- CN209522499U CN209522499U CN201821945062.XU CN201821945062U CN209522499U CN 209522499 U CN209522499 U CN 209522499U CN 201821945062 U CN201821945062 U CN 201821945062U CN 209522499 U CN209522499 U CN 209522499U
- Authority
- CN
- China
- Prior art keywords
- shaft
- pedestal
- lifting rope
- gear
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of novel construction and installation hanging apparatus, including sunpender, motor, pedestal, fuselage, first lifting rope, first gear, first rotating shaft, first sliding block, first sliding groove, sleeve, universal wheel, second gear, second shaft, second lifting rope, fixed link, handwheel, screw rod, gripping block, fixed plate, second sliding block and second sliding slot, motor has been bolted at the top of the pedestal, the output shaft of the motor is connected with first rotating shaft by shaft coupling, the outside of the first rotating shaft is socketed with first gear, the inner wall of the pedestal is corresponding to be connected with the second shaft by bearing, the outside of second shaft is socketed with second gear, two second gears are meshed, and first gear is meshed with the second shaft, the bottom correspondence of the pedestal offers first sliding groove, the utility model , have the characteristics that practical and convenient for mounting and clamping.
Description
Technical field
The utility model relates to technical field of building construction, specially a kind of novel construction and installation hanging apparatus.
Background technique
In construction, frame structure floor needs to carry out lifting transport to wallboard, pipeline and construction equipment.Often at present
Hanging apparatus has driving, crane and hanging basket, and hanging apparatus has higher requirement to its stability, intensity and safety,
And no over-loading uses.
And there are the problems that the practicability is poor and clamping is troublesome for existing hanging apparatus, since small-sized hanging apparatus is to portable
Property and stability have higher requirement, although portability is promoted after existing equipment equipment idler wheel, but and contact area of ground
Reduce, lifting process is unstable;Existing hanging apparatus needs one end by pipeline hanging when lifting by crane tubular articles simultaneously, then
It from pipeline underlying wound and is fastened with fixed rope, cumbersome.Therefore, it designs a kind of practical and convenient for mounting and clamping novel
Construction and installation hanging apparatus is necessary.
Utility model content
The purpose of this utility model is to provide a kind of novel construction and installation hanging apparatus, to solve above-mentioned background technique
The problem of middle proposition.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solutions: the novel construction and installation of one kind are hung
Assembling device, including sunpender, motor, pedestal, fuselage, the first lifting rope, first gear, first rotating shaft, the first sliding block, first sliding groove,
Sleeve, universal wheel, second gear, the second shaft, the second lifting rope, fixed link, handwheel, screw rod, gripping block, fixed plate, second are slided
Block and second sliding slot, motor has been bolted at the top of the pedestal, and the output shaft of the motor passes through shaft coupling activity
It is connected with first rotating shaft, the outside of the first rotating shaft is socketed with first gear, and the inner wall of the pedestal is corresponding living by bearing
Dynamic to be connected with the second shaft, the outside of second shaft is socketed with second gear, and two second gears are meshed, and the
One gear is meshed with the second gear, and the bottom of the pedestal is corresponding to offer first sliding groove, the side peace of the first sliding groove
Equipped with the first sliding block, and sleeve being bolted between two the first sliding blocks, the bottom of the sleeve is connected with universal wheel,
Fuselage is installed at the top of the pedestal, sunpender is provided at the top of the fuselage, the side of the sunpender is provided with first and hangs
Rope, one end of first lifting rope are connected with the second lifting rope, and one end of second lifting rope is connected with gripping block, and described second hangs
The side of rope is provided with fixed plate, and the two sides correspondence of the fixed plate offers second sliding slot, the side pair of the second sliding slot
Second sliding block should be installed, the bottom of the fixed plate is corresponding to be bolted fixed link, and the bottom of the fixed link connects
It is connected to screw rod, one end of the screw rod is connected with handwheel, and the motor and external power supply are electrically connected.
Further, the both ends of the first rotating shaft are flexibly connected with pedestal by bearing.
Further, one end of the sleeve offers thread groove, and the outside of second shaft offers screw thread, and spiral shell
Line and thread groove are fit structure.
Further, the quantity of second lifting rope is four, and is uniformly distributed in the two sides of gripping block.
Further, the gripping block is bolted with the second sliding block.
Further, the bottom of the fixed link offers threaded hole, and the side of the gripping block offers cylinder groove, and
Screw rod and threaded hole and cylinder groove are matching mechanism.
Compared with prior art, the utility model beneficial effect achieved is: the utility model, by being provided with first
The components such as gear, the first sliding block and universal wheel are needing to move so as to which idler wheel is accommodated into pedestal when being not required to mobile
When eject idler wheel, take into account it is portable and stablize, improve the practicability of the hanging apparatus;By being provided with fixed plate, the second sliding block
With the components such as gripping block, solves lifting process fixed rope from pipeline underlying wound and time-consuming and laborious caused by fastening ask
Topic so that the hanging apparatus have the characteristics that it is convenient for mounting and clamping.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this
Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the whole positive structure diagram of the utility model;
Fig. 2 is the motor and pedestal scheme of installation of the utility model;
Fig. 3 is a-quadrant enlarged diagram in Fig. 1 of the utility model;
In figure: 1, sunpender;2, motor;3, pedestal;4, fuselage;5, the first lifting rope;6, first gear;7, first rotating shaft;8,
First sliding block;9, first sliding groove;10, sleeve;11, universal wheel;12, second gear;13, the second shaft;14, the second lifting rope;15,
Fixed link;16, handwheel;17, screw rod;18, gripping block;19, fixed plate;20, the second sliding block;21, second sliding slot.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of novel construction and installation hanging apparatus, packet
Include sunpender 1, motor 2, pedestal 3, fuselage 4, the first lifting rope 5, first gear 6, first rotating shaft 7, the first sliding block 8, first sliding groove 9,
Sleeve 10, second gear 12, the second shaft 13, the second lifting rope 14, fixed link 15, handwheel 16, screw rod 17, clamps universal wheel 11
Block 18, fixed plate 19, the second sliding block 20 and second sliding slot 21, the top of pedestal 3 have been bolted motor 2, motor 2 it is defeated
Shaft is connected with first rotating shaft 7 by shaft coupling, and the outside of first rotating shaft 7 is socketed with first gear 6, the inner wall of pedestal 3
Corresponding to be connected with the second shaft 13 by bearing, the outside of the second shaft 13 is socketed with second gear 12, two the second teeth
Wheel 12 is meshed, and first gear 6 is meshed with second gear 12, and the bottom of pedestal 3, which corresponds to, offers first sliding groove 9, and first
The side of sliding slot 9 is equipped with the first sliding block 8, and has been bolted sleeve 10, the bottom of sleeve 10 between two the first sliding blocks 8
Portion is connected with universal wheel 11, and the top of pedestal 3 is equipped with fuselage 4, and the top of fuselage 4 is provided with sunpender 1, and the side of sunpender 1 is set
It is equipped with the first lifting rope 5, one end of the first lifting rope 5 is connected with the second lifting rope 14, and one end of the second lifting rope 14 is connected with gripping block 18,
The side of second lifting rope 14 is provided with fixed plate 19, and the two sides correspondence of fixed plate 19 offers second sliding slot 21, second sliding slot 21
Side it is corresponding second sliding block 20 is installed, the bottom correspondence of fixed plate 19 has been bolted fixed link 15, fixed link 15
Bottom be connected with screw rod 17, one end of screw rod 17 is connected with handwheel 16, and motor 2 and external power supply are electrically connected;First rotating shaft 7
Both ends be flexibly connected with pedestal 3 by bearing, be convenient for 7 smooth rotation of first rotating shaft;One end of sleeve 10 offers thread groove,
The outside of second shaft 13 offers screw thread, and screw thread and thread groove are fit structure, are convenient for 13 drive sleeve 10 of the second shaft
It is mobile;The quantity of second lifting rope 14 is four, and is uniformly distributed in the two sides of gripping block 18, convenient for slinging gripping block 18;It clamps
Block 18 is bolted with the second sliding block 20, convenient for slinging fixed plate 19 by the second sliding block 20;It opens the bottom of fixed link 15
Equipped with threaded hole, the side of gripping block 18 offers cylinder groove, and screw rod 17 and threaded hole and cylinder groove are matching mechanism, just
In make gripping block 18 clamp tubular pole;When the mobile hanging apparatus, motor 2 is first opened, output shaft drives 7 turns of first rotating shaft
Dynamic, first gear 6 drives second gear 12 to rotate, and rotates the second shaft 13, because the second shaft 13 passes through with sleeve 10
It being threadedly coupled, sleeve 10 is slided in first sliding groove 9 by the first sliding block 8, and universal wheel 11 moves down and jacks up pedestal 3,
The hanging apparatus can be moved at this time, and movement is then turned on motor 2 when finishing, and output shaft rotates backward, and universal wheel 11 takes in bottom
In seat 3, to take into account portable and stablize, the practicability of the hanging apparatus is improved;When using the hanging apparatus, will first it clamp
Block 18 is placed in the two sides of pipeline, rotates handwheel 16, and screw rod 17, which rotates, simultaneously pushes gripping block 18 to move inward, and the second sliding block 20 is the
Sliding in two sliding slots 21 moves upwards the first lifting rope 5, the second lifting rope 14 lifts clamping until gripping block 18 clamps pipeline
Block 18, the second lifting rope 14 give the position that the inside restraining force of gripping block 18 has further fixed gripping block 18, prevent gripping block
18 unclamp pipeline, solve the problems, such as that lifting process fixed rope is from pipeline underlying wound and time-consuming and laborious caused by fastening, make
The hanging apparatus have the characteristics that it is convenient for mounting and clamping.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic
It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (6)
1. a kind of novel construction and installation hanging apparatus, including sunpender (1), motor (2), pedestal (3), fuselage (4), the first lifting rope
(5), first gear (6), first rotating shaft (7), the first sliding block (8), first sliding groove (9), sleeve (10), universal wheel (11), second
Gear (12), the second lifting rope (14), fixed link (15), handwheel (16), screw rod (17), gripping block (18), is consolidated the second shaft (13)
Fixed board (19), the second sliding block (20) and second sliding slot (21), it is characterised in that: be bolted at the top of the pedestal (3)
Have motor (2), the output shaft of the motor (2) is connected with first rotating shaft (7) by shaft coupling, the first rotating shaft (7)
Outside be socketed with first gear (6), the inner wall of the pedestal (3) is corresponding to be connected with the second shaft (13) by bearing,
The outside of second shaft (13) is socketed with second gear (12), and two second gears (12) are meshed, and the first tooth
Wheel (6) is meshed with second gear (12), and the bottom correspondence of the pedestal (3) offers first sliding groove (9), the first sliding groove
(9) side is equipped with the first sliding block (8), and has been bolted sleeve (10), the set between two the first sliding blocks (8)
The bottom of cylinder (10) is connected with universal wheel (11), is equipped with fuselage (4) at the top of the pedestal (3), the top of the fuselage (4)
It is provided with sunpender (1), the side of the sunpender (1) is provided with the first lifting rope (5), and one end of first lifting rope (5) is connected with
One end of second lifting rope (14), second lifting rope (14) is connected with gripping block (18), and the side of second lifting rope (14) is set
It is equipped with fixed plate (19), the two sides correspondence of the fixed plate (19) offers second sliding slot (21), the second sliding slot (21)
Side correspondence is equipped with the second sliding block (20), and the bottom correspondence of the fixed plate (19) has been bolted fixed link (15),
The bottom of the fixed link (15) is connected with screw rod (17), and one end of the screw rod (17) is connected with handwheel (16), the motor
(2) it is electrically connected with external power supply.
