CN209179019U - A kind of foundation pit enclosure structure - Google Patents

A kind of foundation pit enclosure structure Download PDF

Info

Publication number
CN209179019U
CN209179019U CN201821915720.0U CN201821915720U CN209179019U CN 209179019 U CN209179019 U CN 209179019U CN 201821915720 U CN201821915720 U CN 201821915720U CN 209179019 U CN209179019 U CN 209179019U
Authority
CN
China
Prior art keywords
steel
pipe
water inlet
pipe pile
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821915720.0U
Other languages
Chinese (zh)
Inventor
刘勇
姚凯
胡俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan University
Original Assignee
Hainan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan University filed Critical Hainan University
Priority to CN201821915720.0U priority Critical patent/CN209179019U/en
Application granted granted Critical
Publication of CN209179019U publication Critical patent/CN209179019U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of foundation pit enclosure structures, foundation pit enclosure structure includes pipe curtain steel-pipe pile system, ground temperature exchange system and crown beam, wherein crown beam is cast in the top of pipe curtain steel-pipe pile system, and ground temperature exchange system is arranged in pipe curtain steel-pipe pile system and crown beam.Pipe curtain steel-pipe pile system is made of steel-pipe pile and steel sheet pile, steel-pipe pile is identical with the setting depth of steel sheet pile, ground temperature exchange system is made of water inlet manifold, outfall sewer, several water inlet pipes, several exit branch and pumping system, construction method are as follows: Step 1: the formulation of construction technology;Step 2: preparation of construction;Step 3: Specific construction;The utility model has the advantages that increasing deep pit monitor performance, water proof earth-retaining effect is good, and material utilization amount saves, and speed of application is fast, and rigidity is big, and safety is good, and environmental protection and energy saving benefit is prominent, applied widely.

Description

A kind of foundation pit enclosure structure
Technical field
The utility model relates to a kind of building enclosure, in particular to a kind of foundation pit enclosure structure.
Background technique
Currently, the reasonable selection of foundation pit enclosure structure, is the primary work of Foundation Pit Support Design, should according to geological conditions, The characteristics of requirement of surrounding enviroment and different support forms, cost etc. are comprehensive to be determined.General geological conditions is preferable, surrounding enviroment are wanted When asking looser, flexible support, such as soil nail wall can be used;When ambient enviroment requires high, more rigid supporting should be used Form is displaced with controlled level, such as campshed or diaphram wall.Currently used campshed or diaphram wall form mainly have Cast-in-situ bored pile+cement mixing method sealing, armored concrete diaphram wall, steel sheet pile, SMW engineering method stake etc..Wherein, it drills Bored concrete pile+cement mixing method sealing, armored concrete diaphram wall material be mainly armored concrete, consumptive material, energy consumption More, cost is high;Lap position between steel sheet pile is unable to satisfy stringenter water proof requirement, the steel sheet pile when excavation of foundation pit is deeper Often leak is serious;For the stake of SMW engineering method when excavation of foundation pit is deeper, cement earth pile stress cracking may cause water proof failure, and water Soil not can be recycled, and cost is still higher.
Foundation pit enclosure structure is largely a provisional engineering, and all uses of engineering are completed after foundation pit backfill How value makes full use of building enclosure, be the key that at present urgently to be resolved by the provisional permanent effect of engineering performance Problem.
Summary of the invention
Purpose of the utility model is to solve how by the provisional permanent effect of engineering performance, make full use of The problem of building enclosure and a kind of foundation pit enclosure structure provided.
Foundation pit enclosure structure provided by the utility model includes pipe curtain steel-pipe pile system, ground temperature exchange system and crown beam, Wherein crown beam is cast in the top of pipe curtain steel-pipe pile system, and ground temperature exchange system is arranged in pipe curtain steel-pipe pile system and crown beam.
Pipe curtain steel-pipe pile system is made of steel-pipe pile and steel sheet pile, and steel-pipe pile is identical with the setting depth of steel sheet pile, steel The bottom of tubular pole is provided with wedge angle, and the diameter of steel-pipe pile is 2m, and steel sheet pile is AZ26 shape steel plate.
Ground temperature exchange system is by water inlet manifold, outfall sewer, several water inlet pipes, several exit branch and pumping system Composition, wherein the connection of several water inlet pipes is on water inlet manifold and is plugged in steel-pipe pile, several exit branch connections are being discharged It is also plugged in steel-pipe pile on general pipeline, the setting depth of exit branch is lower than the setting depth of water inlet pipe, water inlet manifold and goes out The paragraph that supply mains is located at pipe curtain steel-pipe pile system is embedded in crown beam, and pumping system is located on water inlet manifold, water inlet manifold and One end of outfall sewer with need cool down or heat up building be connected, water inlet manifold, outfall sewer, several water inlet pipes and Several exit branch are PE pipe.
Pumping system is made of filter and water pump, and water pump is Vertical Heat water pump, and water pump is connected with water inlet manifold, mistake Filter is located at the junction of water pump and water inlet manifold.
The construction method of foundation pit enclosure structure provided by the utility model, method are as described below:
Step 1: the formulation of construction technology, Specific construction technique is as follows:
Preparation of construction → measurement net review and construction baseline arrangement → pile transport → immersed tube, the mechanical stake machine of hydraulic or hammering are in place → lifting, staking out → measurement and positioning → vibration, hammering or hydraulic pile sinking → pre-buried water inlet manifold, outfall sewer, water inlet pipe and When exit branch → formwork pours crown beam → construct more than positive negative zero, the cooling of water inlet manifold and outfall sewer and building or Heating device is connected, and pumping system is arranged on water inlet manifold, pumping system includes filter and water pump;
Step 2: preparation of construction:
1), mechanical to prepare: with reliable performance, comply with standard, the construction machinery of A wide selection of colours and designs and equipment, done before construction The maintenance of good mechanical equipment, test-run a machine work, it is ensured that all go well operation in construction period, the mechanical equipment of preparation include: immersed tube, The mechanical stake machine of hydraulic or hammering;Measuring instrument;Filter and water pump in pumping system;
2), material prepares: the material of preparation has: steel-pipe pile;Steel sheet pile;Concrete;Reinforcing bar;The PE of different model is managed, PE Pipe includes: water inlet manifold, outfall sewer, water inlet pipe and exit branch;Coating steel pipe and template;
3) building waste, house refuse, weeds, tree root and the cultivated plant soil of earth's surface, Farm Planning: are removed;Smooth location is extremely Designed elevation determines the sequence of construction of reasonable according to the requirement of design document and construction organization plan;
Step 3: construction method, concrete construction method is as follows:
1), the construction of steel-pipe pile and steel sheet pile and pre-buried water inlet manifold, outfall sewer, water inlet pipe and exit branch, tool Body is as follows:
1., stake machine enter scene, according to designing pile length, carry out equipment assembling;
2., stake machine it is in place, stake machine moves at pre- piling position, it is ensured that pile position deviation≤50mm, perpendicularity deviation≤0.5%;
3., vibration, hammering or hydraulic steel pipe stake and steel sheet pile;
4., pre-buried water inlet manifold, outfall sewer, water inlet pipe and exit branch, water is filled in steel-pipe pile first, then Water inlet pipe and exit branch are inserted into steel-pipe pile, the setting depth of exit branch is lower than the setting depth of water inlet pipe, into The top of water branch pipe is connected with the water inlet manifold in crown beam, and the top of exit branch is connected with the outfall sewer in crown beam;
5., formwork pour crown beam;
2) when, constructing more than positive negative zero, water inlet manifold and outfall sewer are connected with the cooling of building or heating device, Pumping system is assembled on water inlet manifold, pumping system includes filter and water pump.
Stake machine is D128 diesel oil hammer stake machine, diesel hammer upper piston weight: 12800Kg;The every hammer blow energy of diesel hammer: 426500Nm;Diesel hammer cycle: 36-45i/min;Diesel hammer maximum explosive force: 3600KN.
Water pump is Vertical Heat water pump, the flow of water pump is 100 cubic metres/per hour, and 30 meters of the lift of water pump, the function of water pump 15 kilowatts of rate, the material of performance of over current component of water pump is 316 stainless steels, and water pump is driven by variable-frequency motor, heat-exchanger pump, filter and frequency conversion Motor is the assembling of existing equipment, therefore concrete model and specification are not repeated.
The utility model has the beneficial effects that
Technical solution provided by the utility model can combine pattern foundation pit supporting structure with using underground shallow layer ground temperature, utilize the two Respective advantage.The bending resistance of building enclosure can be improved in pipe curtain steel-pipe pile, increases deep pit monitor performance, water proof earth-retaining effect Good, material utilization amount saves, and speed of application is fast, and rigidity is big, and safety is good, and environmental protection and energy saving benefit is prominent, applied widely.Ground temperature exchange System can efficiently use underground shallow layer ground temperature energy, play energy-saving and emission-reduction purpose.The utility model is that pipe curtain steel-pipe pile is pushed to exist Application in foundation pit enclosure structure has played effect outstanding, and rationally utilizes underground shallow layer ground temperature energy, can create considerable warp Benefit of helping and social benefit.Ground temperature exchange system, water storage device when can also be as rainfall do tribute for sponge city It offers, is catchmented when raining big by pipe curtain steel-pipe pile, reduce the discharge to urban discharging pipeline, it can be from pipe curtain steel when becoming a fine day It draws water in pipe and carries out road cleaning, pours the effects of flowers, plants and trees.
Detailed description of the invention
Fig. 1 is building enclosure overall structure diagram described in the utility model.
Fig. 2 is construction method flow diagram described in the utility model.
1, crown beam 2, steel-pipe pile 3, steel sheet pile 4, water inlet manifold 5, outfall sewer 6, water inlet pipe 7, exit branch 8, pumping system 9, building.
Specific embodiment
It please refers to shown in Fig. 1 and Fig. 2:
Foundation pit enclosure structure provided by the utility model includes pipe curtain steel-pipe pile system, ground temperature exchange system and crown beam 1, Wherein crown beam 1 is cast in the top of pipe curtain steel-pipe pile system, and ground temperature exchange system is arranged in pipe curtain steel-pipe pile system and crown beam 1 It is interior.
Pipe curtain steel-pipe pile system is made of steel-pipe pile 2 and steel sheet pile 3, the setting depth phase of steel-pipe pile 2 and steel sheet pile 3 Together, the bottom of steel-pipe pile 2 is provided with wedge angle, and the diameter of steel-pipe pile 2 is 2m, and steel sheet pile 3 is AZ26 shape steel plate.
Ground temperature exchange system is by water inlet manifold 4, outfall sewer 5, several water inlet pipes 6, several exit branch 7 and pumping System 8 forms, wherein the connection of several water inlet pipes 6 is on water inlet manifold 4 and is plugged in steel-pipe pile 2, several exit branch 7 connect To lead to and is also plugged in steel-pipe pile 2 on outfall sewer 5, the setting depth of exit branch 7 is lower than the setting depth of water inlet pipe 6, The paragraph that water inlet manifold 4 and outfall sewer 5 are located at pipe curtain steel-pipe pile system is embedded in crown beam 1, and pumping system 8 is located at total into water On pipe 4, one end of water inlet manifold 4 and outfall sewer 5 is connected with the building 9 for cooling down or heating up is needed, and water inlet manifold 4 goes out Supply mains 5, several water inlet pipes 6 and several exit branch 7 are PE pipe.
Pumping system 8 is made of filter and water pump, and water pump is Vertical Heat water pump, and water pump is connected with water inlet manifold 4, Filter is located at the junction of water pump Yu water inlet manifold 4.
The construction method of foundation pit enclosure structure provided by the utility model, method are as described below:
Step 1: the formulation of construction technology, Specific construction technique is as follows:
Preparation of construction → measurement net review and construction baseline arrangement → pile transport → immersed tube, the mechanical stake machine of hydraulic or hammering are in place → lifting, staking out → measurement and positioning → vibration, hammering or hydraulic pile sinking → pre-buried water inlet manifold 4, outfall sewer 5, water inlet pipe 6 When pouring crown beam 1 → construct more than positive negative zero with 7 → formwork of exit branch, water inlet manifold 4 and outfall sewer 5 and building 9 Cooling or heating device be connected, on water inlet manifold 4 be arranged pumping system 8, pumping system 8 include filter and water pump;
Step 2: preparation of construction:
1), mechanical to prepare: with reliable performance, comply with standard, the construction machinery of A wide selection of colours and designs and equipment, done before construction The maintenance of good mechanical equipment, test-run a machine work, it is ensured that all go well operation in construction period, the mechanical equipment of preparation include: immersed tube, The mechanical stake machine of hydraulic or hammering;Measuring instrument;Filter and water pump in pumping system 8;
2), material prepares: the material of preparation has: steel-pipe pile 2;Steel sheet pile 3;Concrete;Reinforcing bar;The PE of different model is managed, PE pipe includes: water inlet manifold 4, outfall sewer 5, water inlet pipe 6 and exit branch 7;Coating steel pipe and template;
3) building waste, house refuse, weeds, tree root and the cultivated plant soil of earth's surface, Farm Planning: are removed;Smooth location is extremely Designed elevation determines the sequence of construction of reasonable according to the requirement of design document and construction organization plan;
Step 3: construction method, concrete construction method is as follows:
1), the construction of steel-pipe pile 2 and steel sheet pile 3 and pre-buried water inlet manifold 4, outfall sewer 5, water inlet pipe 6 and water outlet branch Pipe 7, specific as follows:
1., stake machine enter scene, according to designing pile length, carry out equipment assembling;
2., stake machine it is in place, stake machine moves at pre- piling position, it is ensured that pile position deviation≤50mm, perpendicularity deviation≤0.5%;
3., vibration, hammering or hydraulic steel pipe stake 2 and steel sheet pile 3;
4., pre-buried water inlet manifold 4, outfall sewer 5, water inlet pipe 6 and exit branch 7, filled in steel-pipe pile 2 first Then water is inserted into water inlet pipe 6 and exit branch 7 in steel-pipe pile 2, the setting depth of exit branch 7 is lower than water inlet pipe 6 Depth is set, and the top of water inlet pipe 6 is connected with the water inlet manifold 4 in crown beam 1, in the top of exit branch 7 and crown beam 1 Outfall sewer 5 is connected;
5., formwork pour crown beam 1;
2) when, constructing more than positive negative zero, the cooling or heating device phase of water inlet manifold 4 and outfall sewer 5 and building 9 Even, pumping system 8 is assembled on water inlet manifold 4, pumping system 8 includes filter and water pump.
Stake machine is D128 diesel oil hammer stake machine, diesel hammer upper piston weight: 12800Kg;The every hammer blow energy of diesel hammer: 426500Nm;Diesel hammer cycle: 36-45i/min;Diesel hammer maximum explosive force: 3600KN.
Water pump is Vertical Heat water pump, the flow of water pump is 100 cubic metres/per hour, and 30 meters of the lift of water pump, the function of water pump 15 kilowatts of rate, the material of performance of over current component of water pump is 316 stainless steels, and water pump is driven by variable-frequency motor, heat-exchanger pump, filter and frequency conversion Motor is the assembling of existing equipment, therefore concrete model and specification are not repeated.

Claims (2)

1. a kind of foundation pit enclosure structure, it is characterised in that: it include pipe curtain steel-pipe pile system, ground temperature exchange system and crown beam, Middle crown beam is cast in the top of pipe curtain steel-pipe pile system, and ground temperature exchange system is arranged in pipe curtain steel-pipe pile system and crown beam, pipe Curtain steel-pipe pile system is made of steel-pipe pile and steel sheet pile, and steel-pipe pile is identical with the setting depth of steel sheet pile, the bottom of steel-pipe pile It is provided with wedge angle, the diameter of steel-pipe pile is 2m, and steel sheet pile is AZ26 shape steel plate, and ground temperature exchange system is by water inlet manifold, water outlet General pipeline, several water inlet pipes, several exit branch and pumping system composition, wherein the connection of several water inlet pipes is on water inlet manifold And be plugged in steel-pipe pile, several exit branch connections are also plugged in steel-pipe pile on outfall sewer, the setting of exit branch Depth is lower than the setting depth of water inlet pipe, and the paragraph that water inlet manifold and outfall sewer are located at pipe curtain steel-pipe pile system is embedded in hat In beam, pumping system is located on water inlet manifold, one end of water inlet manifold and outfall sewer and the building for needing to cool down or heat up It is connected, water inlet manifold, outfall sewer, several water inlet pipes and several exit branch are PE pipe.
2. a kind of foundation pit enclosure structure according to claim 1, it is characterised in that: the pumping system is by filter It is formed with water pump, water pump is Vertical Heat water pump, and water pump is connected with water inlet manifold, and filter is located at the company of water pump and water inlet manifold Meet place.
CN201821915720.0U 2018-11-21 2018-11-21 A kind of foundation pit enclosure structure Active CN209179019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821915720.0U CN209179019U (en) 2018-11-21 2018-11-21 A kind of foundation pit enclosure structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821915720.0U CN209179019U (en) 2018-11-21 2018-11-21 A kind of foundation pit enclosure structure

Publications (1)

Publication Number Publication Date
CN209179019U true CN209179019U (en) 2019-07-30

Family

ID=67373636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821915720.0U Active CN209179019U (en) 2018-11-21 2018-11-21 A kind of foundation pit enclosure structure

Country Status (1)

Country Link
CN (1) CN209179019U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235456A (en) * 2018-11-21 2019-01-18 海南大学 A kind of foundation pit enclosure structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235456A (en) * 2018-11-21 2019-01-18 海南大学 A kind of foundation pit enclosure structure and construction method

Similar Documents

Publication Publication Date Title
CN102635120B (en) Circular deep foundation ditch is without Construction of Supporting structure and construction method
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN107268650A (en) A kind of industrial swirling flow precipitates pool structure not drainage open caisson method
CN110106872A (en) A kind of super thick mud head of district casing concrete pouring of punched hole piles method
CN103243713A (en) Method for planting prestressed pipe pile at one step
CN209179019U (en) A kind of foundation pit enclosure structure
CN104278679A (en) Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN109235456A (en) A kind of foundation pit enclosure structure and construction method
CN110080216B (en) Water storage system utilizing supporting tubular piles and construction method thereof
CN108589708A (en) A kind of Multifunctional cast-in-situ major diameter foundation pit support pipe pile and ground temperature exchange system
CN107905214A (en) A kind of assembled energy diaphram wall package assembly and construction method
CN210238549U (en) Full-automatic water circulation temperature control device for pile foundation construction in frozen soil area
CN207405616U (en) A kind of assembled energy diaphram wall package assembly
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN214143998U (en) Sewage collecting pipe network arrangement structure for households along river
CN104652426B (en) A kind of saline soil area waterglass anticorrosion pile foundation construction method
CN209399990U (en) A kind of field surface observation pier structure
CN206829176U (en) A kind of prefabricated block brick assembled plastic drainage pipeline basis
CN202247856U (en) Earth borrowing annular pile for foundation treatment and underground foundation
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
CN201908303U (en) Square frame-shaped steel cavity concrete cast-in-situ well sinking protecting wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant