CN209369096U - Prefabricated laminated wood wall construction and log cabin structure - Google Patents
Prefabricated laminated wood wall construction and log cabin structure Download PDFInfo
- Publication number
- CN209369096U CN209369096U CN201821713214.3U CN201821713214U CN209369096U CN 209369096 U CN209369096 U CN 209369096U CN 201821713214 U CN201821713214 U CN 201821713214U CN 209369096 U CN209369096 U CN 209369096U
- Authority
- CN
- China
- Prior art keywords
- wall
- pipeline
- connection
- laminated wood
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of prefabricated laminated wood wall construction and log cabin structure, wherein, the prefabricated laminated wood wall construction includes wall, hoisting structure and electrical structure, the hoisting structure is set to the wall, to lift by crane the wall, the electrical structure is set to the wall, and the electrical structure includes being arranged in the wire structure inside the wall and the electrical part set on the wire structure end.While the prefabricated wall, the hoisting structure and the electrical structure are integrated in the wall, when the wall turn sequence, transport, on-site hoisting, it only needs to lift to connect the hoisting structure, the lifting prefabricated wood wall can be realized, when field operation, it does not need to carry out complicated electrical burying work beforehand, it only needs for corresponding node to be attached, completion when most electrical installation is prefabricated in the factory, the Fast Installation at scene may be implemented, improve production, the installation effectiveness of live log cabin structure.
Description
Technical field
The utility model relates to construction wall technical field, in particular to a kind of prefabricated laminated wood wall construction and log cabin knot
Structure.
Background technique
In the prior art, log cabin structure is all that material is transported to scene, carries out production and assembled, production efficiency pole at the scene
It is low, the quality of production is poor.
Wall body structure be log cabin structure component part, in the prior art, not similar prefabricated wood wall construction, be all
Field fabrication and assembly, production efficiency is extremely low, the quality of production is poor.
Utility model content
The main purpose of the utility model is to propose a kind of prefabricated laminated wood wall construction and log cabin structure, it is intended to by wall knot
Structure is integrated to be formed in wall in advance, is only needed to carry out the simple assembly of the wooden wall construction at the scene, is improved production efficiency.
To achieve the above object, the utility model proposes prefabricated laminated wood wall construction, comprising:
Wall;
Hoisting structure is set to the wall, to lift by crane the wall;And
Electrical structure, is set to the wall, the electrical structure include be arranged in wire structure inside the wall, with
And the electrical part set on the wire structure end.
Preferably, the wall includes:
Two wallboards, in being oppositely arranged, two wallboards present it is lower be extended, formed between two wallboards
One installation space;
Multiple wall columns extended in upward and downward, multiple wall columns are set to institute along the width direction interval of the wallboard
It states in installation space;And
Raising-plate, the width direction along the wallboard are extended, and the raising-plate is set to the upper of multiple wall columns
End face.
Preferably, the upper surface of the raising-plate has the lifting installing zone being between two adjacent wall columns
Domain, in the lifting installation region, the raising-plate has provided the first via hole;
The hoisting structure includes the lifting screw rod that upward and downward extends, and the lifting screw rod, which is removably secured, is installed on institute
It states in the first via hole.
Preferably, the hoisting structure further includes the first locking nut set on the lifting screw rod lower end;
The prefabricated laminated wood wall construction further include:
Nut built-in fitting, the nut built-in fitting include the nut mounting groove of opening upwards, and are distributed in the nut
The fixed ring of mounting groove upper end side, lower end surface of the fixed ring to be fixed to the raising-plate upwards, the nut peace
First locking nut is equipped in tankage, the nut mounting groove corresponds to the first via hole setting, and its bottom wall is equipped with and allows
Position hole, the relief hole are worn with for the lifting screw rod;And
Reinforce connector, the connector of reinforcing includes the first segment of horizontal direction extension, upward and downward extension and is divided into institute
It states the second segment of first segment lower section two sides and is correspondingly connected with two linkage sections of the first segment and two second segments,
The first segment is fixedly installed between the fixed ring and the raising-plate, and two second segments are respectively to be fixedly connected
To two wall columns.
Preferably, two wallboards are in upper and lower and control to extended;
The wire structure includes being arranged in the intracorporal installation pipeline of the wall and being set in the installation pipeline inner cavity
Conductor wire, the installation pipeline includes along left and right to the first pipeline of extension, and/or vertically to extending and extend upwardly to
Second pipeline of the raising-plate;
The first mounting structure is respectively equipped on multiple wall columns, multiple first mounting structures are for first pipe
Road installation, first pipeline is fixed on multiple wall columns;
The raising-plate is equipped with the second mounting structure, and second mounting structure is installed for second pipeline, will
Second pipeline is fixed on the raising-plate.
Preferably, the wall column has first mounting surface opposite with the wallboard, and first mounting structure includes
The first mounting groove on first mounting surface, first mounting groove is interior to be equipped with first pipeline;And/or
The raising-plate has second mounting surface opposite with the wallboard, and second mounting structure includes set on described
The second mounting groove on second mounting surface, second mounting groove is interior to be equipped with second pipeline;
Wherein, the prefabricated laminated wood wall construction further include pressure holding block, the pressure holding block be set to first mounting groove with/
Or second in mounting groove, the limit that there is the pressure holding block relatively described first mounting groove and/or the second mounting groove wall surface to be arranged
Plane, the confined planes are equipped with limiting slot, and the limiting slot with first pipeline and/or the second pipeline to be adapted to, institute
Pressure holding block is stated to press first pipeline and/or the second pipeline from back to front, with limit first pipeline be placed in it is described
In first mounting groove and/or limit second pipeline is placed in second mounting groove.
Preferably, the wall in up and down and front and back to be extended;
The prefabricated laminated wood wall construction further includes the connection structure of wall and basis, the connection knot of the wall and basis
Structure includes:
Foundation structure, the base matrix being extended including horizontal direction and the connection on the base matrix upper surface
Chock, for the connection chock in front and back to being extended, the upper surface of the connection chock is equipped with the wall;And
Multiple threaded connectors are set on the wall and the connection chock, the wall to be fixedly installed in
In the foundation structure.
Preferably, the prefabricated laminated wood wall construction includes at least two walls, wherein a wall is vertically
And left and right, to being extended, another wall is vertically and front and back is to being extended, and passes through wall between two walls
Connection structure is fixedly connected;
At least two walls include at least one first wall and at least one second wall, first wall edge
Up and down and left and right is to being extended, and the first installation region, second wall are formed on the side surface of first wall
Vertically and front and back is to being extended, and is formed with the second installation region on the side surface of second wall;
The connecting structure of wall includes screw connection structure, and the screw connection structure is set to first wall and institute
It states between the second wall;
First wall and second wall are mutual at first installation region with second installation region
It abuts, and is fixed by the screw connection structure;
The first connection wall column that upward and downward extends is equipped in first wall at correspondence first installation region;
Second wall is in corresponding the second connection wall column for being equipped with upward and downward at second installation region and extending;
The screw connection structure is arranged on the first connection wall column and the second connection wall column.
Preferably, first installation region is formed in the left side of first wall, second installation region shape
Second wall right side described in Cheng Yu, the screw connection structure include multiple wood screws, multiple wood screws vertically to
Interval setting, the left side of each wood screw from second wall penetrates, and sequentially passes through the second connection wall bone
Column continues to extend locking to the first connection wall column;Alternatively,
First installation region is formed in the left side of first wall, and second installation region is formed in described
Second wall right side, the screw connection structure include multiple screw connecting structures, and multiple screw connecting structures are along upper
Lower to be arranged to interval, each screw connecting structure includes connecting screw and set on two second of the connecting screw both ends
The left side of locking nut, one end from second wall of the connecting screw penetrates, and sequentially passes through second connection
Wall column, continues through the first connection wall column, and two second locking nuts are divided into the connecting screw
Both ends, respectively to lock second wall left side and it is described first connection wall column right side.
The utility model also proposes a kind of log cabin structure, and the log cabin structure includes prefabricated laminated wood wall construction, described pre-
Laminated wood wall construction processed includes:
Wall;
Hoisting structure is set to the wall, to lift by crane the wall;And
Electrical structure, is set to the wall, the electrical structure include be arranged in wire structure inside the wall, with
And the electrical part set on the wire structure end.
In technical solution provided by the utility model, while the prefabricated wall, by the hoisting structure and described
Electrical structure is integrated in the wall, when the wall turn sequence, transport, on-site hoisting, it is only necessary to lifting connection institute
Hoisting structure is stated, can be realized the lifting prefabricated wood wall, when field operation, does not need to carry out complicated electrical burying work beforehand,
It only needs for corresponding node to be attached, completion when most electrical installation is prefabricated in the factory, the quick of scene may be implemented
Installation improves production, the installation effectiveness of live log cabin structure.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, the structure that can also be shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the schematic cross-sectional view of the embodiment of prefabricated laminated wood wall construction provided by the utility model;
Fig. 2 is the first embodiment schematic elevation view of hoisting structure in Fig. 1;
Fig. 3 is the enlarged diagram of part A in Fig. 2;
Fig. 4 is the schematic cross-sectional view of nut built-in fitting in Fig. 2;
Fig. 5 is the second embodiment schematic elevation view of hoisting structure in Fig. 1;
Fig. 6 is the enlarged diagram of part B in Fig. 5;
Fig. 7 is the embodiment schematic elevation view of electrical structure in Fig. 1;
Fig. 8 be Fig. 7 in electrical structure first embodiment along C-C to partial schematic sectional view;
Fig. 9 be Fig. 7 in electrical structure second embodiment along C-C to partial schematic sectional view;
Figure 10 be Fig. 7 in electrical structure 3rd embodiment along C-C to partial schematic sectional view;
Figure 11 is the fourth embodiment local overlooking schematic diagram of electrical structure in Fig. 7;
Figure 12 is the 5th embodiment local overlooking schematic diagram of electrical structure in Fig. 7;
Figure 13 is the sixth embodiment local overlooking schematic diagram of electrical structure in Fig. 7;
Figure 14 is containing there are two the sectional perspective schematic diagrams of the wall spelling of electrical structure in Fig. 7;
Figure 15 is the local left view schematic diagram of electrical structure in Fig. 7;
Figure 16 is the first embodiment schematic top plan view of connecting structure of wall in Fig. 1;
Figure 17 is the second embodiment schematic top plan view of connecting structure of wall in Fig. 1;
Figure 18 is the enlarged diagram of part D in Figure 16;
Figure 19 is the enlarged diagram of part E in Figure 17;
Figure 20 is the first embodiment schematic cross-sectional view of the connection structure on wall and basis in Fig. 1;
Figure 21 is the second embodiment schematic cross-sectional view of the connection structure on wall and basis in Fig. 1;
Figure 22 is the schematic elevation view of foundation structure in Figure 20.
Drawing reference numeral explanation:
The embodiments will be further described with reference to the accompanying drawings for the realization, functional characteristics and advantage of the utility model aim.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that directionality instruction is only used for solving if relating to directionality instruction in the utility model embodiment
Relative positional relationship, the motion conditions etc. between component each under a certain particular pose are released, if the particular pose changes
When, then directionality instruction also correspondingly changes correspondingly.
In addition, if relating to the description of " first ", " second " etc. in the utility model embodiment, " first ", " the
Two " etc. description is used for description purposes only, and is not understood to indicate or imply its relative importance or is implicitly indicated meaning
The quantity of the technical characteristic shown." first " is defined as a result, the feature of " second " can explicitly or implicitly include at least one
A this feature.It in addition, the technical solution between each embodiment can be combined with each other, but must be with ordinary skill
Based on personnel can be realized, this technical side will be understood that when the combination of technical solution appearance is conflicting or cannot achieve
The combination of case is not present, also not within the protection scope of the requires of the utility model.
The utility model proposes a kind of log cabin structure, the log cabin structure includes prefabricated laminated wood wall construction, as long as tool
There is the log cabin structure of the prefabricated laminated wood wall construction to be all contained in the scope of the utility model, Fig. 1 to Figure 22 is that this is practical
The schematic diagram of the embodiment of the prefabricated laminated wood wall construction of novel offer.
Also referring to Fig. 1, Fig. 2 and Fig. 7, the prefabricated laminated wood wall construction 100 includes wall 1, hoisting structure 2 and electricity
Depressed structure 3, wherein the hoisting structure 2 is set to the wall 1, and to lift by crane the wall 1, the electrical structure 3 is set to institute
State wall 1, the electrical structure 3 includes being arranged in the wire structure 3a wall 1 inside and set on the wire structure
The electrical part 3b of the end 3a.
In technical solution provided by the utility model, while prefabricated wall 1, by the hoisting structure 2 and institute
It states electrical structure 3 to be integrated in the wall 1, when the wall 1 turn sequence, transport, on-site hoisting, it is only necessary to which lifting connects
The hoisting structure 2 is connect, can be realized the lifting prefabricated wood wall, when field operation, does not need to carry out complicated electrical pre-buried
Work, it is only necessary to corresponding node be attached, completion when most electrical installation is prefabricated in the factory, scene may be implemented
Fast Installation improves production, the installation effectiveness of live log cabin structure.
In the embodiments of the present invention, the wall 1 is prefabricated molding, can be prefabricated directly in factory, described
Wall 1 includes two wallboards 11, multiple wall columns 12 and raising-plate 13, wherein and two wallboards 11 are in be oppositely arranged, and two
The wallboard 11 is extended in upward and downward, an installation space is formed between two wallboards 11, the wall column 12 is in
Upward and downward is extended, and multiple wall columns 12 are set in the installation space along the width direction interval of the wallboard 11,
The raising-plate 13 is extended along the width direction of the wallboard 11, and the raising-plate 13 is set to multiple wall columns 12
Upper surface, prefabricated in factory, in-site installation improves production efficiency, has preferable effect.
Referring to Figure 2 together to Fig. 6, the upper surface of the raising-plate 13 have be in two adjacent wall columns 12 it
Between lifting installation region, in the lifting installation region, the raising-plate 13 has provided the first via hole 131, the lifting
Structure 2 includes the lifting screw rod 21 that upward and downward extends, and the lifting screw rod 21, which is removably secured, is installed on first via hole
In 131, the lifting screw rod 21 is fixedly installed in first via hole 131, by the way that the hoisting structure 2 is set to the top
On beam slab 13, when the wooden wall in the production process turn sequence, transport, on-site hoisting, it is only necessary to which lifting connects the hoisting structure
2, the lifting prefabricated wood wall can be realized, it is easy to operate, convenient, improve production efficiency.
Bearing structure of the raising-plate 13 as hoisting structure 2, needs preferable structural strength, the utility model
In embodiment, the number of the raising-plate 13 is multiple, and vertically multiple raising-plates 13 are arranged, make to being stacked
The bearing structure for obtaining the hoisting structure 2 has preferable structural strength, reduces and pays the wooden wall in advance described in occurring in hoisting process
There is the risk of overall deformation, there is preferable effect.
In the embodiments of the present invention, the hoisting structure 2 further includes set on the first of lifting 21 head of screw rod
Locking nut 22, the lifting screw rod 21 are worn downwards from the first via hole 131 of the raising-plate 13, first locking nut
22 are sheathed on the lower end of the lifting screw rod 21, and are fixedly installed in the lower end of the raising-plate 13, first locking nut
22 play the role of the fastening tie down screw, and before the wall 1 manufacture is completed, first locking nut 22 must be first pre-
It is first set in the precast wall body 1, when lifting, the lifting screw rod 21 is screwed in, after the completion of lifting, by the lifting screw rod
21 screw out, easy to operate, convenient.
In embodiment provided by the utility model, the prefabricated laminated wood wall construction 100 further includes nut built-in fitting 23,
The nut built-in fitting 23 includes the nut mounting groove 231 of opening upwards, and is distributed in 231 upper end of the nut mounting groove week
The fixed ring 232 of side, lower end surface of the fixed ring 232 to be fixed to the raising-plate 13 upwards, the nut mounting groove
The locking nut is equipped in 231, corresponding first via hole 131 of the nut mounting groove 231 is arranged, and its bottom wall is equipped with and allows
Position hole 233, is worn with for the lifting spiral shell, and first locking is installed by way of the nut built-in fitting 23 is arranged
Nut 22 does not impact the structure of the raising-plate 13, ensure that the structural strength of the raising-plate 13, has preferable
Effect, in addition, it is necessary to explanation, the fixed ring 232 is that the lower end surface of the raising-plate 13 is fixed on by screw 46
On.
Improving the content that the connection structure intensity being equipped at the hoisting structure 2 is also the utility model please specifically join
Fig. 2 to Fig. 4 is read, the prefabricated laminated wood wall further includes reinforcing connector 24, and the connector 24 of reinforcing includes being laterally extended
First segment 241, upward and downward extend and are divided into the second segment 242 of the 241 lower section left and right sides of first segment and be correspondingly connected with
Two linkage sections 243 of the first segment 241 and two second segments 242, the first segment 241 are fixed to the top upwards
The lower end of beam slab 13, two second segments 242 are respectively to be fixedly attached to two wall columns 12, the reinforcement connector 24
It can be plate to be formed by bending, be also possible to profile, such as steel drawstring, optimal is by the rigid drawstring and the wall
The angle of left and right at 45 ° is arranged in bone column 12, and then the length of the second segment 242 is greater than 200mm, by two strong bone columns
It is equipped at the position of connection structure with the raising-plate 13 and forms an entirety, in lifting operation, on the lifting screw rod 21
Pulling force conduct to two wall columns 12, strengthen the structural strength of 2 junction of hoisting structure, have preferable
Effect.
It is, of course, also possible to which a wall column 12 being laterally extended is arranged by the top beam in the lower end of the raising-plate 13
Plate 13 and two wall columns 12 are connected to form a whole, and specifically, please refer to Fig. 5 to Fig. 6, the prefabricated laminated wood wall
100 further include in left and right to extended reinforcement wall column 2512, and the reinforcement wall column 2512 is correspondingly arranged at the installation
Between two wall columns 12 below region, the upper surface for reinforcing wall column 2512 corresponds to first via hole 131
Equipped with the second via hole, the head of the lifting screw rod 21 sequentially passes through first via hole 131 and second via hole, and by institute
It states the first locking nut 22 and is fixed on the lower end for reinforcing wall column 2512, it should be noted that in such reinforcement structure
In embodiment, first locking nut 22 is also pre-buried by the way that groove 56 and limit film is arranged or passes through the setting nut
The form of part 23 pre-sets first locking nut 22 in advance.
Can be set a hoisting structure 2 on one precast wall body 1, naturally it is also possible to which multiple lifting knots are set
Structure 2, in the present embodiment, the installation region, the first via hole 131 and hoisting structure 2 are multiple in being arranged in a one-to-one correspondence, general to be arranged
It is two, is distributed in the symmetrical two sides of 1 center of gravity of precast wall body, the steady movement of the wall 1 during being easy to lift.
For the ease of lifting, in the embodiments of the present invention, the hoisting structure 2 further includes being set to the lifting screw rod
The hanging ring of 21 upper ends, when lifting operation, it is only necessary to the i.e. implementable lifting operation of the hanging ring is caught on, certainly, and in the present embodiment, institute
Stating hoisting structure 2 can choose standard component, as two kinds of same sizes of lifting bolt 46 and eyenut and the standard component of model into
Row matching operation.
The wire structure 3a and electrical part 3b are embedded in the prefabricated wood within the walls in advance, prefabricated wood wall described in on-site consolidation
When, it does not need to carry out complicated electrical burying work beforehand, it is only necessary to be attached corresponding node, improve live log cabin structure
Production, installation effectiveness, specifically, referring to Figure 7 together to Figure 15, the electrical structure 3 is arranged in the wall 1, in order to
It plays preferable fixed function, is to be fixed on the electrical structure 3 on the skeleton of the wall 1, such as wall bone in the present embodiment
On column 12 and raising-plate 13, specifically, the wire structure 3a includes that the installation pipeline 31 that is arranged in the wall 1 is (described
Installation pipeline 31 is worn to supply lines, and in the present embodiment, the installation pipeline 31 is iron pipe or pipeline) and be set to described
Conductor wire 32 in 31 inner cavity of installation pipeline, the installation pipeline 31 include along left and right to extension the first pipeline 311, and/or
Vertically to the second pipeline 312 for extending and extending upwardly to the raising-plate 13, it is respectively equipped on multiple wall columns 12
First mounting structure 33, multiple first mounting structures 33 are installed for first pipeline 311, by first pipeline
311 are fixed on multiple wall columns 12, and the raising-plate 13 is equipped with the second mounting structure 34, second mounting structure
34 install for second pipeline 312, second pipeline 312 are fixed on the raising-plate 13, the wall column 12
Mainly the wire structure 3a extended to fixed horizontal direction, the wire structure 3a that horizontal direction extends are mainly used for as main electricity
Route, the electric wiring with other walls 1 is attached respectively, is mainly prolonged to the fixation upward and downward on the raising-plate 13
Stretch the wire structure 3a of setting, the extended wire structure 3a of upward and downward mainly to the log cabin structure above raising-plate 13
Electric wiring cooperation, for example, configuration log cabin furred ceiling lamp decoration etc..
The wire structure 3a that the wall column 12 is mainly extended to fixed horizontal direction, referring to Fig. 8, the present embodiment
In, the wall column 12 has first mounting surface opposite with the wallboard 11, and first mounting structure 33 includes being set to institute
The first mounting groove 331 on the first mounting surface is stated, first pipeline 311 is equipped in first mounting groove 331, by institute
It states and first mounting groove 331 is set on wall column 12, first pipeline 311 is arranged in first mounting groove 331,
Structure is simple, conveniently, certainly in this embodiment, in order to reduce short circuit to the greatest extent or overload caused by fire risk, in institute
It states in the first mounting groove 331 filled with fire proofing material 39, such as fire prevention clay, flame-retarded plastic etc..
Further, in order to limit the installation of first pipeline 311, referring to Fig. 9, in the present embodiment, it is described prefabricated
Laminated wood wall construction 100 further includes pressure holding block 35, and the pressure holding block 35 is set in first mounting groove 331, the pressure holding block
35 have the confined planes of relatively described first mounting groove, the 331 wall surface setting, and the confined planes are equipped with limiting slot 351, described
Limiting slot 351 with first pipeline 311 to be adapted to, and the pressure holding block 35 to press first pipeline from back to front
311, it is placed in first mounting groove 331 with limiting first pipeline 311, by the limiting slot 351 of the limited block, is made
First pipeline 311 is completely fixed and is installed in first mounting groove 331, during transport, lifting, reduce institute
It states the first pipeline 311 and the risk shaken occurs, there is preferable effect, in addition, the material of the pressure holding block 35 is also fire proofing wood
Matter, for example, using fireproof rubber material etc..
In the fixed another embodiment of first pipeline 311, referring to Fig. 10, in the present embodiment, first peace
Assembling structure 33 includes the first mounting hole 36 provided in the right side of the wall column 12, is equipped with institute in first mounting hole 36
The first pipeline 311 is stated, first pipeline 311, the fixation of first pipeline 311 are fixed by way of mounting hole is set
More firm, stability is more preferable, in addition, in order to reduce electricity to the greatest extent to the risk of prefabricated wood wall burning, in first pipe
Fireproof covering is set between road 311 and first mounting hole 36, on the one hand plays the effect of fixing seal, on the other hand, is played
Flameproof effect.
The wire structure 3a being mainly extended to the fixation upward and downward on the raising-plate 13, please refers to Figure 11,
In the present embodiment, the raising-plate 13 has second mounting surface opposite with the wallboard 11, and second mounting structure 34 wraps
The second mounting groove 341 being set on second mounting surface is included, is equipped with second pipeline 312 in second mounting groove 341,
By the way that second mounting groove 341 is arranged on the raising-plate 13, second pipeline 312 is arranged in second installation
In slot 341, structure is simple, conveniently, certainly in this embodiment, in order to reduce electricity to the greatest extent to the wind of prefabricated wood wall burning
Danger is filled with fire proofing material 39, such as fire prevention clay, flame-retarded plastic etc. in second mounting groove 341.
Further, in order to limit the installation of second pipeline 312, Figure 12 is please referred to, it is described prefabricated in the present embodiment
Laminated wood wall construction 100 further includes pressure holding block 35, and the pressure holding block 35 is set in second mounting groove 341, the pressure holding block
35 have the confined planes of relatively described second mounting groove, the 341 wall surface setting, and the confined planes are equipped with limiting slot 351, described
Limiting slot 351 with second pipeline 312 to be adapted to, and the pressure holding block 35 to press second pipeline from back to front
312, it is placed in second mounting groove 341 with limiting second pipeline 312, by the limiting slot 351 of the limited block, is made
Second pipeline 312 is completely fixed and is installed in second mounting groove 341, during transport, lifting, reduce institute
It states the second pipeline 312 and the risk shaken occurs, there is preferable effect, in addition, the material of the pressure holding block 353 is also fire proofing wood
Matter, for example, using fireproof rubber material etc..
In the fixed another embodiment of second pipeline 312, Figure 13 is please referred to, in the present embodiment, second peace
Assembling structure 34 includes the second mounting hole 37 provided in the upper surface of the raising-plate 13, is equipped with institute in second mounting hole 37
The second pipeline 312 is stated, second pipeline 312, the fixation of second pipeline 312 are fixed by way of mounting hole is set
More firm, stability is more preferable, in addition, in order to reduce electricity to the greatest extent to the risk of prefabricated wood wall burning, in second pipe
Fireproof covering is set between road 312 and second mounting hole 37, on the one hand plays the effect of fixing seal, on the other hand, is played
Flameproof effect.
It should be noted that in order to preferably fix second pipeline 312, second pipeline 312 is neighbouring described
Wall column 12 is arranged, and some position limiting structures is arranged on the wall column 12, and as buckled, snap ring is come as described in limiting second
Pipeline 312.
Installation pipeline 31 described above is the pipeline for needing to be connected between the electric wiring of other walls 1, in this reality
It applies in example, the electrical part 3b includes plug and socket of normal domestic etc., at this time, it may be necessary to from described first be laterally extended
Electrical part 3b electric line is drawn in pipeline 311, specifically, the installation pipeline 31 further includes vertically to extension and described in
The third pipeline that first pipeline 311 extends downwardly, the third pipeline are fixedly installed on the wall column 12, the third pipe
Road is arranged adjacent to the wall column 12, and some position limiting structures are arranged on the wall column 12, such as buckle, snap ring limit
The position third pipeline.
It should be noted that not limiting the concrete type of the electrical part 3b in the utility model, the electrical part 3b can
Think electric coupler 38, civilian plug, socket, electric light etc., the connector 38 be mainly the different walls 1 it
Between route connection, the mounting means of the connector 38 is also the content of the utility model, specifically, please refer to Figure 14 to scheme
15, the left end of the wall 1 is set parallel there are two the wall column 12, positioned at the upper end left side of the wall column 12 in left side
A holding tank 38a is provided, and the holding tank 38a extends upward through the upper surface setting of the wall column 12, the electrical part
3b includes that (in the embodiments of the present invention, the connector 38 is rectangle heavy-duty connector, aviation plug, connects connector 38
One of line terminals), the plug or socket of the connector 38 are set in holding tank 38a, in the junction of two walls 1,
Wherein there are two the wall columns 12 for a wall 1 setting, and a holding tank 38a is opened up at outermost wall column 12, to incite somebody to action
The connector 38, which is hidden, to be set in the holding tank 38a, convenient for the assembly between two walls 1, is had preferable
Effect.
Also referring to Figure 16 to Figure 19, the prefabricated laminated wood wall construction 100 includes at least two walls 1,
In a wall 1 vertically and left and right to be extended, another wall 1 vertically and front and back to be extended, two
It is fixedly connected between the wall 1 by connecting structure of wall 4, by the way that the connecting structure of wall 4 is integrated in the wall 1
It is interior, it is simple, convenient when joint connection in site.
At least two walls 1 include at least one first wall 41 and at least one second wall 42, described first
Wall 41 is vertically and left and right is to being extended, and the first installation region 411 is formed on the side surface of first wall 41,
Second wall 42 is vertically and front and back is to being extended, and is formed with the second installation on the side surface of second wall 42
Region 421, the connecting structure of wall 4 include screw connection structure 43, and the screw connection structure 43 is set to first wall
Between body 41 and second wall 42, first wall 41 and second wall 42 are in first installation region 411
It is mutually abutted at second installation region 421, and fixed by the screw connection structure 43, passes through the threaded connection
Structure 43 is well by first wall 41 and second wall 42 in first installation region 411 and second peace
Be fixed to each other abutting at dress region 421, and thread connecting mode is simple, firm, and on-site consolidation is high-efficient, with first installing zone
Domain 411 and second installation region 421 are positioning datum, and the assembled quality of wall 1 is preferable.
It should be noted that the prefabricated wood wall connecting structure of wall 4 includes a variety of types of attachment, for example, " L " type connects
Connect, it is T-shaped connection and it is cross connection etc. connection types, be illustrated below with " L " type connection type, T-shaped connection
And the modes such as cross connection are referring to " L " type connection type.
In order to reinforce the stability and fastness of connection, in the embodiments of the present invention, first wall 41 and institute
It states the second wall 42 and is designed with wall column 12 in junction, specifically, in correspondence first installation in first wall 41
The first connection wall column 412 that upward and downward extends is equipped at region 411, second wall 42 is corresponding in second installation
The second connection wall column 422 that upward and downward extends is equipped at region 421, the screw connection structure 43 is arranged in described first and connects
It connects on wall column 412 and the second connection wall column 422, connection structure intensity is guaranteed, stable connection, firm.
When first wall 41 is with the L-shaped connection of second wall 42 or T-shaped connection, corresponding institute
It is different to state position of second installation region 421 on second wall 42, specifically, being more in the screw connection structure 43
When a wood screw 43a is attached, Figure 16 and Figure 18 is please referred to, first installation region 411 is formed in first wall
41 left side, second installation region 421 are formed in 42 right side of the second wall, and the screw connection structure 43 wraps
Include multiple wood screw 43a, multiple wood screw 43a are vertically arranged to interval, and the head of each wood screw 43a is from institute
The left side for stating the second wall 42 penetrates, and sequentially passes through the second connection wall column 422, continues to extend locking to described the
One connection wall column 412, the threaded connection of the wood screw 43a, it is simple, convenient to connect, and on-site consolidation high production efficiency has
Preferable effect.
When the screw connection structure 43 is multiple screw connecting structure 43b, Figure 17 and Figure 19 is please referred to, described first
Installation region 411 is formed in the left side of first wall 41, and second installation region 421 is formed in second wall
42 right sides, the screw connection structure 43 include multiple screw connecting structure 43b, multiple edges the screw connecting structure 43b
Upward and downward interval setting, each screw connecting structure 43b include connecting screw 431 and be set to 431 liang of the connecting screw
Two second locking nuts 432 at end, the left side of one end from second wall 42 of the connecting screw 431 penetrate, and
Sequentially pass through it is described second connection wall column 422, continue through it is described first connection wall column 412, two described second
Locking nut 432 is divided into the both ends of the connecting screw 431, respectively to lock left side and the institute of second wall 42
The right side of the first connection wall column 412 is stated, the general manpower handle hole that can be arranged on first wall 41 is to dismount
The second locking nut 432 is stated, by the connection function of the screw connecting structure 43b, locking effect is good, it should be noted that
Prefabricated first wall 41 and when second wall 42 in factory, has reserved and has made the manpower handle hole, and
The prefabricated hole worn for the connecting screw 431 on the first connection wall column 412 and the second connection wall column 412
Hole improves produced on-site, the efficiency of installation as long as scene carries out simple assembled operation.
Further, in the embodiment of first wall 41 and the L-shaped connection type of second wall 42, it is
Further reinforce bonding strength, second installation region 421 be formed in the 42 rear end right side of the second wall and
The trailing flank of second wall 42,41 plate of the first wall being located behind in first wall 41 extend to form to the right a company
Arm 44 is connect, first installation region 411 is also formed into the leading flank of the linking arm 44, and on the linking arm 44
One installation region 411 is supported with the second installation region 421 on the trailing flank for being located at second wall 42 by the fixation of screw 46
It connects, it is fixed by the way that screw 46 is in addition arranged, so that first wall 41 is fixed in two directions with second wall 42,
Fixation is more firm, and structural strength is more preferable.
The leakproofness of first wall 41 and second wall 42 in 1 junction of wall is also in the utility model
Hold, specifically, the prefabricated wood wall connecting structure of wall 4 further includes sealing structure 45, and the sealing structure 45 is set to described
Between first installation region 411 and second installation region 421, the sealing structure 45 includes multiple rubber strips, Duo Gesuo
It states rubber strip and fixes or be adhesively fixed by screw 46, to form the sealing knot by the way that multiple rubber strips are set side by side
Structure 45, and in such a way that screw 46 is fixed or is adhesively fixed, fixed form is simple, and assembly is convenient, and sealing effect is good.
In the embodiments of the present invention, the prefabricated laminated wood wall construction 100 further includes the connection knot of wall and basis
Structure 5, referring to Figure 2 together 0 to Figure 22, the wall 1 is in up and down and front and back is to being extended, the prefabricated laminated wood wall construction
100 further include the connection structure 5 of wall and basis, and the connection structure 5 on the wall and basis includes foundation structure 51 and multiple
Threaded connector 52, wherein the foundation structure 51 is including the extended base matrix 511 of horizontal direction and is set to the basis
Connection chock 512 on 511 upper surface of ontology, the connection chock 512 in front and back to be extended, the connection chock 512
Upper surface be equipped with the wall 1, multiple threaded connectors 52 be set to the wall 1 on the connection chock 512, use
The wall 1 to be fixedly installed in the foundation structure 51, multiple threaded connectors 52 are set to the wooden wall and institute
State on connection chock 512 (when field operation, the threaded connector 52 of inclination merging from top to bottom, and the two of the wooden wall
The merging of side interleaved), the wooden wall to be fixedly installed in the foundation structure 51, the installation of the wooden wall 1 it is in place it is simple,
It is convenient, improve production efficiency.
The connection chock 512 is fixed in the foundation structure 51 by built-in fitting, specifically, the connection gasket
The upper surface of wood 512 is equipped with multiple third mounting grooves 5121, and the bottom wall of each third mounting groove 5121 has provided third peace
Filling hole 5122, the connection structure 5 on the wall and basis further includes multiple pre embedded bolts 53 and multiple third locking nuts 54,
In, multiple pre embedded bolts 53 are set on the base matrix 511 along front and back to interval, and multiple pre embedded bolts 53 are distinguished
Correspondence is arranged in multiple third mounting holes 5122, and each correspondence of third locking nut 54 is sheathed on the pre-buried spiral shell
The upper end of bar 53, and be located in the third mounting groove 5121, the third locking nut 54 is to by the connection chock 512
On locking to the base matrix 511.
Further, in order to make the connection chock 512 play more stable fixed effect, the embodiments of the present invention
In, multiple third mounting grooves 5121 include two groups of third mounting grooves 5121, and third mounting groove 5121 described in every group includes more
It is a along front and back to the third mounting groove 5121 of arrangement, wherein third mounting groove 5121 described in one group be set to the connection chock 512
Right side upper surface, another third mounting groove 5121 is set to the left side upper surface of the connection chock 512, the described in two groups
Three mounting grooves 5121 to connect chock in front and back staggeredly interval setting upwards, two groups of third mounting grooves 5121 being staggered
512 fixed center is located at the geometric center of the connection chock 512, so that the structure of connection is more stable, fixed effect is more preferable.
It should be noted that first the pre-buried pre embedded bolt 53, after pouring concrete, forms an entirety when site operation, have
When body is installed, the interval between pre embedded bolt 53 is first measured, and carry out correction process, then extremely by the pre embedded bolt 53 installation
It is first pre- one by one to twist the third locking nut 54 in the third mounting hole 5122 of the connection chock 512, to the connection chock
After 512 leveling, all third locking nuts 54 are twisted eventually one by one, check all pre embedded bolts 53, exceeds the third
Part in 5121 range of mounting groove, excision, that is, complete the connection chock 512 and the fixed of the foundation structure 51 connects
It connects.
Water-proofing treatment is carried out by laying water-proof coiled material between the connection chock 512 and the base matrix 511, in order to
Further prevent the tide vapour in the foundation structure 51 from entering the wood within the walls, specifically, the embodiments of the present invention
In, multiple wall columns 12 include bottom beam plate 5512, and the bottom beam plate 5512 is set to the lower end of described two wallboards 11,
The wall and basis connection structure 5 further include sealing structure 45, the sealing structure 45 be set to the bottom beam plate 5512 and
Between the connection chock 512, the moisture-proof and waterproof of the wooden wall is further made by the sealing structure 45, is extended
The service life of the wooden wall, has preferable effect, and in the present embodiment, it is in front and back that the sealing structure 45, which includes multiple,
To the rubber strip of extension, multiple rubber strips are fixed by screw 46 or are adhesively fixed.
For the ease of the wooden wall contraposition with the connection chock 512 during installation, in the embodiments of the present invention,
Two wallboards 11 extend downwardly setting, and are arranged in the lower end surface of the prominent bottom beam plate 5512, so that the wood wall
Lower end forms a groove 56, and the upper end of the groove 56 and the connection chock 512 forms concave-convex fit structure, so that the wood
Wall is mounted on the connection chock 512, when the contraposition of the wooden wall and the connection chock 512 is installed, passes through institute
State concave-convex fit structure, by the card of the groove 56 of the wooden wall set on the connection chock 512, letter easy for installation
It is single, quick, in addition, passing through in the embodiment being arranged concordant with the connection upper end of chock 512 of the lower end of the wall 1
Setting 58 structure of sealing plate have preferable appearance so that the connection chock is wrapped up.
In order to reinforce the connection structure intensity of the wooden wall and basis, in the embodiments of the present invention, the wood wall with
The connection structure on basis further includes reinforcing fixing piece 57, and the fixing piece 57 of reinforcing includes the first fixed section that horizontal direction extends
571 and upper and lower and preceding the second rearwardly extending fixed section 572, first fixed section 571 be fixedly attached to the basis this
On body 511, second fixed section 572 is fixedly connected on the side surface of the wallboard 11, and in the present embodiment, the reinforcement is fixed
Part 57 is arranged multiple, and along front and back to being spaced apart, the reinforcement fixing piece 57 is metalwork, first fixed section 571 with
Second fixed section 572 is arranged in a mutually vertical manner, on the one hand, the upright wooden wall and 51 profile angle of foundation structure, separately
On the one hand, the wooden wall and 51 bonding strength of foundation structure are strengthened, there is preferable effect.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model,
It is all under the design of the utility model, equivalent structure transformation made based on the specification and figures of the utility model, or
Directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.
Claims (10)
1. a kind of prefabricated laminated wood wall construction characterized by comprising
Wall;
Hoisting structure is set to the wall, to lift by crane the wall;And
Electrical structure is set to the wall, and the electrical structure includes wire structure, the Yi Jishe being arranged in inside the wall
Electrical part in the wire structure end.
2. prefabricated laminated wood wall construction as described in claim 1, which is characterized in that the wall includes:
Two wallboards, in being oppositely arranged, two wallboards present lower extended, one peace of formation between two wallboards
Fill space;
Multiple wall columns extended in upward and downward, multiple wall columns are set to the peace along the width direction interval of the wallboard
It fills in space;And
Raising-plate, the width direction along the wallboard are extended, and the raising-plate is set to the upper surface of multiple wall columns.
3. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that the upper surface of the raising-plate, which has, to be in
Lifting installation region between two adjacent wall columns, in the lifting installation region, the raising-plate has provided
One via hole;
The hoisting structure includes the lifting screw rod that upward and downward extends, and the lifting screw rod, which is removably secured, is installed on described the
In one via hole.
4. prefabricated laminated wood wall construction as claimed in claim 3, which is characterized in that the hoisting structure further includes set on described
Lift the first locking nut of screw rod lower end;
The prefabricated laminated wood wall construction further include:
Nut built-in fitting, the nut built-in fitting include the nut mounting groove of opening upwards, and are distributed in the nut installation
The fixed ring of slot upper end side, lower end surface of the fixed ring to be fixed to the raising-plate upwards, the nut mounting groove
Interior to be equipped with first locking nut, the nut mounting groove corresponds to the first via hole setting, and its bottom wall is equipped with relief hole,
The relief hole is worn with for the lifting screw rod;And
Reinforce connector, the connector of reinforcing includes that the horizontal direction first segment, the upward and downward that extend extend and be divided into described the
The second segment of one section of lower section two sides and two linkage sections for being correspondingly connected with the first segment and two second segments, it is described
First segment is fixedly installed between the fixed ring and the raising-plate, and two second segments are respectively to be fixedly attached to two
A wall column.
5. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that two wallboards are in upper and lower and left and right
To be extended;
The wire structure includes being arranged in the intracorporal installation pipeline of the wall and leading in the installation pipeline inner cavity
Electric wire, the installation pipeline include to the first pipeline of extension, and/or vertically described to extending and extending upwardly to along left and right
Second pipeline of raising-plate;
The first mounting structure is respectively equipped on multiple wall columns, multiple first mounting structures are pacified for first pipeline
Dress, first pipeline is fixed on multiple wall columns;
The raising-plate is equipped with the second mounting structure, and second mounting structure is installed for second pipeline, will be described
Second pipeline is fixed on the raising-plate.
6. prefabricated laminated wood wall construction as claimed in claim 5, which is characterized in that the wall column has and the wallboard phase
Pair the first mounting surface, first mounting structure includes the first mounting groove on first mounting surface, described first
First pipeline is equipped in mounting groove;And/or
The raising-plate has second mounting surface opposite with the wallboard, and second mounting structure includes being set to described second
The second mounting groove on mounting surface, second mounting groove is interior to be equipped with second pipeline;
Wherein, the prefabricated laminated wood wall construction further includes pressure holding block, and the pressure holding block is set on first mounting groove and/or the
In two mounting grooves, the confined planes that there is the pressure holding block relatively described first mounting groove and/or the second mounting groove wall surface to be arranged,
The confined planes are equipped with limiting slot, and the limiting slot with first pipeline and/or the second pipeline to be adapted to, the pressure holding
Block is placed in first peace to press first pipeline and/or the second pipeline from back to front, to limit first pipeline
In tankage and/or limit second pipeline is placed in second mounting groove.
7. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that the wall is in upper and lower and preceding rearwardly extending
Setting;
The prefabricated laminated wood wall construction further includes the connection structure of wall and basis, the connection structure packet of the wall and basis
It includes:
Foundation structure, the base matrix and the connection gasket on the base matrix upper surface being extended including horizontal direction
Wood, for the connection chock in front and back to being extended, the upper surface of the connection chock is equipped with the wall;And
Multiple threaded connectors are set on the wall and the connection chock, described the wall to be fixedly installed in
In foundation structure.
8. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that the prefabricated laminated wood wall construction includes extremely
Few two walls, wherein a wall is vertically and left and right is to being extended, another wall is vertically and front and back
To being extended, it is fixedly connected between two walls by connecting structure of wall;
At least two walls include at least one first wall and at least one second wall, and first wall is vertically
And left and right is formed with the first installation region, second wall is along upper to being extended on the side surface of first wall
Lower and front and back is formed with the second installation region on the side surface of second wall to being extended;
The connecting structure of wall includes screw connection structure, and the screw connection structure is set to first wall and described the
Between two walls;
First wall and second wall mutually abut at first installation region and second installation region,
And it is fixed by the screw connection structure;
The first connection wall column that upward and downward extends is equipped in first wall at correspondence first installation region;
Second wall is in corresponding the second connection wall column for being equipped with upward and downward at second installation region and extending;
The screw connection structure is arranged on the first connection wall column and the second connection wall column.
9. prefabricated laminated wood wall construction as claimed in claim 8, which is characterized in that first installation region is formed in described
The left side of first wall, second installation region are formed in second wall right side, the screw connection structure packet
Include multiple wood screws, multiple wood screws are vertically arranged to interval, and each wood screw is from a left side for second wall
Side penetrates, and sequentially passes through the second connection wall column, continues to extend locking to the first connection wall column;Alternatively,
First installation region is formed in the left side of first wall, and second installation region is formed in described second
Wall right side, the screw connection structure include multiple screw connecting structures, multiple screw connecting structures vertically to
Interval setting, each screw connecting structure include connecting screw and two second lockings set on the connecting screw both ends
The left side of nut, one end from second wall of the connecting screw penetrates, and sequentially passes through the second connection wall bone
Column, continues through the first connection wall column, and two second locking nuts are divided into the two of the connecting screw
End, respectively to lock the left side of second wall and the right side of the first connection wall column.
10. a kind of log cabin structure, which is characterized in that including prefabricated laminated wood wall construction as claimed in any one of claims 1 to 9.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821713214.3U CN209369096U (en) | 2018-10-22 | 2018-10-22 | Prefabricated laminated wood wall construction and log cabin structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821713214.3U CN209369096U (en) | 2018-10-22 | 2018-10-22 | Prefabricated laminated wood wall construction and log cabin structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209369096U true CN209369096U (en) | 2019-09-10 |
Family
ID=67838489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821713214.3U Active CN209369096U (en) | 2018-10-22 | 2018-10-22 | Prefabricated laminated wood wall construction and log cabin structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209369096U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138214A (en) * | 2018-10-22 | 2019-01-04 | 湖北天欣木结构房制造有限公司 | Prefabricated laminated wood wall construction and log cabin structure |
-
2018
- 2018-10-22 CN CN201821713214.3U patent/CN209369096U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138214A (en) * | 2018-10-22 | 2019-01-04 | 湖北天欣木结构房制造有限公司 | Prefabricated laminated wood wall construction and log cabin structure |
CN109138214B (en) * | 2018-10-22 | 2024-04-09 | 湖北天欣木结构房制造有限公司 | Prefabricated integrated wooden wall structure and wooden house structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563288A (en) | Reinforced concrete frame gridding slab prefabricated energy-saving house | |
CN109138214A (en) | Prefabricated laminated wood wall construction and log cabin structure | |
CN107675794A (en) | Prefabricated steel framework frame module room | |
CN205314355U (en) | A assemble board and assemble prefabricated house for assembling prefabricated house | |
CN204960122U (en) | Prefabricated integrated PVC line box SIP wall body | |
CN108824648A (en) | Space module house | |
CN106609562A (en) | Double-pitch-roof mobile house with base | |
CN209369096U (en) | Prefabricated laminated wood wall construction and log cabin structure | |
CN108951850A (en) | A kind of prefabricated buildings | |
CN207776274U (en) | Water-proof roofing harden structure and building | |
CN206128287U (en) | Assembled wing -room | |
CN209244002U (en) | A kind of wallboard prefabricated components and assembled wall | |
CN108018967B (en) | Novel building partition wall assembly connecting structure and construction method thereof | |
CN204266444U (en) | A kind of profiled sheet and composite floor | |
CN211622031U (en) | Novel prefabricated building node connection structure | |
CN108999318B (en) | Unit curtain wall side buried single pendant structure, unit body with side buried single pendant and unit curtain wall mounting method | |
CN211341295U (en) | Connecting joint of external wall board and beam | |
CN207453124U (en) | Walling system | |
CN210067011U (en) | Assembled building convenient to installation | |
CN208501972U (en) | A kind of assembly of shear wall structure with ribbing | |
CN2813756Y (en) | Assembling safety net column guard-rail | |
CN207453119U (en) | Wallboard and beam connection component and walling system | |
CN204876637U (en) | Portable prefabricated house | |
CN106088514A (en) | A kind of stone material dry suspending slabstone fixed structure with high anti-seismic function | |
CN206971472U (en) | Light gauge cold-formed steel shape steel plate shear force wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |