Single column pier steel plate combination bent cap ruggedized construction
Technical field
The utility model relates to a kind of Single column pier column ruggedized construction, in particular to a kind of Single column pier steel plate combination bent cap is reinforced
Structure.
Background technique
With the continuous construction of China's Single column pier bridge, technology also in continuous maturation, has been widely applied to urban interchange, height
In the construction such as fast highway, the structure type of Cast-in-Situ Continuous Beam is used in most processs of construction, under this Cast-in-Situ Continuous Beam
Portion's structure type is broadly divided into Single column pier and two kinds of twin shaft pier, it can be seen that entire bridge floor in the design structure of Single column pier bridge
Only one intermediate fulcrum, this fulcrum play specific supporting role for bed rearrangement bridge.All vehicles travelled on bridge floor
Weight is all within the tolerance range of this support force.Vehicle will not be generated in normal driving process Bridge uniform force
Safety problem, but seesaw phenomenon can be generated phenomena such as overload of vehicle, automobile are not travelled along bridge center line, cause
Entire bridge structure occurs bridge rollover in the case where discontinuity equalization or phenomena such as support falls off, for the safety of people
Trip brings great security risk.
In consideration of it, in order to improve traditional solely pier structure unbalance stress, transformation reinforced construction method is not good enough, construction cost is high and
The problems such as long in time limit, it would be highly desirable to invent a kind of simple and effective Single column pier steel plate combination bent cap ruggedized construction, improve Single column pier and reinforce
Construction quality and construction efficiency.
Utility model content
The purpose of the utility model is to overcome deficiencies in the prior art, provide a kind of Single column pier steel plate combination bent cap reinforcing
Structure.
This Single column pier steel plate combination bent cap ruggedized construction, including pier stud, concrete cover stripping area, bar planting, embedment
Formula ring flat-plate, annular prestressed muscle, with concrete closing, anchor ear arc plate, to folder riser, regularization band arc top plate, vertical horizontal
Bridge indulges bridge to floor, vertically to floor, horizontal floor of putting more energy into, bearing pad stone, newly-increased support, support leveling bloom, anti-dropout steel
Muscle and bent cap;Concrete cover stripping area, the internal drilling bar planting of concrete cover stripping area, bar planting outside is arranged in the pier stud
Flush type ring flat-plate is set, twice annular presstressed reinforcing steel is set on the outside of flush type ring flat-plate, is injected in concrete cover stripping area
It is closed with concrete;Anchor ear arc plate is installed on the outside of bar planting, the setting of anchor ear arc plate is bolted folder riser to folder riser,
Anchor ear arc plate is bolted with bar planting, and vertical direction across bridge floor is welded on anchor ear arc plate, vertically indulges bridge to floor and level of putting more energy into
Floor, anchor ear arc plate top weld regularization band arc top plate, pinner standing screw preformed hole are arranged on the outside of regularization band arc top plate,
Anti-dropout reinforcing bar is arranged in anchor ear arc plate lower part, and the bearing pad stone setting is on regularization band arc top plate top, bearing pad stone top
Newly-increased support is set, increases holder top newly and support leveling bloom is set, support leveling bloom top is original bent cap.
As preferred: concrete cover stripping area is arranged on pier stud top.
As preferred: bearing pad stone setting is connected, and be in the milk on the outside of regularization band arc top plate by pinner standing screw
Joint filling, bearing pad stone surrounding are arranged pinner and limit angle steel.
The beneficial effects of the utility model are:
(1) the utility model beam lid flange plate cutting uses lossless excision, avoids original pier stud and destroys, hence it is evident that reduces
Destruction to pier stud.
(2) the utility model uses the bar planting of prestressed hoop of chimney monoblock type, processes screw rod, hoop, bores in pier stud design position
Hole carries out pull-out test using the dedicated adhesive curing of bar planting, and installation hoop connect with bar planting, applies prestressing force, bar planting can be improved
Bearing capacity.
Detailed description of the invention
Fig. 1 is the utility model Single column pier steel plate combination bent cap ruggedized construction elevational schematic view;
Fig. 2 is Single column pier steel plate combination bent cap ruggedized construction floor map;
Fig. 3 is support connection schematic diagram;
Fig. 4 is pier stud bar planting floor map;
Fig. 5 is pier stud bar planting elevational schematic view.
Description of symbols: 1- pier stud, 2- concrete cover stripping area, 3- bar planting, 4- flush type ring flat-plate, 5- annular are pre-
Stress rib, 6- are with concrete closing, 7- anchor ear arc plate, 8- to folder riser, 9- regularization band arc top plate, the vertical cross-bridges of 10-
To floor, 11- vertically indulge bridge to floor, 12- put more energy into horizontal floor, 13- bearing pad stone, 14- increase newly support, 15- support leveling
Bloom, 16- pinner limit angle steel, 17- pinner preformed hole, 18- pinner standing screw, 19- anti-dropout reinforcing bar, 20- bent cap.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage
Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle
Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model
In scope of protection of the claims.
As shown in Fig. 1~5, the Single column pier steel plate combination bent cap ruggedized construction, including pier stud 1, concrete cover
Stripping area 2, bar planting 3, flush type ring flat-plate 4, thickness 3mm × width 40mm, annular prestressed muscle 5, diameter 6mm, with label coagulation
Grave closes 6, anchor ear arc plate 7, size 1800mm × 1200mm, to folder riser 8, regularization band arc top plate 9, vertical direction across bridge floor
10, thickness 15mm, bridge is vertically indulged to floor 11, thickness 15mm, horizontal floor 12 of putting more energy into, thickness 16mm, bearing pad stone 13, size
800mm × 600mm × 200mm, newly-increased support 14, model GJZ, size 450mm × 400mm × 650mm, support leveling bloom
15, size 500mm × 500mm × 31mm, pinner limit angle steel 16, pinner preformed hole 17, pinner standing screw 18, anti-dropout steel
Muscle 19, bent cap 20;Bar planting 3, diameter 22mm, bar planting depth 330mm, bar planting bore dia 28mm, bar planting is with glue using dedicated modified
Epoxy adhesive, modified ethenyl adhesive or modified urethane gluing.
Concrete cover stripping area 2, the 2 internal drilling bar planting 3 of concrete cover stripping area, bar planting 3 is arranged in the pier stud 1
Flush type ring flat-plate 4 is arranged in outside, twice annular presstressed reinforcing steel 5 is arranged on the outside of flush type ring flat-plate 4, in concrete cover stripping area
2 are injected with same concrete closing 6;Anchor ear arc plate 7 is installed, the setting of anchor ear arc plate 7 is perpendicular to folder to folder riser 8 on the outside of bar planting 3
Plate 8 is bolted, and anchor ear arc plate 7 is bolted with bar planting 3, and vertical direction across bridge floor 10 is welded on anchor ear arc plate 7, vertically indulges bridge
To floor 11 and horizontal floor 12 of putting more energy into, regularization band arc top plate 9,9 outside of regularization band arc top plate are welded in 7 top of anchor ear arc plate
18 preformed hole of pinner standing screw is set, and anti-dropout reinforcing bar 19 is arranged in 7 lower part of anchor ear arc plate, and the setting of bearing pad stone 13 is fixed
Newly-increased support 14 is arranged in typeization band 9 top of arc top plate, 13 top of bearing pad stone, increases 14 top of support newly and support leveling bloom is arranged
15,15 top of support leveling bloom is original bent cap 20.
The concrete cover stripping area 2 is arranged on 1 top of pier stud.
The setting of bearing pad stone 13 is connected, and be in the milk in 9 outside of regularization band arc top plate by pinner standing screw 18
Joint filling, 13 surrounding of bearing pad stone are arranged pinner and limit angle steel 16.
Anchor ear arc plate 7, to folder riser 8, regularization band arc top plate 9, vertical direction across bridge floor 10, vertically vertical bridge is to floor
11, the model of horizontal floor 12 of putting more energy into is Q345qD type.
After bar planting 3~4 days can random inspection, examine can with jack, anchorage, reaction frame composition system make drawing examination
Test, the resistance to plucking force request of bar planting: C20 bar planting is not less than 113.1kN.