CN209227320U - A kind of permeable tile work pavement structure that solid cement concrete layer is set - Google Patents

A kind of permeable tile work pavement structure that solid cement concrete layer is set Download PDF

Info

Publication number
CN209227320U
CN209227320U CN201821608817.7U CN201821608817U CN209227320U CN 209227320 U CN209227320 U CN 209227320U CN 201821608817 U CN201821608817 U CN 201821608817U CN 209227320 U CN209227320 U CN 209227320U
Authority
CN
China
Prior art keywords
cement concrete
concrete layer
solid cement
layer
tile work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821608817.7U
Other languages
Chinese (zh)
Inventor
李辉
李昊臻
赵文忠
张超
王向平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Qugang Expressway Development Co Ltd
Tongji University
Original Assignee
Hebei Qugang Expressway Development Co Ltd
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Qugang Expressway Development Co Ltd, Tongji University filed Critical Hebei Qugang Expressway Development Co Ltd
Priority to CN201821608817.7U priority Critical patent/CN209227320U/en
Application granted granted Critical
Publication of CN209227320U publication Critical patent/CN209227320U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a kind of permeable tile work pavement structures that solid cement concrete layer is arranged, the pavement structure successively includes permeable tile work surface layer, coarse sand screed-coat, solid cement concrete layer and graded broken stone layer from top to bottom, the graded broken stone layer is laid on soil matrix, and the drilling being evenly arranged is equipped in the solid cement concrete layer.Compared with prior art, the utility model is designed reasonably, structure is simple, and by the way that solid cement concrete layer is arranged, when construction can be used as temporary construction work surface, guarantees that the water permeability of the permeable tile work layer of surface layer is unaffected;Through hole can also be bored when surface construction, rubble is filled, to infiltrate rainwater infiltration;Overall structure takes into account intensity, the permeable requirement with construction technology.

Description

A kind of permeable tile work pavement structure that solid cement concrete layer is set
Technical field
The utility model relates to pavement structure technical fields, and in particular to a kind of that the permeable of solid cement concrete layer is arranged Tile work pavement structure.
Background technique
With popularizing for sponge city, people are more and more stronger for the consciousness of porous pavement.Permeable tile work road surface is as one The effective sponge facility of kind, is chiefly used in pavement, walking street, garden path etc. without motor vehicle load road, and have light-duty The regions such as road, square, the parking lot of load requirement, traditional permeable tile work pavement structure are mostly surface layer, (screed-coat), rubble Base, original state soil matrix layer structure, wherein surface layer function be infiltration rainwater, crushed rock base course function be water storage, original state soil matrix is just In draining;Although meeting the demand of pervious function, due in road structure graded broken stone base it is weak and less in Heavy-load road is applied.Few certain applications are excessively paid attention to mechanics and are held in the permeable tile work road surface in middle heavily loaded region, Chang Yinwei The promotion of loading capability, leads to the reduction of itself water permeability, once there is rainstorm weather, it is easy to there is ponding, influences pedestrian With traffic.In addition, permeable pavement construction technology is simple and crude at this stage, surface layer is often blocked by rubble dust in work progress, thoroughly Aqueous to can significantly reduce, these problems affect the application of the technology to a certain extent.
Utility model content
The purpose of this utility model is exactly to overcome the problems of the above-mentioned prior art and providing one kind can take into account Intensity, the permeable permeable tile work pavement structure with the setting solid cement concrete layer of construction technology.
The purpose of this utility model can be achieved through the following technical solutions: a kind of setting solid cement concrete layer Permeable tile work pavement structure, the pavement structure are successively mixed including permeable tile work surface layer, coarse sand screed-coat, solid cement from top to bottom Solidifying soil layer and graded broken stone layer, the graded broken stone layer are laid on soil matrix, are equipped in the solid cement concrete layer equal The drilling of even arrangement.
The utility model patent at the top of crushed rock base course by being arranged solid cement concrete layer, on the one hand since itself is strong Degree is higher with modulus, can effectively share more load, reduces rubble weak floor carrying load and corresponding deformation;Another party Face provides more smooth plane for superstructure, convenient for construction.In addition, the permeable tile work pavement structure is also close-graded cement Road surface changes permeable pavement road surface and provides a kind of practical and low in cost, construction is simple modification scheme.
Preferably, the solid cement concrete layer is close-graded cement stabilizing concrete, and construction period can be used as road The temporary pavement material layer of vehicle pass-through, utmostly to prevent Construction traffic and road cement from blocking permeable pavement structure surface Permeable " channel ".The traffic total amount of its thickness foundation construction period is within the scope of 12 to 20cm, according to lot of experimental data table Bright, compression strength is greater than or equal to 20MPa, flexural tensile strength is not less than 2.5MPa;Through hole can be bored when surface construction so as to saturating Water, for pore size control 5 to 10cm, excessive will affect can reduce this layer of bearing capacity, too small, should not fill rubble, influence to mat formation There is weak spot in layer flatness;The rubble that nominal particle diameter is 1-2cm is filled in hole, the spacing of wells is not less than 3 with apart from roadside Times aperture, spacing is smaller to generate the damage such as through crack.
Preferably, the thickness of the graded broken stone layer within the scope of 20 to 40cm, porosity 40%, partial size 2 to 5cm。
Preferably, the soil matrix is the native compacted lift of element, and the soil compaction degree of the native compacted lift of element is 93% or so.
Preferably, the screed-coat is coarse sands layer, and the thickness of the coarse sands layer is within the scope of 2 to 3cm and ballast grain sizes exist Within the scope of 0.5 to 1cm.
Preferably, brick road face includes the muti-piece high intensity tile work mutually spliced, adjacent two blocks of high-intensitive tile works it Between have 1 to 2cm permeable gap, the compression strength of the high intensity tile work is greater than or equal to 50MPa and flexural strength is not less than 5Mpa。
Preferably, the mutual composed pattern of tile work can be divided into three classes according to structural behaviour difference, herringbone pattern, parquets pattern With running bond pattern.
Compared with prior art, the beneficial effects of the utility model are embodied in: the permeable tile work pavement structure, and design is closed Reason, structure are simple.By the way that solid cement concrete layer is arranged, the bearing capacity on road surface is significantly improved, while as construction period The current temporary pavement material layer of road vehicle, utmostly to prevent Construction traffic and road cement from blocking permeable pavement structure Permeable " channel " on surface;And when last paved surface layer of material, it can punch on it, under allowing the rainwater of infiltration to continue It seeps, guarantees enough rain penetration abilities, road surface not ponding, in below smooth discharge to road surface and surrounding greenery patches.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the graph of pore diameter distribution of the utility model solid cement concrete layer;
Fig. 3 is that permeable tile work surface layer is mated formation form schematic diagram in embodiment 1;
Fig. 4 is the form schematic diagram of mating formation of parquets pattern;
Fig. 5 is the form schematic diagram of mating formation of running bond pattern.
Wherein, 1 is permeable tile work surface layer, and 2 be coarse sand screed-coat, and 3 be solid cement concrete layer;4 be graded broken stone layer, 5 be anti-filter geotextiles, and 6 be soil matrix, and 7 be drilling, and 8 be high-intensitive floor tile, and 9 be permeable gap.
Specific embodiment
It elaborates below to the embodiments of the present invention, the present embodiment before being with technical solutions of the utility model It puts and is implemented, the detailed implementation method and specific operation process are given, but the protection scope of the utility model is unlimited In following embodiments.
Embodiment 1
A kind of permeable tile work pavement structure that solid cement concrete layer is set, as shown in Figure 1, broken including soil matrix 6, gradation Rock layers 4, solid cement concrete layer 3 and permeable tile work surface layer 1, are equipped with anti-filter geotextiles between soil matrix 6 and graded broken stone layer 4 5, coarse sand screed-coat 2 is equipped between permeable tile work surface layer and solid cement concrete layer 3, permeable tile work surface layer 1 is layed in coarse sand On screed-coat 2.
Specifically, solid cement concrete layer 3 is layed on graded broken stone layer 4.Tile work road surface 1 is more including mutually splicing Block high intensity tile work has 1 to 2cm permeable gap 9 between adjacent two blocks of high-intensitive tile works, and the compression strength of high-intensitive tile work is big In or be equal to 50MPa and flexural strength and be not less than 5Mpa, as shown in figure 3, the figure that high-intensitive floor tile 8 mutually splices in the present embodiment Case is herringbone pattern;As needed, the pattern that high-intensitive floor tile 8 mutually splices can also be parquets pattern (as shown in Figure 4) With running bond pattern (as shown in Figure 5).
Solid cement concrete layer 3 is close-graded cement concrete, and the traffic total amount of thickness foundation construction period is 12 To 20cm, compression strength is greater than or equal to 20MPa, flexural tensile strength is not less than 2.5MPa.The thickness of graded broken stone layer 4 exists Within the scope of 20 to 40cm, porosity 40%, partial size be 2 to 5cm.Soil matrix 6 is the native compacted lift of element, the soil matrix of element soil compacted lift 6 It is pressed in 93% or so.The thickness of coarse sand screed-coat 2 is within the scope of 2 to 3cm and ballast grain sizes are within the scope of 0.5 to 1cm.
As shown in Fig. 2, drilling 7 can be arranged on solid cement concrete layer 3 when construction, aperture is filled 5 to 10cm Rubble, the spacing of wells are not less than 3 times of apertures with apart from roadside.

Claims (10)

1. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged, which is characterized in that the pavement structure is from upper past Under successively include permeable tile work surface layer, coarse sand screed-coat, solid cement concrete layer and graded broken stone layer, the graded broken stone Layer is laid on soil matrix, and the drilling being evenly arranged is equipped in the solid cement concrete layer.
2. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 1, feature exist In the material of the solid cement concrete layer is close-graded cement stabilizing concrete, the solid cement concrete layer With a thickness of 12~20cm.
3. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 1 or 2, feature It is, the drilling runs through solid cement concrete layer, and the aperture of the drilling is 5~10cm, and the hole of two neighboring drilling The heart fills rubble in the drilling away from 3 times of boring apertures are not less than.
4. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 1, feature exist In the permeable tile work surface layer is spliced by the high-intensitive floor tile of muti-piece rectangle, is set between adjacent two pieces high-intensitive floor tiles There is 1~2cm permeable gap.
5. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 4, feature exist In the laying shape of the high intensity floor tile is in herringbone pattern, parquets pattern or running bond pattern.
6. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 5, feature exist In the laying shape of the high intensity floor tile is in herringbone pattern.
7. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 1, feature exist In, the coarse sand screed-coat uses partial size for the rubble of 0.5~1cm, the coarse sand screed-coat with a thickness of 2~3cm.
8. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 1, feature exist In, the graded broken stone layer uses partial size for the rubble of 2~5cm, and the porosity of the graded broken stone layer is 35%~50%, The graded broken stone layer with a thickness of 20~40cm.
9. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 1, feature exist In equipped with anti-filter geotextiles between the graded broken stone layer and soil matrix.
10. a kind of permeable tile work pavement structure that solid cement concrete layer is arranged according to claim 1, feature exist In the soil compaction degree is 90%~95%.
CN201821608817.7U 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that solid cement concrete layer is set Active CN209227320U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821608817.7U CN209227320U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that solid cement concrete layer is set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821608817.7U CN209227320U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that solid cement concrete layer is set

Publications (1)

Publication Number Publication Date
CN209227320U true CN209227320U (en) 2019-08-09

Family

ID=67499401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821608817.7U Active CN209227320U (en) 2018-09-30 2018-09-30 A kind of permeable tile work pavement structure that solid cement concrete layer is set

Country Status (1)

Country Link
CN (1) CN209227320U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110853483A (en) * 2019-11-05 2020-02-28 西安科技大学 Sponge city infiltration road function demonstration model
CN110880270A (en) * 2019-11-05 2020-03-13 西安科技大学 Sponge city brick function demonstration model of mating formation that permeates water
CN114592396A (en) * 2022-03-14 2022-06-07 济南四建集团建材有限责任公司 Rapid permeable pavement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110853483A (en) * 2019-11-05 2020-02-28 西安科技大学 Sponge city infiltration road function demonstration model
CN110880270A (en) * 2019-11-05 2020-03-13 西安科技大学 Sponge city brick function demonstration model of mating formation that permeates water
CN114592396A (en) * 2022-03-14 2022-06-07 济南四建集团建材有限责任公司 Rapid permeable pavement

Similar Documents

Publication Publication Date Title
CN209227320U (en) A kind of permeable tile work pavement structure that solid cement concrete layer is set
CN104480963B (en) The constructional method of a kind of precast module type panel geo-grid reinforced tailing sand barricade
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN109958018A (en) A kind of heavy rainfall urban road water-permeable pavement structure and its construction method
CN108517733A (en) The pavement structure and urban road of urban road
CN104452510B (en) Immediate construction method of rural road
CN106758637A (en) A kind of road and its construction method for having enough to meet the need quick-assembling
CN205368926U (en) Garden way supercrust structure that water permeability is strong
CN104846712A (en) Hard road construction method by naturally recharging underground water
CN109944125A (en) A kind of asphalt concrete pavement structure and its paving process
CN207295358U (en) A kind of platform back of the body for preventing bumping at bridge-head and road surface drainage structure
CN209338948U (en) A kind of water-permeable pavement structure
CN108086087A (en) A kind of construction method of porous pavement
CN110820456A (en) Anti-settling and replacement-filling alternate airport runway and construction method thereof
CN202849895U (en) Structure for repairing urban asphalt pavements
CN207244389U (en) A kind of shallow-layer water storage road surface water-permeable brick
CN209443316U (en) A kind of permeable tile work pavement structure that closely knit asphalt macadam concrete layer is set
CN207484193U (en) Permeable road structure
CN110846966A (en) Highway pavement structure and construction method thereof
CN208293331U (en) The pavement structure and urban road of urban road
CN105421189A (en) Road structure provided with water permeable retaining walls
CN108941145B (en) Intermediate covering layer of refuse landfill and preparation method and application thereof
CN215976685U (en) Anti-crack pavement structure
CN1186504C (en) Ground foundation delay consolidation treatment method
CN205259025U (en) Road structure with barricade permeates water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant