CN209443648U
CN209443648U CN201821804484.5U CN201821804484U CN209443648U CN 209443648 U CN209443648 U CN 209443648U CN 201821804484 U CN201821804484 U CN 201821804484U CN 209443648 U CN209443648 U CN 209443648U
Authority
CN
China
Prior art keywords
module
clamping plate
wall
plate
middle connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821804484.5U
Other languages
Chinese (zh)
Inventor
宫振军
吴飞云
王世琦
朱晨亮
贺秀军
崔卫娟
韩赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi First Construction Group Co Ltd
Original Assignee
Shanxi First Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi First Construction Group Co Ltd filed Critical Shanxi First Construction Group Co Ltd
Priority to CN201821804484.5U priority Critical patent/CN209443648U/en
Application granted granted Critical
Publication of CN209443648U publication Critical patent/CN209443648U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to one kind to exempt from formwork constructional column module, including the first module and the second module, first module, including the first left clamp, the first middle connecting plate and the first right clamping plate, first left clamp and the first right Boards wall are in Contraband shape on the first middle connecting plate;Second module, including the second left clamp, the second middle connecting plate and the second right clamping plate, second left clamp and the second right Boards wall are on the second middle connecting plate, in Contraband shape, second module lower end is respectively arranged with the second conical plate along the second module openings direction on the end face in the second left clamp and the second right clamping plate far from the second middle connecting plate.Using the utility model easy construction, time saving and energy saving, aesthetics is good, can avoid cumbersome process when constructional column formwork construction well, efficiency greatly improves, and sound construction.

Description

One kind exempting from formwork constructional column module
Technical field
The utility model belongs to building engineering field, and in particular to one kind exempts from formwork constructional column module.
Background technique
In the construction of architectural engineering building wall, setting constructs the globality in order to guarantee wall, but work is arranged in constructional column Sequence is various, influences wall integral construction progress, and open-type model does not influence to exempt from formwork constructional column after facilitating constructional column reinforcing bar to bind The use of module, horn mouth model can guarantee to construct the more closely knit tight of casting concrete, while can embody the steady of triangle It is qualitative, it more can guarantee masonry panel globality.
In previous building construction, generally use lower method: constructional column formwork is poured, and working procedure is cumbersome, builds table Face and constructional column pour completion concreting surface and are difficult to a plane.
Summary of the invention
In consideration of it, the purpose of the utility model is to provide a kind of time saving and energy saving, it is efficiently simple and direct, it is well-set to exempt to prop up Mould constructional column module, it is intended to overcome the two uncompacted defects of module junction casting concrete.
In order to achieve the above object, and then the technical solution taken is as follows:
One kind exempting from formwork constructional column module, including the first module and the second module, first module, including the first left folder Plate, the first middle connecting plate and the first right clamping plate, first left clamp and the first right Boards wall are in the first middle connecting plate On, it is in Contraband shape;Second module, including the second left clamp, the second middle connecting plate and the second right clamping plate, described second is left Clamping plate and the second right Boards wall are in Contraband shape, second module lower end is in the second left clamp on the second middle connecting plate The first cone is respectively arranged with along the second module openings direction on the end face on the second right clamping plate far from the second middle connecting plate Shape plate;The lower section of the second module is arranged in first module, and connect with the second module corresponding matching, in addition, described first Module is consistent with the opening direction of the second module, and opening direction is that wall moves towards direction.
Further, the lower end edge wall trend of second middle connecting plate is provided with inclined flitch, the flitch Both ends it is vertical with first clamping plate and second clamping plate connect, the lower section of the second module, the first module is arranged in first module Upper seamed edge and the lower seamed edge of the second module be cooperatively connected, this structure is for constructing construction in wall.
Further, in Yan Qiang on the first left clamp of first module, the first middle connecting plate and the first right clamping plate Body moves towards direction and is provided with trench structure, the lower end edge wall of second left clamp, the second right clamping plate and the second middle connecting plate Body moves towards direction and is respectively arranged with inclined flitch, the flitch both ends by the second conical plate respectively with the second left clamp, the The connection of the edge-perpendicular of two right clamping plates and the second middle connecting plate, the lower end seamed edge of first module are in same plane, institute The lower seamed edge of the upper seamed edge and the second module of stating the first module is cooperatively connected, this structure is for constructing construction in cross wall.
Further, it is provided on the first left clamp of first module and the first right clamping plate moving towards direction along wall The lower end edge wall of trench structure, second left clamp and the second right clamping plate moves towards direction and is respectively arranged with inclined flitch, The both ends of the flitch are connect respectively by the second conical plate with the edge-perpendicular of the second left clamp and the second right clamping plate, and described the The lower end seamed edge of one module is in same plane, and the upper seamed edge of first module and the lower seamed edge of the second module are cooperatively connected, This structure is for constructing construction in J-shaped wall.
Further, trench structure, the second right folder are provided with moving towards direction along wall on the described first right clamping plate The lower end edge wall of plate moves towards direction and is provided with inclined flitch, and the both ends of the flitch pass through the second conical plate and the second right folder The edge-perpendicular of plate connects, and the lower end seamed edge of first module is in same plane, the upper seamed edge of first module and the The lower seamed edge of two modules is cooperatively connected, this structure is for constructing construction in corner wall.
The beneficial effects of the utility model are:
1, module is once arranged, and saves formwork, reinforcing, removes three process, work post requires to reduce.
2, side openings formula facilitates masonry after the completion of the binding of constructional column reinforcing bar.
3, building construction is constructed, one moves back one into formula module, and horn mouth setting avoids two module junctions from pouring coagulation There is leakiness situation in soil.
Due to its easy construction, time saving and energy saving, aesthetics is good, can avoid cumbersome work when constructional column formwork construction well Sequence, efficiency greatly improve, and sound construction.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide a further understanding of the present invention, the utility model Illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model.In attached drawing In:
Fig. 1 is the entity schematic diagram of the utility model Fig. 3 and Fig. 4;
Fig. 2 is the entity schematic diagram of the utility model Fig. 3 and Fig. 5;
Fig. 3 is the structural schematic diagram for the first module that the utility model is constructed in wall end and wall in Fig. 1 involved in construction;
Fig. 4 is the structural schematic diagram of second module of the utility model in Fig. 1 involved in the construction construction of wall end;
Fig. 5 is the structural schematic diagram for the second module that the utility model is constructed in wall in Fig. 1 involved in construction;
Fig. 6 is first modular structure schematic diagram of the utility model in the construction of cross wall construction;
Fig. 7 is second structural schematic diagram of the utility model in the construction of cross wall construction;
Fig. 8 is first modular structure schematic diagram of the utility model in the construction of T-shaped wall construction;
Fig. 9 is second modular structure schematic diagram of the utility model in the construction of T-shaped wall construction;
Figure 10 is first modular structure schematic diagram of the utility model in the construction of corner wall construction;
Figure 11 is second modular structure schematic diagram of the utility model in the construction of corner wall construction;
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection It encloses.
Embodiment one
As described in Fig. 1,3,4, one kind exempts from formwork constructional column module, including the first module 1 and the second module 2, and described first Module 1, including the first left clamp 3, the first middle connecting plate 4 and the first right clamping plate 5, first left clamp 3 and the first right folder Plate 5 is fixed on the first middle connecting plate 4, is in Contraband shape;Connect among second module 2, including the second left clamp 6, second Fishplate bar 7 and the second right clamping plate 8, second left clamp 6 and the second right clamping plate 8 are fixed on the second middle connecting plate 7, are in Contraband shape Shape, 2 lower end of the second module is on the end face in the second left clamp 6 and the second right clamping plate 8 far from the second middle connecting plate 7 The first conical plate 9 is respectively arranged with along 2 opening direction of the second module;The lower section of the second module 2 is arranged in first module 1, First left clamp 3 and the connection of the second left clamp 6, the first right clamping plate 5 and the second right clamping plate 8 connect, in described first Between connecting plate 4 and the second middle connecting plate 7 connection, and successively staggeredly along the vertical direction accumulation connection, reach wall height, this Outside, first module 1 is consistent with the opening direction of the second module 2, and opening direction is that wall moves towards direction.
As shown in Figure 1, above structure is for the construction construction of wall end.
Embodiment two
As shown in Fig. 2,3,5, one kind exempts from formwork constructional column module, including the first module 1 and the second module 2, and described first Module 1, including the first left clamp 3, the first middle connecting plate 4 and the first right clamping plate 5, first left clamp 3 and the first right folder Plate 5 is fixed on the first middle connecting plate 4, is in Contraband shape;Connect among second module 2, including the second left clamp 6, second Fishplate bar 7 and the second right clamping plate 8, second left clamp 6 and the second right clamping plate 8 are fixed on the second middle connecting plate 7, are in Contraband shape Shape, 2 lower end of the second module is on the end face in the second left clamp 6 and the second right clamping plate 8 far from the second middle connecting plate 7 The first conical plate 9 is respectively arranged with along 2 opening direction of the second module;The lower end edge wall of second middle connecting plate 7 moves towards It is provided with inclined flitch 10, the both ends of the flitch 10 and the second left clamp 6 and the second right clamping plate 8 is vertical connect, described One module 1 is arranged in the lower section of the second module 2, and the lower seamed edge of the upper seamed edge of the first module 1 and the second module 2 is cooperatively connected, and Successively staggeredly accumulation connection along the vertical direction, reaches wall height, in addition, the opening side of first module 1 and the second module 2 To consistent, and opening direction is that wall moves towards direction.
As shown in Fig. 2, above structure is for constructing construction in wall.
Embodiment three
As shown in Figure 6,7, one kind exempting from formwork constructional column module, including the first module 1 and the second module 2, first mould Block 1, including the first left clamp 3, the first middle connecting plate 4 and the first right clamping plate 5, first left clamp 3 and the first right clamping plate 5 It is fixed on the first middle connecting plate 4, is in Contraband shape;Second module 2, including the second left clamp 6, the second middle connecting plate 7 and the second right clamping plate 8, second left clamp 6 and the second right clamping plate 8 be fixed on the second middle connecting plate 7, be in Contraband shape, Second module, 2 lower end edge on the end face in the second left clamp 6 and the second right clamping plate 8 far from the second middle connecting plate 7 Second module, 2 opening direction is respectively arranged with the first conical plate 9;Connect among first left clamp 3, first of first module 1 Trench structure 11, second left clamp 6, the second right folder are provided with moving towards direction along wall on fishplate bar 4 and the first right clamping plate 5 The lower end edge wall of plate 8 and the second middle connecting plate 7 moves towards direction and is respectively arranged with inclined flitch 10,10 both ends of flitch It is connect respectively with the edge-perpendicular of the second left clamp 6, the second right clamping plate 8 and the second middle connecting plate 7 by the second conical plate 12, And second conical plate 12 with the first conical plate 9 is also vertical connect, the lower end seamed edge of first module 1 is in same flat The lower seamed edge of face, the upper seamed edge of first module 1 and the second module 2 is cooperatively connected, and successively staggeredly tires out along the vertical direction Product connection, reaches wall height, in addition, first module 1 is consistent with the opening direction of the second module 2, and opening direction Direction is moved towards for wall.
Above structure is for constructing construction in cross wall.
Example IV
As shown in Figure 8,9, one kind exempting from formwork constructional column module, including the first module 1 and the second module 2, first mould Block 1, including the first left clamp 3, the first middle connecting plate 4 and the first right clamping plate 5, first left clamp 3 and the first right clamping plate 5 It is fixed on the first middle connecting plate 4, is in Contraband shape;Second module 2, including the second left clamp 6, the second middle connecting plate 7 and the second right clamping plate 8, second left clamp 6 and the second right clamping plate 8 be fixed on the second middle connecting plate 7, be in Contraband shape, Second module, 2 lower end edge on the end face in the second left clamp 6 and the second right clamping plate 8 far from the second middle connecting plate 7 Second module, 2 opening direction is respectively arranged with the first conical plate 9;First left clamp 3 of first module 1 and the first right clamping plate Trench structure 11, the lower end edge wall of second left clamp 6 and the second right clamping plate 8 are provided with moving towards direction along wall on 5 Move towards direction and be respectively arranged with inclined flitch 10, the both ends of the flitch 10 by the second conical plate 12 respectively with the second left folder Plate 6 is connected with the edge-perpendicular of the second right clamping plate 8, and second conical plate 12 with the first conical plate 9 is also vertical connect, it is described The lower end seamed edge of first module 1 is in same plane, the lower seamed edge cooperation of the upper seamed edge of first module 1 and the second module 2 Connection, and successively staggeredly accumulation connection along the vertical direction, reach wall height, in addition, first module 1 and the second module 2 opening direction is consistent, and opening direction is that wall moves towards direction.
Above structure is for constructing construction in J-shaped wall.
Embodiment five
As shown in Figure 10,11, one kind exempts from formwork constructional column module, including the first module 1 and the second module 2, and described first Module 1, including the first left clamp 3, the first middle connecting plate 4 and the first right clamping plate 5, first left clamp 3 and the first right folder Plate 5 is fixed on the first middle connecting plate 4, is in Contraband shape;Connect among second module 2, including the second left clamp 6, second Fishplate bar 7 and the second right clamping plate 8, second left clamp 6 and the second right clamping plate 8 are fixed on the second middle connecting plate 7, are in Contraband shape Shape, 2 lower end of the second module is on the end face in the second left clamp 6 and the second right clamping plate 8 far from the second middle connecting plate 7 The first conical plate 9 is respectively arranged with along 2 opening direction of the second module;It sets on the first right clamping plate 5 moving towards direction along wall It is equipped with trench structure 11, the lower end edge wall of the second right clamping plate 8 moves towards direction and is provided with inclined flitch 10, the flitch 10 both ends are connect by the second conical plate 12 with the edge-perpendicular of the second right clamping plate 8, and second conical plate 12 and first The also vertical connection of conical plate 9, the lower end seamed edge of first module 1 be in same plane, the upper seamed edge of first module 1 with The lower seamed edge of second module 2 is cooperatively connected, and successively staggeredly accumulation connection along the vertical direction, reaches wall height, in addition, institute It is consistent with the opening direction of the second module 2 to state the first module 1, and opening direction is that wall moves towards direction.
This structure is for constructing construction in corner wall.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (5)

1. one kind exempts from formwork constructional column module, including the first module and the second module, it is characterised in that:
First module, including the first left clamp, the first middle connecting plate and the first right clamping plate, first left clamp and One right Boards wall is in Contraband shape on the first middle connecting plate;
Second module, including the second left clamp, the second middle connecting plate and the second right clamping plate, second left clamp and Two right Boards walls are in Contraband shape on the second middle connecting plate, and second module lower end is right in the second left clamp and second The first conical plate is respectively arranged with along the second module openings direction on an end face on clamping plate far from the second middle connecting plate;
The lower section of the second module is arranged in first module, and connect with the second module corresponding matching, and the edge that successively interlocks Vertical direction accumulation connection, reaches wall height, in addition, first module is consistent with the opening direction of the second module, and Opening direction is that wall moves towards direction.
2. one kind according to claim 1 exempts from formwork constructional column module, which is characterized in that second middle connecting plate Lower end edge wall trend is provided with inclined flitch, and the both ends of the flitch are vertical with first clamping plate and second clamping plate to be connect, the The upper seamed edge of one module and the lower seamed edge of the second module are cooperatively connected, this structure is for constructing construction in wall.
3. one kind according to claim 1 exempts from formwork constructional column module, which is characterized in that the first of first module is left Trench structure, the second left folder are provided with moving towards direction along wall on clamping plate, the first middle connecting plate and the first right clamping plate The lower end edge wall of plate, the second right clamping plate and the second middle connecting plate moves towards direction and is respectively arranged with inclined flitch, the material Board ends are connected with the edge-perpendicular of the second left clamp, the second right clamping plate and the second middle connecting plate respectively by the second conical plate It connects, the lower end seamed edge of first module is in same plane, the upper seamed edge of first module and the lower seamed edge of the second module It is cooperatively connected, this structure is for constructing construction in cross wall.
4. one kind according to claim 1 exempts from formwork constructional column module, which is characterized in that the first of first module is left Trench structure is provided with moving towards direction along wall on clamping plate and the first right clamping plate, second left clamp and the second right clamping plate Lower end edge wall moves towards direction and is respectively arranged with inclined flitch, and the both ends of the flitch are by the second conical plate respectively with second Left clamp is connected with the edge-perpendicular of the second right clamping plate, and the lower end seamed edge of first module is in same plane, and described first The upper seamed edge of module and the lower seamed edge of the second module are cooperatively connected, this structure is for constructing construction in J-shaped wall.
5. one kind according to claim 1 exempts from formwork constructional column module, which is characterized in that on edge on the first right clamping plate Wall moves towards direction and is provided with trench structure, and the lower end edge wall of the second right clamping plate moves towards direction and is provided with inclined material The both ends of plate, the flitch are connect by the second conical plate with the edge-perpendicular of the second right clamping plate, the lower end of first module Seamed edge is in same plane, and the upper seamed edge of first module and the lower seamed edge of the second module are cooperatively connected, this structure is for turning Construction is constructed in the wall of angle.
CN201821804484.5U 2018-11-04 2018-11-04 One kind exempting from formwork constructional column module Expired - Fee Related CN209443648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821804484.5U CN209443648U (en) 2018-11-04 2018-11-04 One kind exempting from formwork constructional column module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821804484.5U CN209443648U (en) 2018-11-04 2018-11-04 One kind exempting from formwork constructional column module

Publications (1)

Publication Number Publication Date
CN209443648U true CN209443648U (en) 2019-09-27

Family

ID=68010493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821804484.5U Expired - Fee Related CN209443648U (en) 2018-11-04 2018-11-04 One kind exempting from formwork constructional column module

Country Status (1)

Country Link
CN (1) CN209443648U (en)

Similar Documents

Publication Publication Date Title
CN214658892U (en) High-low grade concrete intercepting device
CN207959922U (en) A kind of building template mobile convenient for adjusting
CN209443648U (en) One kind exempting from formwork constructional column module
CN209779560U (en) Steel formwork for irrigation and water conservancy concrete channel
CN210421512U (en) Positioning, mounting and connecting structure of PC prefabricated wall board
CN204510810U (en) A kind of formwork structure for shutoff exterior wall reserved opening
CN207919812U (en) Assembled wallboard structure
CN213014377U (en) Basement roof seals post-cast strip structure in advance
CN212427769U (en) Interlocking building block for mould-disassembly-free constructional column
CN109372248A (en) A kind of wall column formwork and its nodal wood type reinforcement means
CN212027114U (en) Building templates for construction
CN210316538U (en) Aluminum mold supporting system for floor lower extension lintel
CN207003720U (en) A kind of assembled integral concrete shear force wall attachment structure
CN219175835U (en) Small-space easy-to-detach aluminum die
CN211498922U (en) Box girder contact net foundation construction template
CN211816410U (en) Modularization pouring template and opposite-pulling connecting piece thereof
CN216690340U (en) Shaping die carrier convenient to dismouting
CN206053128U (en) A kind of special-shaped speed connects formula steel column
CN218375223U (en) Combined pouring template
CN215483772U (en) Large-volume concrete pouring convex-concave structure wall
CN214091027U (en) Wire pipe laying metal formwork exempts from trompil device
CN215407370U (en) Construction structures is pour in step to two walls of building movement joint concrete
CN211816409U (en) Template connecting piece and pouring template
CN216099543U (en) Concrete box culvert forming die
CN216740684U (en) Roof arc flashing template manufacturing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190927

Termination date: 20201104

CF01 Termination of patent right due to non-payment of annual fee