CN209523217U - A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap - Google Patents

A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap Download PDF

Info

Publication number
CN209523217U
CN209523217U CN201821770433.5U CN201821770433U CN209523217U CN 209523217 U CN209523217 U CN 209523217U CN 201821770433 U CN201821770433 U CN 201821770433U CN 209523217 U CN209523217 U CN 209523217U
Authority
CN
China
Prior art keywords
cushion cap
column
buried steel
concrete
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821770433.5U
Other languages
Chinese (zh)
Inventor
李永君
刘玉擎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201821770433.5U priority Critical patent/CN209523217U/en
Application granted granted Critical
Publication of CN209523217U publication Critical patent/CN209523217U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of precast concrete pier columns to combine connecting structure with the steel reinforced concrete of cushion cap, it is characterized in that setting up column pre-buried steel connector in precast concrete column lower part, cushion cap pre-buried steel connector is set on cushion cap top, is connected between column pre-buried steel connector and cushion cap pre-buried steel connector by anchor pole.Assembled stage, pier column pre-buried steel connector are reserved bolthole and are aligned with the overhanging anchor pole of cushion cap pre-buried steel connector at the scene, complete to connect by high strength anchor bar.The utility model uses the concept of steel-concrete combined structure, the pre-buried steel connector in prefabricated stand column and cushion cap, and concrete structure connection is converted to steel structure connection.On-site consolidation is connected using high strength anchor bar, and the technical requirements of joint connection in site construction are greatly lowered.If bridge at a specified future date needs to reconstruct or remove, reversed construction be can be completed.

Description

A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap
Technical field
The utility model belongs to science of bridge building field, and in particular to a kind of steel reinforced concrete of precast concrete pier column and cushion cap Combine connecting structure.
Background technique
With the development of our country's economy, the construction infection of Urban Bridge increasingly by citizen, government, owner, set Count the attention of unit and unit in charge of construction.Traditional construction method based on cast in situs is used in inner city, it will certainly be with Existing road blocks traffic as construction site for a long time, and construction noise can not be controlled effectively, and construction equipment, auxiliary are set It applies needs to repeat to configure, causes resources and energy consumption big, financial resource and material resource waste the problems such as more.How construction quality and warp guaranteed Under the premise of Ji property, more quickly, efficiently, bridge is built up in low energy consumption, be the project that must be solved.
Since this century, the Oversea bridges such as domestic Donghai Bridge, the Yangtze Bridge, port Zhuhai and Macao bridge take the lead in using bridge Beam prefabricated assembling technique, Shanghai City was in recent years in order to adapt to the requirement of green construction, good Min is overhead, northern transverse passage-way, S7 high Frame, military project road be overhead, promotes the use of bridge prefabrication in the projects such as ring road under ring road, the overhead middle Xing Lu in north and south under middle ring National Road spells Dress technology.Country vigorously advocates environmentally protective construction mode in recent years, and prefabricated assembled technology is to reduce construction pollution, promoted The effective means of construction quality.
Urban Bridge substructure precast assembly technology mainly uses grout sleeve interconnection technique and ripple both at home and abroad at present Two kinds of technology paths of pipe interconnection technique.Grout sleeve interconnection technique is a kind of live rebar connecting technology, is perfused in sleeve high Strength mortar connects reinforcing bar by mortar bond stress.Bellows interconnection technique is a kind of live Bar Anchorage technology, in wave High-strength mortar is perfused in line pipe, by bond stress Bar Anchorage in concrete component.Both technologies require constructing In-site pouring high-strength mortar (is commonly called as wet construction), and the requirement for site operation is relatively high, any one sleeve or bellows Grouting failure, can all lead to the reinforcing bar Joint failure, construction risk is larger.If can have one in the construction of precast pier on-site consolidation Technique other than kind wet construction, reduces the technical difficulty to construction, it will pushes the universal of bridge prefabrication assembling technique.
Utility model content
The purpose of this utility model is to provide a kind of precast concrete pier columns to combine connection structure with the steel reinforced concrete of cushion cap It makes, becomes " wet construction " as " dry construction ", overcome the shortcomings of that Conventional attachment methods in terms of construction technology and durability, are realized Precast concrete column and concrete bearing platform assembling construction are convenient, and stress is reliable, economical rationality.
In order to achieve the above objectives, the solution of the utility model is: a kind of precast concrete pier column and cushion cap Steel reinforced concrete combines connecting structure, it is characterised in that column pre-buried steel connector is set up in precast concrete column lower part, on cushion cap top If cushion cap pre-buried steel connector, connected between column pre-buried steel connector and cushion cap pre-buried steel connector by anchor pole.
Further, the column pre-buried steel connector is by bearing plate, encased steel plate, interior perforated panel of putting more energy into, outer stiffener Composition, encased steel plate, interior perforated panel of putting more energy into, outer stiffener are welded on bearing plate, and bearing plate reserves bolthole, the bearing plate It is set to precast concrete column bottom, encased steel plate is arranged in precast concrete column lower outside, perforated panel position of inside putting more energy into On the inside of encased steel plate, outer stiffener is located on the outside of encased steel plate, and the formation of column stirrup is penetrated in the hole for perforated panel of inside putting more energy into and is opened Orifice plate connector reserves bolthole on the bearing plate.
Further, the encased steel plate surrounds a square structure, and is vertically installed on bearing plate, perforated panel of inside putting more energy into It is correspondingly arranged at the inside of the four edges of square structure, and is arranged in vertical direction with corresponding side, the outer stiffener side of being set to The outside of shape structure is not only vertically installed on the four edges of square structure, is also provided on four fillets of square structure, is held Position sets reserved bolthole between two neighboring outer stiffener on pressing plate.
Further, the cushion cap pre-buried steel connector includes upper anchor slab, lower anchor slab, and correspondence is set on upper anchor slab, lower anchor slab Several boltholes are equipped with, the upper end of high strength anchor bar connects upper anchor slab, and the lower end of the high strength anchor bar connects lower anchor slab, the height The upper end of strong anchor pole extends to above concrete bearing platform.
Further, the reserved bolthole of bearing plate setting corresponding with the bolthole of upper anchor slab and lower anchor slab, holds The upper end of high strength anchor bar in platform pre-buried steel connector is fixed after penetrating the reserved bolthole of bearing plate by nut, can be completed The connection of precast concrete column and cushion cap.
Further, the steel reinforced concrete combination connecting structure is cladded with concrete, avoids connecting portion steel by external environment Damage, promoted connection durability.
Further, cushion cap top is recessed recessed portion, and the cushion cap pre-buried steel connector is set to cushion cap recessed portion, And connect in the recessed portion with column pre-buried steel connector, the casting concrete in the recessed portion, so that pre- in cushion cap It buries steel connector and column pre-buried steel connector is cladded with concrete protective steel member, it is ensured that the durability of connection.
The concrete connection between cushion cap and bridge pier is converted steel by pre-buried steel connector in prefabricated stand column and in cushion cap The connection of connector.On-site consolidation is connected using high strength anchor bar, and the technical requirements of joint connection in site construction are greatly lowered.Such as Fruit long term bridge needs to reconstruct or remove, and reversed construction can be completed.Compared with grout sleeve and grouting bellows interconnection technique, The utility model gives full play to the site operation advantage of steel construction, is not influenced by scene temperature, and the scene for avoiding high request is high The grouting construction of strength mortar reduces the technical difficulty to site operation, becomes " wet construction " as " dry construction ", can substantially mention Rise bridge on-site consolidation efficiency and quality.
By adopting the above scheme, the beneficial effects of the utility model are:
One, the on-site consolidation between cushion cap and bridge pier is connected using high strength anchor bar, and the technology of joint connection in site construction is wanted It asks and is greatly lowered.Grouting and maintenance work required for grout sleeve and grouting Bellows Technology site operation are avoided, greatly Width accelerates speed of application.
Two, become the connection of concrete and concrete as the connection of steel and steel, the utility model gives full play to showing for steel construction Field construction advantage, is not influenced by scene temperature, greatly improves the precision and convenience of site operation.
If three, bridge at a specified future date needs to reconstruct or remove, reversed construction be can be completed.
Four, element precast assembly rate is high.Preburied column steel fastener, prefabricated stand column pour work and can complete in factory, The available guarantee of the processing quality of component, scene need to only carry out that dry type is assembled, connection forms precast pier and cushion cap can By connection, meet the developing direction of Bridges in Our Country industrialization, assemblyization.
Detailed description of the invention
Fig. 1 combines connecting structure main view with column steel reinforced concrete for the example of the utility model precast pier.
Fig. 2 is the example of the utility model column pre-buried steel connector main view.
Fig. 3 is the example of the utility model column pre-buried steel connector top view.
Fig. 4 is the example of the utility model cushion cap pre-buried steel connector main view.
Fig. 5 is the example of the utility model cushion cap pre-buried steel connector top view.
Appended drawing reference: 1, precast concrete column;2, cushion cap;3, column pre-buried steel connector;4, cushion cap pre-buried steel connects Device;5, high strength anchor bar;6, it is cladded with concrete;31, bearing plate;32, encased steel plate;33, interior perforated panel of putting more energy into;34, outer stiffener; 35, bolthole is reserved;41, upper anchor slab;42, lower anchor slab.
Specific embodiment
The utility model is further described below in conjunction with the embodiment shown in that figure.
For the connection type of current common precast assembly bridge pier and cushion cap in terms of construction technology and durability not Foot can be improved site operation speed and convenience the utility model proposes one kind, improve the prefabricated of connection stress and durability Bridge pier and cushion cap steel reinforced concrete sectional construction and construction method, Fig. 1 show precast pier and combine connection structure with column steel reinforced concrete Main view is made, Fig. 2 is the example of the utility model column pre-buried steel connector main view.Fig. 3 is that the example of the utility model column is pre- Bury steel connector top view.Fig. 4 is the example of the utility model cushion cap pre-buried steel connector main view.Fig. 5 is that the utility model is real Example cushion cap pre-buried steel connector top view.
A kind of precast concrete pier column of the utility model combines connecting structure with the steel reinforced concrete of cushion cap mainly by prefabricated vertical Column, cushion cap, column pre-buried steel connector, cushion cap pre-buried steel connector, high strength anchor bar, overcoating coagulation local soil type at.
As shown in Figure 1, the steel reinforced concrete combined type connecting structure of a kind of precast concrete pier column and cushion cap, it is characterised in that Column pre-buried steel connector is set up in precast concrete column lower part, sets recessed portion on cushion cap top, and set in the recessed portion Cushion cap recessed portion, column pre-buried steel connector and cushion cap pre-buried steel are inserted into cushion cap pre-buried steel connector, concrete column lower part processed It is connected between connector by anchor pole.Overcoating concrete is poured in recessed portion, overcoating concrete can effectively avoid connecting Damage of the position steel by external environment promotes connection durability.
In conjunction with shown in Fig. 3, Fig. 4, pre-buried steel connector described in the pre-buried steel fastener of column is by bearing plate, encased steel plate, interior Perforated panel, board group of putting more energy into outside put more energy at encased steel plate, interior perforated panel of putting more energy into, outer stiffener are welded on bearing plate, and bearing plate is pre- Stay bolthole.
Using column pre-buried steel connector as bed die when column is prefabricated, assembling reinforcement, casting concrete completion is prefabricated, wherein for Meet anchoring property of the steel connector in column, penetrates column in aperture plate hole of putting more energy into inside preburied column pre-buried steel connector Stirrup forms perforated plate connector.
As shown in connection with fig. 5, the upper end of the high strength anchor bar in cushion cap pre-buried steel connector connects upper anchor slab, the high strength anchor bar Lower end connect lower anchor slab, the upper end of the high strength anchor bar extends to above concrete bearing platform.Upper anchor slab and lower anchor slab both guaranteed The pre-buried precision of high strength anchor bar, and improve the anchoring property of the pre-buried steel fastener of cushion cap.Upper anchor slab and lower anchor slab are intermediate It digs a hole, reduces rolled steel dosage, promote connection economy.Anchor pole extension is determined by construction.The upper end of high strength anchor bar and upper anchor Spiral reinforcement is arranged in plate junction and high anchor pole lower end and lower anchor slab junction, prevents the position concrete local failure.System Anchor slab, spiral reinforcement and high strength anchor bar are all embedded in cushion cap up and down when making cushion cap.
The utility model uses the concept of steel-concrete combined structure, the pre-buried steel connector in prefabricated stand column and cushion cap, will be pre- The concrete structure connection made in assembled site operation is converted to steel structure connection.On-site consolidation between cushion cap and bridge pier uses The technical requirements of joint connection in site construction are greatly lowered in high strength anchor bar connection.If bridge at a specified future date needs to reconstruct or remove, Reversed construction can be completed.Compared with grout sleeve and grouting bellows interconnection technique, the utility model gives full play to steel construction Site operation advantage, do not influenced by scene temperature, avoid the grouting construction of the live high-strength mortar of high request, reduced pair The technical difficulty of site operation becomes " wet construction " as " dry construction ", bridge on-site consolidation efficiency and quality can be substantially improved.
Above-described embodiment description is to understand for the ease of those skilled in the art and apply this practical new Type.Person skilled in the art obviously easily can make various modifications to these embodiments, and described herein General Principle is applied in other embodiments without having to go through creative labor.Therefore, the utility model is not limited to here Embodiment, those skilled in the art's announcement according to the present utility model, do not depart from improvement that the utility model scope is made and Modification should be all within the protection scope of the utility model.

Claims (6)

1. a kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap, it is characterised in that vertical in precast concrete Column pre-buried steel connector is set up in column lower part, sets cushion cap pre-buried steel connector, column pre-buried steel connector and cushion cap on cushion cap top It is connected between pre-buried steel connector by anchor pole.
2. a kind of precast concrete pier column as described in claim 1 combines connecting structure, feature with the steel reinforced concrete of cushion cap Be: the column pre-buried steel connector by bearing plate, encased steel plate, interior perforated panel of putting more energy into, outside put more energy into board group into Covered with Angles Plate, interior perforated panel of putting more energy into, outer stiffener are welded on bearing plate, and bearing plate reserves bolthole, and the bearing plate is set to prefabricated Concrete column bottom, encased steel plate are arranged in precast concrete column lower outside, and perforated panel of inside putting more energy into is located at encased steel plate Inside, outer stiffener are located on the outside of encased steel plate, and column stirrup is penetrated in the hole for perforated panel of inside putting more energy into and forms perforated plate connector, Bolthole is reserved on the bearing plate.
3. a kind of precast concrete pier column as claimed in claim 2 combines connecting structure, feature with the steel reinforced concrete of cushion cap Be: the encased steel plate surrounds a square structure, and is vertically installed on bearing plate, the perforated panel side of being correspondingly arranged at of inside putting more energy into The inside of the four edges of shape structure, and be arranged in vertical direction with corresponding side, outer stiffener is set to the outside of square structure, It is not only vertically installed on the four edges of square structure, is also provided on four fillets of square structure, adjacent two on bearing plate Position sets reserved bolthole between a outer stiffener.
4. a kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap as claimed in claim 2 or claim 3, special Sign is: the cushion cap pre-buried steel connector includes upper anchor slab, lower anchor slab, is correspondingly arranged on several on upper anchor slab, lower anchor slab Bolthole, the upper end of high strength anchor bar connect upper anchor slab, and the lower end of the high strength anchor bar connects lower anchor slab, the high strength anchor bar it is upper End extends to above concrete bearing platform.
5. a kind of precast concrete pier column as claimed in claim 4 combines connecting structure, feature with the steel reinforced concrete of cushion cap It is: the setting corresponding with the bolthole of upper anchor slab and lower anchor slab of the reserved bolthole of the bearing plate, the connection of cushion cap pre-buried steel The upper end of high strength anchor bar in device is fixed after penetrating the reserved bolthole of bearing plate by nut, and it is vertical that precast concrete can be completed The connection of column and cushion cap.
6. a kind of precast concrete pier column as described in claim 1 combines connecting structure, feature with the steel reinforced concrete of cushion cap Be: cushion cap top is recessed recessed portion, and the cushion cap pre-buried steel connector is set to cushion cap recessed portion, and in the recess It is connect in portion with column pre-buried steel connector, the casting concrete in the recessed portion.
CN201821770433.5U 2018-10-30 2018-10-30 A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap Active CN209523217U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821770433.5U CN209523217U (en) 2018-10-30 2018-10-30 A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821770433.5U CN209523217U (en) 2018-10-30 2018-10-30 A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap

Publications (1)

Publication Number Publication Date
CN209523217U true CN209523217U (en) 2019-10-22

Family

ID=68211420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821770433.5U Active CN209523217U (en) 2018-10-30 2018-10-30 A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap

Country Status (1)

Country Link
CN (1) CN209523217U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030706A (en) * 2020-08-26 2020-12-04 绍兴文理学院 Prefabricated bridge pier and capping beam connecting system for assembled beam bridge and construction method of prefabricated bridge pier and capping beam connecting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030706A (en) * 2020-08-26 2020-12-04 绍兴文理学院 Prefabricated bridge pier and capping beam connecting system for assembled beam bridge and construction method of prefabricated bridge pier and capping beam connecting system

Similar Documents

Publication Publication Date Title
CN109555151A (en) Precast concrete column combines connecting structure and construction method with the steel reinforced concrete of cushion cap
CN107060140B (en) Prefabricated double-steel-tube concrete shear wall and assembling method thereof
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN110512647A (en) A kind of partial assembled formula Metro Station Structure design and construction method
CN207597609U (en) A kind of precast concrete concrete frame joint
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN108824818A (en) The method of construction of assembly concrete-filled steel tube frame shear wall structure system
CN109577539A (en) Build inclined roof fabricated construction technique
CN105926771B (en) A kind of the interior joint connection structure and its construction method of prefabricated integral frame column beam
CN107761947A (en) Assembled beam-column connecting node and its construction method
CN108360901A (en) Novel low layer assembled wallboard structure energy dissipating bolt joint
CN112695794A (en) Precast concrete L shape post rim of a cup basis
CN112695795A (en) Precast concrete T shape post rim of a cup basis
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN109457568A (en) A kind of beam prefabricated post-stressed assembly construction Craft of bilateral overlapping
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN108775084A (en) Steel-concrete combines precast beam and prefabricated post connection structure and construction method
CN108374493A (en) Novel low layer assembled wallboard structure energy dissipating steel plate welding node
CN215166634U (en) Assembly type building wallboard connecting structure
CN104695589A (en) Connecting structure and method for prefabricated assembled concrete shearing wall splicing joint
CN209523217U (en) A kind of precast concrete pier column combines connecting structure with the steel reinforced concrete of cushion cap
CN211115052U (en) Shaft type underground stereo garage structure
CN113027021A (en) Support-free prefabricated floor slab with bracket
CN107524162A (en) A kind of assembled corrugated sheet steel Combined concrete pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant