CN209556123U - A kind of dedicated auxiliary fixing device in cast-in-place concrete node - Google Patents

A kind of dedicated auxiliary fixing device in cast-in-place concrete node Download PDF

Info

Publication number
CN209556123U
CN209556123U CN201821745977.6U CN201821745977U CN209556123U CN 209556123 U CN209556123 U CN 209556123U CN 201821745977 U CN201821745977 U CN 201821745977U CN 209556123 U CN209556123 U CN 209556123U
Authority
CN
China
Prior art keywords
cast
steel
bar
fixing device
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821745977.6U
Other languages
Chinese (zh)
Inventor
黄建逵
陆曹平
孟俭杰
王新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nantong Three Construction Group Ltd By Share Ltd
Original Assignee
Jiangsu Nantong Three Construction Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong Three Construction Group Ltd By Share Ltd filed Critical Jiangsu Nantong Three Construction Group Ltd By Share Ltd
Priority to CN201821745977.6U priority Critical patent/CN209556123U/en
Application granted granted Critical
Publication of CN209556123U publication Critical patent/CN209556123U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of dedicated auxiliary fixing device in cast-in-place concrete node, including formwork-support, formwork-support includes bar of sweeping the floor, horizon bar, upright bar, bridging, adjustable jack is arranged in upright bar upper end, formwork steel back cord and template wood back cord are laid on adjustable jack, cast-in-place platform beam bottom mother plate is laid with above template wood back cord, cast-in-place platform beam bottom mother plate upper berth sets the framework of steel reinforcement of cast-in-situ concrete beam, level is set up on the framework of steel reinforcement of cast-in-situ concrete beam, pre-buried PC component spacer bar is equipped with by dedicated auxiliary fixing device on cast-in-situ concrete beam, dedicated auxiliary fixing device includes steel plate and steel pipe.Dedicated auxiliary fixing device is used to reserved PC component spacer bar, solve the problems, such as that PC component spacer bar is reserved in cast-in-place concrete node precisely to be fixed, both it is accurate reserved PC component spacer bar had been met, the adjustment workload that prefabricated PC component is generated by reserved steel bar deviation is eliminate or reduced, the consumption of labour is saved.

Description

A kind of dedicated auxiliary fixing device in cast-in-place concrete node
Technical field
The utility model relates to building field, dress is auxiliarily fixed in specifically a kind of dedicated in cast-in-place concrete node It sets.
Background technique
Industrialization construction the characteristics of having fully demonstrated green building, its main feature is that it is energy saving, water-saving, section material, save land, be environmentally friendly; The operating condition that worker can also be improved, shortens the construction period.In industrialized building, the factorial production PC and field cast-in-place structure are faced Two big difficult points.There is the factorial production PC component technical maturity, quality to stablize, but field cast-in-place structure and material quality are uneven Weighing apparatus, operator difference and there is field cast-in-place node unstable quality.Cast-in-place node equivalent processes are to solve scene conscientiously The effective measures of cast-in-place structural unstable quality.
In " concrete structure engineering construction quality accident specification " (GB50204-2015), " prefabricated concrete structure skill Art regulation " (JGJ1-2014), in " reinforcing bar connection use grout sleeve " (JG/T398-2012), the quality control in work progress There is regulation.Due to different operating procedures, different specifications, built-in fitting allowable error is had differences;Therefore need to take it is special Construction method solve the error difference between the factorial production PC component and PC component cast-in-situ node.
At the scene in cast-in-place concrete node, conventional reserved PC component spacer bar construction method is by reserved PC component Spacer bar binds or is welded on platform framework of steel reinforcement or beam reinforcement cages.The fixed form for either binding or welding is all It is fixed-point type or wire type fixed form, all can not achieve three-dimensional fixation and reserved PC component spacer bar is made deviation occur;Therefore, Need that accurately construction method solves the above problems there is an urgent need to a kind of new reserved PC component spacer bar.
Utility model content
To solve the above-mentioned problems, the utility model discloses a kind of in cast-in-place concrete node dedicated is auxiliarily fixed Device.
The technical solution of the utility model are as follows: a kind of dedicated auxiliary fixing device in cast-in-place concrete node, including Formwork-support, formwork-support include sweep the floor bar, horizon bar, upright bar, bridging, and adjustable jack is arranged in upright bar upper end, adjustable It is laid with formwork steel back cord and template wood back cord on jacking, is laid with cast-in-place platform beam bottom mother plate, cast-in-place platform above template wood back cord It is laid with the framework of steel reinforcement of cast-in-situ concrete beam on beam bottom mother plate, sets up level on the framework of steel reinforcement of cast-in-situ concrete beam, it is existing Pre-buried PC component spacer bar is equipped with by dedicated auxiliary fixing device on pouring concrete beam, dedicated auxiliary fixing device includes Steel plate and steel pipe, steel pipe one end are vertically positioned in the drilling of steel plate.
Further, formwork-support includes sweep the floor bar, horizon bar, upright bar, bridging.
Further, the framework of steel reinforcement of cast-in-situ concrete beam includes cast-in-place beam main tendon, roof beam structure stud and cast-in-situ concrete beam Stirrup, level are erected at the upper surface of cast-in-place platform beam bottom mother plate.
Further, pad is smooth after steel plate and steel-pipe welding are complete.
The usefulness of the utility model: before cast-in-place concrete construction, to reserved PC component spacer bar using dedicated Auxiliary fixing device successfully solves and reserves the problem that PC component spacer bar is precisely fixed in cast-in-place concrete node. It is accurate that this method had both met reserved PC component spacer bar, eliminate or reduces prefabricated PC component and generates because of reserved steel bar deviation Adjustment workload, save the consumption of labour.
Detailed description of the invention
Fig. 1 is that the utility model cast-in-place concrete node PC component is installed figure;
Fig. 2-4 is that the utility model cast-in-place concrete node PC component is installed details figure;
Fig. 5 is that the cast-in-place concrete node beam steel of the utility model and form work engineering complete structural schematic diagram;
Fig. 6 is that the utility model cast-in-place concrete node calibration PC component positioning bar mark completion diagram is intended to;
Fig. 7 is that the utility model cast-in-place concrete node PC component positioning bar is installed figure;
Fig. 8 is that figure is completed in the construction of the utility model cast-in-place concrete node PC component positioning bar;
Fig. 9 is that the utility model cast-in-place concrete node PC component is directed at construction completion figure with positioning bar;
Wherein: 1, bar of sweeping the floor, 2, horizon bar, 3, upright bar, 4, bridging, 5, adjustable jack, 6, formwork steel back cord, 8, cast-in-place Platform beam bottom mother plate, 7, template wood back cord, 9, beam main tendon, 10, beam stirrup, 11, roof beam structure stud, 12, beam elevation line suitable for reading, 13, Column main reinforcement, 14, the mounting height of PC component spacer bar, 15, PC component spacer bar installation site markings, 16, level Instrument, 17, PC component spacer bar, 18, the steel pipe of the dedicated auxiliary fixing device of PC component spacer bar, 19, the positioning of PC component The steel plate of the dedicated auxiliary fixing device of reinforcing bar, 20, beam concrete, 21, PC component, 22, the interior half grouting set being embedded to of PC component Cylinder, 23, slip casting in reinforcing steel bar connecting sleeve tube.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
A kind of dedicated auxiliary fixing device in cast-in-place concrete node, including formwork-support, formwork-support packet Bar 1 of sweeping the floor, horizon bar 2, upright bar 3, bridging 4 are included, 3 upper end of upright bar is arranged adjustable jack 5, is laid with formwork steel on adjustable jack 5 Back cord 6 and template wood back cord 7, template wood back cord 7 are laid with cast-in-place platform beam bottom mother plate 8, cast-in-place 8 upper berth of platform beam bottom mother plate above If the framework of steel reinforcement of cast-in-situ concrete beam, level 16, cast-in-situ concrete beam are set up on the framework of steel reinforcement of cast-in-situ concrete beam Upper to be equipped with pre-buried PC component spacer bar 17 by dedicated auxiliary fixing device, dedicated auxiliary fixing device includes 18 He of steel plate Steel pipe 19 is drilled with drilling machine on steel plate 18 due to installation accuracy height, steel pipe 19 is filled in (drilling machine in the drilling on steel plate The hole site of brill is controlled, and ensures to drill perpendicular to steel plate surface), then plug welding is carried out in two plane of steel plate.It must be tight when welding Lattice control the axis of steel pipe 19 perpendicular to steel plain.After steel plate 18 and steel pipe 19 weld, it is necessary to butt welding taps into row grinding process, Guarantee the flatness of plane.
The framework of steel reinforcement of cast-in-situ concrete beam includes cast-in-place beam main tendon 9, roof beam structure stud 10 and cast-in-place concrete beam stirrup 11, Level 16 is erected at the upper surface of cast-in-place platform beam bottom mother plate 8.
A kind of use construction method of the dedicated auxiliary fixing device in cast-in-place concrete node, including the following steps:
S1: bar 1 of sweeping the floor, horizon bar 2, upright bar 3, bridging 4 are set up as formwork-support, is arranged in the upper end of upright bar 3 Adjustable jack 5 sets formwork steel back cord 6, template wood back cord 7 on adjustable jack 5, is laid on template wood back cord 7 cast-in-place Platform beam bottom mother plate 8 is successively laid with cast-in-place beam main tendon 9, roof beam structure stud 10, cast-in-place concrete on cast-in-place platform beam bottom mother plate 8 Beam stirrup 11, binding form the framework of steel reinforcement of cast-in-situ concrete beam;
S2: in the upper surface of cast-in-place platform beam bottom mother plate 8, level 16 is set up, is observed by level 16, from landing beam + 1000 ㎜ of depth of beam is measured in 8 upper surface of end template upwards, and Cast-in-situ Beam elevation line 12 suitable for reading marks good pre-buried PC component spacer bar Mounting height 14, mark good pre-buried PC component spacer bar installation site markings 15;
S3: pre-buried PC component spacer bar 17 is installed in cast-in-place concrete, installs the special of pre-buried PC component spacer bar 17 With auxiliary fixing device, then framework of steel reinforcement bind is sequentially repaired, and after passing through concealment acceptance, finally pours field cast-in-place section Point concrete;
S4: removing the dedicated auxiliary fixing device of pre-buried PC component spacer bar 17, clears up in cast-in-place concrete node Reserved PC component spacer bar 17, dedicated auxiliary fixing device can be used in turn;
S5:PC component 21 is sling and is transported to infield, interior half grout sleeve 22 and pre-buried PC structure being embedded to of PC component 17 centering of part spacer bar, in place, slip casting 23 in reinforcing steel bar connecting sleeve tube.

Claims (3)

1. a kind of dedicated auxiliary fixing device in cast-in-place concrete node, which is characterized in that described including formwork-support Formwork-support includes sweep the floor bar, horizon bar, upright bar, bridging, and adjustable jack, the adjustable jack is arranged in the upright bar upper end Upper laying formwork steel back cord and template wood back cord are laid with cast-in-place platform beam bottom mother plate above the template wood back cord, described cast-in-place Platform beam bottom mother plate upper berth sets the framework of steel reinforcement of cast-in-situ concrete beam, sets up level on the framework of steel reinforcement of cast-in-situ concrete beam Instrument is equipped with pre-buried PC component spacer bar by dedicated auxiliary fixing device on the cast-in-situ concrete beam, described dedicated auxiliary Helping fixed device includes steel plate and steel pipe, and described steel pipe one end is vertically positioned in the drilling of steel plate.
2. a kind of dedicated auxiliary fixing device in cast-in-place concrete node according to claim 1, it is characterised in that: The framework of steel reinforcement of the cast-in-situ concrete beam includes cast-in-place beam main tendon, roof beam structure stud and cast-in-place concrete beam stirrup, the level Instrument is erected at the upper surface of cast-in-place platform beam bottom mother plate.
3. a kind of dedicated auxiliary fixing device in cast-in-place concrete node according to claim 1, it is characterised in that: Two plane of steel plate is plug welding, and the axis of the steel pipe is perpendicular to steel plain, the steel plate and the complete rear welding of steel-pipe welding Point is smooth.
CN201821745977.6U 2018-10-26 2018-10-26 A kind of dedicated auxiliary fixing device in cast-in-place concrete node Active CN209556123U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821745977.6U CN209556123U (en) 2018-10-26 2018-10-26 A kind of dedicated auxiliary fixing device in cast-in-place concrete node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821745977.6U CN209556123U (en) 2018-10-26 2018-10-26 A kind of dedicated auxiliary fixing device in cast-in-place concrete node

Publications (1)

Publication Number Publication Date
CN209556123U true CN209556123U (en) 2019-10-29

Family

ID=68300081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821745977.6U Active CN209556123U (en) 2018-10-26 2018-10-26 A kind of dedicated auxiliary fixing device in cast-in-place concrete node

Country Status (1)

Country Link
CN (1) CN209556123U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223221A (en) * 2020-09-30 2021-01-15 筑友智造科技投资有限公司 PC component production is with supplementary fixing device and special frock

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223221A (en) * 2020-09-30 2021-01-15 筑友智造科技投资有限公司 PC component production is with supplementary fixing device and special frock
CN112223221B (en) * 2020-09-30 2021-11-12 筑友智造科技投资有限公司 PC component production is with supplementary fixing device and special frock

Similar Documents

Publication Publication Date Title
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN109611102B (en) Construction method for cold excavation underpass overpass
CN112049146A (en) Steel structure foundation embedded part and technological process thereof
CN1978838A (en) Construction method for combined V-shape steel pipe concrete pile
CN107310025A (en) The fabricated device and method for prefabricating of a kind of Prefabricated bar boots
CN208965714U (en) A kind of prefabricated piping lane main frame structure of assembly concrete
WO2023174439A1 (en) Construction method for large pipe shed guide wall at shallow tunnel portal
CN113202222A (en) Construction method for assembled type superposed beam slab
CN104975614B (en) Shaped steel combination formula single side formwork strengthening construction engineering method
CN113622316A (en) Steel truss girder multipoint traction type pushing construction system and construction method thereof
CN209556123U (en) A kind of dedicated auxiliary fixing device in cast-in-place concrete node
CN114809029A (en) High cutting slope anchor rod frame beam coupling construction method
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN110295620A (en) The fast accurate installation method of large-scale space division device overall skid-mounted formula ice chest
CN107965141A (en) The stair tread formwork that both sides are provided with shear wall installs device and erection method
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN105735228B (en) High-lift tooth climbs formula ship lift rack system construction method and installation accuracy control method
CN106401276A (en) Construction method for wall column binding bars of frame type building block enclosing wall
CN207314523U (en) A kind of Novel steel-mixed bean column node constructing structure
CN205857745U (en) Joint bar constructing structure
CN207920076U (en) The stair tread formwork that both sides are provided with shear wall installs device
CN114016518A (en) Underground foundation pit V-shaped column and construction method thereof
CN114134927A (en) Device and method for embedding large power equipment foundation embedded pipe
CN113356189A (en) Full-sleeve hole forming construction method for rotary drilling rig
CN108755669B (en) Construction method for cross-tunnel steel reinforced concrete cast-in-place pile and transfer beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20221101

Granted publication date: 20191029