CN209575882U - Cyclic water tank device is used after a kind of construction of green building - Google Patents

Cyclic water tank device is used after a kind of construction of green building Download PDF

Info

Publication number
CN209575882U
CN209575882U CN201822191584.1U CN201822191584U CN209575882U CN 209575882 U CN209575882 U CN 209575882U CN 201822191584 U CN201822191584 U CN 201822191584U CN 209575882 U CN209575882 U CN 209575882U
Authority
CN
China
Prior art keywords
water tank
fixedly installed
green building
water
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822191584.1U
Other languages
Chinese (zh)
Inventor
张齐兵
韩晓栋
徐秋明
王晨炜
李博昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA NUCLEAR INDUSTRY ZHONGYUAN CONSTRUCTION Co Ltd
Original Assignee
CHINA NUCLEAR INDUSTRY ZHONGYUAN CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA NUCLEAR INDUSTRY ZHONGYUAN CONSTRUCTION Co Ltd filed Critical CHINA NUCLEAR INDUSTRY ZHONGYUAN CONSTRUCTION Co Ltd
Priority to CN201822191584.1U priority Critical patent/CN209575882U/en
Application granted granted Critical
Publication of CN209575882U publication Critical patent/CN209575882U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses use cyclic water tank device after a kind of construction of green building, including fixed mechanism, protection mechanism and water storage device, protection mechanism and water storage device are provided on the fixed mechanism, the fixed mechanism includes chassis, support plate is fixedly installed at the top of the chassis, four right angles at the top of the support plate are fixedly installed with limited post, the protection mechanism includes sleeve, the surface of the sleeve is fixedly installed with buffer spring, the buffer spring is fixedly installed with buffer board, the water tank of the water storage device far from one end of sleeve.The inside of water tank is divided into clear water chamber and soil chamber by the utility model, it is recycled after being purified by coarse filtration screen frame and fine filtering screen frame to sewage in soil chamber, meet green building environmental protection concept, clear water and sewage are separated simultaneously, be conducive to targetedly carry out using improving the practicability of the device clear water and sewage.

Description

Cyclic water tank device is used after a kind of construction of green building
Technical field
The utility model relates to Architectural Equipment technical field, filled after specially a kind of green building construction with cyclic water tank It sets.
Background technique
Green building refers in the life cycle management of building, economizes on resources to the maximum extent, including energy conservation, save land, be water-saving, Material etc., protection environment and reduction pollution are saved, healthy, comfortable and efficient use space is provided for people, with natural harmony symbiosis Building, equipment cyclic water tank is needed on green building construction site, can be building construction process by cyclic water tank In water source is continually provided, ensure that being normally carried out for construction, but the cyclic water tank of existing green building makes With there is also deficiencies below in the process:
1, cyclic water tank lacks protection mechanism, due to construction site complexity, showing for cyclic water tank breakage often occurs As reducing the service life of cyclic water tank;
2, cyclic water tank lacks purification device, single can only recycle to clear water, can not be to generating in work progress Sewage carry out purification recycling.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides after a kind of construction of green building with cyclic water tank device, The problem of it is low to solve cyclic water tank service life, sewage purification can not be utilized.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: using recirculated water after a kind of construction of green building Case apparatus, including fixed mechanism, protection mechanism and water storage device are provided with protection mechanism and water storage dress on the fixed mechanism It sets.
The fixed mechanism includes chassis, is fixedly installed with support plate at the top of the chassis, at the top of the support plate Four right angles are fixedly installed with limited post.
The protection mechanism includes sleeve, and the surface of the sleeve is fixedly installed with buffer spring, and the buffer spring is remote One end from sleeve is fixedly installed with buffer board.
The water tank of the water storage device is bolted at the top of the water tank and is equipped with case lid, the water storage It is fixedly installed with partition in case, the inside of the water tank is divided into clear water chamber and soil chamber by partition, the soil chamber Inside is successively fixedly installed with coarse filtration screen frame and fine filtering screen frame from top to bottom.
The technical program is advanced optimized, the quantity of the protection mechanism is four, and four sleeves pass through bolt It is fixedly connected with corresponding limited post.
The technical program is advanced optimized, each sleeve corresponds to three buffer springs.
The technical program is advanced optimized, the buffer board is arcuate structure, and the buffer board is EPP damping, buffering plate.
The technical program is advanced optimized, the surface of the water tank is fixedly installed with the first row being connected with inside it Water pipe and the second drainpipe.
The technical program is advanced optimized, the first water inlet pipe and the second water inlet pipe are fixedly installed at the top of the case lid.
(3) beneficial effect
Compared with prior art, the utility model provides after a kind of construction of green building with cyclic water tank device, has Below the utility model has the advantages that
1, work as water tank in this way by the way that water tank to be put on chassis with cyclic water tank device after green building construction When internal not no water, water tank can guarantee stability by chassis, and preventing water tank, there is a phenomenon where topple over.
It 2, can be to storage by the cooperation of buffer board and buffer spring with cyclic water tank device after green building construction Protective action is played in the outside of water tank, prevents the outside of water tank impaired, improves the service life of water tank.
3, cyclic water tank device is used after green building construction, the inside of water tank is divided into clear water chamber and soil chamber, In It is recycled after being purified by coarse filtration screen frame and fine filtering screen frame to sewage in soil chamber, meets green building environmental protection reason It reads, while clear water and sewage being separated, be conducive to targetedly carry out using improving the device clear water and sewage Practicability.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model storage tank structure cross-sectional view;
Fig. 3 is the utility model structural side view.
In figure: 1, fixed mechanism;101, chassis;102, support plate;103, limited post;2, protection mechanism;201, sleeve; 202, buffer spring;203, buffer board;3, water storage device;301, water tank;302, case lid;303, partition;304, clear water chamber; 305, soil chamber;306, coarse filtration screen frame;307, fine filtering screen frame;308, the first drainpipe;309, the second drainpipe;3010, first Water inlet pipe;3011, the second water inlet pipe.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: being filled after a kind of construction of green building with cyclic water tank It sets, including fixed mechanism 1, protection mechanism 2 and water storage device 3, is provided with protection mechanism 2 and water storage device 3 on fixed mechanism 1.
Fixed mechanism 1 includes chassis 101, and the top of chassis 101 is fixedly installed with support plate 102,102 top of support plate Four right angles are fixedly installed with limited post 103.
Protection mechanism 2 includes sleeve 201, and the surface of sleeve 201 is fixedly installed with buffer spring 202, and buffer spring 202 is remote One end from sleeve 201 is fixedly installed with buffer board 203.
The water tank 301 of water storage device 3, by the way that water tank 301 to be put on chassis 101, in this way inside water tank 301 When not no water, water tank 301 can guarantee stability by chassis 101, prevent what water tank 301 from toppling over to show As that can play protective action to the outside of water tank 301, prevent from storing up by the cooperation of buffer board 203 and buffer spring 202 The outside of water tank 301 is impaired, improves the service life of water tank 301, the top of water tank 301, which is bolted, to be equipped with Case lid 302, the interior of water tank 301 are fixedly installed with partition 303, and the inside of water tank 301 is divided by partition 303 for clear water chamber 304 and soil chamber 305, the inside of soil chamber 305 be successively fixedly installed with coarse filtration screen frame 306 and fine filtering screen frame 307 from top to bottom, The inside of water tank 301 is divided into clear water chamber 304 and soil chamber 305,306 He of coarse filtration screen frame can be passed through in soil chamber 305 Fine filtering screen frame 307 recycles after purifying to sewage, meets green building environmental protection concept, at the same by clear water and sewage carry out every It opens, is conducive to targetedly carry out using improving the practicability of the device clear water and sewage.
Specifically, the quantity of protection mechanism 2 is four, four sleeves 201 pass through bolt and corresponding limited post 103 It is fixedly connected, facilitates and mount and dismount sleeve 201 and limited post 103.
Specifically, each sleeve 201 corresponds to three buffer springs 202, buffer capacity ensure that, it can be effectively to storage Water tank 301 is protected.
Specifically, buffer board 203 is arcuate structure, buffer board 203 is EPP damping, buffering plate, and the design of arcuate structure can To be adapted with the structure of water tank 301, while the superior performance of EPP damping, buffering plate antidetonation.
Specifically, the surface of water tank 301 is fixedly installed with the first drainpipe 308 and second row being connected with inside it Water pipe 309, facilitates that sewage is discharged out of water tank 301 by treated in the interior clear water of clear water chamber 304 and soil chamber 305.
Specifically, the top of case lid 302 is fixedly installed with the first water inlet pipe 3010 and the second water inlet pipe 3011, facilitating will be clear Water and sewage transport into storage in water tank 301 and recycle.
When in use, empty water tank 301 is put into on chassis 101 first, then successively passes through four sleeves 201 Bolt is fixed with limited post 103, when the installation of four sleeves 201 also after, four buffer boards 203 and water tank 301 it is outer Wall contact, under the action of passing through corresponding buffer spring 202, buffer board 203 can play the outside of water tank 301 anti- Shield effect, prevents external substance from damaging to the outside of water tank 301, follows when beginning to use water tank 301 to carry out water resource When rings, clear water and sewage are passed through into the first water inlet pipe 3010 respectively and the second water inlet pipe 3011 is conveyed into the inside of water tank 301, Clear water is entered in clear water chamber 304 and is stored, and is discharged when use by the first drainpipe 308, and sewage enters soil chamber 305 Interior, sewage successively passes through coarse filtration screen frame 306 and fine filtering screen frame 307 is filtered, and then sewage enters the bottom of soil chamber 305 The sewage of purification is discharged when use by the second drainpipe 309 and is recycled by portion, at the same can by bolt by case lid 302 with Water tank 301 separate, by the fie screen on the coarse strainer and fine filtering screen frame 307 on the coarse filtration screen frame 306 inside soil chamber 305 into Row cleaning, to guarantee the clean-up effect of sewage.
In conclusion using cyclic water tank device after green building construction, the inside of water tank 301 is divided into clear water chamber 304 and soil chamber 305, after being purified by coarse filtration screen frame 306 and fine filtering screen frame 307 to sewage in soil chamber 305 It recycles, meets green building environmental protection concept, while clear water and sewage being separated, be conducive to targetedly to clear water and dirt Water is carried out using improving the practicability of the device.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. using cyclic water tank device, including fixed mechanism (1), protection mechanism (2) and water storage device after a kind of green building construction (3), it is characterised in that: be provided with protection mechanism (2) and water storage device (3) on the fixed mechanism (1);
The fixed mechanism (1) includes chassis (101), is fixedly installed with support plate (102), institute at the top of the chassis (101) It states four right angles at the top of support plate (102) and is fixedly installed with limited post (103);
The protection mechanism (2) includes sleeve (201), and the surface of the sleeve (201) is fixedly installed with buffer spring (202), The buffer spring (202) is fixedly installed with buffer board (203) far from the one end of sleeve (201);
The water tank (301) of the water storage device (3) is bolted at the top of the water tank (301) and is equipped with case lid (302), the interior of the water tank (301) is fixedly installed with partition (303), and the inside of the water tank (301) passes through partition (303) it is divided into clear water chamber (304) and soil chamber (305), the inside of the soil chamber (305) is successively fixedly installed with from top to bottom Coarse filtration screen frame (306) and fine filtering screen frame (307).
2. using cyclic water tank device after a kind of green building construction according to claim 1, it is characterised in that: the protection The quantity of mechanism (2) is four, and four sleeves (201) are fixedly connected by bolt with corresponding limited post (103).
3. using cyclic water tank device after a kind of green building construction according to claim 1, it is characterised in that: each described Sleeve (201) corresponds to three buffer springs (202).
4. using cyclic water tank device after a kind of green building construction according to claim 1, it is characterised in that: the buffering Plate (203) is arcuate structure, and the buffer board (203) is EPP damping, buffering plate.
5. using cyclic water tank device after a kind of green building construction according to claim 1, it is characterised in that: the water storage The surface of case (301) is fixedly installed with the first drainpipe (308) and the second drainpipe (309) being connected with inside it.
6. using cyclic water tank device after a kind of green building construction according to claim 1, it is characterised in that: the case lid (302) the first water inlet pipe (3010) and the second water inlet pipe (3011) are fixedly installed at the top of.
CN201822191584.1U 2018-12-25 2018-12-25 Cyclic water tank device is used after a kind of construction of green building Active CN209575882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822191584.1U CN209575882U (en) 2018-12-25 2018-12-25 Cyclic water tank device is used after a kind of construction of green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822191584.1U CN209575882U (en) 2018-12-25 2018-12-25 Cyclic water tank device is used after a kind of construction of green building

Publications (1)

Publication Number Publication Date
CN209575882U true CN209575882U (en) 2019-11-05

Family

ID=68378829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822191584.1U Active CN209575882U (en) 2018-12-25 2018-12-25 Cyclic water tank device is used after a kind of construction of green building

Country Status (1)

Country Link
CN (1) CN209575882U (en)

Similar Documents

Publication Publication Date Title
CN108840460B (en) Conveying type sewage stage treatment environment-friendly device
CN209575882U (en) Cyclic water tank device is used after a kind of construction of green building
CN202238811U (en) Wastewater recycling device of bottle cleaning machine
CN208104118U (en) A kind of river sewage purifying processing device
CN2844238Y (en) A kind of tank composite set of the recycle-water of classifying
CN206554227U (en) Suspension type catch-basin filter
CN208684585U (en) A kind of sewage-treatment plant of water circulation use
CN216126182U (en) Secondary water supply pump house energy monitoring recovery unit
CN109052841A (en) A kind of artificial swamp
CN111087103B (en) Sewage treatment plant for building process
CN207210105U (en) It is a kind of that there is energy-saving sewage disposal device
CN208878800U (en) Mineral circulation washes stone screening plant
CN209260815U (en) A kind of rain collector for building
CN206867866U (en) A kind of air purifier with automatic cleaning function
CN208265951U (en) A kind of sewage supernatant filter plant
CN206799292U (en) A kind of household small-size water purifier
CN202087117U (en) Sewage treatment filter device
CN206955806U (en) A kind of special sewage-treatment plant of steel plant
CN206580652U (en) A kind for the treatment of tank
CN205672635U (en) The Sewage treatment filter that a kind of marble polishing grinds
CN217340477U (en) Rural sewage treatment plant with multiple filtration
CN204369673U (en) One way of life waste water treatment box
CN208701823U (en) A kind of industrial hand basin
CN213950794U (en) Circulating device is collected to municipal works rainwater of gardens integration
CN210753620U (en) Ore screening installation is used in mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant