CN209542727U - A kind of electronic equipment remote environment pilot system - Google Patents
A kind of electronic equipment remote environment pilot system Download PDFInfo
- Publication number
- CN209542727U CN209542727U CN201822187886.1U CN201822187886U CN209542727U CN 209542727 U CN209542727 U CN 209542727U CN 201822187886 U CN201822187886 U CN 201822187886U CN 209542727 U CN209542727 U CN 209542727U
- Authority
- CN
- China
- Prior art keywords
- module
- test
- equipment
- control
- environmental
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Selective Calling Equipment (AREA)
Abstract
The electronic equipment remote environment pilot system of the utility model includes remote testing front end subsystem 20, operation Monitor And Control Subsystem 30, environmental simulation equipment 40.Wherein, test front end subsystem 20 and optional environmental simulation equipment 40 and tested electronic equipment 50 are arranged in environmental test chamber.It operates Monitor And Control Subsystem 30 to be arranged in office or dedicated operations room, be communicated by telecommunication network with remote testing front end subsystem 20.Tester can be made to be isolated with severe working environment using the utility model, protect the health of tester;Tested equipment can be comprehensively monitored simultaneously; test macro can execute test process, interpretation test result automatically and generate test report; the exception handlers such as preset environmental simulation equipment downtime, power-off, alarm can be executed automatically when being abnormal during test; reduce personnel to the judgement time of test result; the breakdown loss of equipment under test is reduced, guarantees the safety of personnel and equipment.
Description
Technical field
The utility model relates to a kind of electronic equipment remote environment pilot systems, belong to testing for electrical equipment and experimental technique
Field.
Background technique
Currently, with the development of computer technology, effect of the electronic equipment in industrial production and Military Application is increasingly
Greatly.In order to guarantee the reliability of equipment, needs to carry out stringent test and test before equipment factory, especially work in severe ring
Each class of electronic devices in border, other than conventional function and performance test, it is also necessary to carry out all kinds of environmental tests, including but not
It is limited to high temperature, low temperature, temperature shock, low pressure, salt air corrosion, solar radiation, light aging etc..
Currently used environmental test means are needed using various environmental simulation equipment such as high-low temperature chamber, shake table, vacuum
The manufacture of intraocular simulated environment such as tank, these equipment can issue biggish noise, heat, Qiang Guang, radiation when working.Traditional environment
Test system requires operator to operate and monitor near environmental simulation equipment, and working environment is severe, may endanger
The health of testing experiment personnel.
Utility model content
The purpose of the utility model is to overcome the above-mentioned deficiencies of the prior art, provide the examination of a kind of electronic equipment remote environment
Check system.The electronic equipment remote environment pilot system of the utility model includes remote testing front end subsystem, operation monitoring
System, environmental simulation equipment.Wherein, test front end subsystem and optional environmental simulation equipment and the setting of tested electronic equipment exist
Environmental test chamber.It operates Monitor And Control Subsystem to be arranged in office or dedicated operations room, passes through telecommunication network and the long-range survey
Examination front end subsystem is communicated.
The above-mentioned purpose of the utility model is achieved by following technical solution:
A kind of electronic equipment remote environment pilot system, including remote testing front end subsystem, operation Monitor And Control Subsystem, ring
Border analog machine;
Remote testing front end subsystem include environmental simulation equipment control output interface, environmental test data acquisition it is defeated
Incoming interface, test front-end control input interface, environmental test data output interface;The operation Monitor And Control Subsystem includes before testing
End control output interface, environmental test Data Input Interface;The environmental simulation equipment includes the control input of environmental simulation equipment
Interface, environmental test data acquire output interface;
The environmental simulation equipment control output interface is connect with environmental simulation equipment control input interface, the environment examination
It tests data acquisition input interface to connect with environmental test data acquisition output interface, the test front-end control input interface and survey
The connection of front-end control output interface is tried, the environmental test Data Input Interface is connect with environmental test data output interface;
Remote testing front end subsystem sends environmental simulation equipment control instruction to environmental simulation equipment, described long-range
It tests front end subsystem and sends environmental test data to operation Monitor And Control Subsystem, the environmental simulation equipment is to remote testing front end
Subsystem sends environmental test and acquires data, and the operation Monitor And Control Subsystem sends test front end to remote testing front end subsystem
Control instruction.
Above-mentioned electronic equipment remote environment pilot system, remote testing front end subsystem further include equipment under test power supply
Output interface, the equipment under test power supply output interface are connect with external equipment under test power supply interface;The remote testing front end
Subsystem is powered to external equipment under test.
Above-mentioned electronic equipment remote environment pilot system, remote testing front end subsystem further include equipment under test signal
Output interface, equipment under test signal is motivated to respond input interface;The equipment under test signal excitation output interface and outside are tested
Device signal motivates interface connection, and the equipment under test signal response input interface and external equipment under test signal response interface connect
It connects;Subsystem outside portion's equipment under test in the remote testing front end sends pumping signal, and remote testing front end subsystem receives outer
The response signal of portion's equipment under test.
Above-mentioned electronic equipment remote environment pilot system, remote testing front end subsystem further include equipment under test power supply
Output interface, equipment under test signal excitation output interface, equipment under test signal respond input interface;
Remote testing front end subsystem further includes program-controlled power supply module, signal imitation module, data acquisition module, ring
Border analog machine control module, on-site supervision module, communication and control module;
The environmental simulation equipment control output interface is located on environmental simulation device control module;The equipment under test letter
Number response input interface be located on data acquisition module;The test front-end control input interface, the output of environmental test data connect
Mouth is respectively positioned in communication and control module, and the equipment under test power supply output interface is located on program-controlled power supply module, described tested
Device signal excitation output interface is located in signal imitation module;The environmental test data acquisition input interface is located at scene prison
It controls in module.
The program-controlled power supply module, signal imitation module, data acquisition module, environmental simulation device control module, scene
Monitoring module is connect with communication and control module.
Above-mentioned electronic equipment remote environment pilot system, the operation Monitor And Control Subsystem includes communication module, operation input
Module, real-time display module, automatic control and data reading module, data memory module;
The test front-end control output interface and environmental test Data Input Interface are respectively positioned in communication module;The behaviour
Make input module, automatic control and data reading module to connect with communication module;The operation input module, automatically control and
Data interpretation module is connect with real-time display module;The automatic control and data reading module and data memory module connect
It connects.
Above-mentioned electronic equipment remote environment pilot system, the environmental simulation equipment include but is not limited to incubator, shake table,
Vacuum tank.
Above-mentioned electronic equipment remote environment pilot system, remote testing front end subsystem and operation Monitor And Control Subsystem it
Between using cable, twisted pair, optical fiber or above-mentioned three kinds of lines combination connection.
Above-mentioned electronic equipment remote environment pilot system, described includes remote testing front end subsystem and environmental simulation equipment
It is installed in environmental test chamber, the operation Monitor And Control Subsystem is mounted in other operating rooms.
The beneficial effect of the utility model compared with prior art is:
(1) the utility model is used, tester is isolated with severe working environment, protects the health of tester;
(2) the utility model is used, can comprehensively monitor tested equipment, test macro can be executed automatically and be tested
Journey, interpretation test result simultaneously generate test report, to reduce personnel's degree of participation during test, reducing artificial origin causes
Test failure and accident;
(3) preset environmental simulation can be executed automatically when being abnormal during the test using the utility model to set
The exception handlers such as standby shutdown, power-off, alarm, reduce personnel to the judgement time of test result, reduce equipment under test
Breakdown loss guarantees the safety of personnel and equipment;
(4) the test data electronization of the utility model, uses convenient for the storage of data, examination & approval and analysis;
(5) control of the utility model automatic flow, automaticdata interpretation can reduce test with the quantity of compression test personnel
The skill requirement of personnel, achievees the purpose that personnel reduction and enlargement.
Detailed description of the invention
Fig. 1 is the equipment composition block diagram of the utility model;
Fig. 2 is the equipment composition block diagram of the utility model remote testing front end subsystem;
Fig. 3 is the equipment composition block diagram that the utility model operates Monitor And Control Subsystem.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments:
A kind of electronic equipment remote environment pilot system, including remote testing front end subsystem 20, operation Monitor And Control Subsystem
30, environmental simulation equipment 40.
Remote testing front end subsystem 20 includes environmental simulation equipment control output interface, the acquisition of environmental test data
Input interface, environmental test data output interface, equipment under test power supply output interface, is tested test front-end control input interface
Device signal motivates output interface, equipment under test signal to respond input interface.
The operation Monitor And Control Subsystem 30 includes test front-end control output interface, environmental test Data Input Interface.
The environmental simulation equipment 40 includes that environmental simulation equipment controls input interface, the acquisition output of environmental test data connects
Mouthful;
The environmental simulation equipment control output interface is connect with environmental simulation equipment control input interface, the environment examination
It tests data acquisition input interface to connect with environmental test data acquisition output interface, the test front-end control input interface and survey
The connection of front-end control output interface is tried, the environmental test Data Input Interface is connect with environmental test data output interface.Institute
Equipment under test power supply output interface is stated to connect with external equipment under test power supply interface.The equipment under test signal motivates output interface
It is connect with external equipment under test signal excitation interface, the equipment under test signal response input interface and external equipment under test signal
Response interface connection.
Remote testing front end subsystem 20 sends environmental simulation equipment control instruction to environmental simulation equipment 40, described
Remote testing front end subsystem 20 sends environmental test data, remote testing front end subsystem to operation Monitor And Control Subsystem 30
20 power to external equipment under test.Remote testing front end subsystem 20 sends pumping signal to external equipment under test, remotely
Test front end subsystem 20 receives the response signal of external equipment under test.
The environmental simulation equipment 40 sends environmental test to remote testing front end subsystem 20 and acquires data, the operation
Monitor And Control Subsystem 30 sends test front-end control instruction to remote testing front end subsystem 20.
Remote testing front end subsystem 20 further includes that program-controlled power supply module 201, signal imitation module 202, data are adopted
Collect module 203, environmental simulation device control module 204, on-site supervision module 205, communication and control module 206;
The environmental simulation equipment control output interface is located on environmental simulation device control module 204;Described be tested sets
Standby signal response input interface is located on data acquisition module 203;The test front-end control input interface, environmental test data
Output interface is respectively positioned in communication and control module 206, and the equipment under test power supply output interface is located at program-controlled power supply module 201
On, the equipment under test signal excitation output interface is located in signal imitation module 202;The environmental test data acquisition input
Interface is located in on-site supervision module 205.
The program-controlled power supply module 201, signal imitation module 202, data acquisition module 203, the control of environmental simulation equipment
Module 204, on-site supervision module 205 are connect with communication and control module 206.
The operation Monitor And Control Subsystem 30 include communication module 301, operation input module 302, real-time display module 303,
It automatically controls and data reading module 304, data memory module 305;
The test front-end control output interface and environmental test Data Input Interface are respectively positioned in communication module 301;Institute
Operation input module 302, automatic control and data reading module 304 is stated to connect with communication module 301;The operation input mould
Block 302, automatic control and data reading module 304 are connect with real-time display module 303;The automatic control and data interpretation
Module 304 is connect with data memory module 305.
The environmental simulation equipment 40 includes but is not limited to incubator, shake table, vacuum tank.Remote testing front end subsystem
Using the combination connection of cable, twisted pair, optical fiber or above-mentioned three kinds of lines between system 20 and operation Monitor And Control Subsystem 30.It is described to include
Remote testing front end subsystem 20 and environmental simulation equipment 40 are installed in environmental test chamber, the operation Monitor And Control Subsystem 30
It is mounted in other operating rooms.
With reference to the accompanying drawings of the specification, the utility model embodiment is described in detail.
Fig. 1 is to schematically show electronic equipment remote environment pilot system composition figure according to the present utility model.
As shown in Figure 1, the electronic equipment remote environment pilot system of the utility model includes remote testing front end subsystem
20, Monitor And Control Subsystem 30, environmental simulation equipment 40 are operated.Wherein, test front end subsystem 20 and optional environmental simulation equipment
40 and tested electronic equipment 50 be arranged in environmental test chamber.Monitor And Control Subsystem 30 is operated to be arranged in office or dedicated operations
Room is communicated by telecommunication network with remote testing front end subsystem 20.
It should be noted that since checkout console and multiple environmental simulation equipment may be deployed in different places, root
According to the difference of system frequency of use, remote testing front end subsystem 20 and operation Monitor And Control Subsystem 30 can be in a distributed way
Multiple positions are disposed simultaneously, or single position is deployed according to test and content of the test every time.
Referring to Fig. 2, remote testing front end according to the present utility model subsystem 20 includes program-controlled power supply module 201, signal
Analog module 202, data acquisition module 203, environmental simulation device control module 204, on-site monitoring equipment 205 and communication and control
Molding block 206.Wherein, environmental simulation device control module 204 is connected directly with environmental simulation equipment, for controlling environment mould
It proposes standby operation and monitors its operating status;Program-controlled power supply module 201 is connected directly with tested electronic equipment, is flowed according to test
Journey needs to power for equipment and supervision equipment electricity consumption situation.Signal imitation equipment 202 is used to provide all kinds of inputs for equipment under test
Signal excitation;Data acquisition module 203 is used to acquire the output of tested electronic equipment.On-site monitoring equipment 205 is existing for acquiring
All kinds of monitoring informations of field.The operation of communication and control module 206 for other modules in control subsystem, by collected survey
Examination data and monitoring data cached, framing and be transferred to operation Monitor And Control Subsystem 30, and receive operation Monitor And Control Subsystem 30
Control instruction is sent to other modules after frame decoding by the control information of transmission.Communication and control module 206 are simultaneously for tested
When electronic equipment is in an emergency, sends the instructions such as power-off, environmental simulation equipment downtime and exit current measurement condition in time, into
Row emergency cutoff and related emergency operation.
Referring to Fig. 3, operation Monitor And Control Subsystem 30 according to the present utility model includes communication module 301, operation input module
302, real-time display module 303, automatic control and data reading module 304 and data memory module 305.Wherein, mould is communicated
Block 301 handle and to remote testing front end subsystem for receiving the field data from remote testing front end subsystem 20
20 send control instruction.Operation input module 302 defines testing process, input test parameter, setting alarm for operator
Condition, starting test, emergency stop the operation such as test.Real-time display module 303 is for real-time display testing progress, operation ginseng
The contents such as number, monitoring information, warning message.It automatically controls and data reading module 304 is used for the automatic control of testing process simultaneously
Interpretation is carried out to the field data and monitoring data received, with the operating status of the determination tested electronic equipment;Data are deposited
Storage module 305 is used to store the conclusion of the field data received, monitoring data and data interpretation.
Specifically, operation Monitor And Control Subsystem 30 passes through 302 input test process of operation input module, test by operator
Then parameter, alarm parameters etc. establish bidirectional communication link by communication module 301 and remote testing front end subsystem 20, will
The data such as the instruction of environmental simulation equipment operation, power supply instruction, input signal, malfunction monitoring setting parameter carry out framing, press
Framing is carried out according to communication protocol, is sent to remote testing front end subsystem 20, while receiving the biography of remote testing front end subsystem 20
Then defeated field data back carries out interpretation to the field data received with data reading module 304 by automatically controlling
And subsequent control instruction is sent according to process requirements, while various data are passed through 303 real-time display of real-time display module simultaneously
Data memory module 305 is sent into be stored.
By the design of above-mentioned remote environment pilot system, by main environment analog machine, test front end and equipment under test
It is placed in environmental test chamber, operator test using operation Monitor And Control Subsystem in office or dedicated operations room to be determined
The work such as justice, test operation, testing process monitoring, test parameter interpretation.It only needs to exist before and after in testing experiment
Place where front end carries out necessary installation and disassembly, and personnel do not need to avoid in test site during test
Harm when environmental simulation equipment works to staff's health.
The optimal specific embodiment of the above, only utility model, but the protection scope of the utility model not office
It is limited to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in
Change or replacement should be covered within the scope of the utility model.
The content being not described in detail in the utility model specification belongs to the well-known technique of professional and technical personnel in the field.
Claims (8)
1. a kind of electronic equipment remote environment pilot system, it is characterised in that: including remote testing front end subsystem (20), operation
Monitor And Control Subsystem (30), environmental simulation equipment (40);
Remote testing front end subsystem (20) include environmental simulation equipment control output interface, environmental test data acquisition it is defeated
Incoming interface, test front-end control input interface, environmental test data output interface;The operation Monitor And Control Subsystem (30) includes surveying
Try front-end control output interface, environmental test Data Input Interface;The environmental simulation equipment (40) includes environmental simulation equipment
Control input interface, environmental test data acquire output interface;
The environmental simulation equipment control output interface is connect with environmental simulation equipment control input interface, the environmental test number
It is connect according to acquisition input interface with environmental test data acquisition output interface, before the test front-end control input interface and test
End control output interface connection, the environmental test Data Input Interface are connect with environmental test data output interface;
Remote testing front end subsystem (20) sends environmental simulation equipment control instruction to environmental simulation equipment (40), described
Remote testing front end subsystem (20) sends environmental test data, the environmental simulation equipment to operation Monitor And Control Subsystem (30)
(40) environmental test is sent to remote testing front end subsystem (20) acquire data, operation Monitor And Control Subsystem (30) Xiang Yuancheng
It tests front end subsystem (20) and sends test front-end control instruction.
2. a kind of electronic equipment remote environment pilot system according to claim 1, it is characterised in that: the remote testing
Front end subsystem (20) further includes equipment under test power supply output interface, and the equipment under test power supply output interface is tested with outside to be set
The connection of available electrical interface;Remote testing front end subsystem (20) is powered to external equipment under test.
3. a kind of electronic equipment remote environment pilot system according to claim 1, it is characterised in that: the remote testing
Front end subsystem (20) further includes equipment under test signal excitation output interface, equipment under test signal response input interface;The quilt
Measurement equipment signal motivates output interface to connect with external equipment under test signal excitation interface, the equipment under test signal response input
Interface is connect with external equipment under test signal response interface;Remote testing front end subsystem (20) is sent out to external equipment under test
Pumping signal is sent, remote testing front end subsystem (20) receives the response signal of external equipment under test.
4. a kind of electronic equipment remote environment pilot system according to claim 1, it is characterised in that: the remote testing
Front end subsystem (20) further includes equipment under test power supply output interface, equipment under test signal excitation output interface, equipment under test letter
Number response input interface;
Remote testing front end subsystem (20) further includes program-controlled power supply module (201), signal imitation module (202), data
Acquisition module (203), environmental simulation device control module (204), on-site supervision module (205), communication and control module
(206);
The environmental simulation equipment control output interface is located on environmental simulation device control module (204);The equipment under test
Signal response input interface is located on data acquisition module (203);The test front-end control input interface, environmental test data
Output interface is respectively positioned in communication and control module (206), and the equipment under test power supply output interface is located at program-controlled power supply module
(201) on, the equipment under test signal excitation output interface is located on signal imitation module (202);The environmental test data
Acquisition input interface is located on on-site supervision module (205);
The program-controlled power supply module (201), signal imitation module (202), data acquisition module (203), environmental simulation equipment control
Molding block (204), on-site supervision module (205) are connect with communication and control module (206).
5. a kind of electronic equipment remote environment pilot system according to claim 1, it is characterised in that: the operation monitoring
Subsystem (30) includes communication module (301), operation input module (302), real-time display module (303), automatically controls sum number
According to reading module (304), data memory module (305);
The test front-end control output interface and environmental test Data Input Interface are respectively positioned on communication module (301);It is described
Operation input module (302), automatic control and data reading module (304) are connect with communication module (301);The operation is defeated
Enter module (302), automatic control and data reading module (304) to connect with real-time display module (303);The automatic control
It is connect with data reading module (304) with data memory module (305).
6. a kind of electronic equipment remote environment pilot system according to claim 1, it is characterised in that: the environmental simulation
Equipment (40) includes but is not limited to incubator, shake table, vacuum tank.
7. a kind of electronic equipment remote environment pilot system according to claim 1, it is characterised in that: the remote testing
The combination of cable, twisted pair, optical fiber or above-mentioned three kinds of lines is used between front end subsystem (20) and operation Monitor And Control Subsystem (30)
Connection.
8. a kind of electronic equipment remote environment pilot system according to claim 1, it is characterised in that: described includes long-range
Test front end subsystem (20) and environmental simulation equipment (40) are installed in environmental test chamber, the operation Monitor And Control Subsystem
(30) it is mounted in other operating rooms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822187886.1U CN209542727U (en) | 2018-12-25 | 2018-12-25 | A kind of electronic equipment remote environment pilot system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822187886.1U CN209542727U (en) | 2018-12-25 | 2018-12-25 | A kind of electronic equipment remote environment pilot system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209542727U true CN209542727U (en) | 2019-10-25 |
Family
ID=68266102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822187886.1U Active CN209542727U (en) | 2018-12-25 | 2018-12-25 | A kind of electronic equipment remote environment pilot system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209542727U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111964930A (en) * | 2020-07-27 | 2020-11-20 | 芜湖天航装备技术有限公司 | Test method for turbine cooler |
CN112683553A (en) * | 2021-01-06 | 2021-04-20 | 恒大恒驰新能源汽车研究院(上海)有限公司 | New energy automobile test system and test method |
CN114137897A (en) * | 2021-11-23 | 2022-03-04 | 中科新松有限公司 | Environmental performance test system and method for robot |
-
2018
- 2018-12-25 CN CN201822187886.1U patent/CN209542727U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111964930A (en) * | 2020-07-27 | 2020-11-20 | 芜湖天航装备技术有限公司 | Test method for turbine cooler |
CN112683553A (en) * | 2021-01-06 | 2021-04-20 | 恒大恒驰新能源汽车研究院(上海)有限公司 | New energy automobile test system and test method |
CN114137897A (en) * | 2021-11-23 | 2022-03-04 | 中科新松有限公司 | Environmental performance test system and method for robot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209542727U (en) | A kind of electronic equipment remote environment pilot system | |
CN110732109A (en) | automatic monitoring devices of marine fire control steel bottle pressure that puts out a fire | |
CN106774120A (en) | A kind of easy equipment running monitoring fault alarm and transmission method | |
CN207067754U (en) | A kind of generating set remote monitoring system | |
CN110632904A (en) | Control method of automatic water supply system | |
CN105785161A (en) | Uninterruptible power supply static by-pass switch voltage monitoring card testing system and method | |
CN211979462U (en) | Distribution room environment monitoring system | |
CN109794031B (en) | Internet of things intelligent identification and alarm system and method for fire-fighting water pressure meter | |
CN205119365U (en) | Outage self -starting air conditioner device | |
CN205983124U (en) | Comprehensive supervision system | |
CN107807583A (en) | The internal environment detection method of electric power cabinet | |
CN207562262U (en) | Firefighting Pump Control and cruising inspection system based on internet+technology and networking technology | |
CN109254214A (en) | Valve base electronic device Auto-Test System and method | |
CN206115258U (en) | Coal -fired power plant equipment on -line manages diagnostic system | |
CN105510858A (en) | Inverter static bypass switch voltage monitoring card work performance test system and inverter static bypass switch voltage monitoring card work performance test method | |
CN202033207U (en) | Fault diagnosis device of hydraulic excavator | |
CN202758231U (en) | Monitoring system for power environment in machine room | |
CN105652853B (en) | A kind of inverter sync card detecting system and method | |
CN111208795A (en) | Machine room power centralized monitoring system based on Internet of things | |
CN111221291A (en) | Unattended test bed | |
CN104820412A (en) | Energy station house online monitoring alarm system | |
CN213581816U (en) | Real-time data acquisition system for outlet contact | |
CN110794946B (en) | Power management system | |
CN204790451U (en) | Wireless monitoring devices of fire control pump performance | |
CN221103488U (en) | State monitoring system for coal mine power equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |