CN209339956U - A kind of Multipurpose mobile trolley for constructing tunnel - Google Patents

A kind of Multipurpose mobile trolley for constructing tunnel Download PDF

Info

Publication number
CN209339956U
CN209339956U CN201920044780.8U CN201920044780U CN209339956U CN 209339956 U CN209339956 U CN 209339956U CN 201920044780 U CN201920044780 U CN 201920044780U CN 209339956 U CN209339956 U CN 209339956U
Authority
CN
China
Prior art keywords
jack
shaped steel
jurisdiction
section
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920044780.8U
Other languages
Chinese (zh)
Inventor
古艳旗
王轩
许维青
翟志国
哈建波
杨成春
苏清贵
刘超骏
邓业华
杨振朋
宋爽
孙善辉
花楠
高佳
王康乐
李斌
邢会冲
莫松
李萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201920044780.8U priority Critical patent/CN209339956U/en
Application granted granted Critical
Publication of CN209339956U publication Critical patent/CN209339956U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model is a kind of Multipurpose mobile trolley for constructing tunnel, it is supportted including door shaped steel frame, hanging beam, electric hoist, stull, diagonal brace, the first jack, idler wheel, step, support frame, strut, the second jack and section of jurisdiction, Multipurpose mobile trolley has the characteristics that structure is simple, practical, reusable, technologically advanced, it completes as scheduled for subsequent handling flexible arrangement and whole construction line and convenience is provided, solving traditional structure cannot achieve the technical problem that the filling of shield tunnel rail flowering structure tunnel bottom is constructed simultaneously with service channel.

Description

A kind of Multipurpose mobile trolley for constructing tunnel
Technical field
The utility model belongs to constructing tunnel equipment technical field, especially a kind of Multipurpose mobile for constructing tunnel Trolley.
Background technique
After the two shield tunnels driving completion gone forward side by side simultaneously, being separated by 400 meters or so toward depth from hole just need to be two As soon as getting through a service channel between tunnel, tunnel whole in this way is logical as the difference of Excavation Length needs to get through several contacts Road, while the filling construction of rail flowering structure tunnel bottom will be carried out in every tunnel.
It is existing it is mobile trolley used it cannot be guaranteed that rail flowering structure tunnel bottom filling construction while cannot guarantee that wait excavate contact The construction in channel.
Summary of the invention
To solve the above problems, the utility model devises a kind of Multipurpose mobile trolley for constructing tunnel, this is more Purposes is mobile trolley used to can be improved constructing tunnel efficiency, saves the construction period, guarantees the duration node of whole construction line, meets Service channel is constructed while filling with rail flowering structure tunnel bottom.
For achieving the above object, the utility model adopts the following technical solution:
A kind of Multipurpose mobile trolley for constructing tunnel, the Multipurpose mobile trolley include door shaped steel frame, hanging beam, electricity Cucurbit, stull, diagonal brace, the first jack, idler wheel, step, support frame, strut, the second jack and section of jurisdiction support, service channel Height is Hm and its width is Lm, the width D m of rail flowering structure tunnel bottom filling, and ventilation shaft is immediately below being located at the top of the ring of section of jurisdiction It is characterized in that:
The height of single door shaped steel frame is greater than H, width is less than D, and several shaped steel frames are arranged successively simultaneously by identical spacing It is connected into cuboid steelframe by fashioned iron, the cuboid steelframe has door shape construction channel, in appointing for the cuboid steelframe Construction doorframe identical with service channel height H and width L is reserved in side, and the length of the cuboid steelframe is greater than [2~3] L, In the crossbeam lower link hanging beam of middle department's shaped steel frame, the hanging beam first line of a couplet is connected to the electric hoist moved left and right, the left and right of each door shaped steel frame Stull and diagonal brace are connected respectively on the vertical beam of two sides, stull and diagonal brace are connected respectively the first jack, each vertical beam bottom Portion, which couples, idler wheel, and in the vertical beam two sides of head or tail portion, connection has step, couples in the middle part of each step with top There is platform, coupling in the upper end of each crossbeam has support frame, passes through strut respectively at left and right sides of the top of each support frame It is supportted with the second jack connection section of jurisdiction, the spacing of two second jack on same support frame is greater than ventilation shaft diameter.
Due to using technical solution as described above, the utility model generate it is following the utility model has the advantages that
1, the Multipurpose mobile trolley of the utility model when in-orbit flowering structure tunnel bottom is filled, concrete tank and other is applied The standby shape construction channel that can pass through of tooling faster reaches rail flowering structure tunnel bottom filling region, saves the construction time, subtracts Interfering with each other between the filling of rail flowering structure tunnel bottom and Freezing Method for Cross-passage Construction is lacked, to improve construction efficiency.
2, the Multipurpose mobile trolley of the utility model has structure simple, practical, reusable, technologically advanced Feature, complete as scheduled and convenience be provided for subsequent handling flexible arrangement and whole construction line.
3, by the utility model, the step that construction personnel is coupled by two sides can be on the different platforms to each Jack is applied tightly, and each jack is made to withstand on not existing together for section of jurisdiction ring inner surface respectively, both ensure that domain when service channel excavates The globality of section of jurisdiction without the transport of obstruction rail flowering structure tunnel bottom packing material, realizes shield tunnel rail flowering structure tunnel bottom and fills out again It fills and constructs simultaneously with service channel.
Detailed description of the invention
Fig. 1 is the structure schematic diagram of the mobile operation platform of the utility model.
Fig. 1 is: 1- service channel;The filling of 2- rail flowering structure tunnel bottom;3- ventilation shaft;The section of jurisdiction 4- ring;5- shaped steel frames;6- Hanging beam;7- electric hoist;8- stull;9- diagonal brace;The first jack of 10-;11- idler wheel;12- step;13- support frame;14- strut; The second jack of 15-;The support of the section of jurisdiction 16-.
Specific embodiment
The utility model is a kind of Multipurpose mobile trolley for constructing tunnel, can be improved constructing tunnel efficiency, section The about construction period guarantees the duration node of whole construction line, meets while service channel is filled with rail flowering structure tunnel bottom and applies Work.
In conjunction with Fig. 1, Multipurpose mobile trolley includes door shaped steel frame 5, hanging beam 6, electric hoist 7, stull 8, diagonal brace the 9, the 1000th Jin top 10, idler wheel 11, step 12, support frame 13, strut 14, the second jack 15 and section of jurisdiction support 16, the height of service channel 1 are Hm and its width are Lm, and the width D m of rail flowering structure tunnel bottom filling 2, ventilation shaft 3 is located at immediately below 4 top of section of jurisdiction ring, multi-purpose Mobile trolley used specific structure does not repeat separately referring to the technical solution on the way.
It when using Multipurpose mobile trolley, is dragged to by trailer at service channel to be excavated, at this time the construction Doorframe must just treat excavation service channel, then withstand on section of jurisdiction ring respectively by the first jack that each stull and each diagonal brace couple The difference of inner surface sentences the fixed cuboid steelframe, and the second jack of two sides above support frame is then held out against pipe respectively Piece support, by the tight section of jurisdiction ring inner surface of section of jurisdiction support, in the contact position and section of jurisdiction of each first jack and section of jurisdiction ring inner surface It is injury-free with protection pipe loop that the contact position of support and section of jurisdiction ring inner surface installs cushion additional respectively, applies tightly in each second jack Ventilation shaft is not touched in the process.
Multipurpose mobile trolley can be both fixed after the completion of above-mentioned work in every, on the one hand the door shape construction channel energy Enough by concrete tank and other construction equipments, the step that another aspect construction personnel is coupled by two sides can be different On the platform to each jack apply tightly, finally by the construction doorframe treat excavate service channel implement grouting and reinforcing and its Its normal construction, completing should service channel be excavated and construction while the filling of shield tunnel rail flowering structure tunnel bottom.
It is completed since section of jurisdiction ring has spliced reinforcing, to abolish local section of jurisdiction in Freezing Method for Cross-passage Construction, therefore several the One jack should fix the globality that door-shaped frame guarantees section of jurisdiction ring again, while the support of several sections of jurisdiction also plays fixed door shape Frame and the effect for guaranteeing section of jurisdiction ring globality, section of jurisdiction support can realize displacement by strut in subrange.
The technical solution and above-mentioned not described content are executed referring to the routine techniques of shield-tunneling construction.

Claims (1)

1. a kind of Multipurpose mobile trolley for constructing tunnel, which includes door shaped steel frame (5), hanging beam (6), electric hoist (7), stull (8), diagonal brace (9), the first jack (10), idler wheel (11), step (12), support frame (13), branch Bar (14), the second jack (15) and section of jurisdiction support (16), the height of service channel (1) is Hm and its width is Lm, rail flowering structure Fill the width D m of (2) at tunnel bottom, and ventilation shaft (3) is located at underface at the top of section of jurisdiction ring (4), it is characterized in that:
The height of single door shaped steel frame (5) is greater than H, width is less than D, and several shaped steel frames (5) are arranged successively by identical spacing And cuboid steelframe is connected by fashioned iron, the cuboid steelframe has door shape construction channel, in the cuboid steelframe Either side reserves construction doorframe identical with service channel (1) height H and width L, and the length of the cuboid steelframe is greater than [2 ~3] L, in the crossbeam lower link hanging beam (6) of middle department's shaped steel frame (5), hanging beam (6) first line of a couplet is connected to the electric hoist moved left and right (7), stull (8) and diagonal brace (9), stull (8) and diagonal brace (9) are connected respectively on the left and right sides vertical beam of each door shaped steel frame (5) It is connected respectively the first jack (10), each vertical beam bottom, which couples, idler wheel (11), the institute on head or tail portion Stating the connection of vertical beam two sides has step (12), and coupling in the middle part of each step (12) with top has platform, in the upper of each crossbeam End connection has support frame (13), passes through strut (14) and the second jack at left and right sides of the top of each support frame (13) respectively (15) (16) are supportted in connection section of jurisdiction, and it is straight that the spacing of two second jack (15) on same support frame (13) is greater than ventilation shaft (3) Diameter.
CN201920044780.8U 2019-01-11 2019-01-11 A kind of Multipurpose mobile trolley for constructing tunnel Active CN209339956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920044780.8U CN209339956U (en) 2019-01-11 2019-01-11 A kind of Multipurpose mobile trolley for constructing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920044780.8U CN209339956U (en) 2019-01-11 2019-01-11 A kind of Multipurpose mobile trolley for constructing tunnel

Publications (1)

Publication Number Publication Date
CN209339956U true CN209339956U (en) 2019-09-03

Family

ID=67761464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920044780.8U Active CN209339956U (en) 2019-01-11 2019-01-11 A kind of Multipurpose mobile trolley for constructing tunnel

Country Status (1)

Country Link
CN (1) CN209339956U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622948A (en) * 2021-07-23 2021-11-09 北京市政建设集团有限责任公司 Shield tunnel connection channel pipeline device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622948A (en) * 2021-07-23 2021-11-09 北京市政建设集团有限责任公司 Shield tunnel connection channel pipeline device
CN113622948B (en) * 2021-07-23 2023-08-18 北京市政建设集团有限责任公司 Shield tunnel connecting channel pipeline device

Similar Documents

Publication Publication Date Title
CN105649654B (en) Automatic hydraulic inverted arch trestle chassis and its construction method
CN107218064B (en) A kind of large cross-section tunnel changes support and two lining construction methods
CN103016029A (en) Grouped second liner construction method for large cross-section tunnel
CN104563158B (en) Existing subway station realizes the construction method of transfer with new subway station platform layer
CN209339956U (en) A kind of Multipurpose mobile trolley for constructing tunnel
CN105507908A (en) Three-arch construction process for connecting tunnel of large cross-section tunnel
CN103075163A (en) Support change process of second liner construction of large-cross-section tunnel
CN109538218A (en) The method that the filling of shield tunnel rail flowering structure tunnel bottom is constructed simultaneously with service channel
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN109139049A (en) A kind of lining of Underground Subway Station two button arch construction method
CN206986644U (en) A kind of tunnel track simply removes device
CN206874285U (en) The anti-collapse and water burst safety-door device of shield service channel excavation construction
CN107587885B (en) Two-lining trolley structure in standard section of tunnel and assembling method
CN207513606U (en) A kind of counterforce device for shield launching
CN203583439U (en) Concrete faced rockfill dam plastic water stop construction trolley
CN104372746B (en) The prefabricated post stretching Simple T-Girders note concrete form support of railroad bridge and mounting process thereof
CN206092014U (en) Interim support system transfer table car suitable for multi -pilot is wide open and digs
CN206029118U (en) People's air defense door leaf outside board plastic closing device
CN205677263U (en) A kind of fluid pressure type automatic discharging slag ladle
CN204492851U (en) Metro built by mining method transverse passage-way temporary support component
CN209384267U (en) Assembling and supporting device for construction of prefabricated pipe gallery
CN209836697U (en) Long steel rail cross-track shifting device
CN207538080U (en) One kind is laid with for subway station inside wall waterproof, reinforcing steel bar-binding bench vehicle
CN205189896U (en) Tunnel secondary lining prevents flashover ground structure
CN206873489U (en) A kind of subway station roof shield hole retaining wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant