CN209229286U - A kind of novel geological disaster monitoring instrument mounting rack - Google Patents

A kind of novel geological disaster monitoring instrument mounting rack Download PDF

Info

Publication number
CN209229286U
CN209229286U CN201822222298.7U CN201822222298U CN209229286U CN 209229286 U CN209229286 U CN 209229286U CN 201822222298 U CN201822222298 U CN 201822222298U CN 209229286 U CN209229286 U CN 209229286U
Authority
CN
China
Prior art keywords
plate
mounting rack
fixed
steel
geological disaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822222298.7U
Other languages
Chinese (zh)
Inventor
王庆兵
孟凡奇
姜晓飞
孟祥玲
吴丽莉
姚春梅
张永伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Geological Environment Monitoring Station (shandong Geological Disaster Emergency Technical Guidance Center)
Original Assignee
Shandong Geological Environment Monitoring Station (shandong Geological Disaster Emergency Technical Guidance Center)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Geological Environment Monitoring Station (shandong Geological Disaster Emergency Technical Guidance Center) filed Critical Shandong Geological Environment Monitoring Station (shandong Geological Disaster Emergency Technical Guidance Center)
Priority to CN201822222298.7U priority Critical patent/CN209229286U/en
Application granted granted Critical
Publication of CN209229286U publication Critical patent/CN209229286U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a kind of novel geological disaster monitoring instrument mounting rack, including fixed device and bracket, and the fixed device includes four supporting legs for fixing frame bottom, the bracket, and four supporting legs are obliquely installed inwardly in pyramidal structure;A fixed plate is fitted at the top of each supporting leg, the top of the fixed plate is equipped with mounting plate, and the top of the mounting plate is equipped with mounting rack;The mounting rack includes two transverse tubes and two vertical tubes, and two transverse tubes are secured transverse to the top of mounting plate, and the every vertical tube is vertically weldingly fixed on the end of transverse tube, and the vertical tube is equipped with mounting hole, and monitoring device is mounted on mounting rack by mounting hole.Novel geological disaster monitoring instrument mounting rack described in the utility model can effectively install monitoring device, and pass through the design of vertical tube and transverse tube, so that monitoring device is formed hanging structure, effectively prevent the corrosion at monitoring device bottom and back.

Description

A kind of novel geological disaster monitoring instrument mounting rack
Technical field
The utility model belongs to geology monitoring technical field, installs more particularly, to a kind of novel geological disaster monitoring instrument Frame.
Background technique
For geological disaster equipment for monitoring region geological condition, the landform generally installed is changeable, the positions of some installations compared with To be flat, some need is mounted on massif slope, if installation is on the slope, it is necessary to consider that the slope of massif sets monitoring Standby installation influences, and generally requires and manually shakeouts panel region installation equipment, stability that is not only time-consuming and laborious in this way, but also installing Not enough.
Summary of the invention
In view of this, the utility model is directed to a kind of novel geological disaster monitoring instrument mounting rack, it is existing to change It is relatively complicated that Geological Hazards Monitoring installation is installed on massif slope, the inadequate situation of the stability of installation.
In order to achieve the above objectives, the technical solution of the utility model is achieved in that
A kind of novel geological disaster monitoring instrument mounting rack, including fixed device and bracket, the fixed device is for fixing Frame bottom, the bracket include four supporting legs, and four supporting legs are obliquely installed inwardly in pyramidal structure, are led between four supporting legs It crosses stull and vertical support is interconnected and fixed;
A fixed plate is fitted at the top of each supporting leg, the top of the fixed plate is equipped with mounting plate, described The top of mounting plate is equipped with mounting rack;
The mounting rack includes two transverse tubes and two vertical tubes, and two transverse tubes are secured transverse to the top of mounting plate, and every The vertical tube is vertically weldingly fixed on the end of transverse tube, and the vertical tube is equipped with mounting hole, and monitoring device is installed by mounting hole On mounting rack.
Further, two transverse tubes are installed in parallel, and reserving gaps between two transverse tubes, are also welded between two transverse tubes Two, for connecting the longitudinal tubule (L tubule) of transverse tube, are equipped with a longitudinal tubule (L tubule) between two vertical tubes.
Further, the transverse tube and vertical tube are all square tube;
The outside both ends of the transverse tube are all welded with gusset by the position of close end, and the side of gusset is bonded mounting plate Setting, and it is equipped with bolt hole, it is also provided with the bolt hole being connected on mounting plate and fixed plate, the gusset, mounting plate pass through spiral shell Bolt is fixed in fixed plate.
Further, the fixed device is four, and each supporting leg is correspondingly provided with one, and each fixed device includes The bottom of steel column, waist fixing seat, top mounting base, the steel column is acicular texture, convenient for penetrating into soil, described in four In sustained height, the waist fixing seat is fixedly mounted on the middle position of steel column, fitting upper soll layer setting at the top of steel column;
The top mounting base is mounted on the top of steel column for fixed supporting leg bottom.
Further, the waist fixing seat includes the fixed ring of steel plate and installation on the steel plate, and the fixed ring is Tubulose, centre are equipped with axis hole, also are provided with through-hole corresponding with the axis hole on the steel plate, steel column is passed through by axis hole and through-hole Wear waist fixing seat, the side of the fixed ring is provided with two cracks, and two cracks are symmetrical arranged, fixed ring crack position to Outside extends to form clamping section, and the clamping section is correspondingly provided with fishbolt, and the fixed ring passes through clamping section and fishbolt It is fixedly mounted with steel column.
Further, limit connecting rod is additionally provided between two adjacent steel columns;
Two pieces of connecting plates are welded on the outside of each steel column, two connecting plates are in 90 ° of angles;
The limit connecting rod includes steel pipe, and nut is welded at the both ends inner hole of the steel pipe, is opened on the connecting plate There is through-hole corresponding with the nut, the outside of connecting plate is equipped with connection bolt, will limit connecting rod by connecting bolt Both ends tense fitting and are fixed on the inside of connecting plate.
Further, the top mounting base includes support plate and the limited post for being mounted on support plate upper surface;
The support plate and limited post are all cylindrical type steel plate, and the outer diameter of the support plate is greater than the outer diameter of limited post, institute The bottom for stating supporting leg is welded with level board, and limit hole corresponding with the limited post, the level are provided on the level board Sleeve-board is located at the outside fitting support plate installation of limited post.
Further, cylindrical type groove is provided at the top of the limited post, the cylindrical type groove, which is correspondingly provided with, penetrates column, The top for penetrating column is equipped with hammer and pounds pad.
Further, limited post side waist position is provided with annular groove, and the annular groove is correspondingly provided with hoop, Level board is fixed by hoop.
Compared with the existing technology, novel geological disaster monitoring instrument mounting rack described in the utility model has the advantage that
(1) novel geological disaster monitoring instrument mounting rack described in the utility model can effectively pacify monitoring device Dress, and pass through the design of vertical tube and transverse tube, so that monitoring device is formed hanging structure, effectively prevents monitoring device bottom and back The corrosion in portion.
(2) design of the fixed device of novel geological disaster monitoring instrument mounting rack described in the utility model can pacify bracket Mounted in different shaped areas, is penetrated and fixed in the soil by steel column, the top mounting height of steel column is identical, forms other style Horizontal stationary plane is horizontally mounted mounting rack holding, and steel column also effectively increases the stability of bottom.
(3) the waist fixing seat of the fixed device of novel geological disaster monitoring instrument mounting rack described in the utility model can have The stability for increasing steel column and soil surface of effect, the contact area of deflecting increased with soil surface can not only make Steel column is kept upright, and skew is prevented, and can also prevent steel column from sinking.
(4) the limit connecting rod of the fixed device of novel geological disaster monitoring instrument mounting rack described in the utility model not only increases The stability of fixed device is added, has also effectively limited the spacing between steel column, formed fixed gauge case frame structure, convenient for subsequent The installation of bracket.
(5) the top mounting base of the fixed device of novel geological disaster monitoring instrument mounting rack described in the utility model is for pacifying Fixed bracket is filled, the position limiting structure of stable structure is formd between level board and limited post, it is also square after fixed device fixes Just the installation of bracket, it is only necessary to by the installation corresponding with limited post of the limit hole of level board;Limited post is also correspondingly provided with conveniently Installation hammer pounds the cylindrical type groove of pad, pounds pad for installing hammer;The purpose of hammer pounds the installation of pad is to prevent when installing steel column The top of limited post is directly pounded by tup hammer, is easy to produce deformation at the top of limited post, is influenced the installation of level board, so plus The design that hammer pounds pad is entered, after accomplishing fluently steel column, hammer can have been pounded into pad and taken away;And it is equipped with hoop on limited post, prevents level Plate and limited post are detached from.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to provide a further understanding of the present invention, this is practical new The illustrative embodiments and their description of type are not constituteed improper limits to the present invention for explaining the utility model.? In attached drawing:
Fig. 1 is rack assumption diagram described in the utility model embodiment;
Fig. 2 is fixture structure figure described in the utility model embodiment;
Fig. 3 is that fixation device described in the utility model embodiment installs cross-sectional view;
Fig. 4 is waist fixed seat structure figure described in the utility model embodiment;
Fig. 5 is top mounting base structure chart described in the utility model embodiment.
Description of symbols:
1, supporting leg;11, level board;12, fixed plate;2, mounting plate;3, mounting rack;31, transverse tube;32, vertical tube;33, angle steel Plate;34, longitudinal tubule (L tubule);4, steel column;41, support plate;42, limited post;421, cylindrical type groove;422, hammer pounds pad;43, annular groove; 44, connecting plate;5, waist fixing seat;51, steel plate;52, fixed ring;53, clamping section;6, connecting rod is limited;61, nut;7, ring Hoop.
Specific embodiment
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can To be combined with each other.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For limitations of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result, Feature can explicitly or implicitly include one or more of the features.It is in the description of the present invention, unless another It is described, the meaning of " plurality " is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition State the concrete meaning of term in the present invention.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in Figure 1, a kind of novel geological disaster monitoring instrument mounting rack, including fixed device and bracket, the fixed dress It sets for fixing frame bottom, the bracket includes four supporting legs 1, and four supporting legs 1 are obliquely installed inwardly in pyramidal structure, and four It is interconnected and fixed between root supporting leg 1 by stull and vertical support;
The top of each supporting leg 1 is fitted with a fixed plate 12, and the top of the fixed plate 12 is equipped with mounting plate 2, the top of the mounting plate 2 is equipped with mounting rack 3;
The mounting rack 3 includes two transverse tubes 31 and two vertical tubes 32, and two transverse tubes 31 are secured transverse to the upper of mounting plate 2 Side, the every vertical tube 32 are vertically weldingly fixed on the end of transverse tube 31, and the vertical tube 32 is equipped with mounting hole, and monitoring device is logical Mounting hole is crossed to be mounted on mounting rack 3.
Mounting rack 3 can effectively install monitoring device, and pass through the design of vertical tube 32 and transverse tube 31, make to supervise Measurement equipment forms hanging structure, effectively prevents the corrosion at monitoring device bottom and back.
Two transverse tubes 31 are installed in parallel, and reserving gaps between two transverse tubes 31, are also welded with two between two transverse tubes 31 Root is used to connect the longitudinal tubule (L tubule) 34 of transverse tube 31, is equipped with a longitudinal tubule (L tubule) 34 between two vertical tubes 32.
The transverse tube 31 and vertical tube 32 are all square tube;The outside both ends of the transverse tube 31 are all welded with by the position of close end The side fitting mounting plate 2 of gusset 5133, gusset 5133 is arranged, and is equipped with bolt hole, on mounting plate 2 and fixed plate 12 It is provided with the bolt hole of connection, the gusset 5133, mounting plate 2 are bolted in fixed plate 12.
Such as Fig. 2, shown in Fig. 3, the fixed device is four, and each supporting leg 1 is correspondingly provided with one, each fixed dress It sets including steel column 4, waist fixing seat 5, top mounting base, the bottom of the steel column 4 is acicular texture, convenient for penetrating into soil In, in sustained height, the waist fixing seat 5 is fixedly mounted on the middle position of steel column 4 at the top of four steel columns 4, patch Close upper soll layer setting;
The top mounting base is mounted on the top of steel column 4 for 1 bottom of fixed supporting leg.
Bracket can be mounted on different shaped areas by fixed device design, penetrated and fixed in the soil by steel column 4, The top mounting height of steel column 4 is identical, forms the horizontal stationary plane of other style, is horizontally mounted bracket holding, and steel column 4 also has Effect increases the stability of bottom.
Such as Fig. 3, shown in Fig. 4, the waist fixing seat 5 includes steel plate 51 and the fixed ring 52 being mounted on steel plate 51, The fixed ring 52 is tubulose, and centre is equipped with axis hole, also is provided with through-hole corresponding with the axis hole, steel column on the steel plate 51 4 run through waist fixing seat 5 by axis hole and through-hole, and the side of the fixed ring 52 is provided with two cracks, and two cracks are symmetrically set It sets, fixed ring 52 extends to form clamping section 53 in crack position outward, and the clamping section 53 is correspondingly provided with fishbolt, described Fixed ring 52 is fixedly mounted by clamping section 53 and fishbolt and steel column 4.
Waist fixing seat 5 can be effectively increased the stability of steel column 4 Yu soil surface, deflecting increase and soil The contact area on surface can not only make steel column 4 be kept upright, prevent skew, can also prevent steel column 4 from sinking.In installation steel When column 4, first the installation region of every steel column 4 is spread out at plane domain, convenient for the installation of waist fixing seat 5.
Such as Fig. 2, Fig. 3, shown in Fig. 5, limit connecting rod 6 is additionally provided between two adjacent steel columns 4;Each steel column 4 Outside be welded with two pieces of connecting plates 44, two connecting plates 44 are in 90 ° of angles;
The limit connecting rod 6 includes steel pipe, is welded with nut 61, the connecting plate 44 at the both ends inner hole of the steel pipe On be provided with through-hole corresponding with the nut 61, the outside of connecting plate 44 is equipped with connection bolt, will be limited by connection bolt The both ends of connecting rod 6 tense fitting and are fixed on 44 inside of connecting plate.Limit connecting rod 6 not only increases the stabilization of fixed device Property, the spacing between steel column 4 is also effectively limited, fixed gauge case frame structure is formed, convenient for the installation of subsequent bracket.
As shown in Fig. 2, the top mounting base includes support plate 41 and the limited post for being mounted on 41 upper surface of support plate 42;
The support plate 41 and limited post 42 are all cylindrical type steel plate 51, and the outer diameter of the support plate 41 is greater than limited post 42 Outer diameter, the bottom of the supporting leg 1 is welded with level board 11, is provided on the level board 11 corresponding with the limited post 42 Limit hole, the outside fitting support plate 41 that the level board 11 is set in limited post 42 are installed.
The top of the limited post 42 is provided with cylindrical type groove 421, and the cylindrical type groove 421, which is correspondingly provided with, penetrates column, The top for penetrating column is equipped with hammer and pounds pad 422.
The 42 side waist position of limited post is provided with annular groove 43, and the annular groove 43 is correspondingly provided with hoop 7, leads to Hoop 7 is crossed to fix level board 11.
Top mounting base is used for mounting and fixing bracket, and the limit of stable structure is formd between level board 11 and limited post 42 Structure also facilitates the installation of bracket, it is only necessary to which the limit hole of level board 11 and limited post 42 is right after fixed device fixes It should install;Limited post 42 is also correspondingly provided with the cylindrical type groove 421 for facilitating installation hammer to pound pad 422, pounds pad for installing hammer 422;The purpose of hammer pounds the installation of pad 422 is the top in order to when installing steel column 4, prevent from directly pounding limited post 42 by tup hammer The top in portion, limited post 42 is easy to produce deformation, influences the installation of level board 11, so joined the design that hammer pounds pad 422, beats After good steel column 4, hammer can be pounded to pad 422 and taken away;And it is equipped with hoop 7 on limited post 42, prevents level board 11 and limited post 42 are detached from.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (9)

1. a kind of novel geological disaster monitoring instrument mounting rack, it is characterised in that: including fixed device and bracket, the fixed device For fixing frame bottom, the bracket includes four supporting legs (1), and four supporting legs (1) are obliquely installed inwardly in pyramidal structure, It is interconnected and fixed between four supporting legs (1) by stull and vertical support;
A fixed plate (12) is fitted at the top of each supporting leg (1), the top of the fixed plate (12) is equipped with installation The top of plate (2), the mounting plate (2) is equipped with mounting rack (3);
The mounting rack (3) includes two transverse tube (31) He Lianggen vertical tubes (32), and two transverse tubes (31) are secured transverse to mounting plate (2) top, the every vertical tube (32) are vertically weldingly fixed on the end of transverse tube (31), and the vertical tube (32) is equipped with installation Hole, monitoring device are mounted on mounting rack (3) by mounting hole.
2. novel geological disaster monitoring instrument mounting rack according to claim 1, it is characterised in that: two transverse tubes (31) are parallel It installs, and reserving gaps between two transverse tubes (31), two is also welded between two transverse tubes (31) for connecting transverse tube (31) Longitudinal tubule (L tubule) (34), a longitudinal tubule (L tubule) (34) is equipped between two vertical tubes (32).
3. novel geological disaster monitoring instrument mounting rack according to claim 1 or 2, it is characterised in that: the transverse tube (31) It is all square tube with vertical tube (32);
The outside both ends of the transverse tube (31) are all welded with gusset (33) by the position of close end, the side patch of gusset (33) Mounting plate (2) setting is closed, and is equipped with bolt hole, is also provided with the bolt hole being connected to, the angle on mounting plate (2) and fixed plate (12) Steel plate (33), mounting plate (2) are bolted on fixed plate (12).
4. novel geological disaster monitoring instrument mounting rack according to claim 1, it is characterised in that: the fixed device is four A, each supporting leg (1) is correspondingly provided with one, and each fixed device includes steel column (4), waist fixing seat (5), top installation The bottom of seat, the steel column (4) is acicular texture, and convenient for penetrating into soil, the top of four steel columns (4) is in same height Degree, the waist fixing seat (5) are fixedly mounted on the middle position of steel column (4), fitting upper soll layer setting;
The top mounting base is mounted on the top of steel column (4) for fixed supporting leg (1) bottom.
5. novel geological disaster monitoring instrument mounting rack according to claim 4, it is characterised in that: the waist fixing seat It (5) include steel plate (51) and the fixed ring (52) being mounted on steel plate (51), the fixed ring (52) is tubulose, and centre is set There is axis hole, through-hole corresponding with the axis hole also is provided on the steel plate (51), steel column (4) runs through waist by axis hole and through-hole Portion's fixing seat (5), the side of the fixed ring (52) are provided with two cracks, and two cracks are symmetrical arranged, and fixed ring (52) is being pressed from both sides Seam position extends to form clamping section (53) outward, and the clamping section (53) is correspondingly provided with fishbolt, the fixed ring (52) It is fixedly mounted by clamping section (53) and fishbolt and steel column (4).
6. novel geological disaster monitoring instrument mounting rack according to claim 4, it is characterised in that: two adjacent steel columns (4) limit connecting rod (6) is additionally provided between;
Two pieces of connecting plates (44) are welded on the outside of each steel column (4), two connecting plates (44) are in 90 ° of angles;
The limit connecting rod (6) includes steel pipe, and nut (61), the connecting plate are welded at the both ends inner hole of the steel pipe (44) through-hole corresponding with the nut (61) is provided on, the outside of connecting plate (44) is equipped with connection bolt, by connecting spiral shell The both ends for limiting connecting rod (6) are tensed fitting and are fixed on the inside of connecting plate (44) by bolt.
7. novel geological disaster monitoring instrument mounting rack according to claim 4, it is characterised in that: the top mounting base packet It includes support plate (41) and is mounted on the limited post (42) of support plate (41) upper surface;
The support plate (41) and limited post (42) are all cylindrical type steel plate (51), and the outer diameter of the support plate (41) is greater than limit The bottom of the outer diameter of column (42), the supporting leg (1) is welded with level board (11), is provided with and the limit on the level board (11) The corresponding limit hole of column (42), the level board (11) are set in outside fitting support plate (41) installation of limited post (42).
8. novel geological disaster monitoring instrument mounting rack according to claim 7, it is characterised in that: the limited post (42) Top is provided with cylindrical type groove (421), and the cylindrical type groove (421), which is correspondingly provided with, penetrates column, and described penetrate at the top of column sets There is hammer to pound pad (422).
9. novel geological disaster monitoring instrument mounting rack according to claim 7, it is characterised in that: limited post (42) side Face waist location is provided with annular groove (43), and the annular groove (43) is correspondingly provided with hoop (7), by hoop (7) to level Plate (11) fixes.
CN201822222298.7U 2018-12-26 2018-12-26 A kind of novel geological disaster monitoring instrument mounting rack Expired - Fee Related CN209229286U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822222298.7U CN209229286U (en) 2018-12-26 2018-12-26 A kind of novel geological disaster monitoring instrument mounting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822222298.7U CN209229286U (en) 2018-12-26 2018-12-26 A kind of novel geological disaster monitoring instrument mounting rack

Publications (1)

Publication Number Publication Date
CN209229286U true CN209229286U (en) 2019-08-09

Family

ID=67509488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822222298.7U Expired - Fee Related CN209229286U (en) 2018-12-26 2018-12-26 A kind of novel geological disaster monitoring instrument mounting rack

Country Status (1)

Country Link
CN (1) CN209229286U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112180830A (en) * 2020-10-13 2021-01-05 广东省地质建设工程勘察院 Geological disaster early warning monitoring devices

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112180830A (en) * 2020-10-13 2021-01-05 广东省地质建设工程勘察院 Geological disaster early warning monitoring devices
CN112180830B (en) * 2020-10-13 2021-05-25 广东省地质建设工程勘察院 Geological disaster early warning monitoring devices

Similar Documents

Publication Publication Date Title
CN204327103U (en) A kind of reaction frame started for tunneling shield
CN209227638U (en) Uplift pile counterforce device
CN209229286U (en) A kind of novel geological disaster monitoring instrument mounting rack
CN104328810B (en) Prefabricated tubular pile single pile foundation bearing capacity detection improvement method
CN106248507A (en) A kind of civil engineering structure blast injury experiment platform
CN205805019U (en) Column underpinning device
CN207051099U (en) A kind of servicing unit of anchor pole anti-pulling experiment
CN206878313U (en) A kind of lightning-arrest needle construction with multiple fixed structure
CN206090577U (en) Steel sheet pile supports in strutting combination welded truss
CN208748711U (en) A kind of horizontally loading test device
CN207073326U (en) Safety protection device of municipal road foundation pit
CN104032720B (en) It is applicable to test method and the device of deep supporting course bearing capacity
CN206960679U (en) A kind of portable mobile wireless electric wave underground electro magnetic wave perradiator transmitting coil support
CN202416562U (en) Supporting column for wooden structure
CN215407819U (en) Construction cage ground protection fence based on standard knot is built
CN213682085U (en) Steel-pipe pile foundation reinforcing apparatus
CN107901010A (en) A kind of stainless steel cylinder rack that multi-faceted can be used
CN210368694U (en) Sound insulation screen on highway
CN209384292U (en) A kind of static test dedicated fiducial beam
CN215764214U (en) A extend support for colliery rock burst equipment
CN214996308U (en) Support frame for construction convenient to height-adjusting
CN204679021U (en) Pile tube verticality measurement device
CN209620083U (en) Communicate the fixed foundation structure of steel tower
CN209084059U (en) Ball valve foot prop
CN205779834U (en) A kind of hoistable platform for fan test pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809

Termination date: 20211226