CN209323512U - Anchor cable structure in flood discharge energy dissipation rivers erode district - Google Patents

Anchor cable structure in flood discharge energy dissipation rivers erode district Download PDF

Info

Publication number
CN209323512U
CN209323512U CN201822041513.3U CN201822041513U CN209323512U CN 209323512 U CN209323512 U CN 209323512U CN 201822041513 U CN201822041513 U CN 201822041513U CN 209323512 U CN209323512 U CN 209323512U
Authority
CN
China
Prior art keywords
anchor
head
embedded
structures
rock mass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822041513.3U
Other languages
Chinese (zh)
Inventor
杨宜文
邓良军
郭建文
张彩秀
庞博慧
关汉锋
刘权
谢洪林
周钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Lancang River Hydropower Co Ltd
PowerChina Kunming Engineering Corp Ltd
Original Assignee
Huaneng Lancang River Hydropower Co Ltd
PowerChina Kunming Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Lancang River Hydropower Co Ltd, PowerChina Kunming Engineering Corp Ltd filed Critical Huaneng Lancang River Hydropower Co Ltd
Priority to CN201822041513.3U priority Critical patent/CN209323512U/en
Application granted granted Critical
Publication of CN209323512U publication Critical patent/CN209323512U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

An anchor cable structure of a flood discharge and energy dissipation water flow scouring area relates to the field of hydroelectric engineering construction. The utility model discloses the setting is in structures and rock mass foundation intersection, this anchor rope structure of its characterized in that includes interior anchor head, the anchor rope body and consolidates outer anchor head, interior anchor head, the anchor rope body is connected with the outer anchor head order of reinforcement, it includes embedded anchor pier head and dowel steel to consolidate outer anchor head, embedded anchor pier head sets up inside structures, hug closely rock mass foundation surface, embedded dowel steel is respectively buried in top and the bottom of embedded anchor pier head, dowel steel one end is buried inside embedded anchor pier head, and with the reinforcing bar welding of embedded anchor pier head, the dowel steel other end is buried inside structures, with the structure reinforcing bar welding. The utility model discloses consolidate in advance the basic rock mass, strengthened the wholeness and the stability of slope basic rock mass, reduced the safe risk of construction period, do not influence the construction of follow-up flood discharge energy dissipation rivers washout district structures simultaneously again, still can improve the wholeness and the surface smoothness that improve the building.

Description

The anchor cable structure in flood-discharge energy-dissipating current scour area
Technical field
The utility model relates to construction of hydropower plant field, the outer anchor head of especially a kind of anchor cable forms one together with structures A entirety, not only side slope was reinforced, but also increased the anchor cable structure in the flood-discharge energy-dissipating current scour area of structures stability.
Background technique
With the fast development of China's builds to foundation engineering project, prestressed anchor reinforcement technology is widely used to build The engineerings such as reinforcing, Slope Treatment, large underground hole and the deep foundation pit support of object have especially obtained in hydraulic and hydroelectric engineering construction It is used to a large amount of.For example, nearby rock mass generates joint cutting and adverse slope to dam body, stability decline need to do consolidation process.Pass through anchor After rope applies prestressing force to rock stratum, several rock stratum can be worn and are linked togather by prestress anchorage cable, increase rock stratum globality.Due to answering in advance The effect of power can also be such that frictional resistance between rock stratum increases, to enhance the stability of rock stratum and improve bearing capacity.Sometimes rock stratum is Make that there is no joint destructions, but for the Degree of Safety of slope rock mass, it is also desirable to prestressing anchor support.
Currently used prestress anchorage cable is generally collectively constituted by Inner bolt head, anchor cable body and outer anchor head three parts, and its China and foreign countries' anchor head is usually the outer holding force end being made of a bit of Shu Tiyu work anchor slab, anchor pier etc..When structures need to build shakiness in On the basis of determining rock mass, rock mass and structures need to synchronous reinforcing when, it is general to be arranged on structures using by outer anchor head, in structures After the completion of construction, then the mode of construction prestressed cable is carried out, outer anchor head can protrude on structures surface at this time.Sometimes for structure Build object surface it is smooth with it is beautiful, outer anchor head can be also arranged in preformed groove on structures there are preformed groove, to anchor cable Preformed groove is backfilled again after drawing.But for both modes in flood-discharge energy-dissipating current scour area, there are exposed anchor heads to be unable to water resistant Stream washes away or preformed groove fill concrete contraction the problem of cannot resisting current scour, when often result in failure of cable or structures are whole Unstability has biggish security risk.In addition, in flood-discharge energy-dissipating current scour area, for resist water flow to structures wash away with Pulsation pressure difference draws brush effect, and the globality and surface smoothness to structures concrete require also more strictly, above two First usual way destroys the globality of abrasion resistance concrete, second energy dissipating plot structure concrete surface flatness, which is not met, wants It asks, is easy to destroy structures because cavitating, drawing the problems such as brush.
Summary of the invention
To be solved in the utility model is exactly currently used prestress anchorage cable in flood-discharge energy-dissipating current scour area, knot Structure exists and cannot be reinforced side slope rock mass in advance, and exposed anchor head anti-cavitation, scouring capability are insufficient, when often result in outer anchor head gas It the damage inactivations such as loses, wash away, while exposed anchor head influences structures globality and surface smoothness, there is larger cavitation erosion peace The problem of full blast danger provides a kind of outer anchor head of anchor cable and forms an entirety with structures together with, and not only side slope was reinforced, but also increasing Add the anchor cable structure in the flood-discharge energy-dissipating current scour area of structures stability.
The anchor cable structure in the flood-discharge energy-dissipating current scour area of the utility model, setting cross in structures and rock mass basis Place, it is characterised in that the anchor cable structure includes Inner bolt head, anchor cable body and the outer anchor head of reinforcing, Inner bolt head, anchor cable body and the outer anchor of reinforcing Head is linked in sequence, and reinforcing outer anchor head includes embedded anchor pier head and joint bar, and embedded anchor pier head is arranged inside structures, is close to Pre- doweling is distinguished in rock mass surface of base, the top and bottom of embedded anchor pier head, and joint bar one end is embedded in embedded anchor pier head Portion, and the reinforcement welding with embedded anchor pier head, the joint bar other end is embedded to inside structures, with structures reinforcement welding.
Embedded anchor pier head and anchor cable can construct after rock mass base surface is excavated, cleaned out, in time to shakiness Determine rock mass to be reinforced, improves side slope overall stability;After the completion of the construction of external structures, the outer anchor head of anchor cable and structures one Road forms an entirety, and not only side slope had carried out timely reinforcing, but also increased the stability of structures.
The anchor cable structure in the flood-discharge energy-dissipating current scour area of the utility model, structure is simple, design science, easy to use, By the setting of outer anchor head in structures and rock mass basis intersection, anchor cable structure can be made to construct prior to structures, to basic rock mass It is reinforced in advance, strengthens the globality and stability of side slope basis rock mass, reduce the security risk of construction time, while again The globality and surfacing for improving building also can be improved in the construction for not influencing subsequent flood-discharge energy-dissipating current scour area structures Degree;Structures and embedded anchor pier head are linked together by setting joint bar, and make side slope basis rock mass and flood discharge by anchor cable structure Energy dissipating current scour area's structure structure forms the coaction body combined closely, and improves flood-discharge energy-dissipating current scour plot structure Overall stability and safety.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
Wherein, rock mass 1, structures 2, embedded anchor pier head 3, reinforcing bar 4, joint bar 5, anchor cable body 6.
Specific embodiment
Embodiment 1: a kind of anchor cable structure in flood-discharge energy-dissipating current scour area, setting cross in structures 2 and 1 basis of rock mass Place, the anchor cable structure include Inner bolt head, anchor cable body 6 and reinforce outer anchor head, and Inner bolt head, anchor cable body 6 connect with outer anchor head sequence is reinforced It connects, reinforcing outer anchor head includes embedded anchor pier head 3 and joint bar 5, and embedded anchor pier head 3 is arranged inside structures 2, is close to rock mass Pre- doweling 5 is distinguished in 1 surface of base, the top and bottom of embedded anchor pier head 3, and 5 one end of joint bar is embedded in embedded anchor pier head 3 Portion, and welded with the reinforcing bar 4 of embedded anchor pier head 3,5 other end of joint bar is embedded to inside structures 2, is welded with 2 reinforcing bar 4 of structures It connects.
Embedded anchor pier head 3 and anchor cable can construct after 1 base surface of rock mass is excavated, cleaned out, in time to not Rock mass stability 1 is reinforced, and side slope overall stability is improved;After the completion of the construction of external structures 2, the outer anchor head of anchor cable with construct One of object 2 formation, one entirety, not only side slope had carried out timely reinforcing, but also increased the stability of structures 2.
It is illustrated so that Huang steps on power station cushion pool side shore protection slope surface as an example.
The anchor cable structure is set to cushion pool side shore protection slope surface basis rock mass 1 and concrete lining structure intersection, After slope is than the shore protection slope surface foundation excavation for 1:0.5~1:0.2,1000kN/1800kN grades of prestress anchorage cables are used in time Shore protection slope surface basis rock mass 1 is reinforced in advance, the globality and stability of basic rock mass 1 is improved, reduces construction period Security risk;Embedded anchor pier head 3 is poured in basic 1 surface of rock mass, and anchor cable passes through embedded anchor pier head 3 and extends to 1 base of rock mass Plinth depths;When embedded anchor pier head 3 pours, in the embedded 3 pre- doweling 5 in top and bottom of anchor pier head, 5 one end of joint bar is buried Entering inside embedded anchor pier head 3, and is welded with anchor pier head reinforcing bar 4, the other end stretches out in outside embedded 3 figure of anchor pier head, to It is welded when later period pours cushion pool structural concrete with 28 reinforcing bar 4 of Φ inside liner structure;It can be into after anchorage cable stretching Row liner structure concrete pours, and embedded anchor pier head 3 will be fully wrapped around by liner structure concrete at this time, is embedded in lining cutting Inside configuration is integrally formed embedded anchor pier head 3 with liner structure, forms the smooth cushion pool protective slope structure body in surface.By It is embedded in inside liner structure in embedded anchor pier head 3, after the completion of cushion pool liner structure concreting, flood discharge can be promoted and disappeared The integrality and surface smoothness of energy current scour area liner structure, improve structure antiscour and anti-cavitation ability.Meanwhile passing through Anchor cable structure makes basic rock mass 1 form the coaction body combined closely with cushion pool liner structure, improves cushion pool shore protection Overall stability.

Claims (1)

1. a kind of anchor cable structure in flood-discharge energy-dissipating current scour area is arranged in structures (2) and the basic intersection of rock mass (1), It is characterized in that the anchor cable structure includes Inner bolt head, anchor cable body (6) and the outer anchor head of reinforcing, Inner bolt head, anchor cable body (6) and the outer anchor of reinforcing Head is linked in sequence, and reinforcing outer anchor head includes embedded anchor pier head (3) and joint bar (5), and embedded anchor pier head (3) is arranged in structures (2) internal, it is close to rock mass (1) surface of base, pre- doweling (5), joint bar are distinguished in the top and bottom of embedded anchor pier head (3) (5) it is internal to be embedded to embedded anchor pier head (3) for one end, and welds with the reinforcing bar (4) of embedded anchor pier head (3), joint bar (5) other end It is embedded to structures (2) inside, is welded with structures (2) reinforcing bar (4).
CN201822041513.3U 2018-12-06 2018-12-06 Anchor cable structure in flood discharge energy dissipation rivers erode district Active CN209323512U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822041513.3U CN209323512U (en) 2018-12-06 2018-12-06 Anchor cable structure in flood discharge energy dissipation rivers erode district

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822041513.3U CN209323512U (en) 2018-12-06 2018-12-06 Anchor cable structure in flood discharge energy dissipation rivers erode district

Publications (1)

Publication Number Publication Date
CN209323512U true CN209323512U (en) 2019-08-30

Family

ID=67713059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822041513.3U Active CN209323512U (en) 2018-12-06 2018-12-06 Anchor cable structure in flood discharge energy dissipation rivers erode district

Country Status (1)

Country Link
CN (1) CN209323512U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519530A (en) * 2020-04-30 2020-08-11 中铁大桥勘测设计院集团有限公司 Pier head type tunnel anchor and construction method
CN114809040A (en) * 2022-06-09 2022-07-29 中国电建集团中南勘测设计研究院有限公司 Slope reinforcing structure and construction method thereof
CN115748740A (en) * 2022-12-21 2023-03-07 华能澜沧江水电股份有限公司 Ditch and valley large-span inward concave arch type reinforced earth retaining wall supporting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519530A (en) * 2020-04-30 2020-08-11 中铁大桥勘测设计院集团有限公司 Pier head type tunnel anchor and construction method
CN114809040A (en) * 2022-06-09 2022-07-29 中国电建集团中南勘测设计研究院有限公司 Slope reinforcing structure and construction method thereof
CN115748740A (en) * 2022-12-21 2023-03-07 华能澜沧江水电股份有限公司 Ditch and valley large-span inward concave arch type reinforced earth retaining wall supporting method

Similar Documents

Publication Publication Date Title
CN209323512U (en) Anchor cable structure in flood discharge energy dissipation rivers erode district
CN103835311B (en) Post-tensioned prestressing underground diaphragm wall and construction method
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN104847374A (en) Soft rock large-deformation tunnel supporting system and construction method thereof
CN101560767A (en) Method for connecting slotted sections in underground construction of diaphragm wall
CN101761345A (en) Reinforcement device for tunnel top soil and construction method thereof
CN107859145A (en) A kind of drainpipe is plugged into construction method under water
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN202787334U (en) Sealing structure of deep well casing used during tunnel construction
CN108755453A (en) A kind of water punching is damaged the composite reinforcement structure and its reinforcement means of bridge pier
CN108677926A (en) Coercion underground continuous wall and its construction method
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN111733853A (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN102002945A (en) Capsule type anti-corrosion device with pile shoe and anti-corrosion and construction method using device
CN212248284U (en) Steel pipe pile protection system for soft foundation mixed slope
CN210856971U (en) Pile foundation erodees reinforced structure
KR101262865B1 (en) Construction method for cofferdam
CN101545255B (en) Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting
CN201158821Y (en) Cofferdam of steel pouring jacket
CN107964975B (en) Construction method of PBL (Poly-p-phenylene benzobisoxazole) shear force key connection structure of steel pipe composite pile and bearing platform
CN205617396U (en) Close on existing railway line construction protection structure
CN108277798A (en) Prestressing force shaped steel support pile and its construction method
CN115198793A (en) Side slope open cut tunnel supporting structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant