CN209523446U - A kind of scaffold unit - Google Patents
A kind of scaffold unit Download PDFInfo
- Publication number
- CN209523446U CN209523446U CN201822245762.4U CN201822245762U CN209523446U CN 209523446 U CN209523446 U CN 209523446U CN 201822245762 U CN201822245762 U CN 201822245762U CN 209523446 U CN209523446 U CN 209523446U
- Authority
- CN
- China
- Prior art keywords
- vertical bar
- crossbar
- hole
- connecting rod
- locating part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a kind of scaffold unit, including two the first vertical bars disposed in parallel, it is arranged between two the first vertical bars there are two first crossbar, the both ends of first crossbar are connected with corresponding first vertical bar respectively, and the first vertical bar is vertically arranged with first crossbar.First vertical bar both ends offer first through hole, first vertical bar is steel pipe, first vertical bar upper end is inserted with first connecting rod, and the both ends of connecting rod offer the second through-hole, and are inserted into the first through hole of corresponding first vertical bar upper end and the second through-hole of first connecting rod lower end by the first locating part.By designing the scaffold unit, when building scaffold, the lower end of first vertical bar of top scaffold unit is set in the upper end of the first connecting rod of corresponding lower section scaffold unit, and be inserted by the first locating part in the first through hole of corresponding first vertical bar lower end and the second through-hole of first connecting rod upper end, the two is attached, is fastened.It greatly improves and builds efficiency, and improve applicability.
Description
Technical field
The utility model relates to a kind of scaffold units.
Background technique
Scaffold is widely applied in building trade, has and is built using bamboo, wooden stick, also has and built using steel pipe.But
The stand of existing scaffold, which is all temporarily spliced using single vertical bar and cross bar, builds, time-consuming, laborious, low efficiency;If energy
Design a kind of scaffold concatenation unit, it will greatly improve and build efficiency, improve applicability, therefore be badly in need of designing a kind of scaffold
Unit.
Summary of the invention
The purpose of this utility model is to provide a kind of scaffold unit, the stand for solving scaffold in the prior art is all
Temporarily spliced using single vertical bar and cross bar and to be built, it is time-consuming, laborious, the technical issues of low efficiency.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
A kind of scaffold unit, including two the first vertical bars disposed in parallel, between two the first vertical bars there are two settings
First crossbar, the both ends of first crossbar are connected with corresponding first vertical bar respectively, and the first vertical bar is vertically arranged with first crossbar.
The second vertical bar is provided between two first crossbars, the both ends of the second vertical bar are solid with corresponding first crossbar respectively
Even, the second vertical bar is vertically arranged with first crossbar;Second crossbar is provided between second vertical bar and the first vertical bar.
The both ends of first vertical bar offer first through hole, and the first vertical bar is steel pipe, and the upper end of the first vertical bar plugs
There is first connecting rod, the both ends of first connecting rod offer the second through-hole, and pass through the first locating part insertion corresponding first
In the first through hole of vertical bar upper end and the second through-hole of first connecting rod lower end, first connecting rod and the fastening of the first vertical bar are connected
It connects.
By designing the scaffold unit, when building scaffold, by the lower end of the first vertical bar of top scaffold unit
It is set in the upper end of the first connecting rod of corresponding lower section scaffold unit, and is inserted into corresponding first by the first locating part and erects
In the first through hole of bar lower end and the second through-hole of first connecting rod upper end, the two is attached, is fastened.It greatly improves and builds
Efficiency, and improve applicability.Second crossbar is climbed as ladder for the personnel of building.
It is further improved, the both ends of first locating part are movable to be provided with the second locating part, prevents the first locating part
It is detached from the first vertical bar, first connecting rod.
It is further improved, there are two brace connection component, brace connection components for the inside setting of first vertical bar
Including third cross bar and third locating part, one end of third cross bar is fixedly connected with the first vertical bar, the other end and third locating part
Rotation connection;Two brace connection components are located between two first through hole.The both ends of brace are provided with third through-hole, lead to
Setting brace connection component is crossed, one end of brace is set on third cross bar by third through-hole, then rotates third
Locating part keeps it vertical with third cross bar, prevents brace from surprisingly falling off.One end of oblique railing and top scaffold unit are connected
It connects, the other end of oblique railing is connect with lower section scaffold unit, easy to connect, firm.
It is further improved, one end of the third locating part is cambered surface, prevents wedge angle scuffing from building personnel.
It is further improved, second vertical bar is located on the perpendicular bisector of first crossbar, the second vertical bar and left side first crossbar
Between be provided with a second crossbar, setting is there are two second crossbar between the second vertical bar and right side first crossbar.Pass through increase
The quantity of second crossbar improves overall structure stability, while providing more climbing ladders for the personnel of building, and improves safety
Energy.
Compared with prior art, the utility model has the beneficial effects that
By designing the scaffold unit, when building scaffold, by the lower end of the first vertical bar of top scaffold unit
It is set in the upper end of the first connecting rod of corresponding lower section scaffold unit, and is inserted into corresponding first by the first locating part and erects
In the first through hole of bar lower end and the second through-hole of first connecting rod upper end, the two is attached, is fastened.It greatly improves and builds
Efficiency, and improve applicability.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model scaffold unit.
Specific embodiment
To keep the purpose of this utility model and technical solution clearer, below in conjunction with the utility model embodiment to this
The technical solution of utility model is clearly and completely described.
As shown in Figure 1, a kind of scaffold unit, including two the first vertical bars 1 disposed in parallel, between two the first vertical bars
There are two first crossbar 2, the both ends of first crossbar to be connected respectively with corresponding first vertical bar for setting, the first vertical bar and first crossbar
It is vertically arranged.
Be provided with the second vertical bar 3 between two first crossbars, the both ends of the second vertical bar 3 respectively with corresponding first crossbar 2
It is connected, the second vertical bar is vertically arranged with first crossbar;Second crossbar 4 is provided between second vertical bar and the first vertical bar.
The both ends of first vertical bar 1 offer first through hole 6, and the first vertical bar 1 is steel pipe, and the upper end of the first vertical bar is inserted
Equipped with first connecting rod 5, the both ends of first connecting rod offer the second through-hole 7, and are inserted by the first locating part 8 corresponding
It is in the first through hole 6 of first vertical bar upper end and the second through-hole 7 of first connecting rod lower end, first connecting rod and the first vertical bar is tight
It is solidly connected.
By designing the scaffold unit, when building scaffold, by the lower end of the first vertical bar of top scaffold unit
It is set in the upper end of the first connecting rod of corresponding lower section scaffold unit, and is inserted into corresponding first by the first locating part and erects
In the first through hole of bar lower end and the second through-hole of first connecting rod upper end, the two is attached, is fastened.It greatly improves and builds
Efficiency, and improve applicability.Second crossbar is climbed as ladder for the personnel of building.
In the present embodiment, the both ends of first locating part 8 are movable is provided with the second locating part, prevents the first limit
Part and the first vertical bar 1, first connecting rod 5 are detached from.
In the present embodiment, there are two brace connection component, brace connection groups for the inside setting of first vertical bar
Part includes third cross bar 9 and third locating part 10, and one end of third cross bar is fixedly connected with the first vertical bar, and the other end and third limit
Position part rotation connection;Two brace connection components are located between two first through hole.It is logical that the both ends of brace are provided with third
One end of brace is set on third cross bar by third through-hole, is then rotated by the way that brace connection component is arranged by hole
Third locating part keeps it vertical with third cross bar, prevents brace from surprisingly falling off.By one end of oblique railing and top scaffold list
Member connection, the other end of oblique railing is connect with lower section scaffold unit, easy to connect, firm.
In the present embodiment, one end of the third locating part 10 is cambered surface, prevents wedge angle scuffing from building personnel.
In the present embodiment, second vertical bar 3 is located on the perpendicular bisector of first crossbar 2, the second vertical bar and left side first
A second crossbar 4 is provided between cross bar, there are two second crossbars for setting between the second vertical bar and right side first crossbar.Pass through
Increase the quantity of second crossbar, improves overall structure stability, while providing more climbing ladders for the personnel of building, improve peace
Full performance.
Do not done in the utility model illustrate be the prior art or can be realized by the prior art, Er Qieben
Specific implementation case described in utility model is only the preferable case study on implementation of the utility model, is not used to limit practical
Novel practical range.Equivalent changes and modifications made by i.e. all contents according to present utility model application the scope of the patents, should all make
For the technology scope of the utility model.
Claims (5)
1. a kind of scaffold unit, which is characterized in that including two the first vertical bars disposed in parallel, set between two the first vertical bars
It sets there are two first crossbar, the both ends of first crossbar are connected with corresponding first vertical bar respectively, and the first vertical bar and first crossbar are hung down
Straight setting;
The second vertical bar is provided between two first crossbars, the both ends of the second vertical bar are connected with corresponding first crossbar respectively, the
Two vertical bars are vertically arranged with first crossbar;Second crossbar is provided between second vertical bar and the first vertical bar;
The both ends of first vertical bar offer first through hole, and the first vertical bar is steel pipe, and the upper end of the first vertical bar is inserted with the
One connecting rod, the both ends of first connecting rod offer the second through-hole, and are inserted into corresponding first vertical bar by the first locating part
In the first through hole of upper end and the second through-hole of first connecting rod lower end, first connecting rod and the first vertical bar are fastenedly connected.
2. scaffold unit according to claim 1, which is characterized in that the movable setting in both ends of first locating part
There is the second locating part.
3. scaffold unit according to claim 1 or 2, which is characterized in that be provided with two on the inside of first vertical bar
A brace connection component, brace connection component include third cross bar and third locating part, one end of third cross bar and first
Vertical bar is fixedly connected, and the other end and third locating part are rotatablely connected;Two brace connection components be located at two first through hole it
Between.
4. scaffold unit according to claim 3, which is characterized in that one end of the third locating part is cambered surface.
5. scaffold unit according to claim 4, which is characterized in that second vertical bar, which is located in first crossbar, to hang down
On line, a second crossbar is provided between the second vertical bar and left side first crossbar, between the second vertical bar and right side first crossbar
There are two second crossbars for setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822245762.4U CN209523446U (en) | 2018-12-28 | 2018-12-28 | A kind of scaffold unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822245762.4U CN209523446U (en) | 2018-12-28 | 2018-12-28 | A kind of scaffold unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209523446U true CN209523446U (en) | 2019-10-22 |
Family
ID=68228609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822245762.4U Expired - Fee Related CN209523446U (en) | 2018-12-28 | 2018-12-28 | A kind of scaffold unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209523446U (en) |
-
2018
- 2018-12-28 CN CN201822245762.4U patent/CN209523446U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202467161U (en) | Connection structure of scaffold | |
CN205046462U (en) | Foldable pier shaft template joins externally platform | |
CN101736896A (en) | cross-plate scaffold | |
CN209523446U (en) | A kind of scaffold unit | |
CN208202500U (en) | A kind of new type formwork scaffold | |
CN204407796U (en) | A kind of municipal works intert cable special stand | |
CN209538625U (en) | A kind of scaffold | |
CN208533997U (en) | A kind of climbing frame refuge story structure | |
CN207700656U (en) | One kind being used for electric mounting supporting rack | |
CN201190413Y (en) | Double-poling steel tube rectangular fastener | |
CN205276854U (en) | A fastener for connecting steel pipe | |
CN208584642U (en) | A kind of woodworking table saw saw hood | |
CN204475813U (en) | A kind of building operations height adjustable scaffold | |
CN209429259U (en) | A kind of Special-Shaped Column beam-column node structure | |
CN215368572U (en) | Scaffold for building construction | |
CN208023924U (en) | It is a kind of to facilitate assembled construction site scaffold | |
CN208718105U (en) | A kind of steel plate structure | |
CN206655455U (en) | A kind of pier stud reinforcing bar binding platform keel shoe | |
CN207582933U (en) | Super High large span outrigger drawknot structure | |
CN209163395U (en) | The totally-enclosed scaffold system of console mode | |
CN213626618U (en) | Seamless sleeve for scaffold | |
CN204552037U (en) | Combined inserting scaffold | |
CN208686041U (en) | A kind of construction platform being easily installed | |
CN204199654U (en) | The adjustable overarm bracing or strutting arrangement of a kind of building operations | |
CN214062305U (en) | Scaffold guardrail convenient to connect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191022 Termination date: 20211228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |