CN209318698U - For spending the molding cold-heading device of tooth flange nut - Google Patents

For spending the molding cold-heading device of tooth flange nut Download PDF

Info

Publication number
CN209318698U
CN209318698U CN201821743121.5U CN201821743121U CN209318698U CN 209318698 U CN209318698 U CN 209318698U CN 201821743121 U CN201821743121 U CN 201821743121U CN 209318698 U CN209318698 U CN 209318698U
Authority
CN
China
Prior art keywords
main mould
punch die
mold
cushion block
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821743121.5U
Other languages
Chinese (zh)
Inventor
魏双来
王坤
段森明
路凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binko Automotive Fasteners (kunshan) Co Ltd
Original Assignee
Binko Automotive Fasteners (kunshan) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binko Automotive Fasteners (kunshan) Co Ltd filed Critical Binko Automotive Fasteners (kunshan) Co Ltd
Priority to CN201821743121.5U priority Critical patent/CN209318698U/en
Application granted granted Critical
Publication of CN209318698U publication Critical patent/CN209318698U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model discloses one kind for spending the molding cold-heading device of tooth flange nut, including material cutting mechanism, ejecting mechanism, transport mechanism and five molds, and five molds include: for by the first mold of the upset shaping of the blank;The second mold to form a pit is squeezed for the first end to the blank;For the pit to be squeezed to the third mold to form inner hole;Flange is formed for the second end to the blank, pre-punched hole is carried out to the flange and squeezes the first end outer wall of the blank the 4th mold to form colored tooth;Waste material for generating the flange pre-punched hole is gone out, to form the 5th mold of threaded hole bottom outlet on the flange.The utility model can guarantee the length and full weight of colored tooth, improve production efficiency, reduce the cost of raw material.

Description

For spending the molding cold-heading device of tooth flange nut
Technical field
The utility model relates to cold-heading device fields, particularly a kind of for spending the molding cold-heading dress of tooth flange nut It sets.
Background technique
A kind of colored tooth flange nut 1 is generallyd use in automobile instrument panel injection molding plates as attaching nut, structure such as Fig. 1 a- Shown in 1b, flower tooth 11 and flange 12 are wrapped, the colored tooth 11 is equipped with an inner hole 13, sets between the colored tooth 11 and the flange 12 There is the threaded hole 14 of perforation, wherein the design length of the colored tooth 11 is only 2.95-4.1mm, the flange thickness of the flange 12 Only 2.8-3.17mm.
There are two types of the manufacturing method of existing colored tooth flange nut is usual, one is first use common cold-heading device forming embossing Then the gear blank and flange of the flower tooth of tooth flange nut carry out annular knurl processing to gear blank using knurled wheel, secondly carry out to flange Machine adds processing to obtain threaded hole bottom outlet, then carries out tapping to threaded hole bottom outlet, and finally materials and parts are heat-treated and are electroplated;It is another Kind is first to add the gear blank for spending tooth out to the bar machine with flange diameter using machine add mode, is then carried out using knurled wheel to gear blank Secondly annular knurl processing carries out machine to flange and processing is added to obtain threaded hole bottom outlet, then carries out tapping to threaded hole bottom outlet, finally to material Part is heat-treated and is electroplated.When both methods has the disadvantage in that 1. use knurled wheel annular knurl tooth, due to needing to consider The withdrawing space of knurled wheel, knurled wheel are difficult to roll out the part in gear blank with flanged joint into full colored tooth, this will affect colored tooth Length, and then influence flower tooth flange nut bonding strength, if knurled wheel remove chamfering, as far as possible guarantee the full flower in root Tooth, then the service life of knurled wheel will be greatly reduced;2. will cause waste of raw materials using machining mode, it is unfavorable for emission reduction consumption reduction; 3. annular knurl tooth and mach production efficiency are low, processing cost is high.
Utility model content
In order to overcome the defects of the prior art, the utility model embodiment provide it is a kind of for spend tooth flange nut at At least one of the cold-heading device of type, be used to solve the above problems.
The embodiment of the present application discloses: one kind is for spending the molding cold-heading device of tooth flange nut, including material cutting mechanism, top Mechanism, transport mechanism, the first mold, the second mold, third mold, the 4th mold and the 5th mold out, in which:
The material cutting mechanism is used to cut into wire rod blank, and the blank has first end and second along long axis direction End;
The ejecting mechanism is used to jack up the blank cut;
The transport mechanism is for transmitting materials and parts between the ejecting mechanism and five molds;
First mold is used for the upset shaping of the blank;
Second mold is for squeezing the first end of the blank to form a pit;
The third mold is for squeezing the pit to form inner hole;
4th mold is used to forming the second end of the blank into flange, be used to carry out the flange pre-punched hole, And for squeezing the first end outer wall of the blank to form colored tooth;
5th mold is for going out the waste material generated by the pre-punched hole of the flange, to be formed on the flange Threaded hole bottom outlet.
Specifically, first mold, the second mold, third mold respectively include the first main mould and the first punch die, institute The first main mould is stated to be correspondingly arranged with first punch die;First main mould includes the first main mould shell, the first main mould benevolence, the first master Die-cushion block, the first main mould thimble, wherein the first main mould cushion block described in first main mould Renhe connects setting in first master In formwork, the first main mould chamber is equipped in the first main mould benevolence, the first main mould thimble runs through the first main mould cushion block extremely In the first main mould chamber;First punch die includes the first punch die shell, the first punch die cushion block, the first punch die thimble, and described the One punch die cushion block and the first punch die thimble, which connect, to be arranged in the first punch die shell.
Specifically, the 4th mold includes the second main mould being correspondingly arranged and the second punch die, second main mould includes Second main mould shell, the second main mould benevolence, the second main mould cushion block, the second main mould thimble, wherein second described in second main mould Renhe Main mould cushion block, which connects, to be arranged in the second main mould shell, and the second main mould chamber is equipped in the second main mould benevolence, and described second is main Mould thimble is through the second main mould cushion block into the second main mould chamber;Second punch die includes the second punch die shell, second Punch die cushion block, the second punch die thimble, the second punch die benevolence, the second punch die cushion block described in second punch die Renhe, which connects, to be set in institute It states in the second punch die shell, the second die cavity is equipped in the second punch die benevolence, the second punch die thimble is through second punching Die-cushion block is into second die cavity.
Specifically, the 5th mold includes third main mould and third punch die, the third main mould and the third punch die It is correspondingly arranged, the third main mould includes third main mould shell, third main mould benevolence, third main mould cushion block, third main mould Renhe The third main mould cushion block, which connects, to be arranged in the third main mould shell, and third main mould chamber, institute are equipped in the third main mould benevolence The outlet being equipped in third main mould cushion block for waste material to be discharged is stated, the outlet is connected to the third main mould chamber;The third Punch die includes third punch die shell, third punch die cushion block, third punch die thimble and third punch die benevolence, the third punch die cushion block and institute It states third punch die benevolence and connects and be arranged in the third punch die shell, be equipped with third die cavity in the third punch die benevolence, described the Three punch die thimbles penetrate in the third die cavity.
Specifically, the transport mechanism includes for transmitting materials and parts between the 4th mold and the 5th mold Transmission unit, the transmission unit include first clamping member and the second clamping piece, and described first clamping member is equipped with the first arc Slot, second clamping piece be equipped with the second arc groove corresponding with first arc groove, first arc groove with it is described Second arc groove cooperates to clamp the flange.
Specifically, the material cutting mechanism includes scissors or cut-off-die.
The beneficial effects of the utility model are as follows: the colored tooth flange nut is in addition to threaded hole needs to pass through process for machining Complete outer, remaining shape is completed by cold heading technique, using when cold-heading technology forming embossing tooth without considering withdrawing space, therefore it is cold Upsetting technology may be implemented to mold colored tooth in gear blank with the part of flanged joint, guarantees the length of flower tooth, keeps metal streamline Integrality and full weight, it is ensured that the bonding strength of flower tooth flange nut, meanwhile, described in cold-heading device production using the above structure Flower tooth flange nut, is greatly saved raw material, improves production efficiency.
For the above and other objects, features and advantages of the utility model can be clearer and more comprehensible, preferable reality is cited below particularly Example is applied, and cooperates institute's accompanying drawings, is described in detail below.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 a is the main view of colored tooth flange nut;
Fig. 1 b is the cross-sectional view of colored tooth flange nut;
Fig. 2 is in the utility model embodiment for spending the structural schematic diagram of the molding cold-heading device of tooth flange nut;
Fig. 3 is the structural schematic diagram of blank in the utility model embodiment;
Fig. 4 is the structural schematic diagram of third mold in the utility model embodiment;
Fig. 5 is the structural schematic diagram of the 4th mold in the utility model embodiment;
Fig. 6 is the structural schematic diagram of the 5th mold in the utility model embodiment;
Fig. 7 is the structural schematic diagram of transport mechanism described in the utility model embodiment;
Fig. 8 is the structural scheme of mechanism of first clamping member described in the utility model embodiment.
The appended drawing reference of the figures above: 1- flower tooth flange nut, 11- flower tooth, 12- flange, 13- inner hole, 14- threaded hole, 2- material cutting mechanism, 3- ejecting mechanism, 4- transport mechanism, 41- first clamping member, the second clamping piece of 42-, the first arc groove of 43-, The second arc groove of 44-, the first mold of 51-, 511- the first main mould shell, 512- the first main mould benevolence, 513- the first main mould cushion block, 514- First main mould thimble, 515- the first main mould chamber, 516- the first punch die shell, 517- the first punch die cushion block, 518- the first punch die thimble, The second mold of 52-, 53- third mold, the 4th mold of 54-, 541- the second main mould shell, 542- the second main mould benevolence, 543- second are main Die-cushion block, 544- the second main mould thimble, 545- the second main mould chamber, 546- the second punch die shell, 547- the second punch die cushion block, 548- Two punch die thimbles, 549- the second punch die benevolence, the second die cavity of 540-, the 5th mold of 55-, 551- third main mould shell, 552- third Main mould benevolence, 553- third main mould cushion block, 554- third punch die shell, 555- third punch die cushion block, 556- third punch die thimble, 557- Third punch die benevolence, 558- third die cavity, the outlet 559-, 6- blank, 61- first end, 62- second end.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In conjunction with shown in 1a, 1b, 2,3, for spending the molding cold-heading of tooth flange nut described in the utility model embodiment Device includes material cutting mechanism 2, ejecting mechanism 3, transport mechanism 4, the first mold 51, the second mold 52, third mold 53, the 4th mould Tool 54 and the 5th mold 55, in which:
The material cutting mechanism 2 is used to wire rod cutting into blank 6, and the material cutting mechanism 2 in the present embodiment includes scissors or cuts Mould, the blank 6 have first end 61 and second end 62 along long axis direction;
The ejecting mechanism 3 is for jacking up the blank 6 cut;
The transport mechanism 4 is for transmitting materials and parts between the ejecting mechanism 3 and five molds;
First mold 51 is used for the 6 jumping-up shaping of blank;
Second mold 52, which is used to squeeze the first end 61 of the blank, forms a pit;
The third mold 53 is for squeezing the pit to form inner hole 13;
4th mold 54 is used to carry out by the formation of second end 62 flange 12 of the blank 6, by the flange 12 pre- Punching and for squeezing 61 outer wall of first end of the blank 6 to form colored tooth 11;
5th mold 55 is for going out the waste material generated by the pre-punched hole of the flange 12, in the flange 12 Upper 14 bottom outlet of formation threaded hole.
By above structure, in the utility model embodiment, the colored tooth flange nut 1 passes through in addition to the needs of threaded hole 14 Outside process for machining is completed, remaining shape is completed by cold heading technique, is moved back using when cold-heading technology forming embossing tooth 11 without considering Knife space, therefore the part that cold-heading technology may be implemented to connect in gear blank with flange 12 molds colored tooth 11, guarantees flower tooth 11 Length, the integrality and full weight for keeping metal streamline, it is ensured that the bonding strength of flower tooth flange nut, meanwhile, using above-mentioned knot The cold-heading device of structure produces the colored tooth flange nut, and raw material are greatly saved, improve production efficiency.
Specifically, first mold 51, the second mold 52, third mold 53 wrap respectively in conjunction with shown in Fig. 2 and Fig. 4 The first main mould and the first punch die are included, first main mould and first punch die are correspondingly arranged;Wherein, first main mould includes First main mould shell 511, the first main mould benevolence 512, the first main mould cushion block 513, the first main mould thimble 514, the first main mould benevolence 512 Connect with the first main mould cushion block 513 and be arranged in the first main mould shell 511, the is equipped in the first main mould benevolence 512 One main mould chamber 515, the first main mould thimble 514 is through the first main mould cushion block 513 into the first main mould chamber 515; First punch die includes the first punch die shell 516, the first punch die cushion block 517, the first punch die thimble 518, first die pad Block 517 and the first punch die thimble 518, which connect, to be arranged in the first punch die shell 516.The first punch die thimble 518 will In first main mould chamber of the indentation of blank 6 515 after molding, materials and parts are ejected the first main mould chamber 515 by the first main mould thimble 514, by Materials and parts are sent in next mold by transport mechanism 4.
Specifically, the 4th mold 54 includes the second main mould being correspondingly arranged and the second punching in conjunction with shown in Fig. 2 and Fig. 5 Mould, second main mould include the second main mould shell 541, the second main mould benevolence 542, the second main mould cushion block 543, the second main mould thimble 544, wherein the second main mould benevolence 542 and the second main mould cushion block 543 connect setting in the second main mould shell 541, The second main mould chamber 545 is equipped in the second main mould benevolence 542, the second main mould thimble 544 runs through the second main mould cushion block 543 into the second main mould chamber 545;Second punch die includes the second punch die shell 546, the punching of the second punch die cushion block 547, second Mould thimble 548, the second punch die benevolence 549, the second punch die benevolence 549 and the second punch die cushion block 547, which connect, to be arranged described In second punch die shell 546, it is equipped with the second die cavity 540 in the second punch die benevolence 549, the second punch die thimble 548 runs through In the second punch die cushion block 547 to second die cavity 540.The second punch die benevolence 549 is used to blank 6 being pressed into second Flange 12 is formed in main mould chamber 545, the second punch die thimble 548 is used for the pre-punched hole on the flange 12.
Specifically, the 5th mold 55 includes third main mould and third punch die, the third in conjunction with shown in Fig. 2 and Fig. 6 Main mould and the third punch die are correspondingly arranged, and the third main mould includes third main mould shell 551, third main mould benevolence 552, third master Die-cushion block 553, the third main mould benevolence 552 and the third main mould cushion block 553, which connect, to be arranged in the third main mould shell 551 It is interior, it is equipped with third main mould chamber in the third main mould benevolence 552, is equipped in the third main mould cushion block 553 for waste material to be discharged Outlet 559, the outlet 559 are connected to the third main mould chamber;The third punch die includes third punch die shell 554, third punching Die-cushion block 555, third punch die thimble 556 and third punch die benevolence 557, the third punch die cushion block 555 and the third punch die benevolence 557, which connect, is arranged in the third punch die shell 554, is equipped with third die cavity 558 in the third punch die benevolence 557, and described the Three punch die thimbles 556 penetrate in the third die cavity 558.The third punch die benevolence 557 is used for pressure when going out waste material Firmly materials and parts, for the third punch die thimble 556 for going out the waste material that 12 pre-punched hole of flange generates, waste material falls into third die cavity In and from outlet 559 in skid off.
In conjunction with shown in Fig. 7-8, in the present embodiment, the transport mechanism 4 includes in the 4th mold 54 and described The transmission unit of materials and parts is transmitted between 5th mold 55, the transmission unit includes first clamping member 41 and the second clamping piece 42, Described first clamping member 41 is equipped with the first arc groove 43, and second clamping piece 42 is equipped with right with first arc groove 43 The second arc groove 44 answered, first arc groove 43 cooperate with second arc groove 44 to clamp the flange 12.From The materials and parts of four molds 54 ejection have complete flower tooth 11 and flange 12, since flower tooth 11 is used as working face, and the thickness of flange 12 Very little is spent, therefore, transmission unit using the above structure can be to avoid 11 quilt of flower tooth of the materials and parts ejected from the 4th mold 54 It directly clamps and makes that tooth 11 is spent to be damaged, while also avoiding directly causing flange 12 to deform from thickness direction clamping flange 12 Deng.
For spending the course of work of the molding cold-heading device of tooth flange nut as follows described in the present embodiment:
S1: wire rod is cut into blank 6 and passes through 4 feeding of transport mechanism by material cutting mechanism 2;
Blank 6 is carried out shaping by the S2: the first mold 51;
The first end 61 of blank 6 is squeezed and forms a pit by the S3: the second mold 52;
S4: third mold 53 squeezes the pit to form inner hole 13;
S5: the four mold 54 is by 62 shaped flange 12 of second end of blank 6 and to 12 pre-punched hole of flange, while to blank 6 First end 61 outer wall forming embossing tooth 11;
S6: the five mold 55 goes out the waste material generated by the pre-punched hole of flange 12, forms the bottom outlet of threaded hole 14.
Using above-mentioned technique, the blank speed of production of flower tooth flange nut greatly improves production up to 60 per minute Efficiency after the completion of above-mentioned steps, also needs the threaded hole 14 for processing colored tooth flange nut, then carries out hot place to flower tooth flange nut Reason, surface treatment, to improve the mechanical performance of flower tooth flange nut.
Specific embodiment is applied in the utility model to be expounded the principles of the present invention and embodiment, with The explanation of upper embodiment is merely used to help understand the method and its core concept of the utility model;Meanwhile for this field Those skilled in the art, based on the idea of the present invention, there will be changes in the specific implementation manner and application range, comprehensive Upper described, the content of the present specification should not be construed as a limitation of the present invention.

Claims (6)

1. one kind is for spending the molding cold-heading device of tooth flange nut, which is characterized in that including material cutting mechanism, ejecting mechanism, biography Send mechanism, the first mold, the second mold, third mold, the 4th mold and the 5th mold, in which:
The material cutting mechanism is used to wire rod cutting into blank, and the blank has a first end and a second end along long axis direction;
The ejecting mechanism is used to jack up the blank cut;
The transport mechanism is for transmitting materials and parts between the ejecting mechanism and five molds;
First mold is used for the upset shaping of the blank;
Second mold is for squeezing the first end of the blank to form a pit;
The third mold is for squeezing the pit to form inner hole;
4th mold is used to forming the second end of the blank into flange, be used to carry out the flange pre-punched hole and For squeezing the first end outer wall of the blank to form colored tooth;
5th mold is for going out the waste material generated by the pre-punched hole of the flange, to form screw thread on the flange Hole bottom outlet.
2. according to claim 1 for spending the molding cold-heading device of tooth flange nut, which is characterized in that first mould Tool, the second mold, third mold respectively include the first main mould and the first punch die, first main mould and first punch die pair It should be arranged;First main mould includes the first main mould shell, the first main mould benevolence, the first main mould cushion block, the first main mould thimble, wherein First main mould cushion block described in first main mould Renhe, which connects, to be arranged in the first main mould shell, is set in the first main mould benevolence There is the first main mould chamber, the first main mould thimble is through the first main mould cushion block into the first main mould chamber;Described first Punch die includes the first punch die shell, the first punch die cushion block, the first punch die thimble, the first punch die cushion block and first punch die top Needle, which connects, to be arranged in the first punch die shell.
3. according to claim 1 for spending the molding cold-heading device of tooth flange nut, which is characterized in that the 4th mould Tool includes the second main mould being correspondingly arranged and the second punch die, and second main mould includes the second main mould shell, the second main mould benevolence, second Main mould cushion block, the second main mould thimble, wherein the second main mould cushion block described in second main mould Renhe, which connects, to be arranged described second In main mould shell, the second main mould chamber is equipped in the second main mould benevolence, the second main mould thimble runs through the second main mould cushion block To in the second main mould chamber;Second punch die includes the second punch die shell, the second punch die cushion block, the second punch die thimble, second Punch die benevolence, the second punch die cushion block described in second punch die Renhe, which connects, to be set in the second punch die shell, second punching The second die cavity is equipped in mode, the second punch die thimble is through the second punch die cushion block into second die cavity.
4. according to claim 1 for spending the molding cold-heading device of tooth flange nut, which is characterized in that the 5th mould Tool includes third main mould and third punch die, and the third main mould is correspondingly arranged with the third punch die, and the third main mould includes Third main mould shell, third main mould benevolence, third main mould cushion block, the setting that connects of third main mould cushion block described in third main mould Renhe exist In the third main mould shell, it is equipped with third main mould chamber in the third main mould benevolence, is equipped in the third main mould cushion block for arranging The outlet of waste material out, the outlet are connected to the third main mould chamber;The third punch die includes third punch die shell, third punch die Cushion block, third punch die thimble and third punch die benevolence, the third punch die cushion block and the third punch die benevolence, which connect, to be arranged described In third punch die shell, third die cavity is equipped in the third punch die benevolence, the third punch die thimble penetrates the third punch die It is intracavitary.
5. according to claim 1 for spending the molding cold-heading device of tooth flange nut, which is characterized in that the conveyer Structure includes the transmission unit for transmitting materials and parts between the 4th mold and the 5th mold, and the transmission unit includes First clamping member and the second clamping piece, described first clamping member be equipped with the first arc groove, second clamping piece be equipped with Corresponding second arc groove of first arc groove, first arc groove and second arc groove cooperate to clamp the method It is blue.
6. according to claim 1 for spending the molding cold-heading device of tooth flange nut, which is characterized in that the stock-cutter Structure includes scissors or cut-off-die.
CN201821743121.5U 2018-10-26 2018-10-26 For spending the molding cold-heading device of tooth flange nut Active CN209318698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821743121.5U CN209318698U (en) 2018-10-26 2018-10-26 For spending the molding cold-heading device of tooth flange nut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821743121.5U CN209318698U (en) 2018-10-26 2018-10-26 For spending the molding cold-heading device of tooth flange nut

Publications (1)

Publication Number Publication Date
CN209318698U true CN209318698U (en) 2019-08-30

Family

ID=67708675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821743121.5U Active CN209318698U (en) 2018-10-26 2018-10-26 For spending the molding cold-heading device of tooth flange nut

Country Status (1)

Country Link
CN (1) CN209318698U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111390083A (en) * 2020-03-23 2020-07-10 鹏驰五金制品(昆山)有限公司 Automobile nut forming process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111390083A (en) * 2020-03-23 2020-07-10 鹏驰五金制品(昆山)有限公司 Automobile nut forming process

Similar Documents

Publication Publication Date Title
CN207840015U (en) Hexagon flange bolt cold-heading device
CN106141061A (en) A kind of cold-heading molding technique for manufacturing positioning and guiding nut and cold-heading module
CN108856630A (en) The cold-heading molding technique of automobile unusual casing
CN104209443B (en) Spline pin roll cold heading device and production process thereof
CN110180970A (en) The shaping mechanism and its forming method of self-clinching nut
CN204094038U (en) Special shaped screw bolt cold-heading device
CN209318698U (en) For spending the molding cold-heading device of tooth flange nut
CN104209444B (en) Oil pipe joint cold heading device and production technology thereof
CN205032637U (en) Outer flower tooth flange nut cold -heading device
CN106694792A (en) Cold heading device and process for specially-shaped torsion rod
CN108015205A (en) Brake callipers guide finger cold-heading device and its production technology
CN204094035U (en) Spline pin shaft cold-heading device
CN205926972U (en) A cold heading die group for making clamping orient nut
CN107639196A (en) A kind of out star wheel forging finishing mold
CN209340295U (en) Stainless steel studs and its cold-heading device
CN203265505U (en) Die for machining flange parts in warm forging mode
CN106378632A (en) Precise forming mechanism of oil pump oil mouth plunger sleeve
CN207615603U (en) A kind of cold-heading module for manufacturing flange sleeve
CN203109149U (en) Special double-headed bolt cold heading device
CN205926971U (en) A cold heading die group for making drive shaft
CN109500347A (en) Electronic parking adjusting nut cold-heading device and its production technology
CN204094037U (en) Oil connection cold-heading device
CN102601240A (en) Dowel screw forming die
CN204094041U (en) Adjusting screw(rod) cold-heading device
CN102601298A (en) Triangular self-tapping screw manufacturing process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant