CN209412275U - A kind of revolution kiln tail vertical preheater - Google Patents

A kind of revolution kiln tail vertical preheater Download PDF

Info

Publication number
CN209412275U
CN209412275U CN201821955939.3U CN201821955939U CN209412275U CN 209412275 U CN209412275 U CN 209412275U CN 201821955939 U CN201821955939 U CN 201821955939U CN 209412275 U CN209412275 U CN 209412275U
Authority
CN
China
Prior art keywords
shell
kiln tail
tail vertical
revolution kiln
discharging bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821955939.3U
Other languages
Chinese (zh)
Inventor
刘敏
霍磊
刘晓渊
黄宝
常彦鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINDIAN CHEMICAL INDUSTRY Co Ltd PIANGUAN COUNTY
Original Assignee
JINDIAN CHEMICAL INDUSTRY Co Ltd PIANGUAN COUNTY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINDIAN CHEMICAL INDUSTRY Co Ltd PIANGUAN COUNTY filed Critical JINDIAN CHEMICAL INDUSTRY Co Ltd PIANGUAN COUNTY
Priority to CN201821955939.3U priority Critical patent/CN209412275U/en
Application granted granted Critical
Publication of CN209412275U publication Critical patent/CN209412275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)
  • Muffle Furnaces And Rotary Kilns (AREA)

Abstract

The utility model discloses a kind of revolution kiln tail vertical preheaters, are related to preheater.A kind of revolution kiln tail vertical preheater, including shell, with fixed discharging bin in the lower part of the housing, the enclosure interior sets gradually feeding warehouse from top to bottom, pre-heating cabin, blanking device, air-cooled bracket, the middle position of feeding warehouse is provided with separated material cone, there are blanking channels between separated material cone and shell, gas outlet is opened up on the side wall of the shell of separated material cone lower part, gas outlet is connected to flue, the lower part of separated material cone is pre-heating cabin, the lower part of pre-heating cabin is provided with the double-deck pyramid connecting with air-cooled bracket, the double-deck pyramidal surface is covered with hole, tracheae is inserted into hole, tracheae is communicated with discharging bin, air-cooled bracket is fixed on the bottom of shell.The utility model preheats metallurgical briquetting using the high-temperature flue gas that rotary kiln generates, and while recycling to waste heat, reaches and extends flue gas dust collecting system service life, reduces energy consumption, reduce the purpose of pollution.

Description

A kind of revolution kiln tail vertical preheater
Technical field
The utility model relates to preheaters, and in particular to a kind of revolution kiln tail vertical preheater.
Background technique
Rotary kiln refers to rotary calcining kiln, is commonly called as rotary kiln, by processing material difference can be divided into cement kiln, chemical metallurgy kiln and Limekiln.It is implemented recently as national environmental protection policy, resource Distursement, rotary kiln is gradually backward instead of facility, dirty Contaminate earth kiln big, that energy consumption is high, shaft furnace.
Wherein chemical metallurgy rotary kiln can generate big amount temperature and be up to 300 DEG C ~ 400 DEG C during calcining metallurgy pelletizing High-temperature gas, and existing high-temperature dust removal cloth bag, can long-term 260 DEG C of heatproof, 300 DEG C of instantaneous heatproof, not processed High Temperature Gas Body is easy to the effect for making deduster lose dedusting.In addition, the metallurgical briquetting under normal temperature state is directly entered calcined by rotary kiln, meeting Calcination temperature in rotary kiln is had a huge impact, power consumption is increased, increases production cost.
In order to solve the above problems existing in the present technology, the utility model has developed a kind of preheater, is to utilize revolution The high-temperature gas that kiln calcining generates, drying, heating metallurgical briquetting, reduces rotary kiln energy consumption, while effectively reducing rotary kiln and forging The gas temperature emitted is burnt, enables deduster is permanently effective to play a role, plays the role of energy saving.
Summary of the invention
The purpose of the utility model is to provide a kind of revolution kiln tail vertical preheaters.
The utility model is achieved through the following technical solutions:
A kind of revolution kiln tail vertical preheater, including shell, and fixed discharging bin in the lower part of the housing, the enclosure interior It is disposed with feeding warehouse, pre-heating cabin, blanking device, air-cooled bracket from top to bottom, the middle position of the feeding warehouse is provided with Separated material cone offers on the side wall of the shell of separated material cone lower part there are blanking channel between separated material cone and shell Gas outlet, gas outlet are connected to flue, and the lower part of the separated material cone is pre-heating cabin, and the lower part of the pre-heating cabin is provided with The double-deck pyramid connecting with air-cooled bracket, the double-deck pyramidal surface are covered with hole, are inserted into tracheae in hole, the tracheae with go out Feed bin communicates, and the air-cooled bracket is fixed on the bottom of shell.
Further, the inner surface masonry of the shell has wearing-proof refractory material, for reinforcing the mechanical strength of shell, And play heat-insulated effect.
The inner surface of the double-deck pyramid builds high-strength wearable refractory material, and outer surface builds light thermal insulation fire-resistant Material.
There are gaps between orifice plate inside and outside the double-deck pyramid, after connecting with air-cooled bracket, form cooling air channel, are used for It cools to the double-deck pyramid.
The discharging bin is the discharging bin of incline structure, and discharge end is connect with rotary kiln.
The discharging bin inner surface builds high-strength wearable refractory material.
The flue is ring smoke pipeline, is circumferentially positioned at hull outside, offers on the shell more A gas outlet, multiple gas outlets are connected to flue respectively.
The blanking device is plough material scraper, is connect by transmission device with motor and speed reducer, when operation, by electricity Machine makes rotating motion with speed reducer drive, and material is scraped.
The top of the pre-heating cabin is provided with maintenance door, is convenient to clean and overhauls.
The high-temperature gas that calcined by rotary kiln generates is entered enclosure interior by discharging bin by the utility model, by tracheae from The double-deck pyramid enters pre-heating cabin, and the preheating zone formed to metallurgical briquetting preheats, and material is made from feeding warehouse via separated material cone With, along blanking channel enter pre-heating cabin preheating after, rotary kiln is entered from discharging bin by blanking device;And high-temperature flue gas will be metallurgical Pelletizing preheating enters the flue of annular from gas outlet, into smoke duster after itself cooling;Pair of pre-heating cabin lower part There are gaps between orifice plate inside and outside layer pyramid, after connecting with air-cooled bracket, form cooling air channel, for dropping to the double-deck pyramid is cooling Temperature.
In conclusion the utility model preheats metallurgical briquetting using the high-temperature flue gas that rotary kiln generates, carried out to waste heat While recycling, reach and extend flue gas dust collecting system service life, reduces energy consumption, reduce the purpose of pollution.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the perspective view of the utility model;
Fig. 3 is the structural schematic diagram of the double-deck pyramid;
In figure: 1- maintenance door, 2- feeding warehouse, 3- separated material cone, 4- flue, 5- motor, 6- pre-heating cabin, 7- bilayer rib Cone, 8- tracheae, 9- shell, 10- blanking device, the air-cooled bracket of 11-, 12- discharging bin, 13- rotary kiln, 14- transmission device.
Specific embodiment
The utility model is further detailed combined with specific embodiments below, it is to be understood that these embodiments It is merely to illustrate the utility model rather than limitation the scope of the utility model.Those skilled in the art are in the utility model base The various changes or modification made on plinth to the utility model, should all equally fall within the protection scope of the utility model.
A kind of revolution kiln tail vertical preheater as shown in Figure 1, 2, 3, including shell 9, and it is fixed on going out for 9 lower part of shell Feed bin 12 is disposed with feeding warehouse 2, pre-heating cabin 6, blanking device 10, air-cooled bracket 11 inside the shell 9 from top to bottom, The middle position of the feeding warehouse 2 is provided with separated material cone 3, there are blanking channel between separated material cone 3 and shell 9, it is described every Expect to offer gas outlet on the side wall of the shell 9 of 3 lower part of cone, gas outlet is connected to flue 4, the separated material cone 3 Lower part is pre-heating cabin 6, and the lower part of the pre-heating cabin 6 is provided with the double-deck pyramid 7 connecting with air-cooled bracket 11, the double-deck rib It bores 7 surfaces and is covered with hole, be inserted into tracheae 8 in hole, the tracheae 8 is communicated with discharging bin 12, and the air-cooled bracket 11 is fixed on The bottom of shell 9.
Wherein shell 9 inner surface masonry have wearing-proof refractory material, for reinforcing the mechanical strength of shell 9, and play every The effect of heat;12 inner surface of discharging bin builds high-strength wearable refractory material;It is resistance to that the inner surface of the double-deck pyramid 7 builds high-strength wearable Fiery material, outer surface build light thermal insulation fire-resistant material;There are gaps between orifice plate inside and outside the double-deck pyramid 7, with air-cooled bracket After 11 connections, cooling air channel is formed, for cooling to the double-deck pyramid;Discharging bin 12 is the discharging bin of incline structure, out Material end is connect with rotary kiln 13;Flue 4 is ring smoke pipeline, is circumferentially positioned on the outside of shell 9, on the shell 9 Multiple gas outlets are offered, multiple gas outlets are connected to flue 4 respectively;Blanking device 10 is plough material scraper, passes through biography Dynamic device 14 is connect with motor 5 and speed reducer, when operation, is driven and is made rotating motion by motor and speed reducer, material is scraped;Institute The top for the pre-heating cabin stated is provided with maintenance door 1, is convenient to clean and overhauls.

Claims (9)

1. a kind of revolution kiln tail vertical preheater, which is characterized in that including shell, and fixed discharging bin in the lower part of the housing, institute It states enclosure interior and is disposed with feeding warehouse, pre-heating cabin, blanking device, air-cooled bracket, the centre of the feeding warehouse from top to bottom Position is provided with separated material cone, and there are blanking channel, the sides of the shell of separated material cone lower part between separated material cone and shell Gas outlet is offered on wall, gas outlet is connected to flue, and the lower part of the separated material cone is pre-heating cabin, the pre-heating cabin Lower part is provided with the double-deck pyramid connecting with air-cooled bracket, and the double-deck pyramidal surface is covered with hole, and tracheae is inserted into hole, described Tracheae communicated with discharging bin, the air-cooled bracket is fixed on the bottom of shell.
2. a kind of revolution kiln tail vertical preheater according to claim 1, which is characterized in that the inner surface of the shell Masonry has wearing-proof refractory material.
3. a kind of revolution kiln tail vertical preheater according to claim 1 or 2, which is characterized in that the double-deck pyramid Inner surface build high-strength wearable refractory material, outer surface build light thermal insulation fire-resistant material.
4. a kind of revolution kiln tail vertical preheater according to claim 1 or 2, which is characterized in that the double-deck pyramid There are gaps between inside and outside orifice plate.
5. a kind of revolution kiln tail vertical preheater according to claim 1 or 2, which is characterized in that the discharging bin is The discharging bin of incline structure.
6. a kind of revolution kiln tail vertical preheater according to claim 1 or 2, which is characterized in that in the discharging bin Surface builds high-strength wearable refractory material.
7. a kind of revolution kiln tail vertical preheater according to claim 1 or 2, which is characterized in that the flue For ring smoke pipeline, it is circumferentially positioned at hull outside, multiple gas outlets, multiple gas outlet difference are offered on the shell It is connected to flue.
8. a kind of revolution kiln tail vertical preheater according to claim 1 or 2, which is characterized in that the blanking device For plough material scraper, it is connect by transmission device with motor and speed reducer.
9. a kind of revolution kiln tail vertical preheater according to claim 1 or 2, which is characterized in that the pre-heating cabin Top is provided with maintenance door.
CN201821955939.3U 2018-11-26 2018-11-26 A kind of revolution kiln tail vertical preheater Active CN209412275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821955939.3U CN209412275U (en) 2018-11-26 2018-11-26 A kind of revolution kiln tail vertical preheater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821955939.3U CN209412275U (en) 2018-11-26 2018-11-26 A kind of revolution kiln tail vertical preheater

Publications (1)

Publication Number Publication Date
CN209412275U true CN209412275U (en) 2019-09-20

Family

ID=67935282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821955939.3U Active CN209412275U (en) 2018-11-26 2018-11-26 A kind of revolution kiln tail vertical preheater

Country Status (1)

Country Link
CN (1) CN209412275U (en)

Similar Documents

Publication Publication Date Title
CN103924012A (en) Device and method for recovering residual heat by dry-process granulation of metallurgical slag
CN204198825U (en) A kind of dividing wall type refining magnesium rotary kiln
CN106746769B (en) Upright active lime calcining furnace
CN201621949U (en) Externally-heated coal reducing rotary kiln
CN109295298A (en) A kind of revolution kiln tail vertical preheater
CN106556250A (en) A kind of heating rotary kiln
CN103803567A (en) Continuous production device for calcining and whitening black talc and production process thereof
CN108800921A (en) A kind of rotary kiln for calcining phosphorus ore
CN108002416B (en) A kind of drying and calcining processing technology and equipment crystallizing Aluminum Chloride Hexahydrate
CN209412275U (en) A kind of revolution kiln tail vertical preheater
CN206273811U (en) A kind of upright active lime calcining furnace
CN207395454U (en) A kind of primary and secondary rotary kiln with auxiliary temperature-reducing
CN102502572B (en) Calcined coke cooling equipment
CN113443842B (en) Light-burned magnesium production device and production method
CN214792497U (en) Spodumene calcining and converting device
CN108020084A (en) A kind of rotary hearth furnace smoke waste heat utilization system and method
CN101266099B (en) Electromagnetic induction calcinations continuous operation process and its dedicated electromagnetic induction calcining equipment
CN111829337A (en) High-temperature alumina calcining equipment
CN209815974U (en) Device for smelting magnesite with low power consumption
CN206447782U (en) A kind of novel environment friendly kiln
CN207894257U (en) Heat exchange shaft kiln
CN202582173U (en) Annular kiln and material drying device based on annular kiln
CN212253605U (en) High-temperature alumina calcining equipment
CN101659522B (en) Calcined dolomite production machine
CN201981008U (en) Device for calcining needle-like coke by rotary kiln

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant