CN209443472U - A kind of supporting construction of double-row pile combination wide-angle anchor cable - Google Patents

A kind of supporting construction of double-row pile combination wide-angle anchor cable Download PDF

Info

Publication number
CN209443472U
CN209443472U CN201822198722.9U CN201822198722U CN209443472U CN 209443472 U CN209443472 U CN 209443472U CN 201822198722 U CN201822198722 U CN 201822198722U CN 209443472 U CN209443472 U CN 209443472U
Authority
CN
China
Prior art keywords
campshed
pile
row
double
crown beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822198722.9U
Other languages
Chinese (zh)
Inventor
张启军
张昌太
冯雷
孟宪浩
杨铭竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Huirui Technology Co ltd
Original Assignee
QINGDAO YE GAO CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO YE GAO CONSTRUCTION ENGINEERING Co Ltd filed Critical QINGDAO YE GAO CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201822198722.9U priority Critical patent/CN209443472U/en
Application granted granted Critical
Publication of CN209443472U publication Critical patent/CN209443472U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to brick or concrete duct field;It is related to a kind of supporting construction of double-row pile combination wide-angle anchor cable;Including preceding campshed, rear campshed, water-stop curtain stake, front-seat crown beam, heel row crown beam, coupling beam;The preceding campshed is located at the boundary of foundation pit range, and rear campshed is located at the outside of foundation pit range, which is additionally provided with prestress anchorage cable, and water-stop curtain stake is arranged between the preceding campshed and rear campshed;Before at one at campshed and one after campshed and between water-stop curtain form a unit, be longitudinally arranged in parallel between multiple units;Front-seat crown beam is longitudinally connected integral by preceding campshed;Heel row crown beam is longitudinally connected integral by rear campshed;The coupling beam connects front-seat crown beam and heel row crown beam, double-row pile is connected integral;Described prestress anchorage cable one end is fixed on front-seat crown beam;One end is fixed by bored grouting;The rigidity of structure is big, occupies little space, and side wall is avoided largely to seep water.

Description

A kind of supporting construction of double-row pile combination wide-angle anchor cable
Technical field
The utility model relates to building technical fields, in particular relate to deep footing groove enclosing structure, in particular to a kind of double Stake combines the supporting construction of wide-angle anchor cable.
Background technique
Currently, especially northern, the most commonly used is pile-anchor retainings, single in the Deep Foundation Pit Supporting Engineering of vertical cut Campshed adds a layer anchor pole, the retaining design following points limitation or defect:
1, since city surrounding building underground is built, structures influence, horizontal rock-bolt length is too long to construct, Single row pillars The case where anchor structure cannot achieve is relatively common;
2, the stratum of rich groundwater, anchor bolt construction destroy construction curtain, cause soil erosion on the outside of foundation pit, construction finishes Rear wall anchor hole largely seeps water, and foundation pit periphery differential settlement is caused when serious;
3, the anchor pole number of plies is more, and stage excavation construction anchor pole is long in time limit, needs earth excavation close fit, and deep basal pit needs to turn A ramp is changed, causes foundation pit long in time limit, earthwork cooperation is costly.
And under the environmental condition for can not achieve multiple-layer horizontal anchor pole, also there is the supporting patented technology of many double-row piles. But it is looked into, the double-row pile patented technology having disclosed, entirely cantilever earth-retaining, stake top does not have the operative constraint of horizontal force, Foundation pit displacement is relatively large, and stringent to deformation requirements for surrounding enviroment cannot meet the requirements;In addition to stake top between double-row pile Except, most technologies do not connect effectively, and pile body local pressure is big, cause a diameter and arrangement of reinforcement larger, cost is higher.
Wherein, associated patented technology, an entitled " double-row pile composite construction and its construction party for deep basal pit supporting and retaining system The patent application of method " (application No. is 201810123369.X), discloses double -- rowed pipe pile supporting, and heel row tubular pole vertically sets pre- answer Power anchor cable, the main function of the vertical anchor cable are the resistance to capsizings for increasing supporting construction, substantially or cantilever soil-baffling structure.
Entitled " double-row pile combines Deep Foundation Pit Support for Soft Soil structure and construction method with diagonal brace " (application No. is 201610516496.7) patent application discloses that a kind of double-row pile combines Deep Foundation Pit Support for Soft Soil structure with diagonal brace, in base Soil layer is consolidated along the inside of interior campshed setting hole prime cement in hole bottom;Diagonal brace is set between interior campshed and Base isolation system, diagonal brace across The middle vertical steel lattice column of setting;Waist rail is arranged with interior campshed joint in diagonal brace and Base isolation system joint setting bottom support pier. Diagonal brace is set after foundation pit inner excavation a part, needs to excavate close fit, complex process, the duration is longer.
The hair of entitled " a kind of drag-line double-row pile (wall) supporting construction " (application No. is 201510294044.4) Bright application discloses that a kind of front-seat support pile elevates above the soil to form Suo Zhu, heel row support pile plane earth, Suo Zhuyu heel row supporting It is provided between stake to prestressed cable, which belongs to the connection structure between two campsheds, complex process, wherein below earth's surface Drag-line be difficult to realize, it is many that preceding campshed is higher by earth's surface, influences live civil construction, cost is higher.
One entitled " Double-row-piles Structure that a kind of pile body is equipped with concrete-cored horizontal jet grouting stake " (application No. is 201410847109.9) patent of invention discloses on the basis of Retaining Structure with Double-row Piles, the horizontal concrete-cored rotation of construction in layer Stake is sprayed, reinforcing body is prefabricated pile, and construction and excavation process is similar to multilayer suspension roof support, needs a cubic metre of earth close fit, need to convert Ramp, long in time limit, cost is higher.
Entitled " a kind of Retaining Structure with Double-row Piles " (application No. is 201510635259.8), is by existing again after pile Pile body drilling installation fashioned iron and slip casting, front and back campshed are attached, so that the whole lateral rigidity of double-row pile has obtained greatly Promotion, first this method can destroy the most important some main reinforcements of pile body, seriously affect safety of structure;On the other hand, Since drilling will pass through armored concrete, soil layer, armored concrete, existing drilling technique is difficult to realize;Third, double-row pile it Between linking beam arrangement be it is uniformly distributed, do not consider the loading characteristic of double support pile and accordingly arranged.
How foundation pit deformation effectively controlled using Retaining Structure with Double-row Piles, the space for occupying periphery is smaller, avoids side wall A large amount of infiltrations become the Important Problems that those skilled in the art need to solve.
Summary of the invention
The utility model provides a kind of supporting construction of double-row pile combination wide-angle anchor cable based on the above issues;Including preceding Campshed, rear campshed, water-stop curtain stake, front-seat crown beam, heel row crown beam, coupling beam;The preceding campshed is located at the boundary of foundation pit range, after Campshed is located at the outside of foundation pit range, which is additionally provided with prestress anchorage cable, is arranged between the preceding campshed and rear campshed and stops Water curtain pile;Before at one at campshed and one after campshed and between water-stop curtain form a unit, indulge between multiple units To being arranged in parallel;Front-seat crown beam is longitudinally connected integral by preceding campshed;Heel row crown beam is longitudinally connected integral by rear campshed;It is described Coupling beam connects front-seat crown beam and heel row crown beam, double-row pile is connected integral;Described prestress anchorage cable one end is fixed on front-seat hat Beam;One end is fixed on the outer inside soil body of foundation pit by bored grouting.
Preferably, the prestress anchorage cable intersects after passing through disrance sleeve with front-seat crown beam;The prestress anchorage cable is with before Arranging crown beam intersection is that inclined-plane is handled, and inclined-plane and prestress anchorage cable intersect vertically setting, after front-seat crown beam pours, installation at inclined-plane Backing plate and anchorage.
Preferably, the angle that the prestress anchorage cable and preceding campshed are formed is 35 ° -65 °.
Preferably, the disrance sleeve uses pvc pipe or steel pipe, for prestress anchorage cable and front-seat coupling beam to be isolated.
Preferably, the preceding campshed and rear campshed use bored concrete pile, diameter 600-1500mm.
Preferably, forward and backward row's crown beam is respectively arranged at the stake top of preceding campshed Yu rear campshed, and width is greater than stake diameter 100- 150mm, it is highly consistent with stake diameter.
Preferably, water-stop curtain stake is also provided between the preceding campshed disposed in parallel and preceding campshed.
Further, preceding campshed and rear campshed are all made of uneven arrangement of reinforcement, and the support pile stress of preceding campshed and rear campshed is vertical Muscle configures and is all provided with the vertical muscle of support pile construction on the inside of the stress side of pile outer most edge, forward and backward campshed, outside the forward and backward campshed It encloses border and sets support pile tie hoop, support pile tie hoop inner circumferential lap welding connects support pile and puts more energy into muscle;The support pile stress is vertical Muscle, support pile construct vertical muscle and support pile tie hoop, support pile are put more energy into muscle formation reinforcement cage structure, the support pile spiral hoop Muscle spacing is 80-200mm, and muscle spacing of putting more energy into is set as 1500-2000mm.
The utility model has the advantages that
Its support system rigidity of the supporting construction of the utility model is big, draws constraint, Ke Yiyou in conjunction with the anchor of wide-angle anchor pole Effect control foundation pit deformation, upright to excavate, the space for occupying periphery is smaller, and anchor pole only designs one layer of earth's surface, and it is a large amount of to avoid side wall Infiltration, while saving and excavating the duration, improves construction efficiency, energy conservation and environmental protection, and cost is both economical.
This supporting construction is carried out in actual items, obtains howling success, is under complex stratum condition Deep basal pit provides the supporting construction and its construction method of a kind of more safety economy.
Detailed description of the invention:
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is utility model A-A sectional view;
Fig. 3 is crown beam, coupling beam arrangement schematic diagram in the utility model;
Fig. 4 is the utility model arrangement of reinforcement schematic diagram;
Fig. 5 is the utility model B-B sectional view.
Wherein: campshed before 1-;Campshed after 2-;3- water-stop curtain stake;The front row 4- crown beam;5- heel row crown beam;6- coupling beam;7- is pre- Stress anchor cable;8- disrance sleeve;9- backing plate and anchorage;The inclined-plane 10-;11- support pile stress indulges muscle;12- support pile constructs vertical muscle; 13- support pile tie hoop;14- support pile reinforcing rib.
Specific embodiment
With reference to the accompanying drawings of the specification, the present invention is described further.
In conjunction with attached drawing 1-5, which includes preceding campshed 1, rear campshed 2, water-stop curtain stake 3, front-seat crown beam 4, heel row Crown beam 5, coupling beam 6 and prestress anchorage cable 7;Water-stop curtain stake 3 is set between the preceding campshed 1 and rear campshed 2;Campshed 1 before at one With one at after campshed 2 and between the dress one unit base of composition of water-stop curtain 3, be longitudinally arranged in parallel between more lattice units;Before Arrange crown beam 4 preceding campshed 1 is longitudinally connected integral;Heel row crown beam 5 is longitudinally connected integral by rear campshed 2;The coupling beam 6 connects Front-seat crown beam 4 and heel row crown beam 5, double-row pile are connected integral;Described 7 one end of prestress anchorage cable is fixed on front-seat crown beam 4;One End is fixed by bored grouting.
The prestress anchorage cable 7 intersects after passing through disrance sleeve 8 with front-seat crown beam 4;The prestress anchorage cable 7 is preced with front-seat 4 intersection of beam is inclined-plane 10, and inclined-plane 10 and prestress anchorage cable 7 intersect vertically setting, and front-seat crown beam 4 pours installation at back bevel and pads Plate and anchorage 9.
The disrance sleeve 8 uses pvc pipe or steel pipe, for prestress anchorage cable 7 and front-seat coupling beam 4 to be isolated.
The preceding campshed 1 uses bored concrete pile, diameter 600-1500mm with rear campshed 2.
Forward and backward row's crown beam is respectively arranged at the stake top of preceding campshed 1 and rear campshed 2, and width is greater than stake diameter 100- 150mm, it is highly consistent with stake diameter.
Between the preceding campshed 1 disposed in parallel and preceding campshed 1;Water-stop curtain is also provided between campshed 2 and rear campshed 3 afterwards Stake 3.
Preceding campshed 1 is all made of uneven arrangement of reinforcement with rear campshed 2, and the vertical muscle 11 of the support pile stress of preceding campshed 1 and rear campshed 2 is matched It sets and is all provided with the vertical muscle 12 of support pile construction on the inside of the stress side of pile outer most edge, forward and backward campshed, the forward and backward campshed periphery Border sets support pile tie hoop 13, and welding support pile is put more energy into muscle 14 in support pile tie hoop 13;The support pile stress is vertical Muscle 11, support pile construct vertical muscle 12 and support pile tie hoop 13, support pile muscle 14 of putting more energy into and form reinforcement cage structure, the supporting Stake 13 spacing of tie hoop is 80-200mm, and support pile 14 spacing of muscle of putting more energy into is set as 1500-2000mm.

Claims (7)

1. a kind of supporting construction of double-row pile combination wide-angle anchor cable, including preceding campshed, rear campshed, water-stop curtain stake, front-seat hat Beam, heel row crown beam and coupling beam;The preceding campshed is located at the boundary of foundation pit range, and rear campshed is located at the outside of foundation pit range, special Sign is: being additionally provided with prestress anchorage cable, water-stop curtain stake is arranged between the preceding campshed and rear campshed;Campshed and one before at one Campshed and water-stop curtain form a unit behind place, are longitudinally arranged in parallel between multiple units;The front row crown beam will be front-seat Stake is longitudinally connected integral;Heel row crown beam is longitudinally connected integral by rear campshed;The coupling beam connects front-seat crown beam and heel row hat Beam connects double-row pile integral;Described prestress anchorage cable one end is fixed on front-seat crown beam;One end is fixed on by bored grouting The outer inside soil body of foundation pit.
2. the supporting construction of double-row pile combination wide-angle anchor cable according to claim 1, it is characterised in that: the prestressing force Anchor cable intersects after passing through disrance sleeve with front-seat crown beam;The prestress anchorage cable and front-seat crown beam intersection are inclined-plane, inclined-plane with Prestress anchorage cable intersects vertically setting, and backing plate and anchorage are also installed at inclined-plane.
3. the supporting construction of double-row pile combination wide-angle anchor cable according to claim 2, it is characterised in that: the separation sleeve Pipe uses pvc pipe or steel pipe.
4. the supporting construction of double-row pile combination wide-angle anchor cable according to claim 1 or 2, it is characterised in that: described pre- The angle that stress anchor cable and preceding campshed are formed is 35 ° -65 °.
5. the supporting construction of double-row pile combination wide-angle anchor cable according to claim 1, it is characterised in that: the preceding campshed Bored concrete pile, diameter 600-1500mm are used with rear campshed;Forward and backward row's crown beam is respectively arranged at the stake of preceding campshed Yu rear campshed Top, width is greater than stake diameter 100-150mm, highly consistent with stake diameter.
6. the supporting construction of double-row pile combination wide-angle anchor cable according to claim 1, it is characterised in that: described to set in parallel Water-stop curtain stake is also provided between the preceding campshed and preceding campshed set.
7. the supporting construction of double-row pile combination wide-angle anchor cable according to claim 1, it is characterised in that: forward and backward campshed It is all made of uneven arrangement of reinforcement, the support pile stress of preceding campshed and rear campshed indulges muscle configuration in the stress side of pile outer most edge, forward and backward It is all provided with support pile on the inside of campshed and constructs vertical muscle;The peripheral border of the forward and backward campshed sets support pile tie hoop, support pile spiral shell Rotation stirrup inner circumferential lap welding connects support pile and puts more energy into muscle;The support pile stress indulges muscle, support pile constructs vertical muscle and support pile spiral hoop Muscle, support pile muscle of putting more energy into combine to form reinforcement cage structure, and the support pile tie hoop spacing is 80-200mm, and support pile is put more energy into Muscle spacing is set as 1500-2000mm.
CN201822198722.9U 2018-12-26 2018-12-26 A kind of supporting construction of double-row pile combination wide-angle anchor cable Active CN209443472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822198722.9U CN209443472U (en) 2018-12-26 2018-12-26 A kind of supporting construction of double-row pile combination wide-angle anchor cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822198722.9U CN209443472U (en) 2018-12-26 2018-12-26 A kind of supporting construction of double-row pile combination wide-angle anchor cable

Publications (1)

Publication Number Publication Date
CN209443472U true CN209443472U (en) 2019-09-27

Family

ID=68015552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822198722.9U Active CN209443472U (en) 2018-12-26 2018-12-26 A kind of supporting construction of double-row pile combination wide-angle anchor cable

Country Status (1)

Country Link
CN (1) CN209443472U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457709A (en) * 2018-12-26 2019-03-12 青岛业高建设工程有限公司李沧分公司 A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457709A (en) * 2018-12-26 2019-03-12 青岛业高建设工程有限公司李沧分公司 A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN106677189B (en) A kind of taper pile wall supporting type foundation pit supporting construction and its construction method
CN205742213U (en) Foundation pit supporting construction
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN102828520A (en) Ring-shaped inner supporting structure used in deep peat soil deep foundation pit
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN104389628A (en) Landslide section tunnel reinforcing device and reinforcing construction method
CN107012871B (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN203229955U (en) Foundation pit enclosure structure allowing supporting while excavating
CN111877366A (en) Combined type foundation pit supporting structure and construction method thereof
CN205776246U (en) A kind of Structure About Soldier Pile
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN209443472U (en) A kind of supporting construction of double-row pile combination wide-angle anchor cable
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
CN107143149B (en) A kind of existing masonry structure building adds the construction method of basement
CN212248284U (en) Steel pipe pile protection system for soft foundation mixed slope
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
CN106223344B (en) A kind of ground line piled anchor frame foundation pit supporting method
CN212506313U (en) Combined foundation pit supporting structure
CN205804366U (en) A kind of slag runner structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220816

Address after: Unit 701, Building 9, No. 7 Wuyang Road, Shibei District, Qingdao City, Shandong Province 266000

Patentee after: Qingdao Huirui Technology Co.,Ltd.

Address before: 6-3-301, No. 1 Community, Dabu East Resettlement District, No. 7 Liaoyang East Road, Laoshan District, Qingdao City, Shandong Province, 266000

Patentee before: QINGDAO YE GAO CONSTRUCTION ENGINEERING Co.,Ltd.