- CN209443766U CN209443766U CN201822049159.9U CN201822049159U CN209443766U CN 209443766 U CN209443766 U CN 209443766U CN 201822049159 U CN201822049159 U CN 201822049159U CN 209443766 U CN209443766 U CN 209443766U
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- mould plate
- alloy mould
- back cord
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a kind of pouring models for building, including the first aluminum alloy mould plate, second aluminum alloy mould plate, first reinforces back cord, second reinforces back cord and screw rod, the first gap between first aluminum alloy mould plate and the second aluminum alloy mould plate surrounds the first pouring region, the outer wall of first aluminum alloy mould plate and the outer wall of the second aluminum alloy mould plate are respectively arranged with described first and reinforce back cord and the second reinforcing back cord, screw rod sequentially passes through the first reinforcing back cord, first aluminum alloy mould plate, first pours region, second aluminum alloy mould plate and second reinforces back cord, and it is locked together.The casting cement mortar in the first pouring region can pour into wall, the first aluminum alloy mould plate, the second aluminum alloy mould plate, the first reinforcing back cord, the second reinforcing back cord and screw rod are removed after cement mortar solidification, simply, fast, and aluminium alloy quality is light, turnover is convenient, greatly improves construction effect.
Description
Technical field
The utility model relates to building field, in particular to a kind of pouring model for building.
Background technique
Assembled architecture mode is a main trend of national construction industry development, and the prefabricated of complex component can largely reduce mould
Plate application area improves concrete formation effect.Existing PC assembled architecture under conditions of meeting prefabricated rate and assembly rate,
Rest part mostly uses wooden model to construct, and in conjunction with the reinforcing mode of traditional wooden model, lifts PC component, last casting concrete.
In above-mentioned technical proposal, cast-in-place construction technology is reinforced using PC component and traditional wooden model, in PC component and cast-in-place
Junction joint reinforcing is difficult, while application wooden model usable floor area is reduced, and unit price is significantly promoted, and leads to increased costs.
Wooden model Forming Quality gap compared with PC molding component quality is larger simultaneously, it is difficult to reach the requirement of trowel free process, it is in addition wooden
Mould construction needs mechanical engagement, reduces the installation effectiveness of PC component.
Utility model content
The utility model provides a kind of high turnover, sustainable use, assembles simple, at low cost and installation effectiveness can be improved
A kind of pouring model for building.
Purpose of the utility model is realized as follows:
A kind of pouring model for building, including the first aluminum alloy mould plate, the second aluminum alloy mould plate, first reinforce back cord,
Second reinforcing back cord and screw rod, the first gap between first aluminum alloy mould plate and the second aluminum alloy mould plate surround first and pour
Irrigated area domain, the outer wall of first aluminum alloy mould plate and the outer wall of the second aluminum alloy mould plate are respectively arranged with described first and reinforce back
Stupefied and described second reinforces back cord, screw rod sequentially passes through the first reinforcing back cord, the first aluminum alloy mould plate, first pours region, the
Two aluminum alloy mould plates and the second reinforcing back cord are simultaneously locked together.First aluminum alloy mould plate and the second aluminum alloy mould plate enclose
At first pour region, worker by screw rod sequentially pass through the first reinforcing back cord, the first aluminum alloy mould plate, first pouring region,
Second aluminum alloy mould plate and the second reinforcing back cord are simultaneously locked together composition pouring model, then pour in the first pouring region
Cement mortar of pouring water can pour into wall, remove the first aluminum alloy mould plate, the second aluminum alloy mould plate, the after cement mortar solidification
One reinforces back cord, second reinforces back cord and screw rod, and assembling is simple, fast, and aluminium alloy quality is light, Gao Zhouzhuan, can
Sustainable utilization, thus it is at low cost and greatly improve construction efficiency.
The purpose of this utility model can also be solved using following technical measures:
As more specific scheme, first aluminum alloy mould plate and the second aluminum alloy mould plate are " L " type aluminium alloy mould
Plate.
As more specific scheme, first aluminum alloy mould plate and the second aluminum alloy mould plate are arranged to be in the same direction, and first
Corner midpoint line between aluminum alloy mould plate and the second aluminum alloy mould plate and the angle a between horizontal plane are 45 degree, described the
One reinforces the both ends difference of back cord, the first aluminum alloy mould plate, the first pouring region, the second aluminum alloy mould plate and the second reinforcing back cord
It is equipped with screw rod and is locked together by screw rod, model is poured with formation " L " type.
It further include having PCF plate as more specific scheme, the PCF plate outer wall is provided with PCF plate and reinforces back cord, described
First aluminum alloy mould plate and the second aluminum alloy mould plate are in the same horizontal line and backwards to setting, the first aluminum alloy mould plate and second
Aluminum alloy mould plate surrounds the first pouring region of vertical line-styled, and described first reinforces back cord, the first aluminum alloy mould plate, first
The upper end for pouring region, the second aluminum alloy mould plate and the second reinforcing back cord is equipped with the screw rod and locks, and the PCF plate is set
It sets in the lower section of the first aluminum alloy mould plate and the second aluminum alloy mould plate, and the PCF plate and the first aluminum alloy mould plate, the second aluminium close
There is gap between golden template and forms the lateral pouring of line-styled second region, described first reinforces back cord, the first aluminium alloy mould
Plate, lateral line-styled second, which are poured, to be equipped with the first PCF plate screw rod between region, PCF plate and PCF plate reinforcing back cord and locks
Tightly, described second back cord, the second aluminum alloy mould plate, the lateral pouring of line-styled second region, PCF plate and the reinforcing of PCF plate are reinforced
It is equipped with the 2nd PCF plate screw rod between back cord and locks, the first of the vertical line-styled pours region and laterally " one " word
Type second pours region and collectively forms " T " font pouring model.
As more specific scheme, first aluminum alloy mould plate and the second aluminum alloy mould plate are line-styled aluminium alloy
Template.
As more specific scheme, first aluminum alloy mould plate and the second aluminum alloy mould plate are arranged in parallel, institute
State the both ends of the first reinforcing back cord, the first aluminum alloy mould plate, the first pouring region, the second aluminum alloy mould plate and the second reinforcing back cord
It is equipped with the screw rod respectively and locks, pours region to form line-styled first.
It further include having big diagonal brace as more specific scheme, back cord or second is reinforced in big diagonal brace one end connection first
The top of back cord is reinforced, the other end offsets with ground.
It further include having small diagonal brace as more specific scheme, back cord or second is reinforced in small diagonal brace one end connection first
The lower part of back cord is reinforced, the other end offsets with ground.
As more specific scheme, the big diagonal brace, the first reinforcing back cord or the second reinforcing back cord and small diagonal brace enclose jointly
Triangle.
The beneficial effects of the utility model are as follows:
The utility model, first aluminum alloy mould plate and the second aluminum alloy mould plate surround the first pouring region, Gong Rentong
Cross screw rod sequentially pass through the first reinforcing back cord, the first aluminum alloy mould plate, first pour region, the second aluminum alloy mould plate and second plus
Gu back cord is simultaneously locked together composition pouring model, then casting cement mortar can pour into wall in the first pouring region
Body removes the first aluminum alloy mould plate, the second aluminum alloy mould plate, the first reinforcing back cord, the second reinforcing back after cement mortar solidification
Stupefied and screw rod, simply, fast, and aluminium alloy quality is light, turnover is convenient, greatly improves construction effect.
The utility model can also add diagonal brace, and diagonal brace, which up supports, pours model, improve the support ability for pouring model,
It avoids pouring phenomena such as wall tilts, improves the practicability for pouring model.
Detailed description of the invention
Fig. 1 is " L " the type pouring model that the utility model pours model.
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Fig. 3 is " L " type pouring model (being provided with big diagonal brace and small diagonal brace) that the utility model pours model.
Fig. 4 is the B-B cross-sectional view of Fig. 3.
Fig. 5 is the line-styled pouring model that the utility model pours model.
Fig. 6 is the C-C cross-sectional view of Fig. 1.
Fig. 7 is line-styled pouring model (being provided with big diagonal brace and small diagonal brace) that the utility model pours model.
Fig. 8 is the D-D cross-sectional view of Fig. 3.
Fig. 9 is " T " the font pouring model that the utility model pours model.
Figure 10 is the E-E cross-sectional view of Fig. 1.
Figure 11 is " T " font pouring model (being provided with big diagonal brace and small diagonal brace) that the utility model pours model.
Figure 12 is the F-F cross-sectional view of Fig. 3.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and embodiments:
Embodiment 1, in conjunction with Fig. 1 to Fig. 2, a kind of pouring model for building is that " L " type pours model 100, " L " type
Pouring model 100 includes the first aluminum alloy mould plate 1, the second aluminum alloy mould plate 2, first reinforcing reinforcing of back cord 3, second 4 and of back cord
Screw rod 5.The screw rod that the screw rod 5 is 18 millimeters of diameter, first aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2 are " L "
Type aluminum alloy mould plate, 1 outer wall of the first aluminum alloy mould plate are provided with the first reinforcing back cord 3, and 2 outer wall of the second aluminum alloy mould plate is provided with
Second reinforces back cord 4, and first aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2 are setting, and the first aluminum alloy mould plate in the same direction
Angle a between 1 and the second corner midpoint line and horizontal plane between aluminum alloy mould plate 2 is 45 degree, first aluminium alloy
The first gap between template 1 and the second aluminum alloy mould plate 2 surrounds the first pouring region 6, and described first reinforces back cord 3, first
The both ends that aluminum alloy mould plate 1, first pours region 6, the second aluminum alloy mould plate 2 and the second reinforcing back cord 4 are equipped with screw rod respectively
It 5 and is locked together by screw rod 5, model 100 is poured with formation " L " type.
In conjunction with shown in Fig. 3 to Fig. 4, " L " type pours 100 height of model and is greater than 350 millimeters, and " L " type pours mould
Type 100 is provided with big diagonal brace 7 and small diagonal brace 8, and 3 top of back cord is reinforced in the one group big diagonal brace, 7 one end connection first, the other end with
Ground offsets, and the lower part of back cord 3 is reinforced in small 8 one end of diagonal brace connection first, and the other end offsets with ground, the big diagonal brace 7,
First reinforcing back cord 3 and small diagonal brace 8 enclose triangle jointly, and 7 one end of another group big diagonal brace connection second is reinforced on back cord 4
Portion, the other end offset with ground, and the lower part of back cord 4 is reinforced in small 8 one end of diagonal brace connection second, and the other end offsets with ground,
The big diagonal brace 7, second reinforces back cord 4 and small diagonal brace 8 encloses triangle jointly, pours model 100 for support " L " type.
Embodiment 2, in conjunction with Fig. 5 to Fig. 6, a kind of pouring model for building is that line-styled pours model 200, described
It includes the first aluminum alloy mould plate 1, the reinforcing reinforcing of back cord 3, second of the second aluminum alloy mould plate 2, first that line-styled, which pours model 200,
Back cord 4 and screw rod 5.The screw rod that the screw rod 5 is 18 millimeters of diameter, first aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2
It is line-styled aluminum alloy mould plate.First aluminum alloy mould plate, 1 outer wall is provided with the first reinforcing back cord 3, the second aluminum alloy mould plate 2
Outer wall is provided with the second reinforcing back cord 4, and first aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2 are arranged in parallel, institute
It states the first gap between the first aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2 and surrounds the first pouring region 6, described first adds
Gu the both ends that back cord 1, the first aluminum alloy mould plate 1, first pour region, the second aluminum alloy mould plate and the second reinforcing back cord are worn respectively
It equipped with the screw rod and locks, pours region to form line-styled first.
In conjunction with shown in Fig. 7 to Fig. 8, the line-styled pours 200 height of model and is greater than 350 millimeters, the line-styled
It pours model 200 and is provided with big diagonal brace 7 and small diagonal brace 8,3 top of back cord is reinforced in the one group big diagonal brace, 7 one end connection first, separately
One end offsets with ground, and the lower part of back cord 4 is reinforced in small 8 one end of diagonal brace connection second, and the other end offsets with ground, described big
Diagonal brace 7, first reinforces back cord 3 and small diagonal brace 8 encloses triangle jointly, and back is reinforced in 7 one end of another group big diagonal brace connection second
Stupefied 4 top, the other end offset with ground, and the lower part of back cord 4, the other end and ground are reinforced in small 8 one end of diagonal brace connection second
It offsets, the big diagonal brace 7, second reinforces back cord 4 and small diagonal brace 8 encloses triangle jointly, pours model for support line-styled
200。
Embodiment 3, in conjunction with Fig. 9 to Figure 10, a kind of pouring model for building is that " T " font pours model 300, described
It includes the first aluminum alloy mould plate 1, the reinforcing reinforcing of back cord 3, second of the second aluminum alloy mould plate 2, first that " T " font, which pours model 300,
Back cord 4, PCF plate 9, PCF plate reinforce back cord 10, first and reinforce the reinforcing back cord 2 of back cord 1, second and screw rod 5.The screw rod 5 is straight
The screw rod that 18 millimeters of diameter, first aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2 are " L " type aluminum alloy mould plate.
First aluminum alloy mould plate, 1 outer wall is provided with the first reinforcing back cord 3, and 2 outer wall of the second aluminum alloy mould plate is provided with
Second reinforces back cord 4, and first aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2 are arranged in the same horizontal line and backwards,
First aluminum alloy mould plate 1 and the second aluminum alloy mould plate 2 surround the first pouring region 6 of vertical line-styled, and described first reinforces
The upper end that back cord 3, the first aluminum alloy mould plate 1, first pour region 6, the second aluminum alloy mould plate 2 and the second reinforcing back cord 4 is worn
There is the screw rod 5 and locks.
9 outer wall of PCF plate is provided with the PCF plate and reinforces back cord 10, and the PCF plate 9 is arranged in the first aluminium alloy mould
The lower section of plate 1 and the second aluminum alloy mould plate 2, and between the PCF plate 9 and the first aluminum alloy mould plate 1, the second aluminum alloy mould plate 2
There is gap and forms the lateral pouring of line-styled second region 11, described first reinforces back cord 3, the first aluminum alloy mould plate 1, transverse direction
Line-styled second, which is poured, to be equipped with the first PCF plate screw rod 13 between region 11, PCF plate 9 and PCF plate reinforcing back cord 10 and locks
Tightly, described second back cord 3, the second aluminum alloy mould plate 2, the lateral pouring of line-styled second region 11, PCF plate 9 and PCF plate are reinforced
It reinforces and is equipped with the 2nd PCF plate screw rod 12 between back cord 10 and locks, the first of the vertical line-styled pours 6 He of region
Lateral line-styled second pours region 11 and collectively forms " T " font pouring model 300.
" T " font in conjunction with described in Figure 11 to Figure 12 pours 300 height of model and is greater than 350 millimeters, and " T " font is poured
Model 300 is provided with big diagonal brace 7 and small diagonal brace 8, and 3 top of back cord, the other end are reinforced in the one group big diagonal brace, 7 one end connection first
It offsets with ground, the lower part of back cord 3 is reinforced in the one group small diagonal brace, 8 one end connection first, and the other end offsets with ground, described big
Diagonal brace 7, first reinforces back cord 3 and small diagonal brace 8 encloses triangle jointly, and back is reinforced in 7 one end of another group big diagonal brace connection second
Stupefied 4 top, the other end offset with ground, and the lower part of back cord 4, the other end are reinforced in 8 one end of another group small diagonal brace connection second
It offsets with ground, the big diagonal brace 7, second reinforces back cord 4 and small diagonal brace 8 encloses triangle jointly, pours for support " T " font
Fill model 300.
Claims (9)
1. a kind of pouring model for building, including the first aluminum alloy mould plate, the second aluminum alloy mould plate, first reinforce back cord, the
Two reinforce back cord and screw rod, it is characterised in that: the first gap between first aluminum alloy mould plate and the second aluminum alloy mould plate
The first pouring region is surrounded, the outer wall of first aluminum alloy mould plate and the outer wall of the second aluminum alloy mould plate are respectively arranged with described
First reinforces back cord and described second reinforces back cord, and screw rod sequentially passes through the first reinforcing back cord, the first aluminum alloy mould plate, first pours
Irrigated area domain, the second aluminum alloy mould plate and the second reinforcing back cord are simultaneously locked together.
2. pouring model for building according to claim 1, it is characterised in that: first aluminum alloy mould plate and the second aluminium
Alloy templates are " L " type aluminum alloy mould plate.
3. pouring model for building according to claim 2, it is characterised in that: first aluminum alloy mould plate and the second aluminium
Alloy templates are setting, and corner midpoint line and horizontal plane between the first aluminum alloy mould plate and the second aluminum alloy mould plate in the same direction
Between angle a be 45 degree, it is described first reinforce back cord, the first aluminum alloy mould plate, first pouring region, the second aluminum alloy mould plate
It is equipped with screw rod respectively with the both ends of the second reinforcing back cord and is locked together by screw rod, model is poured with formation " L " type.
4. pouring model for building according to claim 2, it is characterised in that: further include having PCF plate, outside the PCF plate
Wall is provided with PCF plate and reinforces back cord, and first aluminum alloy mould plate and the second aluminum alloy mould plate are in the same horizontal line and backwards
Setting, the first aluminum alloy mould plate and the second aluminum alloy mould plate surround the first pouring region of vertical line-styled, and described first adds
Gu the upper end that back cord, the first aluminum alloy mould plate, the first pouring region, the second aluminum alloy mould plate and second reinforce back cord is worn
It states screw rod and locks, the lower section of the first aluminum alloy mould plate and the second aluminum alloy mould plate, and the PCF plate is arranged in the PCF plate
There is gap between the first aluminum alloy mould plate, the second aluminum alloy mould plate and forms the lateral pouring of line-styled second region, it is described
First, which reinforces back cord, the first aluminum alloy mould plate, lateral line-styled second, pours region, PCF plate and PCF plate and reinforces between back cord
It is equipped with the first PCF plate screw rod and locks, the second reinforcing back cord, the second aluminum alloy mould plate, lateral line-styled second are poured
Irrigated area domain, PCF plate and PCF plate, which are reinforced, to be equipped with the 2nd PCF plate screw rod between back cord and locks, the vertical line-styled
First pouring region and lateral line-styled second pour region and collectively form " T " font pouring model.
5. pouring model for building according to claim 1, it is characterised in that: first aluminum alloy mould plate and the second aluminium
Alloy templates are line-styled aluminum alloy mould plate.
6. pouring model for building according to claim 5, it is characterised in that: first aluminum alloy mould plate and the second aluminium
Alloy templates are arranged in parallel, the first reinforcing back cord, the first aluminum alloy mould plate, the first pouring region, the conjunction of the second aluminium
The both ends of golden template and the second reinforcing back cord are equipped with the screw rod respectively and lock, and pour irrigated area to form line-styled first
Domain.
7. pouring model for building according to claim 1, it is characterised in that: it further include having big diagonal brace, the big diagonal brace
The top of back cord or the second reinforcing back cord is reinforced in one end connection first, and the other end offsets with ground.
8. pouring model for building according to claim 7, it is characterised in that: it further include having small diagonal brace, the small diagonal brace
The lower part of back cord or the second reinforcing back cord is reinforced in one end connection first, and the other end offsets with ground.
9. pouring model for building according to claim 8, it is characterised in that: the big diagonal brace, first reinforce back cord or
Second reinforcing back cord and small diagonal brace enclose triangle jointly.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811277518 | 2018-10-30 | ||
CN2018112775184 | 2018-10-30 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209443766U true CN209443766U (en) | 2019-09-27 |
Family
ID=66859551
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822049159.9U Active CN209443766U (en) | 2018-10-30 | 2018-12-07 | Pouring model for building |
CN201811492185.7A Pending CN109826442A (en) | 2018-10-30 | 2018-12-07 | Prefabricated buildings exempt from plastering construction method of construction |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811492185.7A Pending CN109826442A (en) | 2018-10-30 | 2018-12-07 | Prefabricated buildings exempt from plastering construction method of construction |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN209443766U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113374244A (en) * | 2021-06-23 | 2021-09-10 | 晟通科技集团有限公司 | Formwork frame |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110439263A (en) * | 2019-06-27 | 2019-11-12 | 远大住宅工业(上海)有限公司 | Site concrete template system and construction method on a kind of dry wall |
CN110905096A (en) * | 2019-12-11 | 2020-03-24 | 中国十七冶集团有限公司 | Plastering-free construction method for wall, column and beam of fabricated structure |
CN111962857A (en) * | 2020-07-09 | 2020-11-20 | 广州一建建设集团有限公司 | Integrated aluminum die forming method |
CN112922300B (en) * | 2021-01-25 | 2021-10-22 | 浙江东新建设有限公司 | Can stabilize height-adjusting and mobilizable construction frame |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544979A (en) * | 2016-02-03 | 2016-05-04 | 成都市第六建筑工程公司 | Formwork supporting device for wall corner portion construction and construction method |
CN106677520A (en) * | 2017-01-06 | 2017-05-17 | 广东铝遊家科技有限公司 | Beam, floor and corner uptight column composite structure of building aluminium alloy templates |
CN107130791A (en) * | 2017-06-03 | 2017-09-05 | 二十二冶集团精密锻造有限公司 | Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction |
CN108149924A (en) * | 2018-01-17 | 2018-06-12 | 上海建工二建集团有限公司 | A kind of piece method |
-
2018
- 2018-12-07 CN CN201822049159.9U patent/CN209443766U/en active Active
- 2018-12-07 CN CN201811492185.7A patent/CN109826442A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113374244A (en) * | 2021-06-23 | 2021-09-10 | 晟通科技集团有限公司 | Formwork frame |
Also Published As
Publication number | Publication date |
---|---|
CN109826442A (en) | 2019-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209443766U (en) | Pouring model for building | |
CN208563561U (en) | It is a kind of can be with the assembled architecture component of fast hoisting | |
CN210458914U (en) | Connecting structure of prefabricated bridge pier stud and capping beam | |
CN206616862U (en) | Formwork root bracing means | |
CN209468860U (en) | A kind of assembled architecture node connecting structure | |
CN108708452A (en) | The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method | |
CN209040349U (en) | A kind of ring muscle fastening shear wall structure being easily installed | |
CN207436254U (en) | Assembly of shear wall structure | |
CN207228633U (en) | Exempt from that template is cast-in-place to build the prefabricated connector of heat-insulating and decorating wall plug-in type | |
CN103866866B (en) | Super High Core Walls Structure and housing water node after setting a roof beam in place | |
CN206428805U (en) | A kind of concrete prefabricated balcony of assembled steel | |
CN205530340U (en) | Precast concrete retaining wall block | |
CN209468856U (en) | A kind of assembly concrete column beam connecting node | |
CN208563351U (en) | A kind of roadbed side slope arched framework ruggedized construction | |
CN208650446U (en) | A kind of two layers of plug-in wall of clear-water concrete and the plug-in wall connecting node of standard construct | |
CN108691381A (en) | A kind of novel architecture laminated floor slab | |
CN208395991U (en) | The U-shaped integral prefabricated window member that floats, assembled float window joint structure | |
CN208121961U (en) | A kind of assembling frame corner node structure | |
CN209082681U (en) | A kind of prefabricated assembled bay window constructing structure of residential building | |
CN209053429U (en) | A kind of formwork system of assembled architecture | |
CN209099756U (en) | A kind of Quick Release customization aluminum alloy pattern plate component for architecture construction | |
CN207700688U (en) | A kind of linking beam formwork structure | |
CN212897204U (en) | Adjustable fixing and reinforcing device | |
CN208578319U (en) | A kind of aluminum alloy pattern plate Anti-bending structure | |
CN208633261U (en) | The prefabricated platform that floats |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |