CN209247001U CN201821696305.0U CN201821696305U CN209247001U CN 209247001 U CN209247001 U CN 209247001U CN 201821696305 U CN201821696305 U CN 201821696305U CN 209247001 U CN209247001 U CN 209247001U
Authority
CN
China
Prior art keywords
fixedly installed
component
support
sides
rail track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821696305.0U
Other languages
Chinese (zh)
Inventor
史丽涛
郭冉冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821696305.0U priority Critical patent/CN209247001U/en
Application granted granted Critical
Publication of CN209247001U publication Critical patent/CN209247001U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a kind of rail track construction water Pingdu detection devices, including water repellent component, support plate and infrared ray digital display level-meter, the two sides of the support plate surface are all fixedly installed limiting slot, the surface of the limiting slot is all movably installed with positioning component, two sides at the top of the support plate are all fixedly installed with clump weight, water repellent component is fixedly installed at the top of the support component, the internal activity of the water repellent component is equipped with infrared ray digital display level-meter, the two sides of the water repellent component are all movably installed with Anchor plate kit, lifting assembly is fixedly installed at the top of the support plate, and lifting assembly is located at one end of support component, support frame is fixedly installed at the top of the lifting assembly, the two sides of support frame as described above are all fixedly installed with handle.The utility model, which makes the present apparatus in the process of work by being provided with a series of structure, has easy to disassemble and simple operation and other advantages.

Description

A kind of rail track construction water Pingdu detection device
Technical field
The utility model relates to mechanical equipment technical field, specially a kind of rail track construction water Pingdu detection dress It sets.
Background technique
With the continuous development in epoch, rail track construction water Pingdu detection device plays during track construction Important role, rail track construction water Pingdu detection device are one of most important underlying parameter in line upkeep, the ginseng Number define line track safe operations and daily maintenance must condition, the detection of existing rail track construction water Pingdu Device is inconvenient to be adjusted, and manipulation strength is big, influences the quality of detection, and inconvenience dismounts horizon detector, Inconvenient staff carries out using thus it is proposed that a kind of rail track construction water Pingdu detection device is existing to solve The problem of.
Utility model content
The purpose of this utility model is to provide a kind of rail track construction water Pingdu detection devices, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the utility model provides the following technical solutions: a kind of rail track construction water Pingdu inspection Device, including water repellent component, support plate and infrared ray digital display level-meter are surveyed, the two sides of the support plate surface are all fixedly installed Limiting slot, the surface of the limiting slot are all movably installed with positioning component, and the bottom of the positioning component, which is all fixedly installed with, draws Guide wheel, the two sides at the top of the support plate are all fixedly installed with clump weight, support group are fixedly installed at the top of the support plate Part is fixedly installed with water repellent component at the top of the support component, and the internal activity of the water repellent component is equipped with infrared line number Aobvious level meter, the two sides of the water repellent component are all movably installed with Anchor plate kit, liter are fixedly installed at the top of the support plate It comes down to a lower group part, and lifting assembly is located at one end of support component, and support frame, the branch are fixedly installed at the top of the lifting assembly The two sides of support are all fixedly installed with handle.
Preferably, the inside of the positioning component is fixedly installed with mounting plate, and the two sides at the top of mounting plate are all fixedly mounted There is baffle, the inside of baffle is all fixedly installed threaded hole, and the internal activity of threaded hole is equipped with bolt.
Preferably, the inside of the Anchor plate kit is fixedly installed with guide sleeve, and the internal activity of guide sleeve is equipped with adjusting The side of bar, adjusting rod is fixedly installed with limit plate.
Preferably, the inside of the water repellent component is fixedly installed with shell, and the two sides of shell are all fixedly installed mounting hole, Waterproof cover is fixedly installed at the top of shell.
Preferably, the inside of the support component is fixedly installed with pedestal, and support rod is fixedly installed at the top of pedestal, branch Support is fixedly installed at the top of strut.
Preferably, the inside of the lifting assembly is fixedly installed with telescopic sleeving rod, and the surface of telescopic sleeving rod is fixedly installed Limit hole, the top movable of telescopic sleeving rod are equipped with telescopic rod, and the surface of telescopic rod is provided with to be used in conjunction with each other with limit hole Elastic spacing one.
Compared with prior art, the utility model has the beneficial effects that the rail track construction water Pingdu detection device By being equipped with positioning component, the spacing between guide wheel can be adjusted, facilitates staff to various sizes of rail track Detection work is carried out, the quality of work is improved, by being equipped with Anchor plate kit, infrared ray digital display level-meter can be limited Position, facilitates staff to dismount infrared ray digital display level-meter, easy to operate, can be right by being equipped with water repellent component Infrared ray digital display level-meter is protected, and the infiltration of rainwater is prevented, and infrared ray digital display level-meter is caused to damage, and is risen by being equipped with It comes down to a lower group part, lift adjustment can be carried out to the present apparatus, staff be facilitated to carry out using horizontal by being equipped with infrared ray digital display Instrument is able to detect the levelness of rail track, improves the precision of work, can be to water repellent component by being equipped with support component It is supported, staff is facilitated to carry out checking work.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the side view of the utility model;
Fig. 3 is the Anchor plate kit partial structural diagram of the utility model;
Fig. 4 is the water repellent component partial structural diagram of the utility model;
Fig. 5 is the positioning component partial structural diagram of the utility model;
Fig. 6 is the lifting assembly partial structural diagram of the utility model.
In figure: 1, support frame;2, water repellent component;201, waterproof cover;202, mounting hole;203, shell;3, Anchor plate kit; 301, adjusting rod;302, limit plate;303, guide sleeve;4, support component;401, support;402, support rod;403, pedestal;5, it props up Fagging;6, infrared ray digital display level-meter;7, limiting slot;8, guide wheel;9, positioning component;901, threaded hole;902, baffle;903, Bolt;904, mounting plate;10, handle;11, lifting assembly;1101, telescopic rod;1102, telescopic sleeving rod;1103, elastic spacing Part;1104, limit hole;12, clump weight.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to detachably connect It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
Fig. 1-6 is please referred to, a kind of embodiment provided by the utility model: a kind of rail track construction water Pingdu detection dress It sets, including water repellent component 2, support plate 5 and infrared ray digital display level-meter 6, the internal activity of water repellent component 2 are equipped with infrared line number Aobvious level meter 6, infrared ray digital display level-meter 6 are electrically connected by conducting wire and battery, the type of the infrared ray digital display level-meter 6 Number can be EM5416-200, infrared ray digital display level-meter 6 utilize angular transducer sensitive level inclination angle, pass through signal processing and list Inclination angle is directly shown on charactron or is uploaded to computer in the form of numerical value and shown, located by control, the operation of piece machine Reason, so that angle measurement be made to become convenient, fast, realizes the high-acruracy survey at inclination angle, is able to detect the level of rail track Degree, improves the precision of work, the two sides of water repellent component 2 are all movably installed with Anchor plate kit 3, and Anchor plate kit 3 can be to infrared ray Digital display level-meter 6 is limited, and staff is facilitated to dismount infrared ray digital display level-meter 6, easy to operate, support plate 5 The two sides on surface are all fixedly installed limiting slot 7, and the surface of limiting slot 7 is all movably installed with positioning component 9,9 energy of positioning component The spacing between guide wheel 8 is enough adjusted, staff is facilitated to carry out detection work to various sizes of rail track, improves work Quality, the bottom of positioning component 9 is all fixedly installed with guide wheel 8, and the two sides at 5 top of support plate are all fixedly installed with clump weight 12, the top of support plate 5 is fixedly installed with support component 4, and the top of support component 4 is fixedly installed with water repellent component 2, waterproof group Part 2 can protect infrared ray digital display level-meter 6, prevent the infiltration of rainwater, and infrared ray digital display level-meter 6 is caused to damage, The top of support plate 5 is fixedly installed with lifting assembly 11, and lifting assembly 11 can carry out lift adjustment to the present apparatus, facilitate work Personnel carry out using and lifting assembly 11 is located at one end of support component 4, and the top of lifting assembly 11 is fixedly installed with support frame 1, the two sides of support frame 1 are all fixedly installed with handle 10.
Further, the inside of positioning component 9 is fixedly installed with mounting plate 904, all fixed peace in the two sides at 904 top of mounting plate Equipped with baffle 902, the inside of baffle 902 is all fixedly installed threaded hole 901, and the internal activity of threaded hole 901 is equipped with bolt 903, when the present apparatus is worked, adjustable bolt 903 moves mounting plate 904, realizes the spacing to guide wheel 8 It is adjusted.
Further, the inside of Anchor plate kit 3 is fixedly installed with guide sleeve 303, and the internal activity of guide sleeve 303 is equipped with tune Pole 301, the side of adjusting rod 301 are fixedly installed with limit plate 302, when the present apparatus is worked, using adjusting rod 301 Limit plate 302 is driven to limit infrared ray digital display level-meter 6.
Further, the inside of water repellent component 2 is fixedly installed with shell 203, and the two sides of shell 203 are all fixedly installed installation Hole 202, the top of shell 203 are fixedly installed with waterproof cover 201, waterproof cover 201 can rainwater guide, prevention and treatment rainwater seeps Thoroughly, cause infrared ray digital display level-meter 6 impaired.
Further, the inside of support component 4 is fixedly installed with pedestal 403, and pedestal 403 can be supported the present apparatus, The stability of the present apparatus is improved, the top of pedestal 403 is fixedly installed with support rod 402, and the top of support rod 402 is fixedly installed with Support 401.
Further, the inside of lifting assembly 11 is fixedly installed with telescopic sleeving rod 1102, and the surface of telescopic sleeving rod 1102 is fixed It is provided with limit hole 1104, the top movable of telescopic sleeving rod 1102 is equipped with telescopic rod 1101, the surface setting of telescopic rod 1101 There is the elastic spacing one 1103 being used in conjunction with each other with limit hole 1104 to pin elastic spacing when needing to adjust height Part 1103 carries out up and down adjustment to telescopic rod 1101, again unclamps elastic spacing one 1103 after adjusting to suitable position, make bullet Property locating part 1103 is caught in limit hole 1104 and can fix, easy to operate.
Working principle: using before the present apparatus, user of service first detects device, after confirming that there is no problem, in use, The spacing between guide wheel 8 is adjusted first with positioning component 9, infrared ray digital display level-meter 6 is carried out followed by Anchor plate kit 3 Then limit pushes the present apparatus using handle 10, finally carry out levelness detection using infrared ray digital display level-meter 6.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of rail track construction water Pingdu detection device, including water repellent component, support plate and infrared ray digital display level-meter, It is characterized by: the two sides of the support plate surface are all fixedly installed limiting slot, all activity installations of the surface of the limiting slot There is positioning component, the bottom of the positioning component is all fixedly installed with guide wheel, all fixed peace in the two sides at the top of the support plate Equipped with clump weight, it is fixedly installed with support component at the top of the support plate, is fixedly installed at the top of the support component anti- Water assembly, the internal activity of the water repellent component are equipped with infrared ray digital display level-meter, and the two sides of the water repellent component are all movable Anchor plate kit is installed, lifting assembly is fixedly installed at the top of the support plate, and lifting assembly is located at the one of support component It holds, is fixedly installed with support frame at the top of the lifting assembly, the two sides of support frame as described above are all fixedly installed with handle.
2. a kind of rail track construction water Pingdu detection device according to claim 1, it is characterised in that: the positioning The inside of component is fixedly installed with mounting plate, and the two sides at the top of mounting plate are all fixedly installed with baffle, and the inside of baffle is all fixed It is provided with threaded hole, the internal activity of threaded hole is equipped with bolt.
3. a kind of rail track construction water Pingdu detection device according to claim 1, it is characterised in that: the pressing plate The inside of component is fixedly installed with guide sleeve, and the internal activity of guide sleeve is equipped with adjusting rod, and the side of adjusting rod is fixedly mounted There is limit plate.
4. a kind of rail track construction water Pingdu detection device according to claim 1, it is characterised in that: the waterproof The inside of component is fixedly installed with shell, and the two sides of shell are all fixedly installed mounting hole, are fixedly installed at the top of shell anti- Water cover.
5. a kind of rail track construction water Pingdu detection device according to claim 1, it is characterised in that: the support The inside of component is fixedly installed with pedestal, and support rod is fixedly installed at the top of pedestal, branch is fixedly installed at the top of support rod Seat.
6. a kind of rail track construction water Pingdu detection device according to claim 1, it is characterised in that: the lifting The inside of component is fixedly installed with telescopic sleeving rod, and the surface of telescopic sleeving rod is fixedly installed limit hole, and the top of telescopic sleeving rod is living Dynamic to be equipped with telescopic rod, the surface of telescopic rod is provided with the elastic spacing one being used in conjunction with each other with limit hole.
CN201821696305.0U 2018-10-19 2018-10-19 A kind of rail track construction water Pingdu detection device Expired - Fee Related CN209247001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821696305.0U CN209247001U (en) 2018-10-19 2018-10-19 A kind of rail track construction water Pingdu detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821696305.0U CN209247001U (en) 2018-10-19 2018-10-19 A kind of rail track construction water Pingdu detection device

Publications (1)

Publication Number Publication Date
CN209247001U true CN209247001U (en) 2019-08-13

Family

ID=67525371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821696305.0U Expired - Fee Related CN209247001U (en) 2018-10-19 2018-10-19 A kind of rail track construction water Pingdu detection device

Country Status (1)

Country Link
CN (1) CN209247001U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887459A (en) * 2019-11-29 2020-03-17 武昌船舶重工集团有限公司 Migration track detection device and detection method thereof
CN111735368A (en) * 2020-07-02 2020-10-02 合肥皖兴建设工程有限公司 Smart urban rail transit engineering acceptance detection system and detection method
CN112129269A (en) * 2020-09-22 2020-12-25 孙永 Traffic track levelness detection device
CN112551415A (en) * 2020-12-01 2021-03-26 蒋浩 Hydraulic lifting platform guide rail adjusting structure for rail transit maintenance

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887459A (en) * 2019-11-29 2020-03-17 武昌船舶重工集团有限公司 Migration track detection device and detection method thereof
CN111735368A (en) * 2020-07-02 2020-10-02 合肥皖兴建设工程有限公司 Smart urban rail transit engineering acceptance detection system and detection method
CN112129269A (en) * 2020-09-22 2020-12-25 孙永 Traffic track levelness detection device
CN112551415A (en) * 2020-12-01 2021-03-26 蒋浩 Hydraulic lifting platform guide rail adjusting structure for rail transit maintenance

Similar Documents

Publication Publication Date Title
CN209247001U (en) A kind of rail track construction water Pingdu detection device
CN208059896U (en) A kind of building template verticality measurement device
CN205317190U (en) Angle of attack sensor detection device
CN212747771U (en) Underground drainage pipeline inner bottom elevation measuring device
CN108828693A (en) A kind of intelligent testing apparatus for precipitation rain fall based on computer vision
CN204785450U (en) A handheld support for cover protectometer
CN207880363U (en) A kind of meteorological detection environment protection and monitoring device
CN107916773A (en) A kind of adjustable scaffold base for surveying screw rod stress
CN203429195U (en) Measuring auxiliary fixed device of blast furnace shell
CN211263477U (en) Concrete gas content detection device
CN208567900U (en) A kind of Novel engineering management total station
CN209277945U (en) Tunnel-liner testing stand
CN207528204U (en) Slab thickness detection auxiliary device
CN219015296U (en) Gradient detection device
CN211504140U (en) Be used for distancer to carry out net height and diagonal and detect and use basic platform
CN205607384U (en) Side slope gradiometer
CN210981239U (en) House inclination detection device
CN219675105U (en) Land survey measuring device
CN217276138U (en) Be used for building settlement measuring device
CN215984487U (en) Building steel structure overall deformation degree detection equipment
CN205981181U (en) Convenient to use's simple and easy sopwith staff
CN209102044U (en) A kind of rangefinder of power circuit design
CN220978819U (en) High and large formwork support monitoring device
CN211976408U (en) Supporting device for gradient measurement of proton magnetometer
CN209495701U (en) A kind of total station protective device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190813