CN209309524U - Connecting pipe structure and water purifier with same - Google Patents
Connecting pipe structure and water purifier with same Download PDFInfo
- Publication number
- CN209309524U CN209309524U CN201821823687.9U CN201821823687U CN209309524U CN 209309524 U CN209309524 U CN 209309524U CN 201821823687 U CN201821823687 U CN 201821823687U CN 209309524 U CN209309524 U CN 209309524U
- Authority
- CN
- China
- Prior art keywords
- pipeline section
- section
- main body
- pipe structure
- connecting pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims description 14
- 239000010935 stainless steel Substances 0.000 claims description 14
- 229910001220 stainless steel Inorganic materials 0.000 claims description 14
- 230000001681 protective effect Effects 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 230000007704 transition Effects 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 4
- 238000000034 method Methods 0.000 description 12
- 238000003466 welding Methods 0.000 description 9
- 238000004519 manufacturing process Methods 0.000 description 7
- 239000002699 waste material Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000000746 purification Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The utility model provides a connecting pipe structure and have its purifier, the connecting pipe structure includes: the connecting pipe comprises a first pipe section, a second pipe section and a third pipe section, wherein the first pipe section is arranged between the second pipe section and the third pipe section; the first connecting piece is connected with both the first pipe section and the second pipe section so as to connect the first pipe section and the second pipe section through the first connecting piece; the second connecting piece is connected with both the first pipe section and the third pipe section so as to connect the first pipe section and the third pipe section through the second connecting piece; the first pipe section is a flexible pipe, and the second pipe section and the third pipe section are rigid pipes. The utility model discloses a connecting pipe structure has solved the connecting pipe structure among the prior art and has appeared the problem of unable assembly easily.
Description
Technical field
The utility model relates to field of mechanical technique, in particular to a kind of connecting pipe structure and with its water purification
Machine.
Background technique
With water purification industry development, large-scale high-end stainless steel type commercialization water purifier demand is increasing.Current stainless steel type
Water purifier piping connection is rigid connection.
However, leading to stainless steel type commercialization water purifier production week since the dimensional accuracy of raw material and welding procedure etc. limit
Phase is long, and cost benefit is high, and main problem is as follows:
1, in the manufacturing process of stainless steel type water purifier, rigid clamping hoop type connection is very high to welding process requirement, is easy
The overproof problem of pipeline size length caused by occurring because of welding procedure problem there is also because welding verticality not enough leads to nothing
The problem of method is assembled.
2, rigid clamping hoop type connection requires the standard components size such as ball valve, check-valves very high, not can guarantee supplied materials size
In the case where precision, with ideal standard part having a size of foundation, blanking is carried out to stainless steel tube, there is dress in actual welding assembly
The risk unmatched, to generate waste material, i.e., cost of idleness influences efficiency again.
Utility model content
It is existing to solve the main purpose of the utility model is to provide a kind of connecting pipe structure and with its water purifier
Connecting pipe structure in technology is easy to appear the problem of can not assembling.
To achieve the goals above, one aspect according to the present utility model provides a kind of connecting pipe structure, comprising:
Connecting tube, connecting tube include the first pipeline section, the second pipeline section and third pipeline section, and the first pipeline section is arranged in the second pipeline section and third pipeline section
Between;First connector is all connected with the first pipeline section and the second pipeline section, so that the first pipeline section and the second pipeline section pass through the first connection
Part connection;Second connector is all connected with the first pipeline section and third pipeline section, so that the first pipeline section and third pipeline section connect by second
Fitting connection;Wherein, the first pipeline section is flexible pipe, and the second pipeline section and third pipeline section are rigid pipe.
Further, the second pipeline section includes the second pipeline section main body and the third interconnecting piece that connect with the second pipeline section main body, and
One pipeline section includes the first pipeline section main body and the first connecting portion that connect with the first pipeline section main body, and first connecting portion setting is in the first pipe
Close to one end of the second pipeline section, first connecting portion is oppositely arranged section main body with third interconnecting piece;First connector has the first card
Slot, the first connector by the first card slot be fastened on first connecting portion at least partly with third interconnecting piece at least partially.
Further, third interconnecting piece includes that third changeover portion connects cone section with third, and first connecting portion includes the first mistake
Section and the first connection cone section are crossed, the bigger diameter end that the bigger diameter end of the first connection cone section connect cone section with third is oppositely arranged, and first connects
Fitting is fastened on the first connection cone section and is connected in cone section with third.
Further, third pipeline section includes third pipeline section main body and the 4th interconnecting piece that connect with third pipeline section main body, and
One pipeline section includes the first pipeline section main body and the second connecting portion that connect with the first pipeline section main body, and second connecting portion setting is in the first pipe
Close to one end of third pipeline section, second connecting portion is oppositely arranged section main body with the 4th interconnecting piece;Second connector has the second card
Slot, the second connector by the second card slot be fastened on second connecting portion at least partly with the 4th interconnecting piece at least partially.
Further, the 4th interconnecting piece includes the 4th changeover portion and the 4th connection cone section, and second connecting portion includes the second mistake
Section and the second connection cone section are crossed, the bigger diameter end that the bigger diameter end of the second connection cone section connect cone section with the 4th is oppositely arranged, and second connects
Fitting is fastened in the second connection cone section and the 4th connection cone section.
Further, the first connector and the second connector are clip.
Further, the first pipeline section includes pipe main body and protective case, and protective case is set in the outside of pipe main body.
Further, pipe main body is stainless steel flexible hose.
Further, protective case is made of stainless steel material.
Further, protective case is made of steel band or braided steel wire.
Another aspect according to the present utility model provides a kind of water purifier, including connecting pipe structure, wherein connecting tube
Structure is above-mentioned connecting pipe structure.
The connecting pipe structure of the utility model includes the first pipeline section, the second pipeline section and third pipeline section, wherein the first pipeline section is set
It sets between the second pipeline section and third pipeline section, which passes through between rigid pipe (i.e. the second pipeline section and third pipeline section)
It is arranged flexible pipe (i.e. the first pipeline section), makes connection adjustableization of connecting pipe structure and other structures, solve rigid line company
The problems such as more difficult is assembled present in connecing, and be can avoid generating waste material, is reduced cost savings Production Time.Also, the second pipeline section and
The setting of third pipeline section is so that connecting pipe structure meets the function connecting with other structures.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide a further understanding of the present invention, this is practical
Novel illustrative embodiments and their description are not constituteed improper limits to the present invention for explaining the utility model.
In the accompanying drawings:
Fig. 1 shows the structural schematic diagram of the embodiment of connecting pipe structure according to the present utility model.
Wherein, the above drawings include the following reference numerals:
10, connecting tube;11, the first pipeline section;111, the first pipeline section main body;112, first connecting portion;1121, First Transition
Section;1122, the first connection cone section;113, second connecting portion;1131, the second changeover portion;1132, the second connection cone section;12, second
Pipeline section;121, the second pipeline section main body;122, third interconnecting piece;1221, third changeover portion;1222, third connection cone section;13,
Three pipeline sections;131, third pipeline section main body;132, the 4th interconnecting piece;1321, the 4th changeover portion;1322, the 4th connection cone section;20,
First connector;30, the second connector.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another
It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular
Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet
Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
The utility model provides a kind of connecting pipe structure, referring to FIG. 1, include: connecting tube 10, connecting tube 10 includes the
One pipeline section 11, the second pipeline section 12 and third pipeline section 13, the first pipeline section 11 are arranged between the second pipeline section 12 and third pipeline section 13;The
A connection piece 20 is all connected with the first pipeline section 11 and the second pipeline section 12, so that the first pipeline section 11 and the second pipeline section 12 pass through first
Connector 20 connects;Second connector 30 is all connected with the first pipeline section 11 and third pipeline section 13, so that the first pipeline section 11 and third
Pipeline section 13 is connected by the second connector 30;Wherein, the first pipeline section 11 is flexible pipe, and the second pipeline section 12 and third pipeline section 13 are rigid
Property pipe.
The connecting pipe structure of the utility model includes the first pipeline section 11, the second pipeline section 12 and third pipeline section 13, wherein first
Pipeline section 11 is arranged between the second pipeline section 12 and third pipeline section 13, which passes through in rigid pipe (i.e. the second pipeline section 12
And third pipeline section 13) between flexible pipe (i.e. the first pipeline section 11) is set, keep the connection of connecting pipe structure and other structures adjustable
Change, solves and assemble the problems such as more difficult present in rigid line connection, can avoid generating waste material, when reducing cost savings production
Between.Also, the setting of the second pipeline section 12 and third pipeline section 13 is so that connecting pipe structure meets the function connecting with other structures.
The connecting pipe structure of the utility model is applied in rigid line connection by that will be flexibly connected, and makes fixed dimension can
Adjustingization reduces in the manufacturing process of stainless steel type water purifier to welding process requirement, avoids leading because of welding procedure problem
There is error in the pipeline size length of cause, also avoid the problem of not enough leading to not assembly because of welding verticality.
In addition, reduce the requirement to the standard components size such as ball valve, check-valves, with ideal standard part having a size of foundation,
In the case where carrying out blanking to connecting pipe structure, avoids and there is the risk that dress unmatches in actual welding assembly, and then avoid
Waste material is generated, cost is reduced, improves efficiency.
In the present embodiment, the second pipeline section 12 include the second pipeline section main body 121 and connect with the second pipeline section main body 121 the
Three interconnecting pieces 122, the first pipeline section 11 include the first pipeline section main body 111 and the first connecting portion connecting with the first pipeline section main body 111
112, the first pipeline section main body 111 is arranged in close to one end of the second pipeline section 12, first connecting portion 112 and in first connecting portion 112
Three interconnecting pieces 122 are oppositely arranged;First connector 20 has the first card slot, and the first connector 20 is fastened on the by the first card slot
One interconnecting piece 112 at least partly with third interconnecting piece 122 at least partially.
When it is implemented, third interconnecting piece 122 includes that third changeover portion 1221 connects cone section 1222, the first connection with third
Portion 112 includes First Transition section 1121 and the first connection cone section 1122, and the bigger diameter end of the first connection cone section 1122 is connect with third
The bigger diameter end of cone section 1222 is oppositely arranged, and the first connector 20 is fastened on the first connection cone section 1122 and connects cone section 1222 with third
On.
When it is implemented, the first pipeline section main body 111 is welded to connect with First Transition section 1121;Second pipeline section main body 121 with
Third changeover portion 1221 is welded to connect.
When it is implemented, the miner diameter end of the first connection cone section 1122 is connect with First Transition section 1121, third connection cone section
1222 miner diameter end is connect with third changeover portion 1221.
When it is implemented, being arranged between the bigger diameter end of the first connection cone section 1122 and the bigger diameter end of third connection cone section 1222
There is gasket, sealing function is played with the connection to the first pipeline section and the second pipeline section.
In the present embodiment, third pipeline section 13 include third pipeline section main body 131 and connect with third pipeline section main body 131 the
Four interconnecting pieces 132, the first pipeline section 11 include the first pipeline section main body 111 and the second connecting portion connecting with the first pipeline section main body 111
113, the first pipeline section main body 111 is arranged in close to one end of third pipeline section 13, second connecting portion 113 and in second connecting portion 113
Four interconnecting pieces 132 are oppositely arranged;Second connector 30 has the second card slot, and the second connector 30 is fastened on the by the second card slot
Two interconnecting pieces 113 at least partly with the 4th interconnecting piece 132 at least partially.
When it is implemented, the 4th interconnecting piece 132 includes the 4th changeover portion 1321 and the 4th connection cone section 1322, the second connection
Portion 113 includes the second changeover portion 1131 and the second connection cone section 1132, and the bigger diameter end of the second connection cone section 1132 is connect with the 4th
The bigger diameter end of cone section 1322 is oppositely arranged, and the second connector 30 is fastened on the second connection cone section 1132 and the 4th connection cone section 1322
On.
When it is implemented, the first pipeline section main body 111 and the second changeover portion 1131 are welded to connect;Third pipeline section main body 131 with
4th changeover portion 1321 is welded to connect.
When it is implemented, the miner diameter end of the 4th connection cone section 1322 is connect with the 4th changeover portion 1321, the second connection cone section
1132 miner diameter end is connect with the second changeover portion 1131.
When it is implemented, being arranged between the bigger diameter end of the second connection cone section 1132 and the bigger diameter end of the 4th connection cone section 1322
There is gasket, to play sealing function to the connection between the first pipeline section and third pipeline section.
Preferably, the first connector 20 and the second connector 30 are clip.Such setting convenient for the first pipeline section 11 with
Second pipeline section 12, the first pipeline section 11 are connect with third pipeline section 13.
In the present embodiment, the first pipeline section 11 includes pipe main body and protective case, and protective case is set in the outside of pipe main body.Its
In, the first pipeline section 11 easily absorbs various motion deformations and cyclic loading.More particularly to meet under certain condition needed for system compared with
The compensation of big displacement.Movement to pipe-line system, thermal expansion absorbs, absorption of vibrations plays an important role.
Preferably, pipe main body is stainless steel flexible hose or sebific duct.
Preferably, protective case is made of stainless steel material.
Preferably, protective case is made of steel band or braided steel wire.
In the present embodiment, the outer diameter of the first pipeline section 11 is greater than or equal to the outer diameter of the second pipeline section 12;Outside first pipeline section 11
Diameter is greater than or equal to the outer diameter of the second pipeline section 12.The first pipeline section 11, the second pipeline section 12 and third pipeline section 13 are convenient in such setting
Between connection.
In the present embodiment, the second pipeline section main body 121 is provided with the 5th interconnecting piece far from one end of the first pipeline section 11, and the 5th
Interconnecting piece and third interconnecting piece 122 are oppositely arranged on the both ends of the second pipeline section main body 121, the 5th interconnecting piece and third interconnecting piece
122 structures are identical, so that connecting pipe structure and other component or piping connection.
In the present embodiment, third pipeline section main body 131 is provided with the 6th interconnecting piece far from one end of the first pipeline section 11, and the 6th
Interconnecting piece and the 4th interconnecting piece 132 are oppositely arranged on the both ends of third pipeline section main body 131, the 6th interconnecting piece and the 4th interconnecting piece
132 structures are identical, so that connecting pipe structure and other component or piping connection.
In stainless steel water purification set structure, part is replaced to be rigidly connected with flexible connection mode, to reach pipeline size
Adjustableization, it is easy to disassemble, cost is reduced, the purpose of Production Time is saved.
The connecting pipe structure of the utility model it is all be applied to the rigidly connected equipment of stainless steel pipeline all available to.
The utility model additionally provides a kind of water purifier, including connecting pipe structure, wherein connecting pipe structure is above-mentioned implementation
The connecting pipe structure of example.
It can be seen from the above description that the above embodiments of the utility model achieve the following technical effects:
The connecting pipe structure of the utility model includes the first pipeline section 11, the second pipeline section 12 and third pipeline section 13, wherein first
Pipeline section 11 is arranged between the second pipeline section 12 and third pipeline section 13, which passes through in rigid pipe (i.e. the second pipeline section 12
And third pipeline section 13) between flexible pipe (i.e. the first pipeline section 11) is set, keep the connection of connecting pipe structure and other structures adjustable
Change, solves and assemble the problems such as more difficult present in rigid line connection, can avoid generating waste material, when reducing cost savings production
Between.Also, the setting of the second pipeline section 12 and third pipeline section 13 is so that connecting pipe structure meets the function connecting with other structures.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so that presently filed embodiment described herein for example can be in addition to herein
Sequence other than those of diagram or description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that
Be to cover it is non-exclusive include, for example, containing the process, method, system, product or equipment of a series of steps or units not
Those of be necessarily limited to be clearly listed step or unit, but may include be not clearly listed or for these processes, side
The intrinsic other step or units of method, product or equipment.
For ease of description, spatially relative term can be used herein, as " ... on ", " ... top ",
" ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy
The spatial relation of sign.It should be understood that spatially relative term is intended to comprising the orientation in addition to device described in figure
Except different direction in use or operation.For example, being described as if the device in attached drawing is squeezed " in other devices
It will be positioned as " under other devices or construction after part or construction top " or the device of " on other devices or construction "
Side " or " under other devices or construction ".Thus, exemplary term " ... top " may include " ... top " and
" in ... lower section " two kinds of orientation.The device can also be positioned with other different modes and (is rotated by 90 ° or in other orientation), and
And respective explanations are made to the opposite description in space used herein above.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.
Claims (11)
1. a kind of connecting pipe structure characterized by comprising
Connecting tube (10), the connecting tube (10) includes the first pipeline section (11), the second pipeline section (12) and third pipeline section (13), described
First pipeline section (11) is arranged between second pipeline section (12) and the third pipeline section (13);
First connector (20) is all connected with first pipeline section (11) and second pipeline section (12), so that first pipe
Section (11) and second pipeline section (12) are connected by first connector (20);
Second connector (30) is all connected with first pipeline section (11) and the third pipeline section (13), so that first pipe
Section (11) and the third pipeline section (13) are connected by second connector (30);
Wherein, first pipeline section (11) is flexible pipe, and second pipeline section (12) and the third pipeline section (13) are rigid pipe.
2. connecting pipe structure according to claim 1, which is characterized in that second pipeline section (12) includes the second pipeline section master
Body (121) and the third interconnecting piece (122) connecting with the second pipeline section main body (121), first pipeline section (11) include the
One pipeline section main body (111) and the first connecting portion (112) being connect with the first pipeline section main body (111), the first connecting portion
(112) one end in the first pipeline section main body (111) close to second pipeline section (12), the first connecting portion are set
(112) it is oppositely arranged with the third interconnecting piece (122);First connector (20) has the first card slot, and described first connects
Fitting (20) by first card slot be fastened on the first connecting portion (112) at least partly with the third interconnecting piece
(122) at least partially.
3. connecting pipe structure according to claim 2, which is characterized in that the third interconnecting piece (122) includes third mistake
It crosses section (1221) and connects cone section (1222) with third, the first connecting portion (112) includes First Transition section (1121) and first
The bigger diameter end of connection cone section (1122), first connection cone section (1122) connect the bigger diameter end of cone section (1222) with the third
It is oppositely arranged, first connector (20) is fastened on first connection cone section (1122) and connects cone section with the third
(1222) on.
4. connecting pipe structure according to claim 1, which is characterized in that the third pipeline section (13) includes third pipeline section master
Body (131) and the 4th interconnecting piece (132) connecting with the third pipeline section main body (131), first pipeline section (11) include the
One pipeline section main body (111) and the second connecting portion (113) being connect with the first pipeline section main body (111), the second connecting portion
(113) one end in the first pipeline section main body (111) close to the third pipeline section (13), the second connecting portion are set
(113) it is oppositely arranged with the 4th interconnecting piece (132);Second connector (30) has the second card slot, and described second connects
Fitting (30) by second card slot be fastened on the second connecting portion (113) at least partly with the 4th interconnecting piece
(132) at least partially.
5. connecting pipe structure according to claim 4, which is characterized in that the 4th interconnecting piece (132) includes the 4th mistake
Section (1321) and the 4th connection cone section (1322) are crossed, the second connecting portion (113) includes the second changeover portion (1131) and second
Connection cone section (1132), the bigger diameter end that the bigger diameter end of second connection cone section (1132) connect cone section (1322) with the described 4th
It is oppositely arranged, second connector (30) is fastened on second connection cone section (1132) and the 4th connection cone section
(1322) on.
6. connecting pipe structure according to claim 1, which is characterized in that first connector (20) and described second connects
Fitting (30) is clip.
7. connecting pipe structure according to claim 1, which is characterized in that first pipeline section (11) includes pipe main body and guarantor
Sheath, the protective case are set in the outside of the pipe main body.
8. connecting pipe structure according to claim 7, which is characterized in that the pipe main body is stainless steel flexible hose.
9. connecting pipe structure according to claim 7, which is characterized in that the protective case is made of stainless steel material.
10. connecting pipe structure according to claim 9, which is characterized in that the protective case is by steel band or braided steel wire system
At.
11. a kind of water purifier, including connecting pipe structure, which is characterized in that the connecting pipe structure is to appoint in claims 1 to 10
Connecting pipe structure described in one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821823687.9U CN209309524U (en) | 2018-11-06 | 2018-11-06 | Connecting pipe structure and water purifier with same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821823687.9U CN209309524U (en) | 2018-11-06 | 2018-11-06 | Connecting pipe structure and water purifier with same |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209309524U true CN209309524U (en) | 2019-08-27 |
Family
ID=67672404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821823687.9U Active CN209309524U (en) | 2018-11-06 | 2018-11-06 | Connecting pipe structure and water purifier with same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209309524U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110645413A (en) * | 2019-09-24 | 2020-01-03 | 珠海格力智能装备有限公司 | Clamp structure and purifier |
-
2018
- 2018-11-06 CN CN201821823687.9U patent/CN209309524U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110645413A (en) * | 2019-09-24 | 2020-01-03 | 珠海格力智能装备有限公司 | Clamp structure and purifier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209309524U (en) | Connecting pipe structure and water purifier with same | |
CN105829790A (en) | Fluid transfer device and apparatus including such a device | |
CN206001181U (en) | Pipeline elastomeric connector | |
CN102390013B (en) | Assembling and locating device for multi-end membrane type educing pipe and assembling method thereof | |
CN209115858U (en) | A kind of spherical compensating joint | |
CN103133778A (en) | Pipe rotation limiting device | |
CN105546259A (en) | Intelligent and automatic limit compensator | |
CN202240247U (en) | Assembling and locating device for multihead film type lead-out connecting tubes | |
CN206875021U (en) | A kind of loop-type bellows | |
CN104089112B (en) | A kind of electric propulsion system thrust vectoring governor motion flexible conduit | |
CN208417929U (en) | A kind of scale compensator | |
CN204942886U (en) | The combined type expansion joint that a kind of import export is vertical | |
CN210372354U (en) | Swinging corrugated hose | |
CN206929468U (en) | Easy-to-dismount fast connector for pipeline | |
CN202597945U (en) | Welding connection structure of corrugated pipe and joints | |
CN202992398U (en) | Pipeline rotation restraint device | |
CN205505511U (en) | Pipeline module and air conditioner | |
CN216618945U (en) | Pipe and pipe fitting combined flow divider | |
CN216843636U (en) | Widened anti-seepage corrugated plate structure | |
CN201228831Y (en) | Universal joint compensating mechanism for pressure conduit | |
CN206057984U (en) | In the integrated air passage block of line style | |
CN205991277U (en) | A kind of straight pipe pressure-balancing type expansion joint based on inside and outside force combination operating mode | |
CN203963365U (en) | Combined type elbow pressure balanced compensator | |
JPH0370803A (en) | Steam turbine, crossover tube apparatus of the same and method of connecting inlet and outfall of steam turbine | |
CN104989905A (en) | Compactly-combined expansion joint with inlet and outlet perpendicular to each other |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |