Control unit, the control unit are electrically connected with the lifting portion (40), to control the lifting portion (40) along the length in tunnel
Direction is mobile or the width direction along tunnel moves.
9. hanging device according to claim 8, which is characterized in that the hanging device further include:
Infrared positioning region, the infrared positioning region are electrically connected with the control unit, and the infrared positioning region passes through transmitting infrared ray
With the default installation site of the determination inverted arch prefabricated section.
10. hanging device according to claim 8, which is characterized in that the hanging device further include:
Horizontal measuring instrument, the horizontal measuring instrument are electrically connected with the control unit, and the horizontal measuring instrument is for measuring in peace
Fill the horizontal accuracy of the inverted arch prefabricated section of completion status.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822273486.2U CN209583418U (en) | 2018-12-30 | 2018-12-30 | Hanging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822273486.2U CN209583418U (en) | 2018-12-30 | 2018-12-30 | Hanging device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209583418U true CN209583418U (en) | 2019-11-05 |
Family
ID=68351572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822273486.2U Active CN209583418U (en) | 2018-12-30 | 2018-12-30 | Hanging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209583418U (en) |
-
2018
- 2018-12-30 CN CN201822273486.2U patent/CN209583418U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201580915U (en) | Tyre-type gantry crane | |
CN204627625U (en) | Automatic walking lining trolley | |
CN105000482B (en) | Tower crane with walking mechanism | |
CN201010858Y (en) | Device especially for bridge detecting and maintaining | |
CN105016223B (en) | Cross beam supporting system used for tower crane | |
CN103147370A (en) | Device and method for replacing track slab of slab ballastless track | |
CN204823883U (en) | Trolley -bus gantry crane | |
CN109281323A (en) | A kind of roadbed side slope rockbolt installation device | |
CN103510864B (en) | One kind three saves hydraulically extensible suit derrick | |
CN104060835A (en) | Lifting-sliding construction method for single plane truss | |
CN206800215U (en) | Bridge incremental launching Bridge Erector | |
CN107059609A (en) | Bridge maintenance system span formula steel structure platform | |
CN209583418U (en) | Hanging device | |
CN204170002U (en) | A kind of artificial digging pile safety apparatus | |
CN206625845U (en) | A kind of inverted arch trestle | |
CN206529691U (en) | Bridge maintenance system steel construction inspection platform | |
CN206815943U (en) | A kind of pole upside-down mounting group founds lifting device | |
CN203007843U (en) | Variable amplitude deck derrick crane | |
CN209838445U (en) | Tunnel preliminary bracing rapid construction trolley | |
CN205170224U (en) | Crawler -type moves tower crane | |
CN209635762U (en) | Lamp box installs vehicle | |
CN208686396U (en) | Tunnel inverted arch trestle walking rack | |
CN104988921B (en) | Multifunction guard rail breakdown van | |
CN209143537U (en) | Rubber-tyred tunnel tracklaying crane | |
CN207312996U (en) | A kind of high aerial rail road lifting gear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |