CN209194539U - A kind of railway engineering foundation pit construction bracket - Google Patents

A kind of railway engineering foundation pit construction bracket Download PDF

Info

Publication number
CN209194539U
CN209194539U CN201822054913.8U CN201822054913U CN209194539U CN 209194539 U CN209194539 U CN 209194539U CN 201822054913 U CN201822054913 U CN 201822054913U CN 209194539 U CN209194539 U CN 209194539U
Authority
CN
China
Prior art keywords
fixedly installed
upright bar
groups
foundation pit
railway engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822054913.8U
Other languages
Chinese (zh)
Inventor
韩宜康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Institute of Railway Technology
Original Assignee
Nanjing Institute of Railway Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Institute of Railway Technology filed Critical Nanjing Institute of Railway Technology
Priority to CN201822054913.8U priority Critical patent/CN209194539U/en
Application granted granted Critical
Publication of CN209194539U publication Critical patent/CN209194539U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of railway engineering foundation pit construction brackets, including divider, upright bar, fixed frame, support rod and protective plate, the top of the upright bar is fixedly installed with divider by mounting base, three groups of fixing pieces are fixedly installed on the outside of the upright bar, connecting plate is fixedly installed on the inside of the fixing piece, protective plate and web plate are fixedly installed between two groups of connecting plates, the outside of the upright bar is fixedly installed with two groups of fixed frames far from one end of fixing piece, support rod is fixedly installed with below the fixed frame, the bottom of the upright bar is fixedly installed with pedestal.The utility model, which is equipped with divider, can increase the safety of device, make it that can construct to side higher, equipment is separately sought without staff, it ensure that the safety of staff's operation, the stability of apparatus structure can be increased by being equipped with fixed frame simultaneously, the safety for improving device, improves the use safety coefficient of integral support.

Description

A kind of railway engineering foundation pit construction bracket
Technical field
The utility model relates to railway engineering technology field, specially a kind of railway engineering foundation pit construction bracket.
Background technique
Foundation pit is often used in railway engineering, in foundation pit operation, in order to guarantee the safety of staff, is needed Some construction brackets are built, construction personnel stands and carries out construction on construction bracket, and construction bracket is mounted on load-bearing mostly On wall, when using construction bracket, to prevent personnel or the case where construction material falls, as wind is big or personnel between It is crowded can cause falling for personnel or construction material, there are biggish security risks, with the continuous hair of building trade , there is different types of fall arrest construction bracket in the market in exhibition, and fall arrest construction bracket includes construction bracket Main body and protective fence, still, fall arrest construction bracket on the market at present, the structural soundness difference of protective fence entirety and strong Spend low, protective fence is easy to appear the fracture phenomena that fractures in use, so that when construction personnel builds on construction bracket It when building construction, is prone to accidents, the use safety coefficient of construction bracket entirety is low, it is difficult to meet the use need of building trade It asks.
Utility model content
The purpose of this utility model is to provide a kind of railway engineering foundation pit construction brackets, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of railway engineering foundation pit construction bracket, Including divider, upright bar, fixed frame, support rod and protective plate, the top of the upright bar is fixedly installed with divider by mounting base, institute It states and is fixedly installed with three groups of fixing pieces on the outside of upright bar, connecting plate, two groups of companies are fixedly installed on the inside of the fixing piece Protective plate and web plate are fixedly installed between fishplate bar, the outside of the upright bar is fixedly installed with two groups far from one end of fixing piece and consolidates Determine frame, support rod is fixedly installed with below the fixed frame, the bottom of the upright bar is fixedly installed with pedestal, the pedestal Top movable is equipped with perforative holdfast, is fixedly installed with top plate at the top of the holdfast.
Preferably, the inside of the fixed frame is fixedly installed with connector, and the side of connector is fixed by fixing bolt Link block is installed, and one end of link block is fixedly installed with fixed strut.
Preferably, it is fixedly installed with attachment base at the top of the support rod, fixture block is fixedly installed on the outside of attachment base, blocks Installation part is fixedly installed on the outside of block.
Preferably, the inside of the protective plate is fixedly installed with fixed link, and the inside of fixed link is fixedly installed with protective net, And the two sides of protective plate are fixedly installed with two groups of position-limited racks.
Preferably, the inside of the divider is fixedly installed with two groups of baffles, and the inside of baffle is fixedly installed with connecting rod.
Preferably, the bottom of the pedestal is fixedly installed with bottom plate, and the bottom of bottom plate is fixedly installed with extension rod.
Compared with prior art, the utility model has the beneficial effects that the railway engineering foundation pit construction bracket passes through peace The safety that device can be increased equipped with divider makes it that can construct to side higher, separately seeks equipment without staff, It ensure that the safety of staff's operation, while the stability of apparatus structure can be increased by being equipped with fixed frame, improve device Safety, improve the use safety coefficient of integral support, meet the use demand of building trade, can by being equipped with support rod The stability for improving device, increases the rock-steady structure of device, while can further improve the stabilization of device by being equipped with pedestal Structure improves the installation effectiveness of device, can increase the installation of device by being equipped with protective net, prevent rubble from falling, made At safety accident.
Detailed description of the invention
Fig. 1 is the side structure schematic diagram of the utility model;
Fig. 2 is the positive structure schematic of the utility model;
Fig. 3 is the divider structural schematic diagram of the utility model;
Fig. 4 is the fixed rack structure schematic diagram of the utility model.
In figure: 1, divider;101, baffle;102, connecting rod;2, fixing piece;201, connecting plate;3, upright bar;301, it installs Seat;4, fixed frame;401, connector;402, fixing bolt;403, link block;404, fixed strut;5, support rod;501, it installs Part;502, fixture block;503, attachment base;6, pedestal;601, bottom plate;602, extension rod;7, holdfast;701, top plate;8, protective plate; 801, fixed link;802, protective net;803, position-limited rack;9, web plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " after The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to detachably connect It connects, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
Fig. 1-4 is please referred to, a kind of embodiment provided by the utility model: a kind of railway engineering foundation pit construction bracket, packet Divider 1, upright bar 3, fixed frame 4, support rod 5 and protective plate 8 are included, the top of upright bar 3 is fixedly installed with divider by mounting base 301 1, upright bar 3 increases the rock-steady structure of device, provides fixed position for fixing piece 2, mounting base 301 can provide fixed bit for divider 1 It sets, divider 1 can provide construction location for staff, while can also protect the safety of surface personnel, prevent falling from high altitude Object injures by a crashing object, and the outside of upright bar 3 is fixedly installed with three groups of fixing pieces 2, can fixed connecting plate 201 by the cooperation of two groups of fixing pieces 2 Position, the inside of fixing piece 2 is fixedly installed with connecting plate 201, and connecting plate 201 can provide fixed bit for protective plate 8 and web plate 9 It sets, protective plate 8 and web plate 9 is fixedly installed between two groups of connecting plates 201, the construction safety of 8 staff of protective plate prevents wall Body slides, and damages, and web plate 9 can prevent wall rubble from sliding, and the outside of upright bar 3 is fixedly mounted far from one end of fixing piece 2 There are two groups of fixed frames 4, by fixed frame 4 by device and wall connecting, increases the stability of device, the lower section of fixed frame 4 is fixed Support rod 5 is installed, support rod 5 has a certain degree with 3 shape of upright bar, and make its sustainable upright bar 3, increases the stability of device, The bottom of upright bar 3 is fixedly installed with pedestal 6, and pedestal 6 can increase the contact surface on device and ground, improves the stability of device, bottom The top movable of seat 6 is equipped with perforative holdfast 7, and holdfast 7 can facilitate the position of firm banking 6, and the top of holdfast 7 is fixedly mounted There is top plate 701, top plate 701 can facilitate fixed holdfast 7, provide forced position for fixed holdfast 7.
Further, the inside of fixed frame 4 is fixedly installed with connector 401, can be fixed by fixed frame 4 by connector 401 Outgoing in upright bar 3, the side of connector 401 is fixedly installed with link block 403 by fixing bolt 402, and fixing bolt 402 can incite somebody to action Link block 403 is securely seated between the side of connector 401, and link block 403 can be such that fixed strut 404 connect with connector 401, And one end of link block 403 is fixedly installed with fixed strut 404, fixed strut 404 can go deep into metope, increase the stabilization of device Property.
Further, the top of support rod 5 is fixedly installed with attachment base 503, and attachment base 503 can fix the position of support rod 5, The outside of attachment base 503 is fixedly installed with fixture block 502, can be connected attachment base 503 and installation part 501 by fixture block 502 and bolt It connects, the outside of fixture block 502 is fixedly installed with installation part 501, and support rod 5 can be fixed on to the outer of upright bar 3 by installation part 501 Side.
Further, the inside of protective plate 8 is fixedly installed with fixed link 801, and fixed link 801 can provide solid for protective net 802 Positioning is set, and the inside of fixed link 801 is fixedly installed with protective net 802, and protective net 802 can prevent wall falling object, injure work by a crashing object Personnel guarantee the safety of site operation, and the two sides of protective plate 8 are fixedly installed with two groups of position-limited racks 803, and protective plate 8 passes through limit Position frame 803 can increase the stability of protective plate 8 with connector 401.
Further, the inside of divider 1 is fixedly installed with two groups of baffles 101, and baffle 101 can provide fixation for connecting rod 102 Position, the inside of baffle 101 are fixedly installed with connecting rod 102, and connecting rod 102 can prevent rubble falling from high altitude, guarantee work The safety of environment.
Further, the bottom of pedestal 6 is fixedly installed with bottom plate 601, and bottom plate 601 can increase the contact surface of pedestal 6 Yu ground, The stability of device is improved, the bottom of bottom plate 601 is fixedly installed with extension rod 602, and extension rod 602 may extend to ground, make it It is firmly fixed on ground, is not moved, the rock-steady structure of device is improved.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of railway engineering foundation pit construction bracket, including divider (1), upright bar (3), fixed frame (4), support rod (5) and anti- Backplate (8), it is characterised in that: the top of the upright bar (3) is fixedly installed with divider (1), the upright bar by mounting base (301) (3) it is fixedly installed with three groups of fixing pieces (2) on the outside of, is fixedly installed with two groups of connecting plates on the inside of the fixing piece (2) (201), protective plate (8) and web plate (9) are fixedly installed between two groups of connecting plates (201), the outside of the upright bar (3) is remote One end from fixing piece (2) is fixedly installed with two groups of fixed frames (4), is fixedly installed with support rod below the fixed frame (4) (5), the bottom of the upright bar (3) is fixedly installed with pedestal (6), and the top movable of the pedestal (6) is equipped with perforative holdfast (7), top plate (701) are fixedly installed at the top of the holdfast (7).
2. a kind of railway engineering foundation pit construction bracket according to claim 1, it is characterised in that: the fixed frame (4) Inside be fixedly installed with connector (401), the side of connector (401) is fixedly installed with connection by fixing bolt (402) Block (403), and one end of link block (403) is fixedly installed with fixed strut (404).
3. a kind of railway engineering foundation pit construction bracket according to claim 1, it is characterised in that: the support rod (5) Top be fixedly installed with attachment base (503), be fixedly installed on the outside of attachment base (503) fixture block (502), fixture block (502) Outside is fixedly installed with installation part (501).
4. a kind of railway engineering foundation pit construction bracket according to claim 1, it is characterised in that: the protective plate (8) Inside be fixedly installed with fixed link (801), the inside of fixed link (801) is fixedly installed with protective net (802), and protective plate (8) two sides are fixedly installed with two groups of position-limited racks (803).
5. a kind of railway engineering foundation pit construction bracket according to claim 1, it is characterised in that: the divider (1) Inside is fixedly installed with two groups of baffles (101), and the inside of baffle (101) is fixedly installed with connecting rod (102).
6. a kind of railway engineering foundation pit construction bracket according to claim 1, it is characterised in that: the pedestal (6) Bottom is fixedly installed with bottom plate (601), and the bottom of bottom plate (601) is fixedly installed with extension rod (602).
CN201822054913.8U 2018-12-08 2018-12-08 A kind of railway engineering foundation pit construction bracket Expired - Fee Related CN209194539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822054913.8U CN209194539U (en) 2018-12-08 2018-12-08 A kind of railway engineering foundation pit construction bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822054913.8U CN209194539U (en) 2018-12-08 2018-12-08 A kind of railway engineering foundation pit construction bracket

Publications (1)

Publication Number Publication Date
CN209194539U true CN209194539U (en) 2019-08-02

Family

ID=67428212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822054913.8U Expired - Fee Related CN209194539U (en) 2018-12-08 2018-12-08 A kind of railway engineering foundation pit construction bracket

Country Status (1)

Country Link
CN (1) CN209194539U (en)

Similar Documents

Publication Publication Date Title
CN205822747U (en) Architectural engineering scaffold
CN209194539U (en) A kind of railway engineering foundation pit construction bracket
CN109371976A (en) A kind of railway engineering foundation pit construction bracket
CN202767546U (en) External protective rack
CN205532243U (en) Electric power overhauls with support of ascending a height
CN204754248U (en) Super high -rise building construction elevator regularization connects material platform
CN208633574U (en) It is a kind of with preventing people from falling the safety net of effect
CN214740094U (en) High-altitude falling object blocking fence for building construction
CN207149985U (en) 35kV and following outdoor equipment maintenance safety belt supporting frame
CN206621673U (en) Regularization escape device for temporary building
CN206769361U (en) A kind of attachment means of the plug-in expanded metal lath of adhering lifting integral-scaffold
GB2493503A (en) Cantilever scaffold frame
CN216239854U (en) Subway station foundation pit steel support anti-falling protection device
CN110241741A (en) Inspection platform on the outside of a kind of large bridge Bumper rails
CN209585605U (en) Climbing formwork lower hanging protection system
CN209780180U (en) Insulating scaffold for power transmission line construction
CN212129507U (en) Safety protection canopy for building engineering
CN204038917U (en) Detachable external hanging type operating platform
CN208023984U (en) Building safety protective device
CN204103309U (en) A kind of composite type inspection platform
CN203163759U (en) Instrument fixing stand
CN220789430U (en) Fence for bridge construction
CN213477715U (en) Building construction is with rail guard that has concatenation mechanism
CN204703544U (en) A kind of safe and practical high rise elevator well construction guard system
CN213837959U (en) High tension transmission line angle steel tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190802

Termination date: 20191208

CF01 Termination of patent right due to non-payment of annual fee