CN209350575U - A kind of construction of hydro project concrete central mix plant - Google Patents

A kind of construction of hydro project concrete central mix plant Download PDF

Info

Publication number
CN209350575U
CN209350575U CN201822082581.4U CN201822082581U CN209350575U CN 209350575 U CN209350575 U CN 209350575U CN 201822082581 U CN201822082581 U CN 201822082581U CN 209350575 U CN209350575 U CN 209350575U
Authority
CN
China
Prior art keywords
concrete
bent cylinder
construction
flange
agitator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822082581.4U
Other languages
Chinese (zh)
Inventor
赵隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201822082581.4U priority Critical patent/CN209350575U/en
Application granted granted Critical
Publication of CN209350575U publication Critical patent/CN209350575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of construction of hydro project concrete central mix plants, it is related to concrete stirring technique field, the construction of hydro project concrete central mix plant, including agitator, the bottom of the agitator offers concrete outlet, the bottom of the concrete outlet is provided with concrete conveyance room, the concrete conveyance room is internally provided with concrete pump, the output end of the concrete pump, which is fixedly connected with, prevents discrete conveyance conduit, the agitator is internally provided with agitating shaft, is fixedly connected with paddle on the agitating shaft.The construction of hydro project concrete central mix plant, by the way that concrete conveyance room is arranged in the bottom of agitator, and concrete pump is set in the inside of concrete conveyance room, the device can be facilitated to carry out concrete shipment, and improve the working efficiency of the device, and then the quantum of output of concrete is improved, the using effect of the device is effectively raised, the practicability of the device is enhanced.

Description

A kind of construction of hydro project concrete central mix plant
Technical field
The utility model relates to concrete stirring technique field, specially a kind of construction of hydro project concrete stirring dress It sets.
Background technique
Hydraulic engineering is the surface water and groundwater for controlling and deploying nature, reaches and removes the evil emerging sharp purpose and build Engineering, also referred to as Hydraulic Projects, water is human being's production and essential precious resources of living, but the state of its naturally occurring is simultaneously Not in full conformity with the needs of the mankind, hydraulic engineering is only built, just can control water flow, prevents flood, and carry out water It adjusts and distributes, to meet people's lives and production to the needs of water resource, hydraulic engineering needs to build dam, dike, spillway, water Lock, water inlet, channel, the different types of hydraulic structure such as cross mortise, log chute, fish pass, to realize its target, concrete is write a Chinese character in simplified form For " concrete ", refer to by cementitious material one word of concrete for usually saying the general designation for the cementing integral engineered composite material that gathers materials Refer to and make cementitious material with cement, sand, masonry gather materials, and cooperate by a certain percentage with water, water obtained by agitated, molding, maintenance Cement concrete, also referred to as normal concrete, hydraulic engineering often need to use concrete and build dam, and thus people need to carry out coagulation Soil stirring production, existing concrete central mix plant deposits after completion of stirring, and when discharging is more troublesome, inconvenient for use.
Currently, the existing concrete central mix plant for construction of hydro project, inconvenient for use, it is unfavorable for promoting the use of.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of construction of hydro project concrete central mix plant, solution It has determined the existing concrete central mix plant for construction of hydro project, it is inconvenient for use, it is unfavorable for the problem of promoting the use of.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:
A kind of construction of hydro project concrete central mix plant, including agitator, the bottom of the agitator offer coagulation Soil outlet, the bottom of the concrete outlet are provided with concrete conveyance room, and being internally provided with for the concrete conveyance room is mixed Solidifying soil delivery pump, the output end of the concrete pump, which is fixedly connected with, prevents discrete conveyance conduit;
The agitator is internally provided with agitating shaft, and paddle, the stirring are fixedly connected on the agitating shaft The top of bucket is provided with motor, and the outside of the motor is provided with motor case body, and the motor case body is fixedly connected with agitator, The output end of the motor is fixedly connected with agitating shaft.
Optionally, described to prevent that discrete conveyance conduit includes inlet duct, the first bent cylinder, the second bent cylinder, bent cylinder support rod, the One flange, second flange, fixing bolt and outlet conduit.
Optionally, the output end of the concrete pump is provided with inlet duct, and the inlet duct is far from concrete One end of the output end of delivery pump is welded with the first bent cylinder, and the described first bent cylinder is provided with the second song far from one end of inlet duct Cylinder.
Optionally, the side of the described first bent cylinder and the second bent cylinder is provided with bent cylinder support rod, and the described first bent cylinder leans on One end of nearly second bent cylinder is welded with first flange.
Optionally, the described second bent cylinder is welded with second flange close to one end of the first bent cylinder, the first flange and the Edge inside two flanges is threaded with fixing bolt, and the first flange and second flange are fixed by fixing bolt Connection.
Optionally, the described second bent cylinder is fixedly connected with outlet conduit far from one end of the first bent cylinder.
(3) beneficial effect
The utility model provides a kind of construction of hydro project concrete central mix plant, have it is following the utility model has the advantages that
(1), construction of hydro project concrete central mix plant, on the one hand, by the way that concrete is arranged in the bottom of agitator Conveying chamber, and concrete pump is set in the inside of concrete conveyance room, the device can be facilitated to carry out concrete shipment, and The working efficiency of the device is improved, and then improves the quantum of output of concrete, effectively raises the using effect of the device, is enhanced On the other hand the practicability of the device prevents discrete conveyance conduit, energy by the output end setting in setting concrete pump Enough prevent drop of device during discharging due to height from causing the discrete of concrete, to influence the use of concrete Effect can further increase the using effect of the device, enhance the practicability of the device.
(2), the construction of hydro project concrete central mix plant prevents discrete conveyance conduit by setting segmented, can The device is adjusted to the bent cylinder quantity prevented in discrete conveyance conduit according to actual needs, can further facilitate The use of the device expands the scope of application of the device.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the schematic diagram of internal structure of the utility model agitator;
Fig. 3 is the attachment structure schematic diagram of the utility model first flange and second flange;
Fig. 4 is the schematic diagram of internal structure of the utility model concrete conveyance room.
In figure: 1- agitator, 2- concrete outlet, 3- concrete conveyance room, 4- concrete pump, 5- prevent discrete conveying Pipeline, 501- inlet duct, the bent cylinder of 502- first, the bent cylinder of 503- second, 504- song cylinder support rod, 505- first flange, 506- Second flange, 507- fixing bolt, 508- outlet conduit, 6- agitating shaft, 7- paddle, 8- motor, 9- motor case body.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In the present invention unless specifically defined or limited otherwise, term " setting ", " connected ", " connects " installation " Connect ", the terms such as " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection;It can be machine Tool connection;It can be directly connected, it can also be indirectly connected through an intermediary.For those of ordinary skill in the art and Speech, can understand the concrete meaning of above-mentioned term in the present invention as the case may be.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.The meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution:
A kind of construction of hydro project concrete central mix plant, including agitator 1, the bottom of agitator 1 offer concrete Outlet 2, the bottom of concrete outlet 2 are provided with concrete conveyance room 3, concrete conveyance room 3 to be internally provided with concrete defeated Pump 4 is sent, by the way that concrete conveyance room 3 is arranged in the bottom of agitator 1, and concrete is set in the inside of concrete conveyance room 3 Delivery pump 4 can facilitate the device to carry out concrete shipment, and improve the working efficiency of the device, and then improve concrete Quantum of output effectively raises the using effect of the device, enhances the practicability of the device, the output of concrete pump 4 End, which is fixedly connected with, prevents discrete conveyance conduit 5, prevents discrete conveyance conduit by the output end setting in setting concrete pump 4 5, it can prevent drop of device during discharging due to height from causing the discrete of concrete, to influence concrete Using effect can further increase the using effect of the device, enhance the practicability of the device, pass through the anti-of setting segmented Discrete conveyance conduit 5 can be such that the device adjusts according to actual needs to the bent cylinder quantity prevented in discrete conveyance conduit 5 Section, can further facilitate the use of the device, expand the scope of application of the device;
Agitator 1 is internally provided with agitating shaft 6, and paddle 7, the top of agitator 1 are fixedly connected on agitating shaft 6 It is provided with motor 8, the outside of motor 8 is provided with motor case body 9, and motor case body 9 is fixedly connected with agitator 1, the output of motor 8 End is fixedly connected with agitating shaft 6.
A kind of optional technical solution as the utility model: prevent that discrete conveyance conduit 5 includes inlet duct 501, first The bent cylinder 503 of bent cylinder 502, second, bent cylinder support rod 504, first flange 505, second flange 506, fixing bolt 507 and outlet Road 508.
A kind of optional technical solution as the utility model: the output end of concrete pump 4 is provided with inlet duct 501, one end of output end of the inlet duct 501 far from concrete pump 4 is welded with the first bent cylinder 502, and the first bent cylinder 502 is remote One end from inlet duct 501 is provided with the second bent cylinder 503.
A kind of optional technical solution as the utility model: the side of the first bent cylinder 502 and the second bent cylinder 503 is respectively provided with There is bent cylinder support rod 504, the first bent cylinder 502 is welded with first flange 504 close to one end of the second bent cylinder 503.
A kind of optional technical solution as the utility model: the second bent cylinder 503 is welded close to one end of the first bent cylinder 502 There is second flange 506, the edge inside first flange 505 and second flange 506 is threaded with fixing bolt 507, the One flange 505 is fixedly connected with second flange 506 by fixing bolt 507.
A kind of optional technical solution as the utility model: the second bent cylinder 503 is fixed far from one end of the first bent cylinder 502 It is connected with outlet conduit 508.
In conclusion the construction of hydro project concrete central mix plant, in use, user is on the one hand, by stirring Concrete conveyance room 3 is arranged in the bottom of bucket 1, and concrete pump 4 is arranged in the inside of concrete conveyance room 3, can facilitate The device carries out concrete shipment, and improves the working efficiency of the device, and then improves the quantum of output of concrete, effective to improve The using effect of the device, enhances the practicability of the device, on the other hand passes through the output in setting concrete pump 4 End setting prevents discrete conveyance conduit 5, can prevent drop of device during discharging due to height cause concrete from It dissipates, to influence the using effect of concrete, the using effect of the device can be further increased, enhance the practical of the device Property, discrete conveyance conduit 5 is prevented by setting segmented, can allow the device according to actual needs to preventing discrete delivery pipe Bent cylinder quantity in road 5 is adjusted, and can further facilitate the use of the device, expand the scope of application of the device.
It should be noted that in the present invention unless specifically defined or limited otherwise, fisrt feature is in the second spy It can be that the first and second features directly contact or the first and second features are connect indirectly by intermediary "above" or "below" sign Touching.Moreover, fisrt feature can be above the second feature " above ", " above " and " above " fisrt feature right above second feature or Oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature " under ", " lower section " " following " can be fisrt feature and be directly under or diagonally below the second feature, or is merely representative of first feature horizontal height and is less than Second feature.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of construction of hydro project concrete central mix plant, including agitator (1), it is characterised in that:
The bottom of the agitator (1) offers concrete outlet (2), and the bottom of the concrete outlet (2) is provided with coagulation Native conveying chamber (3), the concrete conveyance room (3) are internally provided with concrete pump (4), the concrete pump (4) output end, which is fixedly connected with, prevents discrete conveyance conduit (5);
The agitator (1) is internally provided with agitating shaft (6), is fixedly connected with paddle (7) on the agitating shaft (6), It is provided with motor (8) at the top of the agitator (1), the outside of the motor (8) is provided with motor case body (9), the motor Cabinet (9) is fixedly connected with agitator (1), and the output end of the motor (8) is fixedly connected with agitating shaft (6).
2. a kind of construction of hydro project concrete central mix plant according to claim 1, which is characterized in that
It is described to prevent that discrete conveyance conduit (5) includes inlet duct (501), the first bent cylinder (502), the second bent cylinder (503), bent cylinder branch Strut (504), first flange (505), second flange (506), fixing bolt (507) and outlet conduit (508).
3. a kind of construction of hydro project concrete central mix plant according to claim 1, which is characterized in that
The output end of the concrete pump (4) is provided with inlet duct (501), and the inlet duct (501) is far from coagulation One end of the output end of native delivery pump (4) is welded with the first bent cylinder (502), and the described first bent cylinder (502) is far from inlet duct (501) one end is provided with the second bent cylinder (503).
4. a kind of construction of hydro project concrete central mix plant according to claim 2, which is characterized in that
The side of described first bent cylinder (502) and the second bent cylinder (503) is provided with bent cylinder support rod (504), and described first is bent Cylinder (502) is welded with first flange (505) close to one end of the second bent cylinder (503).
5. a kind of construction of hydro project concrete central mix plant according to claim 2, which is characterized in that
Described second bent cylinder (503) is welded with second flange (506), the first flange close to one end of the first bent cylinder (502) (505) edge internal with second flange (506) is threaded with fixing bolt (507), the first flange (505) and Second flange (506) is fixedly connected by fixing bolt (507).
6. a kind of construction of hydro project concrete central mix plant according to claim 2, which is characterized in that
Described second bent cylinder (503) is fixedly connected with outlet conduit (508) far from one end of the first bent cylinder (502).
CN201822082581.4U 2018-12-12 2018-12-12 A kind of construction of hydro project concrete central mix plant Expired - Fee Related CN209350575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822082581.4U CN209350575U (en) 2018-12-12 2018-12-12 A kind of construction of hydro project concrete central mix plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822082581.4U CN209350575U (en) 2018-12-12 2018-12-12 A kind of construction of hydro project concrete central mix plant

Publications (1)

Publication Number Publication Date
CN209350575U true CN209350575U (en) 2019-09-06

Family

ID=67798901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822082581.4U Expired - Fee Related CN209350575U (en) 2018-12-12 2018-12-12 A kind of construction of hydro project concrete central mix plant

Country Status (1)

Country Link
CN (1) CN209350575U (en)

Similar Documents

Publication Publication Date Title
CN207290501U (en) A kind of efficient brickmaking mixing stirring device for preventing stirring whirlpool
CN105027790B (en) A kind of molten fertile pond of quick dissolving fertilizer
CN207401762U (en) A kind of efficient sandstone screening water cycle utilization device
CN209350575U (en) A kind of construction of hydro project concrete central mix plant
CN209251065U (en) A kind of water-fertilizer integral irrigation sprinkler
CN208650124U (en) It a kind of water conservancy river applies safety and crushes Accrete clearing device
CN206744099U (en) A kind of crops uniform irrigation device with rainwater collecting function
CN206464499U (en) The old wax circulation recycle system of precision-investment casting
CN207344834U (en) A kind of cement highly efficient foaming Field Site Production System
CN105481217B (en) Harmless biological degraded pond
CN209572694U (en) A kind of agricultural irrigation equipment
CN207479187U (en) A kind of integrated improvement soil remediation equipment
CN206769910U (en) A kind of shield weighing apparatus shield mud unified collocation equipment
CN211818063U (en) Injection boosting device of concrete injection machine
CN208691956U (en) A kind of agricultural water conservancy Water saving type watering arrangement
CN212241605U (en) Concrete cement is mixed thick liquid and is made into device
CN208685596U (en) A kind of prefabricated pouring mortar pile
CN207995854U (en) A kind of gardens herbicide spray device
CN209036730U (en) A kind of highway bridge concrete central mix plant
CN207413303U (en) A kind of aquaculture pond Efficient Agitator
CN207983674U (en) A kind of hydraulic engineering concrete high-efficiency stirrer
CN110433700A (en) A kind of pump type casting blender
CN109500997A (en) A kind of geotechnical engineering mud mixing plant
CN213761383U (en) Blendor is used in production of special effect energization reinforcing agent
CN107672035A (en) A kind of cement stirring device of Rapid Cleaning function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906

Termination date: 20201212