CN209457359U - Combined type promotes material platform - Google Patents

Combined type promotes material platform Download PDF

Info

Publication number
CN209457359U
CN209457359U CN201721709160.9U CN201721709160U CN209457359U CN 209457359 U CN209457359 U CN 209457359U CN 201721709160 U CN201721709160 U CN 201721709160U CN 209457359 U CN209457359 U CN 209457359U
Authority
CN
China
Prior art keywords
platform
operating platform
bearing diagonal
frame
material platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721709160.9U
Other languages
Chinese (zh)
Inventor
李福顺
翟玉辉
赖萃旺
陈习锦
李家明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi mutual construction equipment Technology Co., Ltd.
Original Assignee
Guangxi Mutual Building Materials Co Ltd Heng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Mutual Building Materials Co Ltd Heng filed Critical Guangxi Mutual Building Materials Co Ltd Heng
Priority to CN201721709160.9U priority Critical patent/CN209457359U/en
Application granted granted Critical
Publication of CN209457359U publication Critical patent/CN209457359U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of combined type promotion material platform, upper connection frame is fixed with the screw plate being connected and fixed with guide rail on the outside of the vertical tube of left and right, the front end of lateral coaming plate is connected with front side frame, there is the lateral coaming plate otic placode with holes extended downwardly in the bottom of lateral coaming plate, lateral coaming plate is connected and fixed with bolt with material platform chassis from the hole of lateral coaming plate otic placode and is integrated;Expect to connect bearing diagonal connection frame between the material platform bearing diagonal truss of left and right two of platform bearing diagonal assembly, so that the two material platform bearing diagonal truss in left and right are connected as one by bearing diagonal connection frame;The vertical side of three of operating platform upright fence post is separately connected operating platform side wall column, operating platform rear enclosure by key seat, pulley truss is connected between the left and right rail for being located at operating platform working region, the pulley truss is to connect the frame formed with upper sheer pole by left and right vertical bar.Its advantage is that being integrally fastened to guide rail, the interchangeability of component is good, and material platform and station are modularized design, can dismantle, general safety is stablized.

Description

Combined type promotes material platform
Technical field
The utility model relates to attachment type raise scaffold technical field, in particular to a kind of combined type promotes material platform.
Background technique
Chinese patent 2013205385675 discloses title are as follows: the patent document of " a kind of material hoisting platform ", the patent top Crossbeam 7 be single structure, bearing capacity is small, and small with the contact point of guide rail, so that the stability of crossbeam 7 is poor;Guide rail with it is interior Upright bar is mounted in guide rail side in parallel, and major ingredient platform and secondary material platform are successively horizontally mounted at the structure of interior upright bar 5, i.e., material platform be integrally with it is interior Upright bar is connected and fixed, so that material platform guide rail and climbing frame guide rail are inconsistent, causes interchangeability poor, and construction is complicated;Lower hanging body 13 is fixed In interior upright bar 5, so that lower hanging body 13 forms cantilever design, stress is small and unstable.
Summary of the invention
It is an object of the invention to provide one kind to be integrally fastened to guide rail, and the interchangeability of component is good, expects that platform is with station Modularized design can dismantle, general safety, and the combined type stablized promotes material platform.
Solution of the invention is such that
A kind of combined type promotion material platform, including upper connection frame, material platform platform assembly, material platform bearing diagonal assembly, operating platform Assembly, pulley truss, the material platform platform assembly include lateral coaming plate, squab panel, material platform chassis, the material platform bearing diagonal assembly packet Include left and right two material platform bearing diagonal truss, the operating platform assembly include operating platform upright fence post, operating platform rear enclosure, Operating platform side wall column, it is characterised in that: the upper connection frame includes welding the frame formed by upper lower transverse tubule and left and right vertical tube, It is fixed with the screw plate being connected and fixed with guide rail on the outside of the vertical tube of left and right, is erected the left and right of upper connection frame with bolt at screw hole Pipe is separately fixed at the guide rail of the left and right sides;The front end of the lateral coaming plate is connected with front side frame, and the front side frame two sides are Vertical pipe, wherein the front end connection of the vertical pipe and lateral coaming plate of side, the vertical pipe of the other side are connect with guide rail;In lateral coaming plate The lateral coaming plate otic placode with holes extended downwardly is arranged at bottom, is connect lateral coaming plate with material platform chassis with bolt from the hole of lateral coaming plate otic placode It is fixed as one;Bearing diagonal connection frame is connected between the material platform bearing diagonal truss of left and right two of the material platform bearing diagonal assembly, is made Two material platform bearing diagonal truss must be controlled to be connected as one by bearing diagonal connection frame;The three of the operating platform upright fence post A vertical side is respectively fixed with key seat, and the column bottom plate of bottom is provided with connecting hole;Three of operating platform upright fence post are perpendicular Straight sided is separately connected pulley truss, operating platform rear enclosure by key seat, and the bottom of operating platform upright fence post passes through connection Hole is bolted to operating platform chassis;Pulley purlin is connected between the left and right rail for being located at operating platform working region Frame, the pulley truss are to connect the frame formed with upper sheer pole by left and right vertical bar, and left and right vertical bar is bolted point It is not fixedly connected with left and right rail, the lower end in the middle part of pulley truss is hinged with pulley.
More specific technical solution further include: the material platform chassis includes expecting platform upper layer frame and Liao Tai lower layer frame, Liao Tai lower layer frame is provided with two billot platform chassis channel steels along its length, and each on material platform chassis channel steel there are two material platforms tiltedly to prop up Truss connecting hole is supportted, for being connected with material platform bearing diagonal truss, is connected between two billot platform chassis channel steels with square tube, slot Steel front end and square tube are staggered distance, for welding the connecting plate connecting with guide rail.
Further: the material platform upper layer frame uses the rectangular frame of square tubes soldering, and respectively there are three circles for frame two sides Shape hole is parallel to front end square tubes soldering together using a plurality of between frame, frame for being bolted together with lateral coaming plate A notch and material platform guide rail splice welding are opened in frame front end, expect to weld a square tube between platform guide rail splice, weld behind square tube One material platform gusset, material platform gusset also together with the frame square tubes soldering of upper layer, have on gusset one for lifting circular hole, on Layer frame front end has welded turnover panel connection otic placode.
Further: the turnover panel connection otic placode passes through the hinged turnover panel of pin shaft.
Further: operating platform chassis lower part is the frame structure formed with square tubes soldering, frame structure support Operating platform panel is fixed with two operating platform underframe support pipes, the operating platform bottom in the lower part of operating platform chassis Frame support tube is fixedly arranged at the front end with operating platform groove profile bent plate, and the slot of operating platform groove profile bent plate passes through long hole bolt and guide rail Connection;The connecting hole connecting with operating platform bearing diagonal is provided in operating platform underframe support pipe.
It is further: the operating platform panel with operating platform groove profile bent plate, with operating platform bearing diagonal junction It is provided with hole, so that: operating platform groove profile bent plate forms the structure stretched out upwards across operating platform panel, operating platform bearing diagonal Bottom is obtained through operating platform and connect with operating platform underframe support pipe.
It is further: ring-chain hoist lifting lug have been welded in the Liao Tai lower layer frame front end square tube, two ring-chain hoists are hung Ear clip is in square tube.
Further: the ring-chain hoist lifting lug connects ring-chain hoist, and the wirerope of the connection of the ring-chain hoist bypasses In the middle part of pulley truss after hinged pulley, wirerope fixing seat is fixed in end.
Further: the both ends of the operating platform bearing diagonal are welded with operating platform bearing diagonal groove profile bent plate, form card Slot structure, wherein lower end operating platform bearing diagonal groove profile bent plate passes through operating platform bearing diagonal and chassis connecting hole bolt and behaviour Make the connection of platform underframe support pipe, the operating platform bearing diagonal groove profile bent plate of upper end passes through operating platform bearing diagonal guide rail connecting hole 41 are connect with bolt with guide rail.
It is an advantage of the invention that being integrally fastened to guide rail, the interchangeability of component is good, and material platform and station are modularized design, It can dismantle, general safety is stablized.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the part Fig. 1 A enlarged diagram.
Fig. 3 is the part Fig. 1 B enlarged diagram.
Fig. 4 is Fig. 1 Local C enlarged diagram.
Fig. 5 is the part Fig. 1 D enlarged diagram.
Fig. 6 is another angular views of structure shown in Fig. 1.
Fig. 7 is the part Fig. 6 E enlarged diagram.
Fig. 8 is the part Fig. 6 F enlarged diagram.
Fig. 9 is the part Fig. 6 G enlarged diagram.
Figure 10 is material platform platform structure schematic diagram.
Figure 11 is operating platform structural schematic diagram.
Figure 12 is the structural schematic diagram that the present invention is promoted using ring-chain hoist.
Figure 13 is Figure 12 local I enlarged diagram.
Figure 14 is the present invention using the structural schematic diagram for following climbing frame to be promoted.
Figure 15 is Figure 14 local J enlarged diagram.
Figure 16 is the structural schematic diagram of upper connection frame 2.
Figure 17 is the structural schematic diagram of front side frame 3.
Figure 18 is the structural schematic diagram of lateral coaming plate 4.
Figure 19 is the positive structure schematic for expecting platform chassis 6.
Figure 20 is the structure schematic diagram for expecting platform chassis 6.
Figure 21 is the local K enlarged structure schematic diagram of Figure 19.
Figure 22 is the local L enlarged structure schematic diagram of Figure 19.
Figure 23 is 9 structural schematic diagram of operating platform upright fence post.
Figure 24 is the positive structural schematic diagram of operating platform chassis 11.
Figure 25 is the local M enlarged structure schematic diagram of Figure 24.
Figure 26 is the structural schematic diagram at 11 back side of operating platform chassis.
Figure 27 is the local O enlarged structure schematic diagram of Figure 26.
Figure 28 is the local N enlarged structure schematic diagram of Figure 24.
Figure 29 is local H enlarged structure schematic diagram.
Figure 30 is the structural schematic diagram of pulley truss 12.
Figure 31 is the structural schematic diagram of operating platform bearing diagonal 10.
Figure 32 is the structural schematic diagram of guide rail 1.
Appended drawing reference in figure are as follows: 1 is guide rail, and 2 be upper connection frame, and 3 be front side frame;4 be lateral coaming plate, and 5 be back wall Plate, 6 be material platform chassis, and 7 be bearing diagonal connection frame, and 8 material platform bearing diagonal truss, 9 be operating platform upright fence post, and 10 be behaviour Make platform bearing diagonal, 11 be operating platform chassis, and 12 be pulley truss, 13 be operating platform rear enclosure, and 14 is flat for operation Platform side wall column, 15 be material platform cover, and 16 be wall-attached supporting seat, and 17 be reprint, and 18 be ring-chain hoist, and 19 be wirerope, and 20 be steel wire Rope fixing seat, 21 be connection frame pull rod, and 22 promote connection frame for material platform, and 23 be the first column key seat, and 24 be the second column key seat, 25 be column bottom plate, and 26 be pulley truss pasting board, and 27 be pulley truss connecting screw hole, and 28 be upper layer frame, and 29 be lower layer's frame, 30 be material platform gusset, and 31 be material platform guide rail splice, and 32 be turnover panel connection otic placode, and 33 be material platform guide rail splice screw hole, and 34 are Expect that platform lifts ear, 35 be ring-chain hoist lifting lug, and 36 be operating platform groove profile bent plate, and 37 be long hole, and 38 be operating platform bearing diagonal Connecting hole, 39 be material platform bearing diagonal truss connecting hole, and 40 be operating platform bearing diagonal groove profile bent plate, and 41 be operating platform bearing diagonal Guide rail connecting hole, 42 be operating platform bearing diagonal and chassis connecting hole, and 43 is are the slot of channel steel with guide rail frame body connecting pin, 44, 45 be the hole in square tube, and 46 be screw plate, and 47 be connection frame diagonal bracing pipe, and 48 erect support tube for connection frame, and 49 paste for connection frame Plate, 50 be front side frame first through hole, and 51 be the second through-hole of front side frame, and 52 be lateral coaming plate otic placode, and 53 is logical for lateral coaming plate first Hole, 54 be the second through-hole of lateral coaming plate, and 55 be pulley, and 56 be building.
Specific embodiment
As shown in Figure 1, combined type of the invention promotes material platform, including upper connection frame 2, material platform platform assembly, material platform tiltedly prop up Assembly, operating platform assembly, pulley truss 12 are supportted, the material platform platform assembly includes lateral coaming plate 4, squab panel 5, expects platform chassis 6, The material platform bearing diagonal assembly includes the two material platform bearing diagonal truss 8 in left and right, and the operating platform assembly includes that operating platform encloses Column column 9, operating platform rear enclosure 13, operating platform side wall column 14.
As shown in figure 16, the upper connection frame 2 includes welding the frame formed by upper lower transverse tubule and left and right vertical tube, in frame Interior welded connecting frame diagonal bracing pipe 47, connection frame erect support tube 48 to increase intensity, are fixed with and lead on the outside of the vertical tube of left and right Screw plate 46 that rail is connected and fixed simultaneously is welded to connect frame pasting board 49 and is reinforced, with bolt by a left side for upper connection frame 2 at screw hole Right vertical tube is separately fixed at the guide rail of the left and right sides.
The front end of the lateral coaming plate 4 is connected with front side frame 3 as shown in figure 17, and 3 two sides of front side frame are vertical Pipe, wherein the vertical pipe of side is connect by front side frame first through hole 50 with the front end of lateral coaming plate 4, the vertical pipe of the other side The second through-hole of front side frame 51 is connect with guide rail.
As shown in Fig. 8, Figure 18, there is the lateral coaming plate otic placode 52 with holes extended downwardly in the bottom of lateral coaming plate 4, from lateral coaming plate Lateral coaming plate 4 and material platform chassis 6 are connected and fixed and are integrated with bolt at the hole of otic placode 52, lateral coaming plate first through hole 53 with bolt with Front side frame 3 connects, and the bolt of the second through-hole of lateral coaming plate 54 is connect with squab panel 5.
Connect as shown in Figure 1, connecting bearing diagonal between the material platform bearing diagonal truss 8 of the left and right of the material platform bearing diagonal assembly two Frame 7 is connect, so that the material platform bearing diagonal truss 8 of left and right two is connected as one by bearing diagonal connection frame 7, on platform bearing diagonal truss 8 End is connect with material platform chassis 6, and lower end by channel steel with guide rail as shown in figure 3, connect.
As shown in figure 25, the operating platform upright fence post 9 is square tube, is respectively fixed with two three vertical sides First column key seat 23 and a second column key seat 24, the column bottom plate 25 of bottom are provided with connecting hole;Operating platform fence The vertical side of three of column 9 passes through two 23 attended operation platform side fences 14 of the first column key seat, the second column key seat 24 The bottom of attended operation platform rear enclosure 13, operating platform upright fence post 9 is fixed by the connecting hole of column bottom plate 25 with bolt In operating platform chassis 11.
As shown in figure 30, it is connected with pulley truss 12 between the left and right rail for being located at operating platform working region, it is described Pulley truss 12 is to connect the frame formed with upper sheer pole by left and right vertical bar, and left and right vertical bar opens that there are three the connections of pulley truss Screw hole 27, is bolted and is fixedly connected respectively with left and right rail, is hinged with pulley 55 in the lower end at 12 middle part of pulley truss, To increase intensity, pulley truss pasting board 26 is fixed in vertical bar and cross bar junction.
As shown in figures 19-22, the material platform chassis 6 includes material platform upper layer frame 28 and Liao Tai lower layer frame 29, expects platform Lower layer's frame 29 is provided with two billot platform chassis channel steels along its length, and each on material platform chassis channel steel there are two expect platform bearing diagonal Truss connecting hole 39, for material platform bearing diagonal truss 8 be connected with, connected between two billot platform chassis channel steels with square tube, Channel steel front end and square tube are staggered distance, for welding the connecting plate connecting with guide rail.
The material platform upper layer frame 28 uses the rectangular frame of square tubes soldering, and respectively there are three round holes for frame two sides, uses It is bolted together in lateral coaming plate 4, is parallel to front end square tubes soldering together using a plurality of between frame, frame front end It opens a notch and material platform guide rail splice 31 welds, weld a square tube between the material platform guide rail splice of left and right, welded behind square tube Connect a material platform gusset, material platform gusset also together with the frame square tubes soldering of upper layer, expect to have on platform gusset one for lifting Circular hole, upper layer frame front end have welded turnover panel connection otic placode 32, and the turnover panel connection otic placode 32 passes through the hinged turnover panel 17 of pin shaft.
As shown in Figure 25-28,11 lower part of operating platform chassis is the frame structure formed with square tubes soldering, frame knot Structure supports operating platform panel, is fixed with two operating platform underframe support pipes, the behaviour in the lower part of operating platform chassis 11 That makees platform underframe support pipe is fixedly arranged at the front end with operating platform groove profile bent plate 36, and the slot of operating platform groove profile bent plate 36 passes through long hole It is connect with bolt with guide rail;The operating platform connecting with operating platform bearing diagonal 10 is provided in operating platform underframe support pipe tiltedly to prop up Support connecting hole 38.
The operating platform panel is provided with operating platform groove profile bent plate 36, with 10 junction of operating platform bearing diagonal Hole, so that: operating platform groove profile bent plate 36 forms the structure stretched out upwards across operating platform panel, operating platform bearing diagonal 10 Bottom is obtained through operating platform and connect with operating platform underframe support pipe.
As shown in figure 20, ring-chain hoist lifting lug 35, two loop chain calabashes have been welded in the Liao Tai lower layer frame front end square tube Reed lifting lug 35 is clipped in square tube.
As shown in figure 12, the ring-chain hoist lifting lug 35 connects ring-chain hoist 19, the steel of the connection of the ring-chain hoist 19 After cord 19 is around the hinged pulley 55 in 12 middle part of pulley truss, wirerope fixing seat 20 is fixed in end.
As shown in figure 32, the both ends of the operating platform bearing diagonal 10 are welded with operating platform bearing diagonal groove profile bent plate 40, Notch is formed, wherein lower end operating platform bearing diagonal groove profile bent plate 40 passes through operating platform bearing diagonal and chassis connecting hole 42 It is connect with bolt with operating platform underframe support pipe, the operating platform bearing diagonal groove profile bent plate 40 of upper end is tiltedly propped up by operating platform Support guide rail connecting hole 41 bolt is connect with guide rail.
The structure of guide rail 1 of the invention is identical as traditional climbing frame guide rail, has absolute interchangeability, the slot of channel steel therein 44 play the guiding role of vertical direction, and the hole 45 in square tube is used to connect with material rack body.
The present invention has the following two kinds hoisting way:
Hoisting way one:
It is as shown in figure 12 by the way of ring-chain hoist promotion, the ring-chain hoist that ring-chain hoist 18 hangs over material platform chassis is hung On ear 35, the chain and 19 drawknot of wirerope of ring-chain hoist are good, and 19 other end of wirerope is fixed in wirerope fixing seat 20, steel Cord fixing seat 20 is fixed in building 56, and when ring-chain hoist 18 is promoted, material platform is also and then promoted, to achieve the goal. Operating platform effect is: when expecting that platform is promoted, operator need to dismantle or install on the operational platform wirerope and ring-chain hoist Drawknot node, having been promoted every time all needs a wirerope fixing seat up one layer of installation.
Hoisting way two:
As shown in Figure 14,15, it will expect that platform promotes connection frame 22 and is mounted on the guide rail of material platform guide rail bracket and climbing frame respectively, when When material platform needs to be promoted, connection frame pull rod 21 need to only be linked together climbing frame and material platform, at guide rail frame body connecting pin 43 Be fixed on climbing frame guide rail, so that it may as climbing frame promoted to desired position, every time in sequence 21 after the completion of promotion Shackle is removed, and prevents material platform from occurring to be related to climbing frame when safety accident, this mode is convenient and efficient, advantageously reduces labour.

Claims (9)

1. a kind of combined type promotes material platform, including upper connection frame (2), material platform platform assembly, material platform bearing diagonal assembly, operating platform Assembly, pulley truss (12), the material platform platform assembly include lateral coaming plate (4), squab panel (5), material platform chassis (6), the material Platform bearing diagonal assembly includes the two material platform bearing diagonal truss (8) in left and right, and the operating platform assembly includes that operating platform fence is vertical Column (9), operating platform rear enclosure (13), operating platform side wall column (14), it is characterised in that: the upper connection frame (2) include by Upper lower transverse tubule and left and right vertical tube weld the frame to be formed, and the screw hole being connected and fixed with guide rail is fixed on the outside of the vertical tube of left and right The left and right vertical tube of upper connection frame (2) is separately fixed at the guide rail of the left and right sides by plate at screw hole with bolt;The lateral coaming plate (4) front end is connected with front side frame (3), and front side frame (3) two sides are vertical pipe, wherein the vertical pipe and side wall of side The front end of plate (4) connects, and the vertical pipe of the other side is connect with guide rail;There is the side with holes extended downwardly in the bottom of lateral coaming plate (4) Coaming plate otic placode (52), being connected and fixed lateral coaming plate (4) and material platform chassis (6) with bolt from the hole of lateral coaming plate otic placode (52) is one Body;Bearing diagonal connection frame (7) are connected between the material platform bearing diagonal truss (8) of left and right two of the material platform bearing diagonal assembly, so that The material platform bearing diagonal truss (8) of left and right two is connected as one by bearing diagonal connection frame (7);The operating platform upright fence post (9) the vertical side of three is respectively fixed with key seat, and the column bottom plate of bottom is provided with connecting hole;Operating platform upright fence post (9) the vertical side of three is separately connected operating platform side wall column (14), operating platform rear enclosure (13) by key seat, and operation is flat The bottom of platform upright fence post (9) is bolted to operating platform chassis (11) by connecting hole;It works being located at operating platform It is connected between the left and right rail in region pulley truss (12), the pulley truss (12) is to be connected by left and right vertical bar and upper sheer pole The frame to be formed is connect, left and right vertical bar is bolted to be fixedly connected with left and right rail respectively, in the middle part of pulley truss (12) Lower end be hinged with pulley (55).
2. combined type according to claim 1 promotes material platform, it is characterised in that: the material platform chassis (6) includes material platform Upper layer frame (28) and Liao Tai lower layer frame (29), Liao Tai lower layer frame (29) are provided with two billot platform chassis slots along its length Steel, it is each there are two platform bearing diagonal truss connecting hole is expected on material platform chassis channel steel, for using bolt with material platform bearing diagonal truss (8) Connection is connected with square tube between two billot platform chassis channel steels, and channel steel front end and square tube are staggered distance, is connect for welding with guide rail Connecting plate.
3. combined type according to claim 2 promotes material platform, it is characterised in that: the material platform upper layer frame uses square tube Be welded into rectangular frame, respectively there are three round holes for frame two sides, for being bolted together with lateral coaming plate (4), frame it Between be parallel to front end square tubes soldering together using a plurality of, frame front end opens a notch and material platform guide rail splice (31) welding, Weld a square tube between material platform guide rail splice, a material platform gusset welded behind square tube, expect platform gusset also with upper layer frame side Pipe welds together, have on gusset one for lifting circular hole, upper layer frame front end welded turnover panel connection otic placode (32).
4. combined type according to claim 3 promotes material platform, it is characterised in that: the turnover panel connection otic placode (32) passes through The hinged turnover panel of pin shaft (17).
5. combined type according to claim 1 promotes material platform, it is characterised in that: operating platform chassis (11) lower part is The frame structure formed with square tubes soldering, frame structure support operating platform panel, solid in the lower part of operating platform chassis (11) Surely there are two operating platform underframe support pipes, the operating platform underframe support pipe is fixedly arranged at the front end with operating platform groove profile bent plate (36), the slot of operating platform groove profile bent plate (36) is connect by long hole bolt with guide rail;It is opened in operating platform underframe support pipe There is the connecting hole connecting with operating platform bearing diagonal (10).
6. combined type according to claim 5 promotes material platform, it is characterised in that: the operating platform panel is flat with operation Platform groove profile bent plate (36) is provided with hole with operating platform bearing diagonal (10) junction, so that: operating platform groove profile bent plate (36) formation The structure stretched out upwards across operating platform panel, operating platform bearing diagonal (10) bottom is obtained through operating platform and operation is flat The connection of platform underframe support pipe.
7. combined type according to claim 2 promotes material platform, it is characterised in that: in the Liao Tai lower layer frame front end square tube It has welded ring-chain hoist lifting lug (35), two ring-chain hoist lifting lugs (35) are clipped in square tube.
8. combined type according to claim 7 promotes material platform, it is characterised in that: ring-chain hoist lifting lug (35) connection ring Chain block (18), the wirerope (19) of the connection of the ring-chain hoist (18) is around pulley hinged in the middle part of pulley truss (12) (55) after, wirerope fixing seat (20) are fixed in end.
9. combined type according to claim 5 promotes material platform, it is characterised in that: the two of the operating platform bearing diagonal (10) End is welded with operating platform bearing diagonal groove profile bent plate (40), forms notch, wherein lower end operating platform bearing diagonal groove profile is curved Plate (40) is connect by operating platform bearing diagonal with chassis connecting hole (42) with bolt with operating platform underframe support pipe, upper end Operating platform bearing diagonal groove profile bent plate (40) is connect by operating platform bearing diagonal guide rail connecting hole (41) bolt with guide rail.
CN201721709160.9U 2017-12-11 2017-12-11 Combined type promotes material platform Active CN209457359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721709160.9U CN209457359U (en) 2017-12-11 2017-12-11 Combined type promotes material platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721709160.9U CN209457359U (en) 2017-12-11 2017-12-11 Combined type promotes material platform

Publications (1)

Publication Number Publication Date
CN209457359U true CN209457359U (en) 2019-10-01

Family

ID=68034844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721709160.9U Active CN209457359U (en) 2017-12-11 2017-12-11 Combined type promotes material platform

Country Status (1)

Country Link
CN (1) CN209457359U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984593A (en) * 2019-11-21 2020-04-10 中欧国际建工集团有限公司 Assembly type building construction unloading platform and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984593A (en) * 2019-11-21 2020-04-10 中欧国际建工集团有限公司 Assembly type building construction unloading platform and construction method thereof
CN110984593B (en) * 2019-11-21 2021-05-28 中欧国际建工集团有限公司 Assembly type building construction unloading platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN109973112B (en) Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof
CN209457359U (en) Combined type promotes material platform
CN201486120U (en) Detachable steel column connecting construction operation platform
CN212246007U (en) Be used for tower crane bracket welded portable platform
CN211368423U (en) Stay cable tower top lifting traction operation platform
CN218149656U (en) Operating platform in lighting well
CN208310204U (en) Base for supporting and arranging elevator shaft coupling beam template
CN204980945U (en) Supplementary tower crane dismounting device
CN213509662U (en) Diamond device for integral lifting of large-span structure
CN214575559U (en) Elevator shaft assembly type construction operation platform
CN213597445U (en) Lower section track of lifting scaffold
CN203808486U (en) Steel pipe scaffold follow-up platform
CN217102749U (en) Roof large-scale steel beam sliding system
CN210316536U (en) Combined truss for early-dismantling formwork system
CN208964378U (en) The leading truck for preventing steel strand wires from knotting in Steel corridor entirety lifting process
CN109972845A (en) Method for mounting steel roof truss
CN212671236U (en) Steel construction rack whole lifting support frame
CN213294440U (en) Lifting device for integral frame of upright post and roof girder
CN219509259U (en) Safety rope connecting device
CN220080723U (en) Foldable welding cage
CN219622223U (en) Novel scaffold structure
CN219993071U (en) Folding hanging basket for steel structure beam high-altitude operation
CN217581440U (en) Pin-connected panel can have enough to meet need steel construction passageway of going up to one's residence
CN219973857U (en) Super high parapet does not have counter weight hanging flower basket suspension
CN217782808U (en) Hanging basket support for installing tower crown structure of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Keelung Village Industrial Park, Liuzhou City, Iraq Liunan District No. 2 the Guangxi Zhuang Autonomous Region 545000

Patentee after: Guangxi mutual construction equipment Technology Co., Ltd.

Address before: Keelung Village Industrial Park, Liuzhou City, Iraq Liunan District No. 2 the Guangxi Zhuang Autonomous Region 545000

Patentee before: Guangxi mutual building materials Co., Ltd. Heng