CN209415783U - A kind of wall-hung boiler being rapidly heated - Google Patents

A kind of wall-hung boiler being rapidly heated Download PDF

Info

Publication number
CN209415783U
CN209415783U CN201822258969.5U CN201822258969U CN209415783U CN 209415783 U CN209415783 U CN 209415783U CN 201822258969 U CN201822258969 U CN 201822258969U CN 209415783 U CN209415783 U CN 209415783U
Authority
CN
China
Prior art keywords
wall
fixedly connected
furnace shell
water
hanging furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822258969.5U
Other languages
Chinese (zh)
Inventor
张金明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Baidian Electric Appliance Co ltd
Original Assignee
Dezhou Baidian Electrical Appliances Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Baidian Electrical Appliances Co Ltd filed Critical Dezhou Baidian Electrical Appliances Co Ltd
Priority to CN201822258969.5U priority Critical patent/CN209415783U/en
Application granted granted Critical
Publication of CN209415783U publication Critical patent/CN209415783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model discloses a kind of wall-hung boilers being rapidly heated, including wall hanging furnace shell, the bottom end of wall-hung boiler enclosure interior is fixedly connected with set casing, burner is fixedly connected between the inner wall of set casing bottom end, combustion chamber is fixed at the top of burner, heat exchanger is fixedly connected between the inner wall on set casing top, exhaust pipe is fixedly connected at the top of heat exchanger, the gas outlet of exhaust pipe is placed in the top of wall hanging furnace shell, the middle part of the bottom end of wall hanging furnace shell is fixedly connected with the gas outlet of fuel gas conduit, a kind of wall-hung boiler being rapidly heated of the utility model, wall-hung boiler can be made to be rapidly heated by the coil of setting, make the countless small vortex of the generation inside copper metal tube road by electromagnetism cutting, heat water rapidly, achieve the effect that quickly to heat water, solve existing electric wall-hung boiler uses electric power to add heating tube always Heat, the problem of causing power wastage.

Description

A kind of wall-hung boiler being rapidly heated
Technical field
The utility model relates to a kind of wall-hung boiler, in particular to a kind of wall-hung boiler being rapidly heated.
Background technique
Burnt gas wall hanging furnace is collection using water, electricity, gas (fire) Yu Yiti, is capable of providing the advanced of domestic hot-water and independent heating Equipment, use not only facilitate but also are not influenced by extraneous factor, in recent years, be widely used in market at home, by In the characteristic of heat transfer, the actual motion expense and building aspect of wall-hung boiler have close relationship, and major influence factors have room Heat-insulated, wall the thickness in room, thermal insulation material, heat insulating ability of window etc..
The wall-hung boiler that tradition is crossed is to provide heating by electric heating tube, which heats the slow, thermal efficiency using electric power as the energy It is low, volume is big, noise is big, it is inconvenient to install and use and electric power resource waste is serious.
Utility model content
The purpose of this utility model is to provide a kind of wall-hung boilers being rapidly heated, to solve to propose in above-mentioned background technique The heating of wall-hung boiler is slow, the thermal efficiency is low, volume is big, noise is big, installs and uses inconvenient and electric power resource wastes serious problem.
To achieve the above object, the utility model provides the following technical solutions: a kind of wall-hung boiler being rapidly heated, including wall Furnace shell is hung, the bottom end of the wall-hung boiler enclosure interior is fixedly connected with set casing, consolidates between the inner wall of the set casing bottom end Surely it is connected with burner, combustion chamber, fixed company between the inner wall on the set casing top are fixed at the top of the burner It is connected to heat exchanger, exhaust pipe is fixedly connected at the top of the heat exchanger, the gas outlet of the exhaust pipe is placed in wall-hung boiler The middle part of bottom end on the top of shell, the wall hanging furnace shell is fixedly connected with the gas outlet of fuel gas conduit, the fuel gas conduit into Port is communicated with the bottom end of gas storage tank, and the side of the gas outlet of the fuel gas conduit is fixedly connected with burnt gas switch, the combustion The side of the air inlet of tracheae is fixed with the second battery valve, and the side of the wall-hung boiler inner walls is fixedly installed with hot water spiral shell The water outlet of coil, the hot water helix tube is fixedly connected through the bottom end of wall hanging furnace shell with one end of connecting tube, the company The other end of adapter tube is fixedly connected with the water inlet in copper metal tube road, and the first electromagnetism is fixedly installed in the middle part of the connecting tube The outer sheath of valve, the copper metal tube road is equipped with several coils, and the water outlet in the copper metal tube road passes through connecting tube It is fixedly connected with the water inlet of heating structure, the water outlet of the heating structure connects by the way that the side of connecting tube and water tank is fixed It connects, the side of the water tank is fixedly connected by connecting tube with the water inlet of high-pressure hydraulic pump, and the water outlet of the high-pressure hydraulic pump passes through The bottom end that wall-through hangs furnace shell is fixedly connected with cold water helix tube water inlet, and the water outlet of the cold water helix tube passes through connecting tube It is fixedly connected with the water inlet of hot water helix tube.
As a kind of optimal technical scheme of the utility model, the heating structure includes heat dissipation protective jacket, the heat dissipation The inside of protective jacket is equipped with hot duct, and the surface of the heat dissipation protective jacket offers several heat release holes, and hot duct is logical Piping connector is fixedly connected with copper metal tube road.
As a kind of optimal technical scheme of the utility model, the side of the wall hanging furnace shell is fixedly installed with switching surface Plate, the surface of the switch panel are fixedly installed with the first electromagnetic valve switch, second solenoid valve switch and high-pressure hydraulic pump switch, institute It states the first solenoid valve, second solenoid valve and high-pressure hydraulic pump and passes through the first electromagnetic valve switch, second solenoid valve switch and high pressure respectively Pump switch is electrically connected with the power supply.
As a kind of optimal technical scheme of the utility model, guarantor is fixed in the interlayer of the wall-hung boiler inner walls Warm plate.
As a kind of optimal technical scheme of the utility model, the top of the water tank is equipped with case lid.
Compared with prior art, the utility model has the beneficial effects that a kind of wall-hung boiler being rapidly heated of the utility model, By the burner of setting, it can make full use of the gaseous fuel discharged in gas storage tank, quickly heat cold water helix tube Internal water is reduced the pollution of air by the burning of combustion gas, improves the utilization rate of resource, can make wall by the coil of setting It hangs furnace to be rapidly heated, the countless small vortex of the generation inside copper metal tube road is made by electromagnetism cutting, water is heated rapidly, reaches The quickly effect of heating water solves existing electric wall-hung boiler and uses electric power to heat heating tube always, causes electric power unrestrained The problem of taking.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure: 1, wall hanging furnace shell;2, heat exchanger;3, hot water helix tube;4, burner;5, burnt gas switch;6, first Solenoid valve;7, coil;8, hot duct;9, radiate protective jacket;10, copper metal tube road;11, water tank;12, high-pressure hydraulic pump;13, Second solenoid valve;14, gas storage tank;15, cold water helix tube;16, exhaust pipe.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of wall-hung boiler being rapidly heated, including wall hanging furnace shell 1, wall-hung boiler Bottom end inside shell 1 is fixedly connected with set casing, and burner 4, burner 4 are fixedly connected between the inner wall of set casing bottom end Top be fixed with combustion chamber, heat exchanger 2, the top of heat exchanger 2 are fixedly connected between the inner wall on set casing top It is fixedly connected with exhaust pipe 16, the gas outlet of exhaust pipe 16 is placed in the top of wall hanging furnace shell 1, the bottom end of wall hanging furnace shell 1 Middle part is fixedly connected with the gas outlet of fuel gas conduit, and the air inlet of fuel gas conduit is communicated with the bottom end of gas storage tank 14, fuel gas conduit The side of gas outlet is fixedly connected with burnt gas switch 5, and the side of the air inlet of fuel gas conduit is fixed with the second battery valve, wall-hung boiler The side of 1 inner wall of shell is fixedly installed with hot water helix tube 3, and the water outlet of hot water helix tube 3 runs through the bottom end of wall hanging furnace shell 1 It is fixedly connected with one end of connecting tube, the other end of connecting tube is fixedly connected with the water inlet in copper metal tube road 10, connecting tube Middle part be fixedly installed with the first solenoid valve 6, the outer sheath in copper metal tube road 10 is equipped with several coils 7, copper metal tube The water outlet in road 10 is fixedly connected by connecting tube with the water inlet of heating structure, the water outlet of heating structure by connecting tube with The side of water tank 11 is fixedly connected, and the side of water tank 11 is fixedly connected by connecting tube with the water inlet of high-pressure hydraulic pump 12, high pressure The water outlet of water pump 12 is fixedly connected through the bottom end of wall hanging furnace shell 1 with 15 water inlet of cold water helix tube, cold water helix tube 15 Water outlet be fixedly connected by connecting tube with the water inlet of hot water helix tube 3.
Head choosing, heating structure includes heat dissipation protective jacket 9, and the inside of heat dissipation protective jacket 9 is equipped with hot duct 8, and heat dissipation is anti- The surface of sheath 9 offers several heat release holes, and hot duct 8 connects by the way that conduit coupling and copper metal tube road 10 are fixed It connects, is heated up by heating structure to ambient enviroment.
Preferably, the side of wall hanging furnace shell 1 is fixedly installed with switch panel, and the surface of switch panel is fixedly installed with One electromagnetic valve switch, second solenoid valve switch and high-pressure hydraulic pump switch, first solenoid valve 6, second solenoid valve 13 and high pressure Water pump 12 is electrically connected with the power supply by the first electromagnetic valve switch, second solenoid valve switch and high-pressure hydraulic pump switch respectively, is convenient for Manipulation to equipment.
Preferably, be fixed with insulation board in the interlayer of 1 inner wall of wall hanging furnace shell, convenient for inside wall hanging furnace shell 1 into Row heat preservation.
Preferably, the top of water tank 11 is equipped with case lid, reduces the evaporation of 11 internal water of water tank.
When specifically used, the high-pressure hydraulic pump switch being first turned on switch panel will be in water tank 11 by high-pressure hydraulic pump 12 The water in portion is transported to cold water helix tube 15 by connecting tube, by turning on the switch the switch of the second solenoid valve on panel, passes through company Adapter tube is by the burner 4 of the fuel gas transmission inside gas storage tank 14 to model (BH-007), by opening combustion gas manually Switch 5 puts the combustion gas inside burner 4, is burnt in combustion chamber by combustion chamber convenient for combustion gas, is produced by burning Raw heat convection is heated through the cold water of heat exchanger 2, and the water after heating flows through hot water helix tube 3, passes through hot water spiral Pipe 3 reduces heat loss, and by turning on the switch the first electromagnetic valve switch on panel, the water after heating enters copper by connecting tube Matter metallic conduit 10, after the coil 7 being arranged outside copper metal tube road 10 is powered on, the electromagnetic field that is generated by coil 7 The water in copper metal tube road 10 is cut, cutting makes to generate high-speed rotating whirlpool, water body inside copper metal tube road 10 It is further heated up in the process of rotation, the water of heating is then transported to by hot duct 8 by connecting tube, pass through the protective jacket that radiates Heat release hole on 9 is by heat loss to ambient enviroment, while the protective jacket 9 that radiates also functions to the effect of heat preservation, improves the benefit of resource With, after heating, by connecting tube flow into water tank 11, pass through switch panel close the first electromagnetic valve switch, second solenoid valve Switch and high-pressure hydraulic pump switch, by the way that burnt gas switch 5 is turned off manually, operation is completed.
In the description of the present invention, it should be understood that term " coaxial ", " bottom ", " one end ", " top ", " in The orientation of the instructions such as portion ", " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " or position are closed System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, rather than The device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot It is construed as a limitation of the present invention.
In addition, term " first ", " second ", " third ", " the 4th " are used for description purposes only, and should not be understood as instruction or It implies relative importance or implicitly indicates the quantity of indicated technical characteristic, define " first ", " second ", " the as a result, Three ", the feature of " the 4th " can explicitly or implicitly include at least one of the features.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu Calmly ", the terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral; It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly, for this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of wall-hung boiler being rapidly heated, including wall hanging furnace shell (1), which is characterized in that the wall hanging furnace shell (1) is internal Bottom end be fixedly connected with set casing, burner (4), the burner are fixedly connected between the inner wall of the set casing bottom end (4) it is fixed with combustion chamber at the top of, heat exchanger (2), the heat are fixedly connected between the inner wall on the set casing top It is fixedly connected at the top of exchanger (2) exhaust pipe (16), the gas outlet of the exhaust pipe (16) is placed in wall hanging furnace shell (1) The middle part of bottom end on top, the wall hanging furnace shell (1) is fixedly connected with the gas outlet of fuel gas conduit, the air inlet of the fuel gas conduit It is communicated with the bottom end of gas storage tank (14), the side of the gas outlet of the fuel gas conduit is fixedly connected with burnt gas switch (5), described The side of the air inlet of fuel gas conduit is fixed with the second battery valve, and the side of wall hanging furnace shell (1) inner wall is fixedly installed with Hot water helix tube (3), the water outlet of the hot water helix tube (3) is through the bottom end of wall hanging furnace shell (1) and one end of connecting tube It is fixedly connected, the other end of the connecting tube is fixedly connected with the water inlet of copper metal tube road (10), in the connecting tube Portion is fixedly installed with the first solenoid valve (6), and the outer sheath of the copper metal tube road (10) is equipped with several coils (7), described The water outlet in copper metal tube road (10) is fixedly connected by connecting tube with the water inlet of heating structure, and the heating structure goes out The mouth of a river is fixedly connected by connecting tube with the side of water tank (11), and the side of the water tank (11) passes through connecting tube and high-pressure hydraulic pump (12) water inlet is fixedly connected, bottom end and cold water spiral shell of the water outlet of the high-pressure hydraulic pump (12) through wall hanging furnace shell (1) Coil (15) water inlet is fixedly connected, and the water outlet of the cold water helix tube (15) passes through connecting tube and hot water helix tube (3) Water inlet is fixedly connected.
2. a kind of wall-hung boiler being rapidly heated according to claim 1, it is characterised in that: the heating structure includes heat dissipation The inside of protective jacket (9), heat dissipation protective jacket (9) is equipped with hot duct (8), and the surface of heat dissipation protective jacket (9) opens up There are several heat release holes, and hot duct (8) is fixedly connected by conduit coupling with copper metal tube road (10).
3. a kind of wall-hung boiler being rapidly heated according to claim 1, it is characterised in that: the wall hanging furnace shell (1) Side is fixedly installed with switch panel, and the surface of the switch panel is fixedly installed with the first electromagnetic valve switch, second solenoid valve Switch and high-pressure hydraulic pump switch, first solenoid valve (6), second solenoid valve (13) and high-pressure hydraulic pump (12) pass through first respectively Electromagnetic valve switch, second solenoid valve switch and high-pressure hydraulic pump switch are electrically connected with the power supply.
4. a kind of wall-hung boiler being rapidly heated according to claim 1, it is characterised in that: in the wall hanging furnace shell (1) Insulation board is fixed in the interlayer of wall.
5. a kind of wall-hung boiler being rapidly heated according to claim 1, it is characterised in that: set at the top of the water tank (11) There is case lid.
CN201822258969.5U 2018-12-30 2018-12-30 A kind of wall-hung boiler being rapidly heated Active CN209415783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822258969.5U CN209415783U (en) 2018-12-30 2018-12-30 A kind of wall-hung boiler being rapidly heated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822258969.5U CN209415783U (en) 2018-12-30 2018-12-30 A kind of wall-hung boiler being rapidly heated

Publications (1)

Publication Number Publication Date
CN209415783U true CN209415783U (en) 2019-09-20

Family

ID=67941863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822258969.5U Active CN209415783U (en) 2018-12-30 2018-12-30 A kind of wall-hung boiler being rapidly heated

Country Status (1)

Country Link
CN (1) CN209415783U (en)

Similar Documents

Publication Publication Date Title
CN201508017U (en) Improved gas water heater
CN204786636U (en) Afterheat recycling device of kitchen range
CN209415783U (en) A kind of wall-hung boiler being rapidly heated
CN205560872U (en) Power adjustable intelligence commercial fuel gas stove
CN205481191U (en) Afterheat recycling device of kitchen range
CN206222667U (en) Multiple-energy-source wall-hung boiler
CN201892244U (en) Multi-purpose stove
CN210320621U (en) Gas heating water heater
CN209013471U (en) A kind of new energy wall-hung boiler
CN206648283U (en) A kind of new forced exhaust gas water heater
CN205783749U (en) A kind of three backhaul water heaters in terms of hot-water boiler
CN202328421U (en) Combined hearth waste heat reuse device for commercial gas cooker
CN2319745Y (en) Household gas boiler
CN214619687U (en) Multifunctional heat-insulating pressure-bearing hot water stove
CN219713667U (en) Portable outdoor gas water heater
CN215983212U (en) Novel freeze-proof wall-mounted furnace
CN109631318A (en) A kind of interior wall hanging water heater
CN212409058U (en) Water storage type electric wall-mounted stove
CN2916713Y (en) Fuzzy controlled electromagnetic water heater
CN213453856U (en) Energy saver for wall-mounted gas stove
CN219318657U (en) Full premix condensing heat exchanger convenient to maintain
CN209213806U (en) A kind of high-efficient steam generator
CN200975709Y (en) Coal-fired energy-saving heating cooking stove
CN207422639U (en) It is a kind of to automatically control anti-dry wall-hung boiler
CN209978349U (en) Graphene heating instant water heater

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 253400 South of the East Ningnan River in Ningjin Economic and Technological Development Zone, Dezhou City, Shandong Province

Patentee after: Shandong Baidian Electric Appliance Co.,Ltd.

Address before: 253400 South of the East Ningnan River in Ningjin Economic and Technological Development Zone, Dezhou City, Shandong Province

Patentee before: Dezhou Baidian Electrical Appliances Co.,Ltd.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A wall hanging furnace with fast heating

Effective date of registration: 20210425

Granted publication date: 20190920

Pledgee: Shandong Ningjin Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong Baidian Electric Appliance Co.,Ltd.

Registration number: Y2021980003025

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220518

Granted publication date: 20190920

Pledgee: Shandong Ningjin Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong Baidian Electric Appliance Co.,Ltd.

Registration number: Y2021980003025

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A wall mounted furnace with rapid temperature rise

Effective date of registration: 20220531

Granted publication date: 20190920

Pledgee: Shandong Ningjin Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong Baidian Electric Appliance Co.,Ltd.

Registration number: Y2022980006631

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230523

Granted publication date: 20190920

Pledgee: Shandong Ningjin Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong Baidian Electric Appliance Co.,Ltd.

Registration number: Y2022980006631

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A fast heating wall mounted furnace

Effective date of registration: 20230530

Granted publication date: 20190920

Pledgee: Shandong Ningjin Rural Commercial Bank Co.,Ltd.

Pledgor: Shandong Baidian Electric Appliance Co.,Ltd.

Registration number: Y2023980042020

PE01 Entry into force of the registration of the contract for pledge of patent right