2. the novel construction and installation hanging apparatus of one kind according to claim 1, it is characterised in that: the first rotating shaft
(7) both ends are flexibly connected with pedestal (3) by bearing.
3. the novel construction and installation hanging apparatus of one kind according to claim 1, it is characterised in that: the sleeve (10)
One end offers thread groove, and the outside of second shaft (13) offers screw thread, and screw thread and thread groove are fit structure.
4. the novel construction and installation hanging apparatus of one kind according to claim 1, it is characterised in that: second lifting rope
(14) quantity is four, and is uniformly distributed in the two sides of gripping block (18).
5. the novel construction and installation hanging apparatus of one kind according to claim 1, it is characterised in that: the gripping block (18)
It is bolted with the second sliding block (20).
6. the novel construction and installation hanging apparatus of one kind according to claim 1, it is characterised in that: the fixed link (15)
Bottom offer threaded hole, the side of the gripping block (18) offers cylinder groove, and screw rod (17) and threaded hole and cylinder
Slot is matching mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821945062.XU CN209522499U (en) | 2018-11-24 | 2018-11-24 | A kind of novel construction and installation hanging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821945062.XU CN209522499U (en) | 2018-11-24 | 2018-11-24 | A kind of novel construction and installation hanging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209522499U true CN209522499U (en) | 2019-10-22 |
Family
ID=68211753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821945062.XU Active CN209522499U (en) | 2018-11-24 | 2018-11-24 | A kind of novel construction and installation hanging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209522499U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111747316A (en) * | 2020-07-05 | 2020-10-09 | 黄振梅 | Stably-adjusted and transported lifting equipment for municipal engineering and use method thereof |
-
2018
- 2018-11-24 CN CN201821945062.XU patent/CN209522499U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111747316A (en) * | 2020-07-05 | 2020-10-09 | 黄振梅 | Stably-adjusted and transported lifting equipment for municipal engineering and use method thereof |
CN111747316B (en) * | 2020-07-05 | 2022-07-22 | 江苏松柳建设工程有限公司 | Stably-transporting lifting equipment for municipal engineering and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204311720U (en) | High-lift operation hanging cradle | |
CN108892035A (en) | A kind of tubing special purpose crane | |
CN206569935U (en) | A kind of civil engineering rises machine with small hoist | |
CN206357273U (en) | Guide rail is carried with liftable by one kind detection robot | |
CN209522499U (en) | A kind of novel construction and installation hanging apparatus | |
CN204852837U (en) | Cloud platform lifter | |
CN214270075U (en) | Liftable support for construction engineering construction | |
CN210064933U (en) | Hoisting device for construction equipment | |
CN201002955Y (en) | Lifting mechanism | |
CN209670923U (en) | A kind of elevator apparatus applied to oil drilling | |
CN201826761U (en) | Derrick | |
CN208054796U (en) | A kind of cement block boom hoisting | |
CN106235850A (en) | Lifting type article shelf | |
CN207696117U (en) | A kind of limit clamp for processing space equipment | |
CN211470650U (en) | Lifting mechanism of counterweight lifter | |
CN209411642U (en) | A kind of architectural engineering hanging device | |
CN112110363A (en) | Installation equipment for power converter and use method thereof | |
CN210127042U (en) | Transformer substation equipment lifting device | |
CN114536398A (en) | Supporting bench with adjustable underwater robot equipment is used | |
CN213141199U (en) | Building material loop wheel machine convenient to lift adjustment | |
CN210885043U (en) | Engineering machine tool structure hangs commentaries on classics device | |
CN111217256A (en) | Novel building installation hoist and mount device | |
CN219929353U (en) | Communication engineering is with hanging and revolves installation auxiliary device | |
CN214399581U (en) | Lifting device for electromechanical engineering | |
CN219585669U (en) | Furniture hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |