CN209163817U - A kind of self-propelled shield machine complete set of equipments of the free section of fitting - Google Patents

A kind of self-propelled shield machine complete set of equipments of the free section of fitting Download PDF

Info

Publication number
CN209163817U
CN209163817U CN201822117772.XU CN201822117772U CN209163817U CN 209163817 U CN209163817 U CN 209163817U CN 201822117772 U CN201822117772 U CN 201822117772U CN 209163817 U CN209163817 U CN 209163817U
Authority
CN
China
Prior art keywords
slotting tool
support component
shield machine
inner support
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822117772.XU
Other languages
Chinese (zh)
Inventor
刘飞香
程永亮
彭正阳
刘学
闫文彪
刘任丰
张瑞临
陈亮
陈庆宾
张卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Heavy Industry Group Co Ltd
Original Assignee
China Railway Construction Heavy Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Heavy Industry Group Co Ltd filed Critical China Railway Construction Heavy Industry Group Co Ltd
Priority to CN201822117772.XU priority Critical patent/CN209163817U/en
Application granted granted Critical
Publication of CN209163817U publication Critical patent/CN209163817U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The application discloses a kind of self-propelled shield machine complete set of equipments of free section of fitting, compared with prior art, comprising: be set to the inner support component of shield machine body front end;It is set on the inner support component, for excavating the excavation unit of the face soil body;It is set on the inner support component, for conveying the tapping mechanism of dregs;It is set on the inner support component, for being fitted the outer supporting module of free section and the supporting soil body;For founding the steel arch-shelf assembling machine of arch, for making the jumbolter of anchor pole, bridge is mixed for spraying mixed spray, for lining cutting, lining cutting operating equipment of maintenance work etc..The self-propelled shield machine complete set of equipments of the free section of fitting provided by the present application, compared to existing technologies, outer supporting module can fit free section, equipment high recycling rate, wide adaptability;Integrate excavation, slag tap, lining cutting, the operations such as maintenance, and can be effectively reduced construction cost, improves construction safety and construction efficiency.

Description

A kind of self-propelled shield machine complete set of equipments of the free section of fitting
Technical field
This application involves constructing tunnel equipment technology fields, more specifically more particularly to a kind of fitting free section Self-propelled shield machine complete set of equipments.
Background technique
Currently, carrying out driving to tunnel using shield machine is a particularly important step in constructing tunnel field.Common Method for tunnel construction specifically includes that mining method construction and shape of a hoof shield construction.Mining method construction is mechanical simple, construction speed Degree is slow, and construction operation environment is poor, and tunnel is easy to collapse and causes personnel safety accident.Shape of a hoof shield construction generally requires pre- Tubulation sheet built forms Lining Ring, provides the support reaction of propulsion for shield machine, pipe-plate lining increases construction cost, and managed Piece sealing, pipe sheet assembling qualitative factor influence situations such as there are spillages, leak in tunnel, and tunnel Forming Quality is poor.
However, shape of a hoof shield method tunneling boring cutterhead excavation construction generally only adapts to soft soil layer and breaks for single excavate Face, after excavated section variation, shield machine must redesign manufacture, and shield machine recycling rate of waterused is poor;When front of tunnel heading goes out When the obstacles such as existing barrier, it is difficult to handle;And the device is complicated for shield machine, equipment cost is high;Shield machine needs when tunneling to excavation Dregs injection foam, the modifying agents such as bentonite to improve dregs, the dregs ejected carries modifying agent and is easy pollution environment.
Therefore it provides a kind of self-propelled shield machine complete set of equipments of the free section of fitting, can be improved the recycling of equipment Rate increases the adaptability of equipment, reduces construction cost, and effect improves construction safety and construction efficiency, has become this field skill Art personnel technical problem urgently to be resolved.
Utility model content
In order to solve the above technical problems, the application provides a kind of self-propelled shield machine complete set of equipments of free section of fitting, It can be fitted free section, adapt to a variety of excavated sections, and equipment high recycling rate, wide adaptability significantly improve the weight of equipment Multiple utilization rate, increases the adaptability of equipment, reduces construction cost, improves construction efficiency and construction safety.
Technical solution provided by the present application is as follows:
A kind of self-propelled shield machine complete set of equipments of the free section of fitting, comprising: be set to the interior of shield machine body front end Support component;It is set on inner support component, for excavating the excavation unit of the face soil body;It is set on inner support component, For conveying the tapping mechanism of dregs;It is set on inner support component, for being fitted the outer branch of free section and the supporting soil body Protect module.
Further, in a kind of preferred mode of the utility model, outer supporting module includes: to be set to inner support component Upper segmental arc, and telescopic top slotting tool mechanism;It is set to inner support components side segmental arc, and telescopic side slotting tool mechanism; It is set to segmental arc under inner support component, and telescopic bottom slotting tool mechanism.
Further, outer supporting module further includes being horizontally placed in the middle part of inner support component, and telescopic middle part is inserted Cutter mechanism;
Further, top slotting tool mechanism, side slotting tool mechanism, bottom slotting tool mechanism are by arc-shaped curved arrangement point Cloth.
Further, in a kind of preferred mode of the utility model, top slotting tool mechanism includes: to be excavated for being inserted into The top slotting tool of the soil body;It is set on inner support component, for controlling the elastic top propelling cylinder of top slotting tool;Side Slotting tool mechanism includes: the side slotting tool for being inserted into the soil body to be excavated;It is set on inner support component, for controlling side slotting tool Elastic side propelling cylinder;Bottom slotting tool mechanism includes: the bottom slotting tool for being inserted into the soil body to be excavated;In being set to In support component, for controlling the elastic bottom propelling cylinder of bottom slotting tool;Middle part slotting tool mechanism include: for be inserted into Excavate the middle part slotting tool of the soil body;It is set on inner support component, for controlling the elastic middle part propelling cylinder of middle part slotting tool.
Further, in a kind of preferred mode of the utility model, the length of top slotting tool is consistent, the length of bottom slotting tool Degree is consistent;The length of top slotting tool is greater than the length of bottom slotting tool;Length and bottom of the length of side slotting tool between top slotting tool Between the length of portion's slotting tool;The length of side slotting tool is successively decreased along the side of the side of top slotting tool mechanism to bottom slotting tool mechanism; The length of middle part slotting tool is consistent.
Further, in a kind of preferred mode of the utility model, the self-propelled shield machine for being fitted free section is complete Equipment further include: the earth-retaining mechanism being set on inner support component;Earth-retaining mechanism includes: the gear for stopping the soft soil body to collapse Native plate;For promoting the telescoping mechanism of breast boards.
Further, in a kind of preferred mode of the utility model, the self-propelled shield machine for being fitted free section is complete Equipment further include: be set to inner support component rear end, be used to support the tail shield of the soil body, tail shield passes through telescopic oil cylinder and inner support group Part connection.
Further, in a kind of preferred mode of the utility model, the self-propelled shield machine for being fitted free section is complete Equipment further include: be set on tail shield, for building the steel arch-shelf assembling machine of arch.
Further, in a kind of preferred mode of the utility model, the self-propelled shield machine for being fitted free section is complete Equipment further include: be set to tail shield rear end for making the jumbolter of anchor pole.
Further, in a kind of preferred mode of the utility model, the self-propelled shield machine for being fitted free section is complete Equipment further include: be set to jumbolter rear end for spraying mixed spray and mix bridge.
Further, in a kind of preferred mode of the utility model, the self-propelled shield machine for being fitted free section is complete Equipment further include: be set to the lining cutting operating equipment for spraying mixed bridge rear end.
In addition, the application also provides a kind of method for carrying out constructing tunnel using above-mentioned shield machine, following step is specifically included It is rapid:
Step 1: preparation of construction: shield machine is assembled and debugged in starting well, it is made to have the condition of originating;
Step 2: release top, side and middle part slotting tool module: oil cylinder stretches out, and successively releases top slotting tool, side slotting tool And middle part slotting tool module, form eaves before supporting;
Step 3: stretching out earth-retaining mechanism: excavating the soil body in front of earth-retaining mechanism, stretch out baffle mechanism;
Step 4: excavating and be unearthed: excavating mechanism spoil body, the soil body excavated out is transported by tapping mechanism;
Step 5: releasing bottom slotting tool: releasing bottom slotting tool after the completion of excavating;
Step 6: the follow-up of inner support component: the synchronous retraction of oil cylinder on all slotting tools, by rubbing for slotting tool shell and soil layer Power is wiped as support reaction, because steel is greater than steel to rigid coefficient of friction, between slotting tool and soil layer to the coefficient of friction of soil Frictional force is greater than the frictional force of slotting tool and inner support component, pulls inner support component one stroke distances of Forward, Lai Shixian shield Machine advances;
Step 7: vertical arch, spray mix, two serve as a contrast: excavating the soil body simultaneously, the vertical arch of arch assembling machine, jumbolter are beaten anchor pole, sprayed Mixed bridge pneumatically placed concrete forms preliminary bracing to tunnel cross-section, and using lining cutting operating equipment with a certain distance from host simultaneously Carry out secondary lining;
Step 8: tunnel molding: by above-mentioned steps S1 to S7 cycle operation, until driving is completed, tunnel molding;
Step 9: receiving shield machine: received well can be not provided with, dismantled in predeterminated position, realize that disassembly rollback is applied in hole Work.
The self-propelled shield machine complete set of equipments of a kind of free section of fitting provided by the utility model, with prior art phase Than, comprising: it is set to the inner support component of shield machine body front end, is provided on inner support component for excavating the face soil body Excavation unit, the tapping mechanism for conveying dregs and for being inserted into the soil body to be excavated and supporting the outer of the excavation regions soil body Supporting module.The outer supporting module being directed to can be used for being fitted free section and the supporting soil body, can be directed to different Excavated section fits a variety of sections, can make equipment high recycling rate, wide adaptability;In addition, passing through outer supporting in the application The setting of module can be supported face over advanced, facilitate to excavate unit and treat and excavate the soil body and excavated, high degree On improve working security and construction efficiency.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is that the entirety of the self-propelled shield machine complete set of equipments of the free section of fitting provided by the embodiment of the utility model is shown It is intended to;
Fig. 2 be top slotting tool provided by the embodiment of the utility model mechanism or bottom slotting tool mechanism or side slotting tool mechanism or The detailed schematic of middle part slotting tool mechanism;
Fig. 3 is that parallel excavation face slotting tool mechanism provided by the embodiment of the utility model and earth-retaining mechanism rigging position are illustrated Figure;
Fig. 4 is top provided by the embodiment of the utility model, side, middle part slotting tool mechanism stretching schematic diagram;
Fig. 5 is that schematic diagram stretches out in earth-retaining mechanism provided by the embodiment of the utility model;
Fig. 6 is that front schematic view is stretched out by earth-retaining mechanism provided by the embodiment of the utility model;
Fig. 7 is the excavation soil body provided by the embodiment of the utility model and schematic diagram of slagging tap;
Fig. 8 is that schematic diagram stretches out in bottom slotting tool provided by the embodiment of the utility model mechanism;
Fig. 9 is inner support component provided by the embodiment of the utility model follow-up, host Forward schematic diagram;
Figure 10 is vertical arch provided by the embodiment of the utility model, spray is mixed, two lining process schematic diagrames.
Description of symbols: outer supporting module 1;Top slotting tool mechanism 11;Side slotting tool mechanism 12;Bottom slotting tool mechanism 13;Middle part slotting tool mechanism 14;Propelling cylinder 15;Top slotting tool 111;Top propelling cylinder 112;Side slotting tool 121;Side promotes Oil cylinder 122;Bottom slotting tool 131;Bottom propelling cylinder 132;Middle part slotting tool 141;Middle part propelling cylinder 142;Inner support component 2; Excavate unit 3;Tapping mechanism 4;Earth-retaining mechanism 5;Tail shield 6;Telescopic oil cylinder 7;Steel arch-shelf assembling machine 8;Jumbolter 9;Spray mixed bridge 10;Lining cutting operating equipment 16.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution in the application, the application will be implemented below Technical solution in example is clearly and completely described, it is clear that described embodiment is only that a part of the application is implemented Example, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, shall fall in the protection scope of this application under the premise of labour.
It should be noted that it can directly exist when element is referred to as on " being fixed on " or " being set to " another element On another element or indirectly setting on the other element;When an element is known as " being connected to " another element, It can be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", under ", "front", "rear", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on the figure or position are closed System is merely for convenience of description the application and simplifies description, rather than the device or element of indication or suggestion meaning must have Specific orientation is constructed and operated in a specific orientation, therefore should not be understood as the limitation to the application.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.It is multiple in the description of the present application ", " several " be meant that two or Two or more, unless otherwise specifically defined.
It should be clear that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate specification to be taken off The content shown is not limited to the enforceable qualifications of the application so that those skilled in the art understands and reads, therefore Do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the application Under the effect of can be generated and the purpose that can reach, it should all still fall in techniques disclosed in this application content and obtain the model that can cover In enclosing.Meanwhile cited such as "upper" in this specification, "lower", "left", "right", " centre " and " one " term, be also only Convenient for being illustrated for narration, rather than to limit the enforceable range of the application, relativeness is altered or modified, in no essence It changes under technology contents, when being also considered as the enforceable scope of the application.
Please be as shown in Figures 1 to 10, the utility model embodiment provides a kind of self-propelled shield machine of free section of fitting Complete set of equipments, comprising: be set to the inner support component 2 of shield machine body front end;It is set on inner support component 2, for excavating The excavation unit 3 of the face soil body;It is set on inner support component 2, for conveying the tapping mechanism 4 of dregs;It is set to interior branch On support component 2, for being fitted the outer supporting module 1 of free section and the supporting soil body.
The self-propelled shield machine complete set of equipments of the free section of fitting provided by the embodiment of the utility model, with prior art phase Than the self-propelled shield machine complete set of equipments for the free section of fitting that the utility model embodiment is related to includes: to be set to shield machine The inner support component 2 of body front end is provided with excavation unit 3 for excavating the face soil body on inner support component 2, for defeated Send the tapping mechanism 4 of dregs and the outer supporting module 1 for being inserted into the soil body to be excavated and the support excavation regions soil body.Wherein relate to And outer supporting module 1 can be used for being fitted free section and the supporting soil body, can fit for different excavated sections A variety of sections can make equipment high recycling rate, wide adaptability;In addition, by the setting of outer supporting module 1 in the application, it can Face over advanced is supported, facilitates to excavate unit 3 and treat and excavates the soil body and excavated, largely improve construction Safety and construction efficiency.
Specifically, in the utility model embodiment, outer supporting module 1 includes: to be set to segmental arc on inner support component 2, And telescopic top slotting tool mechanism 11;It is set to 2 side segmental arc of inner support component, and telescopic side slotting tool mechanism 12;If It is placed in segmental arc under inner support component 2, and telescopic bottom slotting tool mechanism 13.
More specifically, outer supporting module 1 further includes being horizontally placed on the middle part of inner support component 2, and telescopic middle part Slotting tool mechanism 14.
More specifically, arc-shaped curved arrangement is pressed by top slotting tool mechanism 11, side slotting tool mechanism 12, bottom slotting tool mechanism 13 Distribution.
Wherein, outer supporting module 1 can fit a variety of sections for different excavated sections, and middle part slotting tool mechanism 14 is at flat Excavated section is divided into two excavated sections up and down, had both guaranteed working security and upper and lower section can excavate simultaneously by planar, Improve construction efficiency.When excavated section is smaller, middle part slotting tool mechanism 14 can be cancelled, according to tunnel cross-section size and stratum Difference can be not provided with or be arranged one or more middle part slotting tool mechanisms, can be divided into excavated section on 1,2 or multiple Lower part, slotting tool mechanism form and combining form are also not necessarily limited to this.
Frame parts is formed by various curved beams and straight beam module, is then assembled into inner support modular construction, is slotting tool module And other each components in inside provide support.This application involves inner support component 2 be it is modular, so excavated section shape, It is very easy that size changes, as long as changing certain sizes of inner support component 2, remaining components is only done accordingly Quantity change carry out it is assembled, so that it may the new digger with slotting tool for obtaining different section size and form, to realize a tractor serves several purposes Purpose.
Wherein, mechanism is excavated for excavating the face soil body, uses various forms of excavation mechanisms for different geology, such as Back-hoe bucket, cutting tooth, olecranon shovel etc., according to speed of application and the needs of excavated section size, can be equipped with multiple excavation mechanisms;One As upper excavation mechanism is provided with above middle part slotting tool mechanism 14, for excavating the soil body on section top;In middle part slotting tool mechanism 14 lower sections are provided with lower excavation mechanism, for excavating the soil body of section lower part.
Wherein, for conveying dregs various forms of tapping mechanisms 4 or mode can be used, such as in tapping mechanism 4 as needed Belt conveyor is slagged tap, screw conveyor is slagged tap, drag conveyor is slagged tap, and form is unlimited.
Specifically, in embodiments of the present invention, propelling cylinder 15 includes top propelling cylinder 112, side propelling cylinder altogether 122, bottom propelling cylinder 132, middle part propelling cylinder 142.
Specifically, in the utility model embodiment, top slotting tool mechanism 11 includes: the top for being inserted into the soil body to be excavated Portion's slotting tool 111;It is set on inner support component 2, for controlling the elastic top propelling cylinder 112 of top slotting tool 111;Side Slotting tool mechanism, portion 12 includes: the side slotting tool 121 for being inserted into the soil body to be excavated;It is set on inner support component 2, for controlling The elastic side propelling cylinder 122 of side slotting tool 121;Bottom slotting tool mechanism 13 includes: for being inserted into the soil body to be excavated Bottom slotting tool 131;It is set on inner support component 2, for controlling the elastic bottom propelling cylinder 132 of bottom slotting tool 131; Middle part slotting tool mechanism 14 includes: the middle part slotting tool 141 for being inserted into the soil body to be excavated;It is set on inner support component 2, for controlling The elastic middle part propelling cylinder of system middle part slotting tool.
More specifically, in the utility model embodiment, top slotting tool 111, side slotting tool 121, bottom slotting tool 131, The one end of middle part slotting tool 141 far from inner support component 2 is wedge structure.The wedge structure of slotting tool can effectively help slotting tool better It is inserted into the power consumption in excavator body, reduce oil pump.
Specifically, in the utility model embodiment, the slotting tool length of top slotting tool mechanism 11 is consistent, bottom slotting tool mechanism 13 slotting tool length is consistent;The slotting tool length of top slotting tool mechanism 11 is greater than the slotting tool length of bottom slotting tool mechanism 13;It inserts side The slotting tool length of cutter mechanism 12 is between the slotting tool length of top slotting tool mechanism 11 and bottom slotting tool mechanism 13;Side slotting tool machine The slotting tool length of structure 12 is successively decreased along the side of the side of top slotting tool mechanism 11 to bottom slotting tool mechanism 13;Middle part slotting tool mechanism 14 Slotting tool length it is consistent.
More specifically, slotting tool is strip, is greater than slotting tool and inner support group by the frictional force between slotting tool and soil layer The frictional force of part, shield machine self-propelled can be made by providing support reaction without the external world, and saving general shield driving must provide The Lining Ring of support reaction.
Specifically, in the utility model embodiment, it is fitted the self-propelled shield machine complete set of equipments of free section further include: The earth-retaining mechanism 5 being set on inner support component 2;Earth-retaining mechanism 5 includes: the breast boards for stopping the soft soil body to collapse;With In the telescoping mechanism for promoting breast boards.
Specifically, in the utility model embodiment, it is fitted the self-propelled shield machine complete set of equipments of free section further include: It is set to 2 rear end of inner support component, is used to support the tail shield 6 of the soil body, tail shield 6 is connected by telescopic oil cylinder 7 and inner support component 2 It connects.
Specifically, in the utility model embodiment, it is fitted the self-propelled shield machine complete set of equipments of free section further include: It is set on tail shield 6, for building the steel arch-shelf assembling machine 8 of arch.
Specifically, in the utility model embodiment, it is fitted the self-propelled shield machine complete set of equipments of free section further include: 6 rear end of tail shield is set to for making the jumbolter 9 of anchor pole.
Specifically, in the utility model embodiment, it is fitted the self-propelled shield machine complete set of equipments of free section further include: It is set to 9 rear end of jumbolter and mixes bridge 10 for spraying mixed spray.
Specifically, in the utility model embodiment, it is fitted the self-propelled shield machine complete set of equipments of free section further include: It is set to the lining cutting operating equipment 16 for spraying mixed 10 rear end of bridge.
In addition, the utility model embodiment also provides a kind of method for carrying out constructing tunnel using above-mentioned shield machine, specifically Include the following steps:
Step 1: preparation of construction: shield machine is assembled and debugged in starting well, it is made to have the condition of originating;
Step 2: release top, side and middle part slotting tool module: oil cylinder stretches out, and successively releases top slotting tool, side slotting tool And middle part slotting tool module, form eaves before supporting;
Step 3: stretching out earth-retaining mechanism: excavating the soil body in front of earth-retaining mechanism, stretch out baffle mechanism;
Step 4: excavating and be unearthed: excavating mechanism spoil body, the soil body excavated out is transported by tapping mechanism 4;
Step 5: releasing bottom slotting tool: releasing bottom slotting tool after the completion of excavating;
Step 6: the follow-up of inner support component: the synchronous retraction of oil cylinder on all slotting tools, by rubbing for slotting tool shell and soil layer Power is wiped as support reaction, because steel is greater than steel to rigid coefficient of friction, between slotting tool and soil layer to the coefficient of friction of soil Frictional force is greater than the frictional force of slotting tool and inner support component, pulls inner support component one stroke distances of Forward, Lai Shixian shield Machine advances;
Step 7: vertical arch, spray mix, two serve as a contrast: excavating the soil body simultaneously, the vertical arch of arch assembling machine, jumbolter are beaten anchor pole, sprayed Mixed bridge pneumatically placed concrete forms preliminary bracing to tunnel cross-section, and using lining cutting operating equipment with a certain distance from host simultaneously Carry out secondary lining;
Step 8: tunnel molding: by above-mentioned steps S1 to S7 cycle operation, until driving is completed, tunnel molding.
Step 9: receiving shield machine: received well can be not provided with, dismantled in predeterminated position, realize that disassembly rollback is applied in hole Work.
To sum up, the self-propelled shield machine complete set of equipments for the free section of fitting that the utility model embodiment is related to, has more A slotting tool mechanism passes through the simple transformation of pair of interior support component progress and adapts to any break to realize the free section of fitting Face can be circle, be also possible to the various sections such as the shape of a hoof, rectangular, equipment high recycling rate, wide adaptability;By inserting Knife, which stretches out, can be achieved excavation face advance support, and mechanical excavation is slagged tap, and working security is effectively improved, and improve construction efficiency;By Frictional force between slotting tool and soil layer is greater than the frictional force of slotting tool and inner support component, and shield can be made by providing support reaction without the external world Structure machine self-propelled, the Lining Ring of support reaction must be provided by saving general shield driving;Cast-in-place mode replaces pipe-plate lining side Formula reduces construction cost, improves tunnel quality;Without injecting sediment improvement agent, no pollution to the environment into the soil body when construction;It connects Time receiving is not necessarily to received well, can dismantle shield machine in situ and realize the construction that can retract.The utility model embodiment further relates to one kind and answers The method for carrying out constructing tunnel with above-mentioned shield machine equally has above-mentioned beneficial effect.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest scope consistent with features of novelty.

Claims (10)

1. a kind of self-propelled shield machine complete set of equipments of the free section of fitting characterized by comprising be set to shield machine main body The inner support component of front end;It is set on the inner support component, for excavating the excavation unit of the face soil body;It is set to institute It states on inner support component, for conveying the tapping mechanism of dregs;It is set on the inner support component, for being fitted free section And the outer supporting module of the supporting soil body.
2. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 1, which is characterized in that described outer Supporting module includes: to be set to segmental arc on the inner support component, and telescopic top slotting tool mechanism;It is set to the interior branch Support component side segmental arc, and telescopic side slotting tool mechanism;It is set to segmental arc under the inner support component, and telescopic bottom Slotting tool mechanism.
3. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 2, which is characterized in that described outer Supporting module further include: be horizontally placed in the middle part of the inner support component, and telescopic middle part slotting tool mechanism.
4. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 3, which is characterized in that the top Slotting tool mechanism, portion includes: the top slotting tool for being inserted into the soil body to be excavated;It is set on the inner support component, for controlling State the elastic top propelling cylinder of top slotting tool;Side slotting tool mechanism includes: the side for being inserted into the soil body to be excavated Portion's slotting tool;It is set on the inner support component, for controlling the elastic side propelling cylinder of the side slotting tool;It is described Bottom slotting tool mechanism includes: the bottom slotting tool for being inserted into the soil body to be excavated;It is set on the inner support component, for controlling The elastic bottom propelling cylinder of the bottom slotting tool;Middle part slotting tool mechanism includes: for being inserted into the soil body to be excavated Middle part slotting tool;It is set on the inner support component, for controlling the elastic middle part propelling cylinder of the middle part slotting tool.
5. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 4, which is characterized in that the top The length of portion's slotting tool is consistent, and the length of the bottom slotting tool is consistent;The length of the top slotting tool is greater than the bottom slotting tool Length;The length of the side slotting tool is between the length of the top slotting tool and the length of the bottom slotting tool;The side The length of portion's slotting tool is successively decreased along the side of the side of top slotting tool mechanism to bottom slotting tool mechanism;The middle part slotting tool Length it is consistent.
6. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 5, which is characterized in that fitting is certainly By the self-propelled shield machine complete set of equipments of section further include: the earth-retaining mechanism being set on the inner support component;The earth-retaining Mechanism includes: the breast boards for stopping the soft soil body to collapse;For promoting the telescoping mechanism of the breast boards.
7. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 6, which is characterized in that described quasi- Close the self-propelled shield machine complete set of equipments of free section further include: be set to inner support component rear end, be used to support the soil body Tail shield, the tail shield connect by telescopic oil cylinder with the inner support component.
8. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 7, which is characterized in that described quasi- Close the self-propelled shield machine complete set of equipments of free section further include: be set on the tail shield, for building the steel arch-shelf of arch Assembling machine.
9. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 8, which is characterized in that described quasi- Close the self-propelled shield machine complete set of equipments of free section further include: be set to tail shield rear end, the anchor pole for beating anchor pole bores Machine;It is set to the jumbolter rear end, mixes bridge for spraying mixed spray.
10. the self-propelled shield machine complete set of equipments of the free section of fitting according to claim 9, which is characterized in that described It is fitted the self-propelled shield machine complete set of equipments of free section further include: be set to the lining cutting operating equipment for spraying mixed bridge rear end.
CN201822117772.XU 2018-12-17 2018-12-17 A kind of self-propelled shield machine complete set of equipments of the free section of fitting Active CN209163817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822117772.XU CN209163817U (en) 2018-12-17 2018-12-17 A kind of self-propelled shield machine complete set of equipments of the free section of fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822117772.XU CN209163817U (en) 2018-12-17 2018-12-17 A kind of self-propelled shield machine complete set of equipments of the free section of fitting

Publications (1)

Publication Number Publication Date
CN209163817U true CN209163817U (en) 2019-07-26

Family

ID=67344019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822117772.XU Active CN209163817U (en) 2018-12-17 2018-12-17 A kind of self-propelled shield machine complete set of equipments of the free section of fitting

Country Status (1)

Country Link
CN (1) CN209163817U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441469A (en) * 2018-12-17 2019-03-08 中国铁建重工集团有限公司 A kind of the self-propelled shield machine complete set of equipments and method for tunnel construction of the free section of fitting
CN113401586A (en) * 2021-06-26 2021-09-17 山东省公路桥梁建设有限公司 Tunnel excavation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441469A (en) * 2018-12-17 2019-03-08 中国铁建重工集团有限公司 A kind of the self-propelled shield machine complete set of equipments and method for tunnel construction of the free section of fitting
CN109441469B (en) * 2018-12-17 2024-02-13 中国铁建重工集团股份有限公司 Self-propelled shield tunneling machine complete equipment fitting free section and tunnel construction method
CN113401586A (en) * 2021-06-26 2021-09-17 山东省公路桥梁建设有限公司 Tunnel excavation method
CN113401586B (en) * 2021-06-26 2022-05-10 山东省公路桥梁建设集团有限公司 Tunnel excavation method

Similar Documents

Publication Publication Date Title
CN103452559B (en) Vertical shaft shield machine
CN109441469A (en) A kind of the self-propelled shield machine complete set of equipments and method for tunnel construction of the free section of fitting
CN107120121B (en) A kind of shield-tunneling construction supplements slip casting anti-settling control method in real time
CN102268993B (en) Method for excavating tunnel in high liquid limit soil
CN109555528B (en) Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation and method for protecting support
CN209163817U (en) A kind of self-propelled shield machine complete set of equipments of the free section of fitting
CN104389612A (en) Treatment method for tunnel local collapse
CN101922293A (en) Method for installing waterproof steel plate in construction of underground tunnel
CN205225271U (en) Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
JP2007217911A (en) Construction method of underground cavity and tunnel construction method
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
JP2007303156A (en) Shield roof construction method
CN209011828U (en) A kind of shield machine structure
CN209604005U (en) A kind of open type double structure development machine
CN109026035A (en) Tunnel circumferential direction variable cross-section digs method
CN103244127B (en) A kind of method accelerating Multi-arch Tunnel Construction speed
CN210422621U (en) Multi-mode hard rock heading machine
CN104164898A (en) U-shaped trench earthwork heading machine
Qiu et al. First application of mechanized method using earth pressure balance TBM with large horseshoe-shaped cross section to loess mountain tunnel: A case study of Baicheng tunnel
CN110359934A (en) Hexagon section of jurisdiction, supporting construction and method for tunnel construction
CN204001021U (en) A kind of excavation of earthwork conveying device of U-shaped irrigation canals and ditches development machine
CN110486052A (en) A kind of press injecting type concrete support method and the supporting mechanism for implementing it
CN103104265B (en) Advanced lining method and lining equipment used in construction of weak surrounding rock tunnel
CN110056370A (en) It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after
CN205189880U (en) Shield constructs to be assembled section of jurisdiction and crosses undercut tunnel construction structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant