CN209271102U - A kind of asphalt smoke gas purifying flue gas coagulation prevention device - Google Patents

A kind of asphalt smoke gas purifying flue gas coagulation prevention device Download PDF

Info

Publication number
CN209271102U
CN209271102U CN201821938678.4U CN201821938678U CN209271102U CN 209271102 U CN209271102 U CN 209271102U CN 201821938678 U CN201821938678 U CN 201821938678U CN 209271102 U CN209271102 U CN 209271102U
Authority
CN
China
Prior art keywords
heat
asphalt smoke
flue gas
outlet
blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821938678.4U
Other languages
Chinese (zh)
Inventor
杜伟
于英鹏
丛亚峰
丛华威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WEIHAI ZHENGDA ENVIRONMENT EQUIPMENT Co Ltd
Original Assignee
WEIHAI ZHENGDA ENVIRONMENT EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIHAI ZHENGDA ENVIRONMENT EQUIPMENT Co Ltd filed Critical WEIHAI ZHENGDA ENVIRONMENT EQUIPMENT Co Ltd
Priority to CN201821938678.4U priority Critical patent/CN209271102U/en
Application granted granted Critical
Publication of CN209271102U publication Critical patent/CN209271102U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model discloses a kind of asphalt smoke gas purifying flue gas coagulation prevention device, including blower, heat blower, the blower connects the input end of heat blower by the outlet air end of itself, and the outlet end of heat blower connects asphalt smoke purifying system flue.The problem of equipment uses completely new heat blower, temperature adjustable apparatus and inlet filtering apparatus, solves in previous asphalt smoke purifying system, bitumen flue gas, tar adherency inner wall of the pipe obstruction pipeline.It is undesirable to overcome asphalt smoke purifying system operational effect, the problem of the bitumen flue gas loss of workshop.

Description

A kind of asphalt smoke gas purifying flue gas coagulation prevention device
Technical field
The utility model relates to green anode workshop asphalt smoke gas purifying technical field, specifically a kind of bitumen flue gas is net Change flue gas coagulation prevention device.
Background technique
Green anode workshop asphalt smoke purifying system, it is each to gather dust a little to pitch when using black method asphalt smoke gas purifying Flue gas is collected, and carbon dust is added in the duct, to adhesiveness bitumen flue gas and tar carry out absorption mixing, make its at For dry big dust particles, purification emptying is then carried out by pulsed jet cloth filter.As bitumen flue gas, tar temperature drop It is low, it can shift to an earlier date and be solidified in inner wall of the pipe, is adhered in inner wall of the pipe, as time increases, will lead to pipeline obstruction, vehicle Interior bitumen flue gas loss no flue gas coagulation prevention device or is adopted in traditional green anode workshop asphalt smoke purifying system Directly the air containing carbon dust is heated with electric heating, and electric heater mainly utilizes electric heating tube and air heat-exchange, Its principle is the direct ingress of air of adding thermal resistance, and with increasing for time is used, electric heating tube surface temperature reaches the burning point of dust, The attached carbon dust of product has the possibility of kindling at any time, there is very big hidden danger, thus part of the manufacturer using when fear heating of catching fire not open Device.Cause asphalt smoke purifying system operational effect undesirable, workshop bitumen flue gas loss.
Utility model content
The purpose of this utility model is to provide a kind of asphalt smoke gas purifying flue gas coagulation prevention device, equipment uses completely new Heat blower, temperature adjustable apparatus and inlet filtering apparatus, solve in previous asphalt smoke purifying system, glance coal The problem of gas, tar adherency inner wall of the pipe obstruction pipeline.It is undesirable to overcome asphalt smoke purifying system operational effect, workshop drip The problem of green flue gas loss.
In order to achieve the above objectives, the utility model uses following technical solution, and a kind of asphalt smoke gas purifying flue gas is anti- Condensing means, including blower, heat blower, the blower connect the input end of heat blower by the outlet air end of itself, The outlet end of heat blower connects asphalt smoke purifying system flue.
The heat blower includes the first temperature-detecting device, steel combined with aluminum fins set, second temperature detection device, connection Case, the steel combined with aluminum fins set are fixed on inside header, and the steel combined with aluminum fins set is at least arranged one group, the header two End is separately connected inlet box road and EXPORT CARTON road, and inlet box road air inlet connects fan outlet by intake stack, described EXPORT CARTON road air outlet connects asphalt smoke purifying system flue by wind pipe.
First temperature-detecting device is set on the inlet box road, second temperature detection device is set on EXPORT CARTON road, In the sensor of the first temperature-detecting device protrude into inside inlet box road, wherein the sensor of second temperature detection device protrudes into Inside EXPORT CARTON road.
The steel combined with aluminum fins set include heat-conducting oil pipes, heat conductive oil inlet adapter tube, conduction oil outlet adapter tube, left tube sheet, Right tube plate, steel combined with aluminum fin, imported valve, outlet valve, the heat-conducting oil pipes are curved in Curved Continuous, and are fixed on left tube sheet On right tube plate, the import of heat-conducting oil pipes connects the heat conductive oil inlet adapter tube, and the outlet of heat-conducting oil pipes connects conduction oil outlet Adapter tube, the steel combined with aluminum fin are arranged in heat-conducting oil pipes outer wall and are integrally formed formula structure, and conduction oil is connect by heat conductive oil inlet Pipe flows into, and is taken over and is flowed out by conduction oil outlet, and the heat conductive oil inlet, which is taken over, is arranged imported valve, on conduction oil outlet adapter tube Outlet valve is set.
Galvanized sheet is surrounded outside the header, and alumina silicate insulating layer is laid between header and galvanized sheet.
The fan outlet connects first pipe by the pipeline that is flexible coupling, and first pipe is intake stack, the discharge pipe Road includes sequentially connected second pipe, third pipeline, the 4th pipeline.
The fan inlet connects air filter, and inlet adjusting is arranged in the fan inlet and air filter junction Door.
The air filter includes shell, filter layer, shield, and the shell inner port connects fan outlet, shell External port connects shield, and the filter layer setting is inside the housing.
The utility model has the advantages that compared with prior art
The utility model be it is a kind of prevented in the asphalt smoke purifying system of carbon industry green anode workshop bitumen flue gas and The device of tar condensation obstruction.The hot wind generated after heat exchange is pipelined in asphalt smoke purifying system flue.It passes System is in traditional green anode workshop asphalt smoke purifying system, without flue gas coagulation prevention device or using electric heating directly to containing There is the air of carbon dust to be heated, and electric heater mainly utilizes electric heating tube and air heat-exchange, principle is adding thermal resistance Direct ingress of air, with increasing for time is used, electric heating tube surface temperature reaches the burning point of dust, and the attached carbon dust of product has at any time There is very big hidden danger in the possibility of kindling.Heat blower carries out flue gas, steel using conduction oil heat exchange in the utility model The temperature of aluminium composite fin group avoids the possibility of kindling well below the burning point of dust in air.The heat blower is adopted It is exchanged heat with steel combined with aluminum fins set, heating sheet uses high efficiency and heat radiation aluminium flake, and radiating efficiency is high.Maximum temperature is no more than 270 DEG C, risk of explosion on fire is not present;To ensure that equipment safety operation, the normal of asphalt smoke purifying system ensure that Operation, reduces the maintenance amount of equipment, reaches the discharge standard of national regulation.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of the asphalt smoke gas purifying flue gas coagulation prevention device of the utility model.
Fig. 2 is the planar structure schematic diagram of the asphalt smoke gas purifying flue gas coagulation prevention device of the utility model.
Fig. 3 is heat blower structural front view.
Fig. 4 is heat blower the structure left view.
Fig. 5 is steel combined with aluminum fins set structural schematic diagram.
Fig. 6 is Fig. 5 top view.
Fig. 7 is steel combined with aluminum fin partial enlarged view.
In figure: 1, blower;2, be flexible coupling pipeline;3, air filter;4, shield;5, first pipe;6, hot wind occurs Device;7, second pipe;8, third pipeline;9, the 4th pipeline;10, asphalt smoke purifying system flue;11, the first temperature detection fills It sets;12, steel combined with aluminum fins set;13, second temperature detection device;14, inlet box road;15, EXPORT CARTON road;16, imported valve; 17, outlet valve;18, heat conductive oil inlet is taken over;19, conduction oil outlet is taken over;20, left tube sheet;21, right tube plate;22, steel aluminium is multiple Close fin.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to Fig. 7 is please referred to, the utility model provides a kind of technical solution: asphalt smoke gas purifying flue gas coagulation prevention device, Including blower 1, heat blower 6, the blower 1 includes being flexible coupling pipeline 2, air filter 3, inlet adjusting door, it is described into Mouth adjusts door and is located at fan inlet, and the air filter includes shell, filter layer, shield 4, and the heat blower includes First temperature-detecting device 11, steel combined with aluminum fins set 12, second temperature detection device 13, inlet box road 14, EXPORT CARTON road 15, Imported valve 16, outlet valve 17, insulating layer, blower 1 connect first pipe 5, heat blower 6 and drip with heat blower 6 Green flue gas purification system flue 10 connects second pipe 7, third pipeline 8, the 4th pipeline 9.
The blower 1 is fixed on ground using expansion bolt, including integral support, resilient cushion, guarantees to reduce blower vibration The dynamic influence to equipment.
The pipeline 2 that is flexible coupling is canvas flexibility material.
The air filter 3 is by flanged joint in fan inlet pipeline.
The shield 4 is by flanged joint in filter inlet pipeline.
The heat blower includes the first temperature-detecting device, steel combined with aluminum fins set, second temperature detection device, connection Case, the heat blower 6 include 5 groups of steel combined with aluminum fins sets 12, and every group is equipped with an imported valve 16, one outlet valve 17,5 groups of steel combined with aluminum fins sets 12 are bolted.5 groups of steel combined with aluminum fins sets are connected by flange, pipeline, bolt It connects and summarizes equipped with a general import valve, a general export valve.
The steel combined with aluminum fins set 12 includes heat-conducting oil pipes, heat conductive oil inlet adapter tube 18, conduction oil outlet adapter tube 19, a left side Tube sheet 20, right tube plate 21, steel combined with aluminum fin 22, the steel combined with aluminum fins set 12 is fixed on inside heat blower 6, described Steel combined with aluminum fins set 12 is at least arranged one group, and the heat-conducting oil pipes are curved in Curved Continuous, and are fixed on left tube sheet and right tube plate On, the import of heat-conducting oil pipes connects the heat conductive oil inlet adapter tube, and the outlet connection conduction oil outlet adapter tube of heat-conducting oil pipes is described Steel combined with aluminum fin is arranged in heat-conducting oil pipes outer wall and is integrally formed formula structure, and conduction oil is taken over by heat conductive oil inlet and flowed into, by Conduction oil outlet adapter tube outflow, the heat conductive oil inlet, which is taken over, is arranged imported valve, and outlet is arranged on conduction oil outlet adapter tube Valve.14 air inlet of inlet box road connects blower 1 by first pipe 5 and exports, and 15 air outlet of EXPORT CARTON road passes through Second pipe 7, third pipeline 8, the 4th pipeline 9 connect asphalt smoke purifying system flue 10.Each group of left tube sheet 20, right pipe Plate 21 is each attached in header.
First temperature-detecting device 11 is installed on inlet box road 14, and second temperature detection device 13 is installed on EXPORT CARTON Road 15, for monitoring the temperature and the temperature difference of import, outlet.
The fan inlet position is provided with air filter 3, and fan outlet position is equipped with the pipeline 2 that is flexible coupling, and import is set There is blower-starting valve door, the 6 inlet box road 14 of heat-conduction oil heat air generator is equipped with the first temperature-detecting device 11, EXPORT CARTON road 15 are equipped with second temperature detection device 13.The heat-conduction oil heat air generator is equipped with 5 groups of steel combined with aluminum fins sets 13, heat-conduction oil heat Alumina silicate insulating layer is laid outside air generator, covering galvanized sheet makes appearance.
The blower 1, which is blasted, enters heat-conduction oil heat air generator by first pipe 5 through 3 filtered air of air filter 6, the air passes through the steel combined with aluminum fin 22 of steel combined with aluminum fins set 12, enters second pipe 7.The air with it is thermally conductive Oil carries out heat exchange by steel combined with aluminum fin 22, and air is not generated with conduction oil and directly contacted.
Asphalt smoke gas purifying flue gas coagulation prevention device first positions the position of heat blower 6, is sent out according to hot wind in assembling The position adjustment installation blower 1 of raw device 6, air filter 3, shield 4, first pipe 5, second pipe 7, third pipeline 8, the The trend of four pipelines 9, blower 1 are installed on ground using expansion bolt and integral support, and heat blower 6 is solid using expansion bolt Due to ground.The effect of the shield 4 is to prevent sundries and other sundries from entering heat blower 6, the air filter 3 Purpose be to prevent carbon dust in green anode workshop and other dust from entering heat blower, the steel aluminium in heat blower 6 is multiple Fins set 12 is closed to heat air by conduction oil heat exchange.
The utility model first opens the imported valve 16 and outlet valve 17 of heat blower 6 when equipment is run, and makes to lead Hot oil recycles in heat blower, open 1 inlet adjusting door of blower, start blower, outdoor air under the drive of blower, into Enter heat blower 6, steel combined with aluminum fins set 12 exchanges heat in heat blower 6, since steel combined with aluminum fins set 12 is single Position heat exchange area is big, and rapidly, heat transfer rate is fast, air is heated to 100 DEG C in a short time, hot-air passes through pipe for air heat transfer Road enters asphalt smoke purifying system flue, ensure that the overall operation temperature of system, prevents bitumen flue gas from generating condensation, pipeline Obstruction, ensure that the overall operation of asphalt smoke purifying system.
The utility model be it is a kind of prevented in the asphalt smoke purifying system of carbon industry green anode workshop bitumen flue gas and The device of tar condensation obstruction.The hot wind generated after heat exchange is pipelined in asphalt smoke purifying system flue, if Standby mainly includes blower 1, the pipeline 2 that is flexible coupling, air filter 3, shield 4, first pipe 5, the pipe of heat blower 6, second Road 7, third pipeline 8, the 4th pipeline 9, asphalt smoke purifying system flue 10, the first temperature-detecting device 11, steel combined with aluminum wing Piece group 12, second temperature detection device 13, inlet box road 14, EXPORT CARTON road 15, imported valve 16, outlet valve 17, conduction oil Entrance sleeve 18, conduction oil outlet adapter tube 19, left tube sheet 20, right tube plate 21, steel combined with aluminum fin 22.Tradition is in traditional raw sun In the asphalt smoke purifying system of pole workshop, without flue gas coagulation prevention device or using electric heating directly to the air containing carbon dust into Row heating, and electric heater mainly utilizes electric heating tube and air heat-exchange, principle is the direct ingress of air of adding thermal resistance, with Using increasing for time, electric heating tube surface temperature reaches the burning point of dust, and the attached carbon dust of product has the possibility of kindling at any time, exists Very big hidden danger.Heat blower carries out flue gas using conduction oil heat exchange in the utility model, steel combined with aluminum fins set Temperature avoids the possibility of kindling well below the burning point of dust in air.The heat blower uses steel combined with aluminum fin Group exchanges heat, and heating sheet uses high efficiency and heat radiation aluminium flake, and radiating efficiency is high.Maximum temperature is no more than 270 DEG C, and there is no on fire Risk of explosion;To ensure that equipment safety operation, it ensure that the normal operation of asphalt smoke purifying system, reduce equipment Maintenance amount reaches the discharge standard of national regulation.
The utility model is designed reasonably, structure is simple, easily manufactures, at low cost, easy to use, maintenance cost is low, solves The problem of bitumen flue gas easily condenses during collection, using effect is good, long service life.
In the description of the present invention, it should be understood that temporald eixis or positional relationship are based on the figure Orientation or positional relationship is merely for convenience of description the utility model, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (8)

1. a kind of asphalt smoke gas purifying flue gas coagulation prevention device, which is characterized in that including blower, heat blower, the blower The input end of heat blower is connected by the outlet air end of itself, the outlet end of heat blower connects asphalt smoke purifying system Flue.
2. a kind of asphalt smoke gas purifying flue gas coagulation prevention device according to claim 1, which is characterized in that the hot wind hair Raw device includes the first temperature-detecting device, steel combined with aluminum fins set, second temperature detection device, header, the steel combined with aluminum wing Piece group is fixed on inside header, and the steel combined with aluminum fins set is at least arranged one group, and the header both ends are separately connected inlet box Road and EXPORT CARTON road, inlet box road air inlet connect fan outlet by intake stack, and EXPORT CARTON road air outlet is logical Cross wind pipe connection asphalt smoke purifying system flue.
3. a kind of asphalt smoke gas purifying flue gas coagulation prevention device according to claim 2, which is characterized in that the inlet box First temperature-detecting device is set on road, second temperature detection device is set on EXPORT CARTON road, wherein the first temperature-detecting device Sensor protrude into inside inlet box road, wherein the sensor of second temperature detection device protrudes into inside EXPORT CARTON road.
4. a kind of asphalt smoke gas purifying flue gas coagulation prevention device according to claim 2 or 3, which is characterized in that the steel Aluminium composite fin group includes heat-conducting oil pipes, heat conductive oil inlet adapter tube, conduction oil outlet adapter tube, left tube sheet, right tube plate, steel combined with aluminum Fin, imported valve, outlet valve, the heat-conducting oil pipes are curved in Curved Continuous, and are fixed on left tube sheet and right tube plate, thermally conductive The import of oil pipe connects the heat conductive oil inlet adapter tube, the outlet connection conduction oil outlet adapter tube of heat-conducting oil pipes, and the steel aluminium is answered It closes fin to be arranged in heat-conducting oil pipes outer wall and be integrally formed formula structure, conduction oil is taken over by heat conductive oil inlet and flowed into, by conduction oil Discharge connection outflow, the heat conductive oil inlet, which is taken over, is arranged imported valve, and outlet valve is arranged on conduction oil outlet adapter tube.
5. a kind of asphalt smoke gas purifying flue gas coagulation prevention device according to claim 2 or 3, which is characterized in that described Galvanized sheet is surrounded outside case, and alumina silicate insulating layer is laid between header and galvanized sheet.
6. a kind of asphalt smoke gas purifying flue gas coagulation prevention device according to claim 2 or 3, which is characterized in that the wind Machine outlet connects first pipe by the pipeline that is flexible coupling, and first pipe is intake stack, and the wind pipe includes being sequentially connected Second pipe, third pipeline, the 4th pipeline.
7. a kind of asphalt smoke gas purifying flue gas coagulation prevention device according to claim 2 or 3, which is characterized in that the wind Machine import connects air filter, and inlet adjusting door is arranged in the fan inlet and air filter junction.
8. a kind of asphalt smoke gas purifying flue gas coagulation prevention device according to claim 7, which is characterized in that the air mistake Filter includes shell, filter layer, shield, and the shell inner port connects fan outlet, and housing outward end mouth connects shield, institute State filter layer setting inside the housing.
CN201821938678.4U 2018-11-23 2018-11-23 A kind of asphalt smoke gas purifying flue gas coagulation prevention device Active CN209271102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821938678.4U CN209271102U (en) 2018-11-23 2018-11-23 A kind of asphalt smoke gas purifying flue gas coagulation prevention device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821938678.4U CN209271102U (en) 2018-11-23 2018-11-23 A kind of asphalt smoke gas purifying flue gas coagulation prevention device

Publications (1)

Publication Number Publication Date
CN209271102U true CN209271102U (en) 2019-08-20

Family

ID=67602249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821938678.4U Active CN209271102U (en) 2018-11-23 2018-11-23 A kind of asphalt smoke gas purifying flue gas coagulation prevention device

Country Status (1)

Country Link
CN (1) CN209271102U (en)

Similar Documents

Publication Publication Date Title
CN104975668B (en) Curtain wall with solar air and hot-water heat collector
CN108826348B (en) The air pre-heater with rotary heating surface of blocking rotor ash can be reduced
CN102748956A (en) Method and device for recovering and utilizing kiln waste heat by spray drying tower in ceramic industry
CN209271102U (en) A kind of asphalt smoke gas purifying flue gas coagulation prevention device
CN103017328A (en) Combustion and heat exchange system of heating equipment
CN211819631U (en) Container structure of container type gas generator set
CN201187876Y (en) Electric hot blast heating furnace
CN108870432A (en) The method for reducing air pre-heater with rotary heating surface blocking rotor ash
CN202938611U (en) High-efficiency energy-saving environment-friendly vertical type hot-air stove
CN206361915U (en) A kind of energy-saving gas water heater
CN202057024U (en) Water storage type electromagnetic water heater
CN211903296U (en) Air duct heater with anti-sticking heating element
CN104975921A (en) Heat-storage energy-saving preheating device
CN208671055U (en) The air pre-heater with rotary heating surface for reducing blocking rotor ash is bypassed using high-pressure blast
CN207065620U (en) Preheat the air pre-heater with rotary heating surface of the anti-incrustation of rotor First air cold end
CN202757295U (en) Solar hot air flow heat exchanging water heater
CN105627590A (en) Heating-ventilating dual-purpose solar air collector
CN103712439B (en) Rotary kiln outer drum waste heat collecting system and collecting method thereof
CN205482285U (en) Thermal -arrest fires burning furnace for stoving
CN207065621U (en) Preheat the air pre-heater with rotary heating surface of the anti-incrustation of rotor Secondary Air cold end
CN202770228U (en) Furnace waste heat recycling device of spray drying tower in ceramic industry
CN207438702U (en) A kind of instant heating type electric heating furnace of far infrared
CN208671053U (en) The air pre-heater with rotary heating surface of blocking rotor ash is reduced using bypass circulation
CN208671054U (en) The air pre-heater with rotary heating surface for reducing blocking rotor ash is bypassed using low-pressure air
CN104165405B (en) Heating device of purification room applied after biomass gasification station is provided with firewall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An anti condensation device for asphalt flue gas purification

Effective date of registration: 20210331

Granted publication date: 20190820

Pledgee: Shandong Wendeng Rural Commercial Bank Co., Ltd

Pledgor: WEIHAI ZHENGDA ENVIRONMENT EQUIPMENT Co.,Ltd.

Registration number: Y2021980002326