CN2094618U - Protecting device for tunnel construction - Google Patents

Protecting device for tunnel construction Download PDF

Info

Publication number
CN2094618U
CN2094618U CN 91216493 CN91216493U CN2094618U CN 2094618 U CN2094618 U CN 2094618U CN 91216493 CN91216493 CN 91216493 CN 91216493 U CN91216493 U CN 91216493U CN 2094618 U CN2094618 U CN 2094618U
Authority
CN
China
Prior art keywords
tunnel
column
truss
construction
protector according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 91216493
Other languages
Chinese (zh)
Inventor
赵焰炎
刘真
吴宝麟
翟东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI AN SCIENCE AND TECHNOLOGY I
Original Assignee
XI AN SCIENCE AND TECHNOLOGY I
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI AN SCIENCE AND TECHNOLOGY I filed Critical XI AN SCIENCE AND TECHNOLOGY I
Priority to CN 91216493 priority Critical patent/CN2094618U/en
Publication of CN2094618U publication Critical patent/CN2094618U/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a protecting device for the tunnel construction which is used for the railway tunnel, in particular to a maintenance device for the extension and the construction of the electrized railway tunnel. The whole structure of the utility model is an assembling-type steel construction in the closed-type screwed connection. The extend and the construction of the electrized railway tunnel can be carried out under the condition of ensuring that the power is not fail, and the traveling can not stopped, for example the removing and the replacement of the tunnel liner, the enlargement of the cross section of the tunnel, etc. The utility model provides the new construction equipment for reforming the existing line of the railway, and adding the double line. The utility model can also be used for the extension and the construction in the non-electrized railway tunnel. The safety is high.

Description

Protecting device for tunnel construction
The utility model relates to a kind of railway tunnel that is used for, particularly electrified railway tunnels enlarging, construction maintenance unit.
Do not having a power failure, under the situation about not cutting off traffic, transforming railway tunnel, to Development of Railway, improving transport capacity has been a difficult problem of being badly in need of solution.Tunnel reconstruction work is to carry out under the condition that has a power failure, cuts off traffic both at home and abroad at present." railway track top architectural furniture " (Chinese patent: 86204286.0) of railway scientific research institution, Xi'an development, solved the problem of livewire work, make in bright, the hangar tunnel construction of electrified sections and accomplish uninterrupted operation, improve efficiency of construction greatly, reduced the conveyance loss that causes because of power failure.But said apparatus is that the enlarging construction in wired tunnel is inapplicable for electric railway, still need have a power failure, and cuts off traffic, and constructs.
The utility model is according to the deficiency of prior art, a kind of new design scheme has been proposed, design a kind of constructing tunnel protector, purpose provides a kind of constructing tunnel equipment that neither cuts off traffic and can guarantee construction safety in electrified railway tunnels, can be used for removing or change tunnel lining is promptly arranged, enlarge tunnel cross-section etc., can be used as the template of augmenting lining cutting again.Be to transform the railway existing line, increase and build multiple line new construction equipment is provided.
Technical essential of the present utility model is that total is closed, bolted pin-connected panel steel work.The arch ring of this constructing tunnel protector comprises three sections arch joints, be provided with the flank door, spiral is set on the truss upright-column to be supported and connector, rotate the leading screw that spiral supports, leading screw is tightly supportted in tunnel lining, and the leading screw that rotates connector can make and hang over the band that is embedded in the tunnel lining and collude chain link tension on the anchor pole.Longeron is provided with the transverse splicing bar under the trusses, by cross bar with hound is hinged forms.Cross bar is passing between the sleeper below the rail, near ballast aggregate.Hound is connected with following longeron by bolt, and the transverse splicing bar can be with horizontal load by hound, and cross bar passes to ballast aggregate, strengthens the stability increasing supporting capacity of whole device by the use of connector, support helix and transverse splicing bar.For preventing that quarrel stone falls into the driving gauge in the construction, arch ring is provided with steel plate, and truss upright-column is provided with band frame steel plate, also is provided with steel plate on the flank door, makes the sealing of this device, to realize safe construction.
Accompanying drawing 1 is a constructing tunnel protector elevation
Accompanying drawing 2 is a constructing tunnel protector lateral view
In accompanying drawing 1,1 is truss, and 2 for encircleing joint down, and 3 is the intermediate arches joint, and 4 is all-insulated plate, and 5 is fixed coupling unit, and 6 for band colludes anchor pole, and 7 is tunnel lining, and 8 is support helix, and 9 is cross bar, and 10 is hound, and 11 is travelling wheel, and 12 is interim rail.
In accompanying drawing 2,13 is truss upright-column, and 14 is the control sprocket wheel of flank door, 15 is driving chain, and 16 for the flank door opens and closes spiral, and 17 is the flank door, 18 is the framework of flank door, 19 is flank door bolt axle, and 20 is the vertical connecting rod of arch ring, and 21 is arch ring top steel plate, 22 is longeron on the truss, 23 is truss band frame steel plate, and 24 is longeron under the truss, and 25 is jack.
Now in conjunction with the accompanying drawings the utility model is elaborated.
The utility model total is closed, and the pin-connected panel steel work that spiral connects is by truss 1, arch joint 2,3, all-insulated plate 4, transverse splicing bar 9,10, running part 11,12, support helix 8, flank gate control sprocket wheel 14, fixed connection bar 5, driving chain 15, jack 25 grades are partly formed.Specifically be performed such: the top of the utility model both sides truss 1 is fixed with arch joint 2,3 respectively, is become a whole arch ring between arch joint 2 saves 3 with arch by bolted on connection.Change the width that intermediate arches joint 3 can change close whole device; Change column 13 height on the both sides truss 1, can change whole height of devices, to adapt to the different headroom in tunnel.Column 13 is provided with longeron 22, following longeron 24.Last longeron 22 connects with bolt and column 13 respectively mutually with following longeron 24.The arch ring 2,3 that truss 1 top is provided with connects with last longeron 22 mutually by bolt respectively.For stability and the security reliability that intensifier uses, truss upright-column 13 is provided with screw, leading screw and connects the fixed coupling unit 5 that chain link is formed, support helix 8.The screw of fixed connection spare 5 is welded on the column 13, is fixing joining link before the leading screw.Joining link hangs over to be embedded in to be with in the tunnel lining 7 and colludes on the anchor pole 6, can strain joining link or unclamp joining link by rotational lead screw.Support helix 8 is made up of screw, leading screw.Screw is welded on the column 13, and rotational lead screw tightly supports in tunnel lining 7 the leading screw supporting surface.It is by cross bar 9 and hound 10 hinged forming that the following longeron 24 of truss 1 is provided with the transverse splicing bar, and cross bar 9 passes between the sleeper of track below, is close to ballast aggregate.Hound 10 is connected with following longeron 24 by bolt, the transverse splicing bar can pass to ballast aggregate by hound 10, cross bar 9 with horizontal load, by the use of fixed connection spare 5, support helix 8 and transverse splicing bar 9,10, strengthen the stability of whole device, strengthen supporting capacity.Following arch joint 2 is provided with flank door 17, and truss upright-column 13 is provided with flank gate control sprocket wheel 14, and longeron 22 is provided with the flank door and opens and closes spiral 16 on the truss.Rotate flank gate control sprocket wheel 14, pass to the flank door by driving chain 15 and open and close spiral 16, drive flank door 17 opens around bearing pin 19 rotations or regains.Arch and tunnel top that flank door 17 opens this device of back fit tightly, be unlikely very big shock loading, before this device moves, must fall, and the withdrawal of flank door 17, make this device fall back arch ring 2,3 and tunnel vault everywhere distance equate, be convenient to mobile this device and the overhead contact built-in spare of can preventing and collide.For preventing that quarrel stone falls into the driving gauge in the construction, at arch ring 2,3, steel plate is housed respectively on the flank door 17, on truss upright-column 13, also be provided with band frame steel plate, make this device for closed.
The utility model compared with the prior art can be in the feelings that do not have a power failure, do not cut off traffic Under the condition, electrified railway tunnels is extended construction, for example remove or change tunnel-liner, enlarge tunnel cross-section etc. Be to transform Existing Railway Line, increase and build multiple line new construction equipment is provided. Simultaneously, this device also can be used for the enlarging construction in the non-electrified railway tunnel, safety, reliable. The utility model resistance to overturning is good, has stronger bearing capacity, and the ballast in can effectively preventing from constructing enters the driving gauge, the traffic safety in guaranteeing to construct.

Claims (6)

1, a kind of railway tunnel that is used for, particularly electrified railway tunnels enlarging, the construction maintenance unit, comprise truss, column, steel arch ring, traveling and electric bonding, it is characterized in that total is closed steel work, its steel arch ring is to be formed by connecting by spiral by three joint arch joints 2,3, and the steel arch ring is provided with flank door 17; Truss upright-column 13 is provided with fixed connection spare 5, support helix 8; The following longeron 24 of truss 1 is provided with by cross bar 9 and the hound 10 hinged transverse splicing bars that form.
2, constructing tunnel protector according to claim 1 is characterized in that the supporting surface of support helix 8 heads tightly supports in tunnel lining.
3, constructing tunnel protector according to claim 1 is characterized in that fixed connection spare 5 is made up of screw, leading screw and joining link; Screw is welded on the column 13, is fixed with joining link before the leading screw, and joining link hangs over the band that is embedded in the tunnel lining 7 and colludes on the anchor pole 6.
4, constructing tunnel protector according to claim 1 is characterized in that cross bar 9 passes, and is close to ballast aggregate between the sleeper of rail below.
5, constructing tunnel protector according to claim 1 is characterized in that arch joint 2,3, is respectively arranged with steel plate on the truss upright-column 13.
6, constructing tunnel protector according to claim 1, it is characterized in that flank door 17 and operating system thereof are by the flank gate control sprocket wheel 14 that is arranged on the column 13, flank door on the truss on the longeron 22 opens and closes spiral 16, and driving chain 15 and the bearing pin 19 that is arranged on the arch joint 2 constitute.
CN 91216493 1991-06-24 1991-06-24 Protecting device for tunnel construction Withdrawn CN2094618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 91216493 CN2094618U (en) 1991-06-24 1991-06-24 Protecting device for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 91216493 CN2094618U (en) 1991-06-24 1991-06-24 Protecting device for tunnel construction

Publications (1)

Publication Number Publication Date
CN2094618U true CN2094618U (en) 1992-01-29

Family

ID=4924385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 91216493 Withdrawn CN2094618U (en) 1991-06-24 1991-06-24 Protecting device for tunnel construction

Country Status (1)

Country Link
CN (1) CN2094618U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352756A (en) * 2011-07-28 2012-02-15 中铁二十二局集团第六工程有限公司 Door arc steel frame reinforcing system
CN101963060B (en) * 2010-10-15 2012-07-11 西南交通大学 Tunnel construction method based on steel tube arch-rib supporting structure
CN102797476A (en) * 2012-08-10 2012-11-28 中国建筑第四工程局有限公司 Reinforcing system for preventing partition from biasing in tunnel
CN102852548A (en) * 2012-09-03 2013-01-02 柳州市京阳节能科技研发有限公司 Safety device for construction, danger removal and blockage prevention
CN103470285A (en) * 2013-09-27 2013-12-25 福州大学 Construction device for in-situ maintenance or extension of highway tunnel
CN103485791A (en) * 2013-09-27 2014-01-01 福州大学 Construction method for in-situ maintenance or extension of road tunnel
CN104746445A (en) * 2013-12-25 2015-07-01 柳州市京阳节能科技研发有限公司 Large danger eliminating construction security device
CN110410127A (en) * 2019-07-12 2019-11-05 湖南三五二环保科技有限公司 A kind of automatic moving type coal working face withdraws device and its application method
CN110410128A (en) * 2019-07-12 2019-11-05 湖南三五二环保科技有限公司 A kind of crawler type coal working face withdraws device and its application method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963060B (en) * 2010-10-15 2012-07-11 西南交通大学 Tunnel construction method based on steel tube arch-rib supporting structure
CN102352756A (en) * 2011-07-28 2012-02-15 中铁二十二局集团第六工程有限公司 Door arc steel frame reinforcing system
CN102352756B (en) * 2011-07-28 2014-11-26 中铁二十二局集团第六工程有限公司 Door arc steel frame reinforcing system
CN102797476A (en) * 2012-08-10 2012-11-28 中国建筑第四工程局有限公司 Reinforcing system for preventing partition from biasing in tunnel
CN102852548A (en) * 2012-09-03 2013-01-02 柳州市京阳节能科技研发有限公司 Safety device for construction, danger removal and blockage prevention
CN102852548B (en) * 2012-09-03 2015-05-13 柳州市京阳节能科技研发有限公司 Safety device for construction, danger removal and blockage prevention
CN103470285A (en) * 2013-09-27 2013-12-25 福州大学 Construction device for in-situ maintenance or extension of highway tunnel
CN103485791A (en) * 2013-09-27 2014-01-01 福州大学 Construction method for in-situ maintenance or extension of road tunnel
CN104746445A (en) * 2013-12-25 2015-07-01 柳州市京阳节能科技研发有限公司 Large danger eliminating construction security device
CN110410127A (en) * 2019-07-12 2019-11-05 湖南三五二环保科技有限公司 A kind of automatic moving type coal working face withdraws device and its application method
CN110410128A (en) * 2019-07-12 2019-11-05 湖南三五二环保科技有限公司 A kind of crawler type coal working face withdraws device and its application method

Similar Documents

Publication Publication Date Title
CN201400500Y (en) Multifunctional lifter with platform for abnormal high building construction
CN206143629U (en) Super roomy gauge last quarter inspection trolley of compound section steel structure bridge
CN207932932U (en) A kind of twin beams slope Bridge Erector
CN2094618U (en) Protecting device for tunnel construction
CN209666893U (en) With the removable contact net tower wagon for grabbing rail device
CN111287498B (en) Protective shed frame for construction of overhead bridge box girder crossing railway and erection method
CN108560510A (en) Surface low road movable overhaul platform in a kind of power station
CN112814712A (en) Advanced reinforcement support bracket and moving method thereof
CN207795282U (en) A kind of tunnel steel arch frame trolley
CN218090318U (en) Device for removing temporary track and sleeper of shield tunnel
CN208218244U (en) A kind of bridge crane being conveniently replaceable electric block
CN110145317A (en) A kind of technique on shield machine's station-crossing construction method
CN211648252U (en) Mine shaft suspension safety door
CN212425191U (en) Subway evacuation platform floor device based on major diameter shield constructs
CN111364300B (en) Multifunctional construction vehicle for subway rail
CN209652753U (en) A kind of inspection trolley for the maintenance of large span truss trestle
CN210193271U (en) Automatic car device that crosses that prevents floating of mining endless rope winch wire rope
CN109079454B (en) A kind of oil cylinder of hydraulic support column provision for disengagement
CN2388220Y (en) Multi-direction light maintenance traveller for steel girder truss bridge
CN109440641A (en) A kind of inspection trolley for the maintenance of large span truss trestle
CN218025072U (en) Low-clearance gantry crane for dismantling low-clearance electricity-proof shed
CN217440023U (en) Translation trolley for oversized rectangular jacking pipe joints
CN216198258U (en) Migration system of advance reinforcing support of stope face
CN220642330U (en) Crown block for reconstruction construction of concrete pool in factory building
CN217678361U (en) Curved rail moving turnout

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
COR Change of bibliographic data

Free format text: CORRECT: DESIGNER; FROM: ZHAO YANYAN TO: ZHAO YAN

CU01 Correction of utility model patent

Correction item: Designer

Correct: Zhao Yan

False: Zhao Yanyan

Page: Fei

Correction item: Agent

Correct: Guo Yanlu

False: Guo Lu

Page: Fei

CU03 Correction of utility model patent gazette

Correction item: Designer

Correct: Zhao Yan

False: Zhao Yanyan

Number: 5

Volume: 8

Correction item: Agent

Correct: Guo Yanlu

False: Guo Lu

Number: 5

Volume: 8

ERR Gazette correction

Free format text: CORRECT: DESIGNER; FROM: ZHAO YANYAN TO: ZHAO YAN

C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
RN01 Renewal of patent term
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee