CN209114504U - A kind of basement bottom plate rear pouring tape structure - Google Patents

A kind of basement bottom plate rear pouring tape structure Download PDF

Info

Publication number
CN209114504U
CN209114504U CN201821569434.3U CN201821569434U CN209114504U CN 209114504 U CN209114504 U CN 209114504U CN 201821569434 U CN201821569434 U CN 201821569434U CN 209114504 U CN209114504 U CN 209114504U
Authority
CN
China
Prior art keywords
bottom plate
concrete
well
sediment well
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821569434.3U
Other languages
Chinese (zh)
Inventor
吴永顺
黄胜水
苏亚森
黄韩毅
苏志斌
郑开宾
江冠煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Seven Construction Group Co Ltd
Original Assignee
Fujian Seven Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Seven Construction Group Co Ltd filed Critical Fujian Seven Construction Group Co Ltd
Priority to CN201821569434.3U priority Critical patent/CN209114504U/en
Application granted granted Critical
Publication of CN209114504U publication Critical patent/CN209114504U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of basement bottom plate rear pouring tape structure, including bottom plate, post-cast strip;One sediment well is set every 25~30 meters and corner below the post-cast strip;The bottom of the sediment well is C15 concrete bed course, and side wall is brick mold;The inner wall of the sediment well is from outside to inside successively including cement mortar screeding layer, waterproof layer, microlith concrete cover, reinforced concrete;The inner wall of the sediment well is inclined outwardly at well head in 45 degree;Suction pump is equipped in the sediment well.The utility model, which is used, is arranged sediment well method every 25~30 meters and corner under bottom plate rear pouring tape, both it had solved conventional method building waste to be difficult to clean out, it saves a large amount of manpower and material resources again and can guarantee the construction quality of post-cast strip concrete, there is significant economic benefit and social benefit.

Description

A kind of basement bottom plate rear pouring tape structure
Technical field
The utility model belongs to construction engineering technical field, and in particular to a kind of basement bottom plate rear pouring tape structure.
Background technique
It the problems such as in order to solve concrete coagulation contraction, temperature change drawing crack, is stayed in advance in basement bottom board and sets post-cast strip, Post-cast strip needs to pour after a certain period of time, causes difficulty to the discharge of ponding, the removing of rubbish at post-cast strip.
There are mainly two types of traditional basement bottom plate rear pouring tape setting methods: one, reserving the sediment channel process (example of 150mm high A kind of basement bottom plate rear pouring tape structure as disclosed in Chinese utility model patent CN204000956U): after basement bottom board The sediment slot with lower section setting with post-cast strip width, 150mm high is poured, building waste must not exceed 100mm high.Post empiricism Before, it needs to clean out the rubbish of concrete contact surface dabbing and building waste etc., must not exceed 100mm in sediment slot, so Concrete placings are carried out by design requirement afterwards;Two, reinforcing strip way is set under post-cast strip: one being arranged below basement bottom plate rear pouring tape Fixed high reinforcing strip, no setting sediment slot.Before post empiricism, need the rubbish of concrete contact surface dabbing and building waste etc. It cleans out, then carries out concrete placings by design requirement.
, which often there is building waste, in traditional method to be cleaned out, and the chemical cleaning project water in post-cast strip can not be drained, Excess moisture during pouring concrete influences concrete construction quality.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of novel basement bottom plate rear pouring tape structures, both It solves the problems, such as that conventional method building waste is difficult to clean out, construction water can not be drained, in turn ensures post-cast strip concrete Construction quality.
The utility model is realized in this way:
A kind of basement bottom plate rear pouring tape structure, including bottom plate, post-cast strip;Below the post-cast strip every 25~30 meters with And a sediment well is arranged in corner;The bottom of the sediment well is C15 concrete bed course, and side wall is brick mold;The sediment well it is interior Wall is from outside to inside successively including cement mortar screeding layer, waterproof layer, microlith concrete cover, reinforced concrete;The inner wall of the sediment well It is inclined outwardly at well head in 45 degree;Suction pump is equipped in the sediment well.
Further, the C15 concrete bed course is 100mm thick;The brick mold is 120mm thick.
Further, the reinforcing bar of the reinforced concrete is arranged by double-layer double-direction Φ 14@200;The concrete strength etc. of the reinforced concrete The same basement bottom board of grade.
Further, the sediment well inside dimension is long 500mm, width 500mm, high 500mm.
Utility model has the advantages that being arranged 500 every 25~30 meters and corner using under bottom plate rear pouring tape (length) × 500 (width) × 500 (height) sediment well (and sump) method, both solved conventional method building waste be difficult to clear up it is dry Only, a large amount of manpower and material resources are saved again and can guarantee the construction quality of post-cast strip concrete, there is significant economic benefit and social benefit.
Detailed description of the invention
The utility model will be further described in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
Reinforcing bar model, the construction technology of bottom plate and post-cast strip are the prior art, are repeated no more in the present embodiment, below in detail It is thin to illustrate that the utility model relates to the specific embodiments of structure.
As shown in Figure 1, a kind of basement bottom plate rear pouring tape structure, including bottom plate 1, post-cast strip 2;2 lower section of post-cast strip Every 25~30 meters and corner, one sediment well 3 is set;The bottom of the sediment well 3 is 100mm thickness C15 concrete bed course 4, side wall For 120mm thickness brick mold 5;The inner wall of the sediment well 3 from outside to inside successively include cement mortar screeding layer 6, it is waterproof layer 7, thin Stone concrete cover 8, reinforced concrete 9;The inner wall of the sediment well 3 is inclined outwardly at well head in 45 degree;It is equipped in the sediment well Suction pump (not shown).
The reinforcing bar of reinforced concrete 9 is arranged by double-layer double-direction Φ 14@200, the same basement bottom board of the concrete strength grade of reinforced concrete 9.
3 inside dimension of sediment well is long 500mm, width 500mm, high 500mm.
Specific construction process are as follows:
1. positioning measurement: according to engineering practice, a sediment is arranged every 25~30 meters and corner by post-cast strip Well setting, sediment well inside dimension be 500 (length) × 500 (width) × 500 (height), specific configuration way See Figure:
2. earth excavation and sediment well cushion construction: earth excavation carries out simultaneously with basement post-pouring zone earth excavation, adopts It manually excavates, excavation width and length are 1250mm, and cutting depth is lower than 750mm at post-cast strip;Then 100mm thickness is poured C15 concrete bed course.
3. sediment well brick mold is constructed: according to the good line of ink marker of bullet, using 120 wide cement bricks (or the brick tire with corresponding engineering Mould material) it is built, interior dead size is 1000 (length) × 1000 (width) × 750 (height).
4. sediment well construction of waterproof layer: levelling using the progress of 20mm solid cement mortar on the inside of sediment shaft bottom, side wall;It is to be onstructed Carry out waterproof layer (the same engineering design of material) construction after conditions permit, sediment well waterproof layer and basement bottom board and post-cast strip it is anti- Water layer carries out simultaneously, 30mm thickness fine-stone concrete waterproof protective layer of then constructing.
5. the binding construction of sediment well reinforcing bar: mounting base, side wall reinforcing bar, reinforcing bar are arranged by double-layer double-direction Φ 14@200, bottom Plate and side wall thicknesses are 200mm.
6. sediment well concrete is constructed: installation inner template, bottom plate, side wall thicknesses 200mm, concrete strength grade is the same as basement bottom Plate.
The sediment well of the utility model can be used before bottom plate rear pouring tape construction as interim catch pit.It is poured due to after When band is not constructed, the side of permanent catch pit is usually higher than the bottom surface of post-cast strip, and the water inside all post-cast strips can not flow into collection Puddle.The problem of draining can be fully solved draining is carried out using sediment well.When can construct bottom plate rear pouring tape when, concrete surface The rubbish of dabbing and the rubbish being accumulated in inside post-cast strip, can be rinsed using high pressure water, rubbish is allowed to focus on sediment It is purged in well, sediment must not be higher by the bottom surface of basement bottom board.Draining pump is installed in sediment well location, construction can be used Water is drained, and guarantees that rubbish is cleaned out in post-cast strip.
The product form and style of above-described embodiment and schema and non-limiting the utility model, any technical field The appropriate changes or modifications that those of ordinary skill does it all should be regarded as the patent category for not departing from the utility model.

Claims (4)

1. a kind of basement bottom plate rear pouring tape structure, including bottom plate, post-cast strip;It is characterized by: below the post-cast strip every 25~30 meters and one sediment well of corner setting;The bottom of the sediment well is C15 concrete bed course, and side wall is brick mold;It is described The inner wall of sediment well is from outside to inside successively including cement mortar screeding layer, waterproof layer, microlith concrete cover, reinforced concrete;It is described heavy The inner wall of slag well is inclined outwardly at well head in 45 degree;Suction pump is equipped in the sediment well.
2. a kind of basement bottom plate rear pouring tape structure as described in claim 1, it is characterised in that: the C15 concrete bed course is 100mm is thick;The brick mold is 120mm thick.
3. a kind of basement bottom plate rear pouring tape structure as described in claim 1, it is characterised in that: the reinforcing bar of the reinforced concrete is pressed Double-layer double-direction Φ 14@200 setting;The same basement bottom board of the concrete strength grade of the reinforced concrete.
4. a kind of basement bottom plate rear pouring tape structure as described in claim 1, it is characterised in that: the sediment well inside dimension is Long 500mm, width 500mm, high 500mm.
CN201821569434.3U 2018-09-26 2018-09-26 A kind of basement bottom plate rear pouring tape structure Active CN209114504U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821569434.3U CN209114504U (en) 2018-09-26 2018-09-26 A kind of basement bottom plate rear pouring tape structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821569434.3U CN209114504U (en) 2018-09-26 2018-09-26 A kind of basement bottom plate rear pouring tape structure

Publications (1)

Publication Number Publication Date
CN209114504U true CN209114504U (en) 2019-07-16

Family

ID=67199418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821569434.3U Active CN209114504U (en) 2018-09-26 2018-09-26 A kind of basement bottom plate rear pouring tape structure

Country Status (1)

Country Link
CN (1) CN209114504U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065038A (en) * 2020-09-27 2020-12-11 中建八局科技建设有限公司 Base plate advanced water stop post-cast strip structure and construction method thereof
CN113338346A (en) * 2021-06-29 2021-09-03 北京天润建设有限公司 Post-cast strip drainage structure, drainage system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065038A (en) * 2020-09-27 2020-12-11 中建八局科技建设有限公司 Base plate advanced water stop post-cast strip structure and construction method thereof
CN113338346A (en) * 2021-06-29 2021-09-03 北京天润建设有限公司 Post-cast strip drainage structure, drainage system and construction method thereof

Similar Documents

Publication Publication Date Title
CN209723052U (en) The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
CN104372890A (en) Construction method of bare concrete prefabricated box beam with complicated structure
CN201738479U (en) Roof expansion joint integrated cover plate waterproof structure
CN203531009U (en) Basement bottom plate rubble layer hydrophobic structure
CN209114504U (en) A kind of basement bottom plate rear pouring tape structure
CN103015719A (en) Integral casting process for reinforced concrete wastewater tank of pre-drilling engineering
CN208534025U (en) Floor slab back casting band separate support formwork erecting structure
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN110644318A (en) Concrete construction method for field road pavement
CN114808776A (en) Prefabricated installation construction method for prefabricated box culvert pipe
CN111074951A (en) Post-cast strip structure and construction process thereof
CN104594654B (en) A kind of concrete structure reinforcement scheme generation method
CN108638322B (en) Prefabricated post concreting method in a kind of assembled architecture
KR20140139217A (en) Concrete protection wall with linear drainage functions and construction method thereof
CN213296440U (en) Water stop structure for post-cast strip of underground chamber bottom plate
CN109537822B (en) Drainage ditch construction process
CN209620278U (en) Concrete anti-bank template structure with can have enough to meet need reinforcing bar inside lining
CN105019656B (en) Construction method for floor system concrete post-cast strip suspended formwork
CN102287003A (en) Dam concrete cabin surface water accumulation hidden pipe discharge method
CN115387393A (en) Post-cast strip pre-sealing quick construction method
CN213979911U (en) Basement outer wall post-cast strip template structure
CN115233686A (en) Concrete construction method for bottom plate at joint of underground lane and comprehensive pipe gallery
CN114215345A (en) Construction method for independent support bracket template of post-cast strip of top plate of reservoir
CN104234315B (en) Three-back-shaped external wall rod structure and construction method thereof
CN110847230A (en) Basement retaining wall concrete pouring construction process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant