CN209484155U - The novel press leak stoppage tool of oil pipeline - Google Patents

The novel press leak stoppage tool of oil pipeline Download PDF

Info

Publication number
CN209484155U
CN209484155U CN201920112881.4U CN201920112881U CN209484155U CN 209484155 U CN209484155 U CN 209484155U CN 201920112881 U CN201920112881 U CN 201920112881U CN 209484155 U CN209484155 U CN 209484155U
Authority
CN
China
Prior art keywords
oil pipeline
fixture
welding steel
cyclic annular
lower fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920112881.4U
Other languages
Chinese (zh)
Inventor
吴登辉
孟江
黎秋汝
袁帅
刘益妮
李欣霖
卢海东
郭瑜
蒋欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University of Science and Technology
Original Assignee
Chongqing University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University of Science and Technology filed Critical Chongqing University of Science and Technology
Priority to CN201920112881.4U priority Critical patent/CN209484155U/en
Application granted granted Critical
Publication of CN209484155U publication Critical patent/CN209484155U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model provides a kind of novel press leak stoppage tool of oil pipeline, including upper fixture, lower fixture, air bag, cyclic annular welding steel and clamp connector, upper fixture and lower fixture are U-type groove structure, it is flexibly connected respectively by clamp connector between two free ends of upper fixture and two free ends of lower fixture, air bag is located in the U-type groove of upper fixture, lower fixture is synthesized by two arcwalls, two arcwalls are located at the end at the arc top of U-type groove and are locked by clamping screw, cyclic annular welding steel is clamped in the U-type groove of lower fixture, the sealing agent at the leakage for blocking oil pipeline is coated in the inner ring of cyclic annular welding steel, air bag holds out against cyclic annular welding steel after inflation, make to fit closely and welded at the leakage of cyclic annular welding steel and oil pipeline.The advantages of the utility model are as follows: 1. easy for installation;2. good security;3. recovery utilization rate is high;4. adapting to the operation of different tube diameters;5. being suitable for the leak stopping of most of pressure limits.

Description

The novel press leak stoppage tool of oil pipeline
Technical field
The utility model belongs to oil pipeline blocking technology field, more specifically, is related to a kind of the novel of oil pipeline Press leak stoppage tool.
Background technique
Pipeline Leak is one of the problem for influencing the normal production and transport of petroleum industry and being faced, and the leakage of crude oil can make At significant problems such as resources loss, Accidents Disasters, environmental pollutions.Serious leakage also results in production and is unable to operate normally, quilt Compel parking repairing, fire explosion occurs, causes the environmental pollution of unrepairable, everything will all bring huge economic damage It loses, brings serious consequence to production.
Currently, the common technique device of oil pipeline leak stopping has fast bunding device for plugging, clip device for plugging, stopper is blocked up Leakage device, agent injecting type sealing device etc..Since the pressure of leak position is big, during leak stopping, these leak stopping dress The problems such as it is big to set that there are positioning difficulties, complicated for operation, poor sealing performance.Meanwhile the existing Pipe leakage stopper scope of application has Limit, is difficult effectively to block the oil pipeline of different tube diameters, to be unable to satisfy the demand of oil pipeline safe operation.Cause This, developing a kind of tape-pressure leakage clogging device for being suitable for different tube diameters has important engineering significance.
Utility model content
In view of the above problems, the purpose of the utility model is to provide a kind of novel press leak stoppage tool of oil pipeline, with Solve existing device for plugging there are positioning difficulties it is big, it is complicated for operation, poor sealing performance and the defeated of different tube diameters can not be adapted to The problem of oil-piping.
The novel press leak stoppage tool of oil pipeline provided by the utility model, including upper fixture, lower fixture, air bag, ring Shape welding steel and clamp connector, upper fixture and lower fixture are U-type groove structure, two free ends of upper fixture and lower fixture Two free ends between be flexibly connected respectively by clamp connector, air bag is located in the U-type groove of upper fixture, and lower fixture is by two A arcwall synthesis, two arcwalls are located at the end at the arc top of U-type groove and are locked by clamping screw, cyclic annular welding steel folder Tightly in the U-type groove of lower fixture, it is coated with the sealing agent at the leakage for blocking oil pipeline in the inner ring of cyclic annular welding steel, Air bag holds out against cyclic annular welding steel after inflation, makes to fit closely at the leakage of cyclic annular welding steel and oil pipeline and go forward side by side Row welding;Clamp connector includes two connection bolts and a spring, two connect bolts respectively with upper fixture, lower fixture The end thread of free end connects, and spring is connected between two connection bolts.
Furthermore it is preferred that structure be that air bag fast aeration plug is provided on air bag.
Additionally, it is preferred that structure be that the height of cyclic annular welding steel is higher than the height of lower fixture.
Furthermore preferred structure is, the screw rod of one of connection bolt screws in the end of the free end of upper fixture and leads to Nut check is crossed, the screw rod of another connection bolt screws in the end of the free end of lower fixture and by nut check, two companies The head of connecting bolt is welded with hook, and the both ends of spring are hooked on two hooks.
Furthermore it is preferred that structure be that the end for the free end that screw rod of one of connection bolt screws in upper fixture simultaneously leads to Nut check is crossed, the screw rod of another connection bolt screws in the end of the free end of lower fixture and by nut check, and spring is Concave spring, two end caps of spring are on the head of two connection bolts.
Furthermore preferred structure is, the buffering of arc is offered on the upper fixture inner wall opposite with cyclic annular welding steel Groove, edge and the buffer groove of air bag fit closely.
Compared with prior art, the novel press leak stoppage tool of oil pipeline provided by the utility model, can obtain with Lower technical effect:
1, lower fixture synthesizes U-type groove structure by two arcwalls, is locked at arc top by bolt, by the pine for adjusting bolt Tightness, the slot diameter of adjustable U-type groove, to enable lower fixture to clamp the cyclic annular welding steel of different-diameter, so as to not Oil pipeline with caliber is blocked.
2, the air bag after inflating is to cyclic annular welding steel application pressure, at the leakage for making cyclic annular welding steel and oil pipeline Fitting completely;
3, buffer groove can play buffer function to the contact position of air bag and upper fixture.
Detailed description of the invention
By reference to the following description in conjunction with the accompanying drawings and the contents of the claims, and with to the utility model more Comprehensive understanding, other purposes and result of the utility model will be more clearly understood and understood.
In the accompanying drawings:
Fig. 1 is the three-dimensional structure diagram according to the novel press leak stoppage tool of the oil pipeline of the utility model embodiment one;
Fig. 2 is the plane structure chart according to the novel press leak stoppage tool of the oil pipeline of the utility model embodiment one.
Appended drawing reference therein include: 1- air bag, 101- air bag fast aeration plug, 2- upper fixture, 201- buffer groove, Fixture, 301- arched arm, 4- clamping screw, 5- ring-type welding steel, 6- oil pipeline, 7- clamp connector, 701- under 3- One connection bolt, the connection of 702- second bolt, 703- spring.
Identical label indicates similar or corresponding feature or function in all the appended drawings.
Specific embodiment
Specific embodiment of the utility model is described in detail below with reference to attached drawing.
Embodiment one
Fig. 1 and Fig. 2 respectively illustrates the novel press leak stoppage tool of the oil pipeline according to the utility model embodiment one Stereochemical structure and planar structure.
As Fig. 1 and Fig. 2 jointly shown in, the utility model embodiment one provide oil pipeline novel press leak stopping work Tool, comprising: air bag 1, upper fixture 2, lower fixture 3, clamping screw 4, cyclic annular welding steel 5 and clamp connector 7, upper fixture 2 with Lower fixture 3 is U-type groove structure, passes through one between two free ends of upper fixture 2 and two free ends of lower fixture 3 respectively Clamp connector 7 is flexibly connected, and clamp connector 7 plays the role of being flexibly connected upper fixture 2 and lower fixture 3, and air bag 1 is located at upper In the U-type groove of fixture 2, lower fixture 3 synthesizes U-type groove structure by two arcwalls 301, and two arcwalls 301 are located at the arc of U-type groove End at top offers threaded hole, is locked two arcwalls 301 by clamping screw 4, and cyclic annular welding steel 5 is for wearing Oil pipeline 6 is contacted with ring-type welding steel 5 with resting at cyclic annular welding steel 5 at the leakage of oil pipeline 6, ring-type weldering It connects steel plate 5 to be clamped in the U-type groove of lower fixture 3, is coated with sealing agent in the inner ring of cyclic annular welding steel 5, sealing agent can be to defeated It is blocked at the leakage of oil-piping 6;By adjusting the elasticity of clamping screw 4, the slot of the U-type groove of adjustable lower fixture 3 Diameter, to enable lower fixture 2 to clamp the cyclic annular welding steel 5 of different-diameter, so that the oil pipeline 6 to different tube diameters carries out It blocks.
It is provided with air bag fast aeration plug 101 on air bag 1, air bag 1 is filled by air bag fast aeration plug 101 Gas, air bag 1 gradually expand and hold out against cyclic annular welding steel 5, to apply pressure to cyclic annular welding steel 5, make cyclic annular welding steel It is fitted closely at plate 5 and the leakage of oil pipeline 6, reaches the maximization of sealing agent plugging effect.
In order to which buffer function is played in the contact position to air bag 1 and upper fixture 2, welded on the inner wall of upper fixture 2 with ring-type The opposite position of steel plate 5 offers the buffer groove 201 of arc, and after inflation, edge and buffer groove 201 closely paste air bag 1 It closes.
Clamp connector 7 includes that the first connection bolt 701, second connects bolt 702 and spring 703, the first connection bolt 701 screw rod screws in the end of the free end of upper fixture 2 and by nut check, under the screw rod of the second connection bolt 702 screws in The end of the free end of fixture 3 and the head welding that bolt 702 is connect with second by nut check, the first connection bolt 701 Have hook (not shown go out), the both ends of spring 703 are hooked on two hooks.
After blocking at the leakage of oil pipeline 6, without dismantling cyclic annular welding steel 5, cyclic annular welding steel 5 is quite and oil transportation The crust of pipeline 6 needs to weld together cyclic annular welding steel 5 with oil pipeline 6, for side to guarantee bonding strength Just it welds, the height of cyclic annular welding steel 5 is higher than the height of lower fixture 2.
Embodiment two
Embodiment two is only that the structure of clamp connector is different from the difference of embodiment one, the oil transportation that embodiment two provides The other structures of the novel press leak stoppage tool of pipeline are the same as example 1, and the clamp connector of embodiment two equally includes First connection bolt, the second connection bolt and spring, the screw rod of the first connection bolt screw in the end of the free end of upper fixture simultaneously By nut check, the screw rod of the second connection bolt screws in the end of the free end of lower fixture and by nut check, and spring is Concave spring, i.e. the both ends diameter of spring be greater than interlude diameter, the both ends of spring be respectively fitted over the first connection bolt with On the head of second connection bolt, the head that the first connection bolt connect bolt with second is stuck on spring, to guarantee to connect Connect intensity.
More than, only specific embodiment of the present utility model, but protection scope of the utility model is not limited thereto, Anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in variation or replace It changes, should be covered within the scope of the utility model.Therefore, the protection scope of the utility model should be with claim Subject to protection scope.

Claims (6)

1. a kind of novel press leak stoppage tool of oil pipeline, which is characterized in that including upper fixture, lower fixture, air bag, cyclic annular weldering Steel plate and clamp connector are connect, the upper fixture and the lower fixture are U-type groove structure, two free ends of the upper fixture It is flexibly connected respectively by clamp connector between two free ends of the lower fixture, the air bag is located at the upper fixture U-type groove in, the lower fixture is synthesized by two arcwalls, and the end that two arcwalls are located at the arc top of U-type groove passes through lock Tight bolt locking, the ring-type welding steel are clamped in the U-type groove of the lower fixture, in the inner ring of the cyclic annular welding steel The sealing agent being coated at the leakage for blocking oil pipeline, the air bag hold out against the cyclic annular welding steel after inflation Plate makes to fit closely and welded at the cyclic annular welding steel and the leakage of the oil pipeline;
The clamp connector include two connection bolts and a spring, two connection bolts respectively with the upper fixture, institute The end thread connection of the free end of lower fixture is stated, the spring is connected between two connection bolts.
2. the novel press leak stoppage tool of oil pipeline as described in claim 1, which is characterized in that be arranged on the air bag There is air bag fast aeration plug.
3. the novel press leak stoppage tool of oil pipeline as described in claim 1, which is characterized in that the ring-type welding steel Height be higher than the lower fixture height.
4. the novel press leak stoppage tool of oil pipeline as described in claim 1, which is characterized in that one of connection bolt Screw rod screw in the upper fixture free end end and by nut check, described in screw rod of another connection bolt screws in Simultaneously by nut check, the heads of two connection bolts are welded with hook for the end of the free end of lower fixture, and the two of the spring End hook is hung on two hooks.
5. the novel press leak stoppage tool of oil pipeline as described in claim 1, which is characterized in that one of connection bolt Screw rod screw in the upper fixture free end end and by nut check, described in screw rod of another connection bolt screws in The end of the free end of lower fixture simultaneously passes through nut check, and the spring is concave spring, and two end caps of the spring are two On the head of a connection bolt.
6. the novel press leak stoppage tool of oil pipeline as described in claim 1, which is characterized in that in the upper fixture and institute The buffer groove that arc is offered on the opposite inner wall of cyclic annular welding steel is stated, the edge of air bag is closely pasted with the buffer groove It closes.
CN201920112881.4U 2019-01-23 2019-01-23 The novel press leak stoppage tool of oil pipeline Active CN209484155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920112881.4U CN209484155U (en) 2019-01-23 2019-01-23 The novel press leak stoppage tool of oil pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920112881.4U CN209484155U (en) 2019-01-23 2019-01-23 The novel press leak stoppage tool of oil pipeline

Publications (1)

Publication Number Publication Date
CN209484155U true CN209484155U (en) 2019-10-11

Family

ID=68132209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920112881.4U Active CN209484155U (en) 2019-01-23 2019-01-23 The novel press leak stoppage tool of oil pipeline

Country Status (1)

Country Link
CN (1) CN209484155U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795253A (en) * 2020-07-14 2020-10-20 高奎武 Automatic plugging robot for underwater natural gas pipeline leakage and use method thereof
CN114562634A (en) * 2022-02-28 2022-05-31 国家石油天然气管网集团有限公司 Flexible oversleeve sealing liner and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795253A (en) * 2020-07-14 2020-10-20 高奎武 Automatic plugging robot for underwater natural gas pipeline leakage and use method thereof
CN111795253B (en) * 2020-07-14 2022-01-18 重庆创御智能装备有限公司 Automatic plugging robot for underwater natural gas pipeline leakage and use method thereof
CN114562634A (en) * 2022-02-28 2022-05-31 国家石油天然气管网集团有限公司 Flexible oversleeve sealing liner and preparation method thereof
CN114562634B (en) * 2022-02-28 2024-05-03 国家石油天然气管网集团有限公司 Flexible oversleeve sealing liner and preparation method thereof

Similar Documents

Publication Publication Date Title
CN209484155U (en) The novel press leak stoppage tool of oil pipeline
CN210484987U (en) Pipeline plugging device
CN203162404U (en) Cooling water pipe pressure test connector
CN204554225U (en) The outer pod apertures of a kind of first-aid clamp tears valve self-closing device open
CN206439630U (en) A kind of angle valve leak stoppage device of liquefied petroleum gas steel cylinder
CN204533955U (en) Pipe leakage stopper
CN110375149B (en) Tank bottom connecting pipe corner sand hole leakage stopping device and application thereof
CN205001756U (en) Pipeline rapid repairing device
CN202484516U (en) Auxiliary pipe orifice sealing device
CN214405001U (en) Fire-fighting equipment pressure test sealing connection assembly
CN205824479U (en) A kind of roof pressing type pipeline sand holes device for plugging
CN204474701U (en) A kind of blast furnace water-cooling but wall pressure testing device
WO2020134825A1 (en) Flexible device for rapid plugging by pressure application
CN111271533A (en) Quick pressure-resistant sealing device for pagoda type water joint
CN2752584Y (en) Pipe with press releasing hoop plugging device
CN203490128U (en) Tension test device for gate valve rod
CN204153359U (en) Demountable tube joint
CN205013959U (en) Small -bore pipeline under pressure presses plugging device in area
CN219624817U (en) Clamping tool for welding type valve flow test
CN204893856U (en) Dismouting piston nut's clamping tools
CN212107360U (en) Quick pressure-resistant sealing device for pagoda type water joint
CN214500485U (en) Anchor type pipe plug
CN220912585U (en) Portable pressure testing frock
CN218954347U (en) Quick plugging device for flange
CN220470894U (en) Quick leak-stopping tool for pipeline end

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant