CN209179774U - Tunnel excavation builder's staging - Google Patents

Tunnel excavation builder's staging Download PDF

Info

Publication number
CN209179774U
CN209179774U CN201821923883.3U CN201821923883U CN209179774U CN 209179774 U CN209179774 U CN 209179774U CN 201821923883 U CN201821923883 U CN 201821923883U CN 209179774 U CN209179774 U CN 209179774U
Authority
CN
China
Prior art keywords
fixed
builder
bull stick
pedestal
staging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821923883.3U
Other languages
Chinese (zh)
Inventor
汤仕龙
虞金球
毛攀
柴长城
柴喜林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jinxi Industrial Co Ltd
Original Assignee
Jiangxi Jinxi Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Jinxi Industrial Co Ltd filed Critical Jiangxi Jinxi Industrial Co Ltd
Priority to CN201821923883.3U priority Critical patent/CN209179774U/en
Application granted granted Critical
Publication of CN209179774U publication Critical patent/CN209179774U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of tunnel excavation builder's staging, comprising: pedestal;Support plate, the basal sliding of the support plate is in the top of the pedestal;Transverse slat, the two sides of the transverse slat are both secured between two opposite sides of the support plate;The bottom end of first bull stick, first bull stick rotates in the top of the transverse slat;Second bull stick, the bottom end of second bull stick rotate in the top of first bull stick;Placement plate, the lower rotation of the placement plate is in the top of second bull stick.Tunnel excavation builder's staging provided by the utility model, rock has been buffered to the impact force of arc panel, extend arc panel service life, the rock when construction or country rock generate rock burst above bracket is avoided to fall the construction worker hurt on tunnel excavation rack, safety when work is substantially increased, the builder's staging does not need to improve the using effect of builder's staging all the time by artificial movement.

Description

Tunnel excavation builder's staging
Technical field
The utility model relates to builder's staging technical field more particularly to a kind of tunnel excavation builder's stagings.
Background technique
Tunnel Engineering be build underground, it is underwater, massif building, place an iron railway, build highway, a series of building of carrying out If work, being broadly divided into tunnel planning, exploration, design, perforation control measurement and construction working, tunnel can divide according to position For mountain tunnel, submerged tunnel and city tunnel three categories, wherein building most is mountain tunnel.
Existing constructing tunnel needs to use builder's staging, generally by door frame, flexible operation post, geomantic omen electrical interface, lifting The builder's staging of the compositions such as equipment, running mechanism, but current builder's staging is excessively single, can not realize that well tunnel is opened The demand of digging cannot be supported rock in construction, will cause rock and fall the construction work hurt on tunnel excavation rack Industry personnel reduce safety when work, cause unnecessary economic loss, and there are security hidden troubles, reduce work Efficiency.
Utility model content
The technical issues of the utility model solves is to provide a kind of safe tunnel excavation builder's staging.
In order to solve the above technical problems, tunnel excavation builder's staging provided by the utility model, comprising: pedestal;Branch Fagging, the basal sliding of the support plate is in the top of the pedestal;Transverse slat, the two sides of the transverse slat are both secured to described in two Between the opposite side of support plate;The bottom end of first bull stick, first bull stick rotates in the top of the transverse slat;Second turn Bar, the bottom end of second bull stick rotate in the top of first bull stick;Placement plate, the lower rotation of the placement plate is in institute State the top of the second bull stick;The side of the support plate is fixed in the side of first workbench, first workbench;Second work Make platform, the side of the support plate is fixed in the side of second workbench;Third workbench, the one of the third workbench The top of the support plate is fixed in side;The third workbench is fixed in telescopic spring bar, the bottom end of the telescopic spring bar Top;The top of the telescopic spring bar is fixed in arc panel, the bottom of the arc panel;Spring, one end of the spring It is fixed on the bottom of the arc panel, the top of the third workbench is fixed in the bottom end of the spring;Telecontrol equipment, it is described The bottom of the pedestal is fixed at the top of telecontrol equipment.
Preferably, the telecontrol equipment includes motor, and the output shaft of the motor is fixedly connected with the first belt pulley, described The surface of first belt pulley is sequentially connected with the second belt pulley by belt, is fixedly connected at the axle center of second belt pulley Rotating bar, the both ends of the rotating bar are fixedly connected to runner, and the two sides on the surface of the rotating bar are rotatably connected to branch Bracer, the top of the supporting block are fixedly connected with the bottom of the pedestal.
Preferably, the two sides at the top of the pedestal are fixedly connected to ladder, the top of the ladder and the third The bottom of workbench is fixedly connected.
Preferably, be fixedly connected with the first telescopic rod at the top of the transverse slat, the top of first telescopic rod with it is described The bottom of placement plate is fixedly connected.
Preferably, the side of the support plate is fixedly connected with fixed plate, and the surface of the fixed plate is provided with threaded rod, And one end of threaded rod runs through the pedestal and extends to the bottom of the pedestal.
Preferably, the two sides of the bottom of the pedestal are fixedly connected to the second telescopic rod.
Preferably, the bottom end of second telescopic rod is fixedly connected with mounting blocks, and the two sides of the bottom of the mounting blocks are equal It is rotatably connected to rotation seat, the surface pivots of the rotation seat are connected with bull stick.
Compared with the relevant technologies, tunnel excavation builder's staging provided by the utility model is had the advantages that:
The utility model provides a kind of tunnel excavation builder's staging, is fixed on third by the bottom end of telescopic spring bar The top of workbench;The top of telescopic spring bar is fixed in arc panel, the bottom of arc panel;One end of spring, spring is fixed on The top of third workbench is fixed in the bottom of arc panel, the bottom end of spring, has buffered rock to the impact force of arc panel, has extended Arc panel service life avoids the rock when construction or country rock generate rock burst above bracket from falling and hurts tunnel excavation platform Construction worker on frame has substantially increased safety when work, has been fixedly connected with first by the output shaft of motor The surface of belt pulley, the first belt pulley is sequentially connected with the second belt pulley, fixed company at the axle center of the second belt pulley by belt Be connected to rotating bar, the both ends of fixed link are fixedly connected to runner, convenient for being moved to builder's staging, do not need all the time by It is artificial mobile, the using effect of builder's staging is improved, the working efficiency of tunnel excavation is improved.
Detailed description of the invention
Fig. 1 is a kind of structural representation of preferred embodiment of tunnel excavation builder's staging provided by the utility model Figure;
Fig. 2 is the structural schematic diagram of telecontrol equipment provided by the utility model;
Fig. 3 is the partial enlarged view that A goes out in Fig. 1.
[description of symbols]
1, pedestal, 2, support plate, 3, transverse slat, the 4, first bull stick, the 5, second bull stick, 6, placement plate, the 7, first workbench, 8, Second workbench, 9, third workbench, 10, spring, 11, telescopic spring bar, 12, arc panel, 13, ladder, 14, first is flexible Bar, 15, fixed plate, 16, threaded rod, 17, telecontrol equipment, 171, motor, the 172, first belt pulley, the 173, second belt pulley, 174, rotating bar, 175, runner, 176, supporting block, the 18, second telescopic rod, 19, mounting blocks, 20, rotation seat, 21, bull stick.
Specific embodiment
In order to make the technical problems, technical solutions and advantages to be solved by the utility model clearer, below in conjunction with attached drawing And specific embodiment is described in detail.
Please refer to Fig. 1, Fig. 2 and Fig. 3, wherein Fig. 1 is tunnel excavation builder's staging provided by the utility model A kind of preferred embodiment structural schematic diagram;Fig. 2 is the structural schematic diagram of telecontrol equipment provided by the utility model;Fig. 3 is The partial enlarged view that A goes out in Fig. 1.A kind of tunnel excavation builder's staging, comprising: pedestal 1;Support plate 2, the support plate 2 Basal sliding in the top of the pedestal 1;Transverse slat 3, it is opposite that the two sides of the transverse slat 3 are both secured to two support plates 2 Side between;First bull stick 4, the bottom end of first bull stick 4 rotate in the top of the transverse slat 3;Second bull stick 5, it is described The bottom end of second bull stick 5 rotates in the top of first bull stick 4;Placement plate 6, the lower rotation of the placement plate 6 is in described The top of second bull stick 5;The side of the support plate 2 is fixed in first workbench 7, the side of first workbench 7;Second The side of the support plate 2 is fixed in workbench 8, the side of second workbench 8;Third workbench 9, convenient for different positions The tunnel set works, and the top of the support plate 2 is fixed in the side of the third workbench 9;Telescopic spring bar 11, institute The top of the third workbench 9 is fixed in the bottom end for stating telescopic spring bar 11;The bottom of arc panel 12, the arc panel 12 is solid Due to the top of the telescopic spring bar 11;The bottom of the arc panel 12, institute are fixed in spring 10, one end of the spring 10 The top of the third workbench 9 is fixed in the bottom end for stating spring 10;The top of telecontrol equipment 17, the telecontrol equipment 17 is fixed In the bottom of the pedestal 1.
The telecontrol equipment 17 includes motor 171, and the power supply of motor 171 is connected with external power supply, the motor 171 Output shaft is fixedly connected with the first belt pulley 172, and the surface of first belt pulley 172 is sequentially connected with the second skin by belt Belt wheel 173 is fixedly connected with rotating bar 174 at the axle center of second belt pulley 173, and the both ends of the rotating bar 174 are solid Surely it is connected with runner 175, the two sides on the surface of the rotating bar 174 are rotatably connected to supporting block 176, the supporting block 176 Top be fixedly connected with the bottom of the pedestal 1.
The two sides at the top of the pedestal 1 are fixedly connected to ladder 13, the top of the ladder 13 and the third work The bottom for making platform 9 is fixedly connected, and is facilitated staff to climb up builder's staging and is worked.
The top of the transverse slat 3 is fixedly connected with the first telescopic rod 14, and the top of first telescopic rod 14 is put with described The bottom for setting plate 6 is fixedly connected, convenient for running tool to construction personnel.
The side of the support plate 2 is fixedly connected with fixed plate 15, and the surface of the fixed plate 15 is provided with threaded rod 16, And one end of threaded rod 16 runs through the pedestal 1 and extends to the bottom of the pedestal 1.Convenient for mobile support plate 2 into Row is fixed.
The two sides of the bottom of the pedestal 1 are fixedly connected to the second telescopic rod 18.
The bottom end of second telescopic rod 18 is fixedly connected with mounting blocks 19, and the two sides of the bottom of the mounting blocks 19 turn Dynamic to be connected with rotation seat 20, the surface pivots of the rotation seat 20 are connected with bull stick 21, convenient for builder's staging is fixed, mention The high stability of builder's staging.
The working principle of tunnel excavation builder's staging provided by the utility model is as follows:
When work: starting motor 171 drives the rotation of the first belt pulley 172, and the rotation of the first belt pulley 172 drives the second skin Belt wheel 173 rotates, and the rotation of the second belt pulley 173 drives rotating bar 174 to rotate, and the rotation of rotating bar 174 drives runner 175 to rotate, To be moved to operation platform, pressure is generated to arc panel 12 by rock, drives telescopic spring bar 11 mobile, arc panel 12 mobile drive springs 10 are mobile, when needing tool, start telescopic rod 14, drive the rotation of the first bull stick 4, the first 4 turns of bull stick Dynamic to drive the rotation of the second bull stick 5, the rotation of the second bull stick 5 drives placement plate 6 mobile, when the work is required, is creeped by ladder 13 It works to designated position, to reach a kind of tunnel excavation builder's staging.
Compared with the relevant technologies, tunnel excavation builder's staging provided by the utility model has following beneficial to effect Fruit:
The utility model provides a kind of tunnel excavation builder's staging, is fixed on by the bottom end of telescopic spring bar 11 The top of three workbench 9;The top of telescopic spring bar 11 is fixed in arc panel 12, the bottom of arc panel 12;Spring 10, spring 10 One end be fixed on the bottom of arc panel 12, the bottom end of spring 10 is fixed on the top of third workbench 9, has buffered rock to arc The impact force of shape plate 12 extends 12 service life of arc panel, avoids when construction or country rock generate rock burst above bracket Rock falls the construction worker hurt on tunnel excavation rack, has substantially increased safety when work, has passed through motor 171 output shaft is fixedly connected with the first belt pulley 172, and the surface of the first belt pulley 172 is sequentially connected with second by belt Belt pulley 173 is fixedly connected with rotating bar 174 at the axle center of second belt pulley 173, and the both ends of rotating bar 174 are fixedly connected with There is runner 175, convenient for moving builder's staging, does not need to improve the use of builder's staging all the time by artificial movement Effect improves the working efficiency of tunnel excavation.
The above is preferred embodiments of the present invention, it is noted that for the ordinary skill of the art For personnel, under the premise of not departing from principle described in the utility model, it can also make several improvements and retouch, these improvement It also should be regarded as the protection scope of the utility model with retouching.

Claims (7)

1. a kind of tunnel excavation builder's staging characterized by comprising
Pedestal;
Support plate, the basal sliding of the support plate is in the top of the pedestal;
Transverse slat, the two sides of the transverse slat are both secured between two opposite sides of the support plate;
The bottom end of first bull stick, first bull stick rotates in the top of the transverse slat;
Second bull stick, the bottom end of second bull stick rotate in the top of first bull stick;
Placement plate, the lower rotation of the placement plate is in the top of second bull stick;
The side of the support plate is fixed in the side of first workbench, first workbench;
The side of the support plate is fixed in the side of second workbench, second workbench;
The top of the support plate is fixed in the side of third workbench, the third workbench;
The top of the third workbench is fixed in telescopic spring bar, the bottom end of the telescopic spring bar;
The top of the telescopic spring bar is fixed in arc panel, the bottom of the arc panel;
The bottom of the arc panel is fixed in spring, one end of the spring, and the third work is fixed in the bottom end of the spring Make the top of platform;
Telecontrol equipment is fixed on the bottom of the pedestal at the top of the telecontrol equipment.
2. tunnel excavation builder's staging according to claim 1, which is characterized in that the telecontrol equipment includes electricity Machine, the output shaft of the motor are fixedly connected with the first belt pulley, and the surface of first belt pulley is sequentially connected by belt There is the second belt pulley, rotating bar is fixedly connected at the axle center of second belt pulley, the both ends of the rotating bar are fixed to be connected It is connected to runner, the two sides on the surface of the rotating bar are rotatably connected to supporting block, the top of the supporting block and the pedestal Bottom be fixedly connected.
3. tunnel excavation builder's staging according to claim 1, which is characterized in that the two sides at the top of the pedestal It is fixedly connected to ladder, the top of the ladder is fixedly connected with the bottom of the third workbench.
4. tunnel excavation builder's staging according to claim 1, which is characterized in that the top of the transverse slat is fixed to be connected It is connected to the first telescopic rod, the top of first telescopic rod is fixedly connected with the bottom of the placement plate.
5. tunnel excavation builder's staging according to claim 1, which is characterized in that the side of the support plate is fixed It is connected with fixed plate, the surface of the fixed plate is provided with threaded rod, and one end of threaded rod through the pedestal and extends To the bottom of the pedestal.
6. tunnel excavation builder's staging according to claim 1, which is characterized in that the two sides of the bottom of the pedestal It is fixedly connected to the second telescopic rod.
7. tunnel excavation builder's staging according to claim 6, which is characterized in that the bottom end of second telescopic rod Mounting blocks are fixedly connected with, the two sides of the bottom of the mounting blocks are rotatably connected to rotation seat, and the surface of the rotation seat turns It is dynamic to be connected with bull stick.
CN201821923883.3U 2018-11-21 2018-11-21 Tunnel excavation builder's staging Active CN209179774U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821923883.3U CN209179774U (en) 2018-11-21 2018-11-21 Tunnel excavation builder's staging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821923883.3U CN209179774U (en) 2018-11-21 2018-11-21 Tunnel excavation builder's staging

Publications (1)

Publication Number Publication Date
CN209179774U true CN209179774U (en) 2019-07-30

Family

ID=67373650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821923883.3U Active CN209179774U (en) 2018-11-21 2018-11-21 Tunnel excavation builder's staging

Country Status (1)

Country Link
CN (1) CN209179774U (en)

Similar Documents

Publication Publication Date Title
CN205472513U (en) A lift platform for power plant equipment overhauls
CN207877176U (en) A kind of quick-lift attachreactor for road and bridge construction
CN110424270B (en) Anti-falling device for urban bridge construction
CN210366892U (en) Quick lifting means of instrument is used in civil engineering road and bridge construction
CN214834620U (en) Supporting platform for lighting well
CN209179774U (en) Tunnel excavation builder's staging
CN213204900U (en) Lifting device for be used for fitment
CN206595631U (en) A kind of transmission line of electricity servicing unit
CN211522924U (en) Bridge construction is with hanging basket convenient to adjusting position
CN209099747U (en) It prevents from reversing elevating scaffold
CN208252093U (en) A kind of tower-type transmission chain energy-saving beam pumping unit
CN205935603U (en) Electric overhaul equipment auxiliary device
CN202558578U (en) Dedicated manually operated lifting device for support
CN201953356U (en) Oil pumping machine
CN212799368U (en) Large-scale power equipment hoisting mounting frame
CN201202442Y (en) Balance energy-saving oil pumping machine
CN212222300U (en) Tunnel engineering excavation construction rack
CN210217097U (en) Hanging basket for outer wall of wind power generator
CN209831123U (en) But angle regulation's drill bit prosthetic devices
CN210885045U (en) Tower crane with vertical ladder anti-falling device
CN203555689U (en) Electric hanging basket for vertical shaft
CN207158729U (en) Fan blade hollow inspection platform intelligent balance lifting-point device
CN107161923B (en) Energy storage power station staff protection device
CN217025246U (en) Ascending device for maintaining power equipment
CN217025239U (en) Combined maintenance device for wind power generation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant