CN209384124U - A kind of steel truss girder purlin piece turnover hoisting structure - Google Patents

A kind of steel truss girder purlin piece turnover hoisting structure Download PDF

Info

Publication number
CN209384124U
CN209384124U CN201822203261.XU CN201822203261U CN209384124U CN 209384124 U CN209384124 U CN 209384124U CN 201822203261 U CN201822203261 U CN 201822203261U CN 209384124 U CN209384124 U CN 209384124U
Authority
CN
China
Prior art keywords
lifting lug
boom
steel truss
truss girder
top boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822203261.XU
Other languages
Chinese (zh)
Inventor
刘洪全
陈方能
李小松
曾希琦
唐志
朱子旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanqiao Nantong Co ltd
Original Assignee
Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd filed Critical Jiangsu Zhongtie Shanqiao Heavy Industry Co Ltd
Application granted granted Critical
Publication of CN209384124U publication Critical patent/CN209384124U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of steel truss girder purlin piece turnover hoisting structure, steel truss girder includes top boom, lower boom, web member and brace;It is characterized by also including lifting lug, the lifting lug has several and is separately positioned on top boom and lower boom;Direction that the lifting lug is arranged on top boom and the direction being arranged on lower boom are orthogonal;By being staggeredly equipped with lifting lug respectively on the top boom and lower boom of steel truss girder in the utility model, it ensure that lifting lug accepts stability in lifting;In addition, the junction that web member and chord member is arranged in lifting lug on top boom ensure that the reasonability of stress point impetus, the position of lifting lug lifts by crane steel truss girder, ensure that the web member and brace in steel truss girder are not susceptible to deformation;It does not need to occupy special place yet.

Description

A kind of steel truss girder purlin piece turnover hoisting structure
Technical field
The utility model relates to bridge truss turn over aid field more particularly to a kind of steel truss girder purlin piece turnover hoistings Structure.
Background technique
Currently, when being converted to vertical position progress section assembling, being generally required special after the completion of steel truss girder purlin piece prosposition is assembled Purlin piece overturning tire is completed to realize, not only needs to design special tooling, also need special place when turning and turning over, turn In vertical position, state is transported to assembled place afterwards, can only be by loop wheel machine air transport, and difficulty and security risk are all bigger, corresponding to take With can also greatly increase.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of steel truss girder purlin piece turnover hoisting structures, are able to solve one As the piece switching process of steel truss girder purlin in turn over need dedicated site and special turning tool, the big problem of difficulty Risks.
In order to solve the above technical problems, the technical solution of the utility model are as follows: a kind of steel truss girder purlin piece turnover hoisting structure, Steel truss girder includes top boom, lower boom, web member and brace;Its innovative point in: further include lifting lug, the lifting lug have several and It is separately positioned on top boom and lower boom;Direction that the lifting lug is arranged on top boom and the direction being arranged on lower boom are mutual It is perpendicular;
It is provided with two groups of lifting lugs on the top boom and is arranged perpendicular to the upper surface of top boom, every group of lifting lug setting There are two the first lifting lug unit and the second lifting lug unit parallel to each other, the first lifting lug unit of the lifting lug group on top boom is located at The surface of web member and top boom joining place, the second lifting lug unit are located at the side of the first lifting lug unit;
Setting is arranged there are two lifting lug and perpendicular to the side surface of lower boom on the lower boom, two on the lower boom A lifting lug is respectively third lifting lug unit and the 4th lifting lug unit;The third lifting lug unit and the 4th lifting lug unit and top boom On two groups of lifting lugs interlock in the extending direction position of chord member;
Lifting lug unit includes a pair of otic placode parallel to each other and the connecting rod that is vertically connected between otic placode.
Further, it is welded between the connecting rod and otic placode using penetration.
Utility model has the advantages that
1) it ensure that in the utility model by being staggeredly equipped with lifting lug respectively on the top boom and lower boom of steel truss girder Lifting lug accepts stability in lifting;In addition, web member is arranged in lifting lug on top boom and the junction of chord member ensure that stress Steel truss girder is lifted by crane in the position of the reasonability of point impetus, lifting lug, ensure that the web member and brace in steel truss girder are not susceptible to deformation; It does not need to occupy special place yet.
Detailed description of the invention
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.
Fig. 1 is a kind of gooseneck purlin piece turnover hoisting structure of the utility model.
Fig. 2 is a kind of A-A schematic diagram of gooseneck purlin piece turnover hoisting structure of the utility model.
Fig. 3 is a kind of B-B schematic diagram of gooseneck purlin piece turnover hoisting structure of the utility model.
Specific embodiment
The following examples can make professional and technical personnel that the utility model be more fully understood, but therefore will not The utility model is limited among the embodiment described range.
A kind of steel truss girder purlin piece turnover hoisting structure as shown in Figure 1 to Figure 3, steel truss girder include top boom 1, lower boom 2, Web member and brace 3;It further include lifting lug 4, the lifting lug 4 has several and is separately positioned on top boom 1 and lower boom 2;Institute It is orthogonal to state the direction being arranged on the direction and lower boom 2 that lifting lug 4 is arranged on top boom 1.
It is provided with two groups of lifting lugs on top boom 1 and is arranged perpendicular to the upper surface of top boom 1, every group of lifting lug 4 setting There are two the first lifting lug unit 41 and the second lifting lug unit 42 parallel to each other, the first lifting lug list of the lifting lug group on top boom 1 Member 41 is located at the surface of web member and 1 joining place of top boom, and the second lifting lug unit position 42 is in the side of the first lifting lug unit 41.
Setting is arranged there are two lifting lug and perpendicular to the side surface of lower boom 2 on lower boom 2, two on the lower boom 2 A lifting lug is respectively third lifting lug unit 43 and the 4th lifting lug unit 44;The third lifting lug unit 43 and the 4th lifting lug unit 44 Interlock with two groups of lifting lugs 4 on top boom 1 in the extending direction position of chord member.
Lifting lug unit includes a pair of otic placode parallel to each other and the connecting rod that is vertically connected between otic placode.
It is welded between connecting rod and otic placode using penetration.
It should be understood by those skilled in the art that the present utility model is not limited to the above embodiments, above-described embodiment and Only illustrate the principles of the present invention described in specification, on the premise of not departing from the spirit and scope of the utility model, The utility model also has various changes and improvements, these changes and improvements both fall within the scope of the claimed invention It is interior.The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (2)

1. a kind of steel truss girder purlin piece turnover hoisting structure, steel truss girder include top boom, lower boom, web member and brace;Its feature exists In: it further include lifting lug, the lifting lug has several and is separately positioned on top boom and lower boom;The lifting lug is in top boom The direction being arranged on the direction of upper setting and lower boom is orthogonal;
It is provided with two groups of lifting lugs on the top boom and is arranged perpendicular to the upper surface of top boom, every group of lifting lug is provided with two First lifting lug unit of a first lifting lug unit and the second lifting lug unit parallel to each other, the lifting lug group on top boom is located at web member With the surface of top boom joining place, the second lifting lug unit is located at the side of the first lifting lug unit;
Setting is arranged there are two lifting lug and perpendicular to the side surface of lower boom on the lower boom, and two on the lower boom hang Ear is respectively third lifting lug unit and the 4th lifting lug unit;On the third lifting lug unit and the 4th lifting lug unit and top boom Two groups of lifting lugs interlock in the extending direction position of chord member;
Lifting lug unit includes a pair of otic placode parallel to each other and the connecting rod that is vertically connected between otic placode.
2. a kind of steel truss girder purlin piece turnover hoisting structure according to claim 1, it is characterised in that: the connecting rod and ear It is welded between plate using penetration.
CN201822203261.XU 2018-09-28 2018-12-26 A kind of steel truss girder purlin piece turnover hoisting structure Active CN209384124U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018215925545 2018-09-28
CN201821592554 2018-09-28

Publications (1)

Publication Number Publication Date
CN209384124U true CN209384124U (en) 2019-09-13

Family

ID=67873613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822203261.XU Active CN209384124U (en) 2018-09-28 2018-12-26 A kind of steel truss girder purlin piece turnover hoisting structure

Country Status (1)

Country Link
CN (1) CN209384124U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118004892A (en) * 2024-04-08 2024-05-10 中铁四局集团有限公司 Truss sheet land safety overturning control device and use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118004892A (en) * 2024-04-08 2024-05-10 中铁四局集团有限公司 Truss sheet land safety overturning control device and use method

Similar Documents

Publication Publication Date Title
CN201850085U (en) Primary truss arm and crawler crane with the same
CN209384124U (en) A kind of steel truss girder purlin piece turnover hoisting structure
CN201099590Y (en) Large-sized trussed-beam type crane detaching type single shear connection girder structure
CN201634347U (en) Ultra-large tower crane and lower support assembly thereof
CN203545535U (en) Auxiliary arm and crane
CN208648548U (en) A kind of suspender for handling U-shaped beam reinforcement cages
CN108946435A (en) A kind of hanging beam structure
WO2013139116A1 (en) Arm joint for truss arm, truss arm, and crane with truss arm
CN101811646A (en) Crawler crane with lateral reinforcement structure
CN207177086U (en) It is a kind of can quick assembling set up truss
CN214003773U (en) Assembled multi-wing D-shaped lifting lug
CN206606918U (en) A kind of boat segmental is from tire and the T-shaped suspension ring and its mounting structure of total group lifting
CN214399503U (en) Multi-steel-beam component hoisting rigging for high-rise steel structure construction
CN205531009U (en) Concatenation formula large -span steel truss
CN207390868U (en) A kind of plate drawing system for being used to fix auxiliary operating mode
CN209009978U (en) A kind of hanging beam structure
CN209009988U (en) A kind of hoisting device for reinforcement cage
CN201574048U (en) Crawler crane with lateral strengthening structure
CN208668432U (en) A kind of connection structure of steel purlin and bracing members
CN206219084U (en) The main string standard knot of double angle
CN207131062U (en) A kind of job platform
CN109110629A (en) A kind of hoisting device for reinforcement cage
CN215828181U (en) Universal crane main beam structure
CN204549898U (en) A kind of movable arm type tower machine auxiliary device
CN204690594U (en) A kind of simple and easy door frame of the Slidable for the installation of framing type steel box-girder crossbeam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 226500 Wenjin Road, Yangtze River Town, Rugao City, Nantong City, Jiangsu Province

Patentee after: China Railway Shanqiao (Nantong) Co.,Ltd.

Address before: 226500 Wenjin Road, Yangtze River Town, Rugao City, Nantong City, Jiangsu Province

Patentee before: JIANGSU CHINA RAILWAY SHANHAIGUAN BRIDGE HEAVY INDUSTRY Co.,Ltd.